Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date: Temp.
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location Wind Speed
MES Formation : GE (P) AF JAMNAGAR Chainage: Humidity
SL Brief of Stages Date: MES JE SIGN. REMARKS / RECTIFICATION
DONE
PREPARATORY WORK
OK Not OK
OK Not OK
TACK COAT
OK Not OK
OK Not OK
OK Not OK
OK Not OK
OK Not OK
OK Not OK
OK Not OK
OK Not OK
OK Not OK
OK Not OK
# 1. Only signature of Engineer-in-charge is mandatory on Job Card. 2. Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Site Lab)
SIGNATURE:
DATE:
JOB CARD: SUB-GRADE PREPARATION
Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date:
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location
MES FORMATION : GE (P) AF JAMNAGAR Chainage:
SL Brief of Stages MES JE REMARKS
NO DATE SIGN / RECTIFICATION DONE
OK Not OK
2 Proper Shoulders are in place
OK Not OK
3 Surface cleaned properly
OK Not OK
4 No any Soft and yielding subbase
OK Not OK
5 Initial level is recorded
OK Not OK
6 Water is sprinkled on surface
OK Not OK
7 Thickness of Layer are marked
OK Not OK
8 Rolling and Spreading Equipments are in place
OK Not OK
9 Sufficient quantity of Soil available at site
OK Not OK
Checks During Process
1 Degree of Pulverization
OK Not OK
2 Sufficient loose thickness of material as per trail bay
OK Not OK
3 Moisture content during rolling checked as per approved job mix and recorded
OK Not OK
4 Rolling and consolidating of sub grade as per trial bay and recorded
OK Not OK
5 Camber and gradient as per approved profile
OK Not OK
6 surface regularity of sub grade checked and recorded. #
OK Not OK
7 Field Density, Field CBR value and 'K' value tested and recorded.#
OK Not OK
8 Final level taken and recorded
OK Not OK
# 1. Only signature of Engineer-in-charge is mandatory on Job Card. 2. Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge (Site) Engineer-in-charge
(Site Lab)
SIGNATURE:
DATE:
Job Card Granular Sub Base
Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date:
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location
MES FORMATION : GE (P) AF JAMNAGAR Chainage:
: Size
SL Brief of Stages Date and signature of JE REMARKS
NO
/
RECTIFICA
TION DONE
Checks Before start of Work
1 Conforming Physical
Requirements of Material and
record maintain.
OK
OK Not OK
2 Proper Shoulders are in place
OK
OK Not OK
3 Surface cleaned properly
OK
OK Not OK
4 No any Soft and yielding
subbase
OK
OK Not OK
5 Initial level is recorded
OK
OK Not OK
6 Water is sprinkled on surface
OK
OK Not OK
7 Thickness of Layer are
marked
OK
OK Not OK
8 Rolling and Spreading
Equipments are in place
OK
OK Not OK
Checks During Process
1 Uniform Spreading is done
OK
OK Not OK
2 Sufficient loose thickness of
material as per trial bay
OK
OK Not OK
3 Moisture content during
rolling checked as per
approved job mix and
recorded
OK
OK Not OK
4 Sequence of Rolling is proper
and speed is within 5 km/hr
OK
OK Not OK
5 Rolling and consolidating of
GSB material as per trial bay
OK
OK Not OK
6 Surface regularity of sub
grade checked and recorded.
#
OK
OK Not OK
7 Field Density and Field CBR
value tested and recorded.#
OK
OK Not OK
8 Final level taken and recorded
OK
OK Not OK
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Site Lab)
SIGNATURE:
DATE:
JOB CARD: WET MIX MACADAM (WMM)
Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date:
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location
MES Formation : GE (P) AF JAMNAGAR Chainage:
SL Brief of Stages DATE AND MES JE SIGN. REMARKS / RECTIFICATION DONE
OK Not OK
2 Proper Shoulders are in place
OK Not OK
3 Surface cleaned properly
OK Not OK
4 No any Soft and yielding GSB surface
OK Not OK
5 Initial level is recorded
OK Not OK
6 Water is sprinkled on surface
OK Not OK
7 Thickness of layer by string line for sensor paver are marked as per
approved profile and checked.
OK Not OK
8 Proper Rolling Equipments are in place
OK Not OK
9 Spreading Equipments are in place
OK Not OK
Checks During Process
1 Uniform Spreading is done & no segregation
OK Not OK
2 Proper Thickness is achived
OK Not OK
3 Sequence of Rolling is proper as per trial bay and speed is within 5 km/hr
OK Not OK
4 Surface regularity of WMM checked and recorded. #
OK Not OK
5 Density of surface is checked & recorded.#
OK Not OK
6 Final level taken and recorded
OK Not OK
#1.Only signature of Engineer-in-charge is mandatory on Job Card. 2.Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Site Lab)
SIGNATURE:
DATE:
JOB CARD: DRY LEAN CONCRETE (DLC)
Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date: Temp.
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location Wind Speed
MES Formation : GE (P) AF JAMNAGAR Chainage: Humidity
OK Not OK
2 Proper Shoulders are in place
OK Not OK
3 Surface cleaned properly
OK Not OK
4 No any Soft and yielding WMM surface
OK Not OK
5 Initial level is recorded
OK Not OK
6 Water is sprinkled on surface
OK Not OK
Thickness of layer by string line for sensor paver are marked as per
7
approved profile and checked.
OK Not OK
8 Proper Rolling Equipments are in place
OK Not OK
9 Spreading Equipments(Mechanical Paver) are in place
OK Not OK
Checks During Process
1 Uniform Spreading is done & no segregation
OK Not OK
2 Proper thickness is achived & joints are vertical
OK Not OK
3 Sequence of Rolling is proper as per trial bay and speed is within 5 km/hr
OK Not OK
5 Density of surface is checked & recorded.#
OK Not OK
4 Surface regularity of WMM checked and recorded. #
OK Not OK
6 Final level taken and recorded
OK Not OK
7 Curing for 7 days by sprinkling of water and cover with gunny bags/hessian
OK Not OK
# 1. Only signature of Engineer-in-charge is mandatory on Job Card. 2. Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Site Lab)
SIGNATURE:
DATE:
JOB CARD: PAVEMENT QUALITY CONCRETE (PQC)
Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date: Temp.
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location Wind Speed
MES Formation : GE (P) AF JAMNAGAR Chainage: Humidity
REMARKS / RECTIFICATION
SL Brief of Stages Date and Initial of JE
DONE
Checks Before start / Prog of Work
1 Readiness of T&P at site
OK Not OK
2 Tack coat @2 kg/Xsqm and laying 400 micron HDPE sheet with sealing
on the surface
OK Not OK
3 Confirming level of the string wire as per approved profile.#
OK Not OK
4 Conforming Physical Requirements of PQC Mix.#
OK Not OK
5 Proper Compaction and finishing of PQC is Done
OK Not OK
6 Checking of achieved level/ thickness of PQC slab
OK Not OK
7 Texturing is done proper.#
OK Not OK
8 Embosing of Panel number and Date of casting
OK Not OK
9 Initial curing done by curing compound
OK Not OK
10 Uniform Spreading is done & no segregation of curing compound
OK Not OK
12 Initial cutting is done timely
OK Not OK
13 Final curing by forming bunds for 21 days
OK Not OK
14 Testing of Str of Cube and Beam and cutting of core.#
OK Not OK
# 1. Only signature of Engineer-in-charge is mandatory on Job Card.2.Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Lab)
SIGNATURE:
DATE:
TOLERANCE LIMIT OF FINISH SURFACE