Sunteți pe pagina 1din 1

M

Condensate from balancing


line musn´t be routed into
valve chamber.

IP valves chamber

VACUUM BREAKER P&ID clarifications according to document


JO003-10-MA_-MDD-DSP-003 (formal AB150112 )

Safety diaphragm

HP valves chamber

AIR COOLED CONDENSER


HP part of Steam turbine IP/LP part of Steam turbine

Generator

Interlock - steam
superheated
less than 30 °C

M M
Sifon
S-trap
3.5m

Hot / warm start: min 260 °C


Cold start: min 200 °C, max 290°C
Pressure acc. CRH steam
DRAIN POT
M
M

BOOSTER PUMP
M

Valve 40LBC10AA201 to be placed in Flash Tank


horisontal pipeline. The actuator will be M
in upper position.

M
OWNER: OWNER'S MANUFACTURER:
ENGINEER:

Sifon
S-trap
M DESIGNER: EPC CONTRACTOR:
min 1.2 m

PROJECT:

Samra Phase IV Add-On Combined Cycle Project


Sifon
S-trap - - - - - -
min 1 m
D - - - - -
C 10/11/2016 IDOM comments 28/10/2016 HAVRANEK TUSEK KOTEN
B 14/10/2016 TECHNICAL MEETING I COMMENTS HAVRANEK TUSEK KOTEN
A 26/8/2016 SECOND ISSUE HAVRANEK TUSEK KOTEN
Fan of Vent steam condenser Fan of Vent steam condenser
0 21/6/2016 FIRST ISSUE - CHANGE OF KKS; P&ID GENERAL UPDATE HAVRANEK TUSEK KOTEN
Oil Cooler No.1 Oil Cooler No.2
REV DATE DESCRIPTION DONE CHECKED APPROVED
HP hydraulic aggregate
EPC CONT. SIGNATURE DATE
FOR INFORMATION X

STATUS
FOR CONSTRUCTION
FOR APPROVAL
FOR OWNER REVIEW
Vent steam condenser skid (VSC SKID) VALID FOR PURCHASE - -
AS BUILT
FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:

JO003-10-MA_-MDD-DSP-001 P&ID
SIZE: SCALE: SHEET: 1/1
A1 - NEXT: -
STEAM-WATER
VENT STEAM CONDENSER (VSC)
14.11.2016 12.12.2016 13.12.2016 15.12.2016 e
IDOM comments
Generator Cooler Generator Cooler HAVRANEK.JAN TUSEK.JAN PORUBCAN.IVAN KOTEN.PETR
HAVRANEK.JAN - 17.10.2016 17.10.2016 10.11.2016 10.11.2016 11.11.2016
d
IDOM comments 28.10.2016 HAVRANEK.JAN TUSEK.JAN PORUBCAN.IVAN KOTEN.PETR
HAVRANEK.JAN - 14.10.2016 02.09.2016 14.10.2016 14.10.2016 14.10.2016
c
TECHNICAL MEETING I COMMENTS HAVRANEK.JAN TUSEK.JAN PORUBCAN.IVAN KOTEN.PETR
HAVRANEK.JAN - 26.08.2016 16.08.2016 31.08.2016 01.09.2016 01.09.2016
b
Generator Cooler Generator Cooler SECOND ISSUE HAVRANEK.JAN TUSEK.JAN PORUBCAN.IVAN KOTEN.PETR
Sifon Sifon Sifon Sifon
S-trap S-trap S-trap S-trap HAVRANEK.JAN - 03.08.2016 11.07.2016 04.08.2016 04.08.2016 15.08.2016
min 1.2 m min 1.2 m min 1.2 m min 1.2 m a
BOOSTER PUMPS Internal revision - layout design HAVRANEK.JAN SIROKY.ZDENEK HRDINA.JIRI KOTEN.PETR
Popis změny Vypracoval Kontroloval Schválil HIP
Rev.
Nature of Revision Elaborated by Checked by Approved by Chief Engineer
Měřítko/Scale Projekt/Project

N Samra IV
Název dokumentu/Document title
Schéma pára-voda
P&ID Steam-water
For Engineering 13.06.2016 21.06.2016 22.06.2016 27.06.2016
P100206 M01
HAVRANEK.JAN TUSEK.JAN PORUBCAN.IVAN KOTEN.PETR
Číslo projektu Stupeň dokumentace Skup. dok. Vypracoval Kontroloval Schválil HIP
Project No. Design Stage Doc. Group Elaborated by Checked by Approved by Chief Engineer
List.č.: 1 Listů:
Elektronický soubor / Electronic file: Pt6012770_1_e_0.dwg Sheet No.: Sheets:
1
Č. dokumentu projektu / Project Doc. No.: JO003-10-MA_-MDD-DSP-001 D
DRAINING HEADERS MUST BE PLACED ABOVE Č. dokumentu autora / Originator Doc. No.: Pt6012770 e