NATIONAL TRANSMISSION & DESPATCH COMPANY.

DAILY PROGRESS REPORT DURING THE MONTH OF 01/2020.


DATE. SUB-DIVISION. TRANSMISSION LINE. LOCATION ATTENDED. WORK CARRIEDOUT. SUPERVISED BY.

06-01-2020. 500kv T/L NKI. CPHGC-JSO 30 to 71 Petrolling. Mr.Mansoor Ahmed AE (T)

06-01-2020. 500kv T/L Cum PQ-DADU 58(57Nos) Installed missing braces. Mr.Amir Raza AE (T)
Store JSO.

06-01-2020. 500kv T/L Dadu. PQ-DADU 146 to 150 Tree cutting. Mr. Waseem Raja AE.

07-01-2020. 500kv T/L NKI. NKI-JSO 147 to 149 Tree Cutting & Earth Mr.Mansoor Ahmed AE (T)
backfilling.

07-01-2020. 500kv T/L Cum NKI-JSO 367 to 370 Tree Cutting. Mr.Amir Raza AE (T)
Store JSO.

07-01-2020. 500kv T/L Dadu. PQ-DADU 60(24Nos),61(19Nos:) Installed missing braces. Mr. Waseem Raja AE.

08-01-2020. 500kv T/L NKI. CPHGC-JSO 116 to 118 Tree Cutting . Mr.Mansoor Ahmed AE (T)

08-01-2020. 500kv T/L Cum NKI-JSO 471 to 474 Tree Cutting. Mr.Amir Raza AE (T)
Store JSO.

08-01-2020. 500kv T/L Dadu. PQ-DADU 58(D)(55Nos) Installed missing braces. Mr. Waseem Raja AE.

09-01-2020. 500kv T/L NKI. NKI-JSO 118 to 120 Tree Cutting & Earth Mr.Mansoor Ahmed AE (T)
backfilling.

09-01-2020. 500kv T/L Cum CPHGC-JSO 472 to 475 Tree Cutting. Mr.Amir Raza AE (T)
Store JSO.

09-01-2020. 500kv T/L Dadu. PQ-DADU 58(D)(20Nos),59(43Nos:) Installed missing braces. Mr. Waseem Raja AE.

10-01-2020. 500kv T/L NKI. NKI-JSO 150 & 151 Tree Cutting . Mr.Mansoor Ahmed AE (T)
10-01-2020. 500kv T/L Cum CPHGC-JSO 466 to 471 Tree Cutting. Mr.Amir Raza AE (T)
Store JSO.

10-01-2020. 500kv T/L Dadu. PQ-DADU 200 to 202 Tree Cutting. Mr. Waseem Raja AE.

13-01-2020. 500kv T/L NKI. NKI-JSO 151(32Nos) Installed missing braces. Mr.Mansoor Ahmed AE (T)

13-01-2020. 500kv T/L Cum CPHGC-JSO 462 to 465 Tree Cutting. Mr.Amir Raza AE (T)
Store JSO.

13-01-2020. 500kv T/L Dadu. PQ-DADU 432 to 395 Petrolling. Mr. Waseem Raja AE.

14-01-2020. 500kv T/L NKI. NKI-JSO 130 to 131 Tree Cutting. Mr.Mansoor Ahmed AE (T)

14-01-2020. 500kv T/L Cum CPHGC-JSO 425 to 432 Tree Cutting. Mr.Amir Raza AE (T)
Store JSO.

14-01-2020. 500kv T/L Dadu. PQ-DADU 150 to 151 Tree Cutting @ the legs of Mr. Waseem Raja AE.
Loc No:150 & b/w Span 150-
151

15-01-2020. 500kv T/L NKI. CPHGC-JSO 128 to 130 Tree Cutting & Anti-rust Mr.Mansoor Ahmed AE (T)
painting.

15-01-2020. 500kv T/L Cum CPHGC-JSO 407 to 411 Tree Cutting. Mr.Amir Raza AE (T)
Store JSO.

15-01-2020. 500kv T/L Dadu. PQ-DADU 151 to 153 Tree Cutting & Co-ordinated Mr. Waseem Raja AE.
with PQ team Lahore for
verification of tower braces
installed in various locations
of PQ-DADU & DJ-I.

16-01-2020. 500kv T/L NKI. CPHGC-JSO 137 to 139 Tree Cutting . Mr.Mansoor Ahmed AE (T)

16-01-2020. 500kv T/L Cum CPHGC-JSO 402 to 406 Tree Cutting. Mr.Amir Raza AE (T)
Store JSO.

16-01-2020. 500kv T/L Dadu. PQ-DADU 294(31Nos:) Installed missing braces & Co- Mr. Waseem Raja AE.
ordinated with PQ team
Lahore for verification of
tower braces installed in
various locations of PQ-
DADU & DJ-I.
17-01-2020. 500kv T/L NKI. CPHGC-JSO 139(42Nos:) Installed missing braces. Mr.Mansoor Ahmed AE (T)

17-01-2020. 500kv T/L Cum CPHGC-JSO 200 to 253 Petrolling. Mr.Amir Raza AE (T)
Store JSO.

17-01-2020. 500kv T/L Dadu. PQ-DADU 295(34Nos:) Installed missing braces. Mr. Waseem Raja AE.

20-01-2020. 500kv T/L NKI. CPHGC-JSO 131 to 133 Tree Cutting. Mr.Mansoor Ahmed AE (T)

20-01-2020. 500kv T/L Dadu. PQ-DADU 358(23Nos:) Installed missing braces. Mr. Waseem Raja AE.

359 Tree Cutting.

21-01-2020. 500kv T/L NKI. CPHGC-JSO 133(39Nos:) Installed missing braces. Mr.Mansoor Ahmed AE (T)

21-01-2020. 500kv T/L Cum NKI-JSO 359 to 367 Tree Cutting. Mr.Amir Raza AE (T)
Store JSO.
354(02Nos:) Installed joint plates.

21-01-2020. 500kv T/L Dadu. DADU-JSO-I 37 to 73 Petrolling. Mr. Waseem Raja AE.

22-01-2020. 500kv T/L NKI. NKI-JSO 82 & 83 Tree Cutting. Mr.Mansoor Ahmed AE (T)

22-01-2020. 500kv T/L Cum NKI-JSO 350(02Nos:),352(02Nos:), Installed joint plates. Mr.Amir Raza AE (T)
Store JSO. 353(02Nos:),355(08Nos:)

22-01-2020. 500kv T/L Dadu. DADU-JSO-I 01 to 36 Petrolling. Mr. Waseem Raja AE.

PQ-DADU 345 to 360 Petrolling.

23-01-2020. 500kv T/L NKI. NKI-JSO 86 to 88 Tree Cutting. Mr.Mansoor Ahmed AE (T)

23-01-2020. 500kv T/L Dadu. PQ-DADU 296(40Nos:) Installed missing braces. Mr. Waseem Raja AE.

24-01-2020. 500kv T/L NKI. CPHGC-JSO 134(09Nos:),135(06Nos:) Installed missing braces & Mr.Mansoor Ahmed AE (T)
Tree Cutting.

25-01-2020. 500kv T/L Cum PQ-Dadu. 64 to 66 Night Petrolling. Mr.Amir Raza AE (T)
Store JSO. DADU-JSO-I 351 to 367 Night Petrolling.

27-01-2020. 500kv T/L NKI. CPHGC-JSO 122 & 123 Tree Cutting. Mr.Mansoor Ahmed AE (T)

27-01-2020. 500kv T/L Dadu. DADU-JSO-I 284 to 286 Tree Cutting. Mr. Waseem Raja AE.
28-01-2020. 500kv T/L NKI. CPHGC-JSO 412 & 414 Rehabilitation work of broken Mr.Mansoor Ahmed AE (T)
Conductor.

28-01-2020. 500kv T/L Cum CPHGC-JSO 412 to 414 Loading & Un-loading of Mr.Amir Raza AE (T)
Store JSO. Conductor from GSO store
JSO Colony to site of work.

28-01-2020. 500kv T/L Dadu. DADU-JSO-I 282 to 284 Tree Cutting. Mr. Waseem Raja AE.

29-01-2020. 500kv T/L Dadu. PQ-DADU 298(31Nos:) Installed missing braces. Mr. Waseem Raja AE.

29-01-2020 & 500kvT/L NKI, CPHGC-JSO 412 to 414, Sub-Conductor-C, Rehabilitation work of broken Mr.Mansoor Ahmed AE (T)
30-01-2020. Cum Store JSO, Blue Phase. Conductor. Mr.Amir Raza AE (T) Mr.
DADU & LLC-III 412 to 414,Blue Phase. Installed 12Nos: Spacers, vide Waseem Raja AE.
JSO PTW No: 1334.

31-01-2020. 500kv T/L NKI. CPHGC-JSO 89(D) Cleaning of Disc Insults:, vide Mr.Mansoor Ahmed AE (T)
PTW No: 1342.

31-01-2020. 500kv T/L Cum CPHGC-JSO 360 to 366(N) Cleaning of Disc Insults:, vide Mr.Amir Raza AE (T)
Store JSO. PTW No: 1342.

31-01-2020. 500kv LLC-III CPHGC-JSO 414 to 415 Installed Spacres, vide PTW Mr. Waseem Raja AE.
JSO. No: 1342.

EXECUTIVE ENGINEER
500KV T/LINE GSO DIVISION NTDCL:
DADU.