Sunteți pe pagina 1din 7

JOB CARD

Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date: Temp.
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location Wind Speed
MES Formation : GE (P) AF JAMNAGAR Chainage: Humidity
SL Brief of Stages Date: MES JE SIGN. REMARKS / RECTIFICATION
DONE

PREPARATORY WORK

1 Preparing bituminous/concrete surfaces by brushing with wire brushes for


removeing caked mud, paint & oil etc sweeping with brooms and finally
fanning the cleaned surfaces with gunny bags & air compressor to remove
all loose dirt.

OK Not OK

2 Checking of required level on Sting wire

OK Not OK

TACK COAT

3 Confirming of Temp of Tack Coat

OK Not OK

4 Spreding of tack coat @ 3-3.5 kg/10sqm

OK Not OK

DENSE BITUMINOUS MACADAM GD- II (DBM) CORRECTION LAYER

5 Confirming of required Temp of DBM recd at site

OK Not OK

6 Required quantity of DBM for the day work

OK Not OK

7 Sufficient loose thickness of material laid

OK Not OK

8 Checking of the temp for rolling

OK Not OK

9 Rolling and consolidating of DBM

OK Not OK

10 Field density tested and recorded#

OK Not OK

11 Trueness of the DBM surface checked with straight edge #

OK Not OK

12 Checking of level taken and recorded

OK Not OK

# 1. Only signature of Engineer-in-charge is mandatory on Job Card. 2. Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Site Lab)
SIGNATURE:

DATE:
JOB CARD: SUB-GRADE PREPARATION
Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date:
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location
MES FORMATION : GE (P) AF JAMNAGAR Chainage:
SL Brief of Stages MES JE REMARKS
NO DATE SIGN / RECTIFICATION DONE

Checks Before start of Work


SUB GRADE
1 Conforming Physical Requirements of Material and record maintain.

OK Not OK
2 Proper Shoulders are in place

OK Not OK
3 Surface cleaned properly

OK Not OK
4 No any Soft and yielding subbase

OK Not OK
5 Initial level is recorded

OK Not OK
6 Water is sprinkled on surface

OK Not OK
7 Thickness of Layer are marked

OK Not OK
8 Rolling and Spreading Equipments are in place

OK Not OK
9 Sufficient quantity of Soil available at site

OK Not OK
Checks During Process
1 Degree of Pulverization

OK Not OK
2 Sufficient loose thickness of material as per trail bay

OK Not OK
3 Moisture content during rolling checked as per approved job mix and recorded

OK Not OK
4 Rolling and consolidating of sub grade as per trial bay and recorded

OK Not OK
5 Camber and gradient as per approved profile

OK Not OK
6 surface regularity of sub grade checked and recorded. #

OK Not OK
7 Field Density, Field CBR value and 'K' value tested and recorded.#

OK Not OK
8 Final level taken and recorded

OK Not OK
# 1. Only signature of Engineer-in-charge is mandatory on Job Card. 2. Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge (Site) Engineer-in-charge
(Site Lab)
SIGNATURE:
DATE:
Job Card Granular Sub Base
Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date:
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location
MES FORMATION : GE (P) AF JAMNAGAR Chainage:
: Size
SL Brief of Stages Date and signature of JE REMARKS
NO

/
RECTIFICA
TION DONE
Checks Before start of Work
1 Conforming Physical
Requirements of Material and
record maintain.
OK
OK Not OK
2 Proper Shoulders are in place
OK
OK Not OK
3 Surface cleaned properly
OK
OK Not OK
4 No any Soft and yielding
subbase
OK
OK Not OK
5 Initial level is recorded
OK
OK Not OK
6 Water is sprinkled on surface
OK
OK Not OK
7 Thickness of Layer are
marked
OK
OK Not OK
8 Rolling and Spreading
Equipments are in place
OK
OK Not OK
Checks During Process
1 Uniform Spreading is done
OK
OK Not OK
2 Sufficient loose thickness of
material as per trial bay
OK
OK Not OK
3 Moisture content during
rolling checked as per
approved job mix and
recorded

OK
OK Not OK
4 Sequence of Rolling is proper
and speed is within 5 km/hr
OK
OK Not OK
5 Rolling and consolidating of
GSB material as per trial bay
OK
OK Not OK
6 Surface regularity of sub
grade checked and recorded.
#
OK
OK Not OK
7 Field Density and Field CBR
value tested and recorded.#
OK
OK Not OK
8 Final level taken and recorded
OK
OK Not OK
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Site Lab)
SIGNATURE:
DATE:
JOB CARD: WET MIX MACADAM (WMM)
Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date:
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location
MES Formation : GE (P) AF JAMNAGAR Chainage:
SL Brief of Stages DATE AND MES JE SIGN. REMARKS / RECTIFICATION DONE

Checks Before start of Work


1 Conforming Physical Requirements of Mix. #

OK Not OK
2 Proper Shoulders are in place

OK Not OK
3 Surface cleaned properly

OK Not OK
4 No any Soft and yielding GSB surface

OK Not OK
5 Initial level is recorded

OK Not OK
6 Water is sprinkled on surface

OK Not OK
7 Thickness of layer by string line for sensor paver are marked as per
approved profile and checked.

OK Not OK
8 Proper Rolling Equipments are in place

OK Not OK
9 Spreading Equipments are in place

OK Not OK
Checks During Process
1 Uniform Spreading is done & no segregation

OK Not OK
2 Proper Thickness is achived

OK Not OK
3 Sequence of Rolling is proper as per trial bay and speed is within 5 km/hr

OK Not OK
4 Surface regularity of WMM checked and recorded. #

OK Not OK
5 Density of surface is checked & recorded.#

OK Not OK
6 Final level taken and recorded

OK Not OK
#1.Only signature of Engineer-in-charge is mandatory on Job Card. 2.Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Site Lab)
SIGNATURE:

DATE:
JOB CARD: DRY LEAN CONCRETE (DLC)

Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date: Temp.
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location Wind Speed
MES Formation : GE (P) AF JAMNAGAR Chainage: Humidity

Date and Signature


SL Brief of Stages REMARKS / RECTIFICATION DONE
of JE
Checks Before start of Work
1 Conforming Physical Requirements of DLC Mix.

OK Not OK
2 Proper Shoulders are in place

OK Not OK
3 Surface cleaned properly

OK Not OK
4 No any Soft and yielding WMM surface

OK Not OK
5 Initial level is recorded

OK Not OK
6 Water is sprinkled on surface

OK Not OK
Thickness of layer by string line for sensor paver are marked as per
7
approved profile and checked.

OK Not OK
8 Proper Rolling Equipments are in place

OK Not OK
9 Spreading Equipments(Mechanical Paver) are in place

OK Not OK
Checks During Process
1 Uniform Spreading is done & no segregation

OK Not OK
2 Proper thickness is achived & joints are vertical

OK Not OK
3 Sequence of Rolling is proper as per trial bay and speed is within 5 km/hr

OK Not OK
5 Density of surface is checked & recorded.#

OK Not OK
4 Surface regularity of WMM checked and recorded. #

OK Not OK
6 Final level taken and recorded

OK Not OK
7 Curing for 7 days by sprinkling of water and cover with gunny bags/hessian

OK Not OK
# 1. Only signature of Engineer-in-charge is mandatory on Job Card. 2. Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Site Lab)

SIGNATURE:

DATE:
JOB CARD: PAVEMENT QUALITY CONCRETE (PQC)
Name of Work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STN JAMNAGAR
CA No : CE(AF)G/JAM/39 OF 2018-19 Date: Temp.
Name of Contractor : M/S KCC BUILDCON PVT LTD Site / Location Wind Speed
MES Formation : GE (P) AF JAMNAGAR Chainage: Humidity
REMARKS / RECTIFICATION
SL Brief of Stages Date and Initial of JE
DONE
Checks Before start / Prog of Work
1 Readiness of T&P at site

OK Not OK
2 Tack coat @2 kg/Xsqm and laying 400 micron HDPE sheet with sealing
on the surface
OK Not OK
3 Confirming level of the string wire as per approved profile.#

OK Not OK
4 Conforming Physical Requirements of PQC Mix.#

OK Not OK
5 Proper Compaction and finishing of PQC is Done

OK Not OK
6 Checking of achieved level/ thickness of PQC slab

OK Not OK
7 Texturing is done proper.#

OK Not OK
8 Embosing of Panel number and Date of casting

OK Not OK
9 Initial curing done by curing compound

OK Not OK
10 Uniform Spreading is done & no segregation of curing compound

OK Not OK
12 Initial cutting is done timely

OK Not OK
13 Final curing by forming bunds for 21 days

OK Not OK
14 Testing of Str of Cube and Beam and cutting of core.#

OK Not OK
# 1. Only signature of Engineer-in-charge is mandatory on Job Card.2.Upper Box is for JE (Civ) and Lower box is for Engineer-in-charge.
Rep of Contractor Engineer-in-charge(Site) Engineer-in-charge(Lab)
SIGNATURE:
DATE:
TOLERANCE LIMIT OF FINISH SURFACE

Sl No Nature of Work Tolerance Reference Remarks


Limit in mm
1 Cutting Formation (+)20 to (-)25 CA-PS-15.2.5 Page No 205
2 Soil Stabilization 15 CA-PS-Table 5.2 Page No 210
3 Granular Sub Base (GSB) 12 CA-PS-Table 5.2 Page No 210
4 Wet Mix Maccadam (WMM) 12 CA-PS-Table 5.2 Page No 210
5 Dry Lean Concrete(DLC) 10 MORTH -902.4 Page No 419
Pavement Quality Concrete
6 3 MORTH -902.5 Page No 419
(PQC)

TOLERANCE LIMIT OF FINISH SURFACE

Sl No Nature of Work Tolerance Reference Remarks


Limit in mm
1 Cutting Formation (+)20 to (-)25 CA-PS-15.2.5 Page No 205
2 Soil Stabilization 15 CA-PS-Table 5.2 Page No 210
3 Granular Sub Base (GSB) 12 CA-PS-Table 5.2 Page No 210
4 Wet Mix Maccadam (WMM) 12 CA-PS-Table 5.2 Page No 210
5 Dry Lean Concrete(DLC) 10 MORTH -902.4 Page No 419
Pavement Quality Concrete
6 3 MORTH -902.5 Page No 419
(PQC)

TOLERANCE LIMIT OF FINISH SURFACE

Sl No Nature of Work Tolerance Reference Remarks


Limit in mm
1 Cutting Formation (+)20 to (-)25 CA-PS-15.2.5 Page No 205
2 Soil Stabilization 15 CA-PS-Table 5.2 Page No 210
3 Granular Sub Base (GSB) 12 CA-PS-Table 5.2 Page No 210
4 Wet Mix Maccadam (WMM) 12 CA-PS-Table 5.2 Page No 210
5 Dry Lean Concrete(DLC) 10 MORTH -902.4 Page No 419
Pavement Quality Concrete
6 3 MORTH -902.5 Page No 419
(PQC)