J SOMAIYA COLLEGE OF ARTS AND COMMERCE


Name – Aditya kesarwani
Roll No. : - 42
Class – TYBMS
Subject – PROJECT MANAGEMENT
Topic – TOLL NAKA
Group Number – 10
TOLL PLAZA
A place on a road where there is a line of tollbooths
Following is the list of the toll naka that we selected and visited for our project:-
1. The Vashi Bridge Toll Naka.
2. The Bandra Worli Sea Link Toll Naka.
3. The Airoli Bridge Toll Naka.
4. The Thane – Mulund (Check Naka) Toll Naka.
As the roads are maintained by the Maharashtra State Road Development Corporation
Limited (MSRDC) The toll maintenance and collection of the money is done by the MEP
Infrastructures Developers Limited.

INTRODUCTION

The BWSL project is a part of the Western Freeway Sea Project, which, in turn, is a part of
a larger proposal to upgrade the road transportation network of greater Mumbai. In the first
phase it will connect Bandra to Worli whereas in the subsequent phases the plans are to take
it further to Haji Ali and then to Nariman Point. It is a connecting bridge linking the city of
Mumbai with its western suburbs and has the potential to bring about permanent and far
reaching changes in the travel patterns of the area. The Bandra-Worli Sea Link is primarily
meant to provide an alternative to the Mahim Causeway route that is presently the only
connection between South Mumbai and the Western and Central suburbs. The project has
been commissioned to offer a quicker alternative to the north-south traffic that presently
amounts to approximately 125,000 cars a day. The project has been commissioned by the
Maharashtra State Road Development Corporation Ltd (MSRDC) and the Maharashtra
Government and is being built by HCC (Hindustan Construction Company). As a builder of
landmark infrastructure projects around the country, HCC has handled numerous challenges
both in terms of location and technology. The BWSL project offered HCC an opportunity to
accomplish one more feat: to construct an eight-lane freeway over the open sea for the first
time in India
Customers

• Mainly working class people who have to travel daily for work
• Heavy loaders vehicle and four wheelers
• Travellers

COSTING
The total cost of all four projects are 2106.64 Cr
The cost of BWSL is :-
The original plan estimated the cost at ₹6.6 billion (US$93 million) to be completed in five
years. But the project was subject to numerous public interest litigations, with the 5-year
delay resulting in the cost escalating to ₹16 billion (US$220 million), with the additional
interest cost alone accounting for ₹7 billion (US$98 million)

Rates of Toll Naka at Vashi, Airoli ,Mulund & Bandra Worli Sea Link
Toll Naka Location Cars/Jeeps (Rs.) Light Motor Bus & Trucks Multi Axel
Vehicles (Rs.) (Rs.) Vehicles (Rs.)

Vashi Toll 35/- 55/- 105/- 135/-

Airoli Toll 35/- 55/- 105/- 135/-

Mulund Toll 35/- 55/- 105/- 135/-

Bandra Worli Sea 70/- 110/- 145/- Not allowed


Link

The toll station (TP) and collection system will provide for three different types of toll
collection, as follows:
– Fully automatic system: Electronic payment through On board Units mounted on the
vehicles which allow passage without stopping.
– Semi-automatic system: Electronic payment through a smart card, which allows payment
without having to pay cash.
– Manual toll collection: Payment of toll by cash, requiring vehicle drivers to make cash
payment to a toll attendant, and stopping for cash exchange.
WEAKNESS
STRENGTH • 23% cost overrun.
• Reducing the distance • Second, the project being years behind
between Point A and Point schedule.
B
• There was also criticism directed at the
• Generating employment
crumbling road surface on the bridge soon after
• Revenue boost
completion.

SWOT Analysis
PROJECT BENEFITS / OTHER FEATURES

• Estimated savings in Vehicle Operating Costs (VOC): Rs. 100 Crores per annum.
• Considerable savings in travel time (20 to 30 minutes) due to increased speed and reduced
delays (23 signals avoided).
• Stress free driving.
• Reduced accidents.
• Reduction in traffic on existing roads because of traffic diversion to the Sea Link.

OPPORTUNITY THREAT
• Employment opportunity • Vehicular emissions are the worst kind of
• Revenue generated to pollution.
government • Tidal pattern changes and coastline erosions
• Society welfare were also taken into consideration.
• Tourism boost
• New technology

• Reduction in Carbon Monoxide and Nitrogen Oxide Levels in Mahim, Dadar, Prabhadevi
and Worli along existing roads..
• Landscaping along the approaches and waterfront promenade enhance the environment
and add green spots to the city.

Location

- Mahim Bay, Maharashtra.


- Mumbai Highway, Vashi Village, Sector 13 Vashi.
- Navi Mumbai, Maharashtra 400703 (Khadi Pul Navi Mumbai Toll Naka).
- Mulund, Maharashtra .
The reason to choose the location

• Not to affect the normal life of Mumbai people and get mumbai a new landmark.
• Reduced noise pollution in Mahim, Dadar, Prabhadevi and Worli along existing
roads
• Reduction in traffic on existing road.
• One of the four entry points for entering into Mumbai.
• Connecting two area / cities
• Boost connectivity

Ratings

I as a team member visited toll naka i.e. Bandra – Worli Sea Link Toll naka and there I
questioned the toll Naka guy some questions about the sea link project he gave me some
information but wasn’t that much supportive. He shared his work pattern and helped me in
knowing about the problems he faces while working . According to me I rate myself a 9/10
because I did the ground work it was difficult to approach the toll guy and questioning him.
Finding the secondary data and talking to the officials, it hasn’t gone as expected because
people were scared to answer the questions and was’t that supportive
Group efforts collectively rated at 9 as everyone worked very hard and managed to meet the
toll naka guy even during the rush hour which helped us to get information easily and were
very supportive. Group members have actively participated in group discussion and meetings.
As timings of all seven of us were not matching for visiting the toll plaza we divided the group
into the sub-group Each individual of the group has played a crucial role in the completion of
this project.