Sunteți pe pagina 1din 5

Egypt Gas

Technical Affairs Page 1 of 5

__________________________________________________________________________

Polyethylene Polymer

Technical Requirements

2018

Doc. No. Document Rev. Issue date Issue for Prepared by APPROVED BY

Technical Requirements: Polyethylene


TC.PE.008 5 29-5-2018 APPROVAL ENG.MAI MOH. ENG.AMR ELZEINY
Polymers
Egypt Gas
Technical Affairs Page 2 of 5

__________________________________________________________________________

Polyethylene Polymers
Technical Requirements

1. Related Reference standards:


1.1. GIS/PL 2 part 1: Polyethylene pipes and fittings for natural gas and
suitable manufactured gas, general and Polyethylene Compounds
for use in polyethylene pipes and fittings.
1.2. EN 1555 part 1: Plastic Piping Systems for the supply of Gases
Fuels (PE), general.
1.3. TC.PE.001: Egypt Gas Technical Requirements P.E Electrofusion
Fittings.
1.4. TC.PE.002 Egypt Gas Technical Requirements P.E Pipes.
1.5. TC.PE.00* Egypt Gas Technical Requirements P.E Valves.
1.6. TC.PE.007 Egypt Gas Technical Requirements P.E Transition
Fitting & Polyethylene Coupling.

2. General:

2.1. This document specifies the technical requirements of polymers used


for PE pipes and fitting PE-80 and PE-100.
2.2. This document is a supplementary to documents TC.PE.001,
TC.PE.002 and TC.PE.006 and TC.PE.007.
2.3. All specifications stated above shall be the latest edition.
2.4. Other national or international standards, which promise to confer
equal or better quality, could be also acceptable upon Egypt Gas
approval.
2.5. The accepted polymers by Egypt Gas are in the attached list in
Annex (I).
2.6. Other polymers that are not within the list of Egypt Gas approved
polymers shall go through an approved process before being
accepted.

Doc. No. Document Rev. Issue date Issue for Prepared by APPROVED BY

Technical Requirements: Polyethylene


TC.PE.008 5 29-5-2018 APPROVAL ENG.MAI MOH. ENG.AMR ELZEINY
Polymers
Egypt Gas
Technical Affairs Page 3 of 5

__________________________________________________________________________

2.7. To introduce a polymer that is not within Egypt Gas approved list,
the following documents shall be provided for technical evolution:-
1) Technical data sheet of the polymer.

2) The bidder shall submit a valid conformity certificates from


one of the following approved firms or its successors or its
accredited bodies which declare that the polymer is in
accordance to the above mentioned specs.

 BG England
 Advantica England
 BSI England
 NMI Netherland
 D.V.G.W Germany
 S.V.G.W Switzerland
 D.S Denmark
 IIP Italy
 EOS Egypt (For batch release tests only)
 TUV Rhineland
 Kiwa United kingdom
 BUREAU VERITAS ITALY
3) Reference list for pipe and fitting made of this polymer and
supplied to gas companies, the list shall specify (product,
product manufacturer, client, client contacts, year …)

4) For PE-100 polymers approved by the PE-100 plus


association is an advantage.

Doc. No. Document Rev. Issue date Issue for Prepared by APPROVED BY

Technical Requirements: Polyethylene


TC.PE.008 5 29-5-2018 APPROVAL ENG.MAI MOH. ENG.AMR ELZEINY
Polymers
Egypt Gas
Technical Affairs Page 4 of 5

__________________________________________________________________________
2.8. It should be clear that the evaluation and assessment of a new
polymer is a process that requires time that may exceed the time
dedicated for the technical study of a (Fitting or Pipes) Bid. The
suppliers are encouraged to continuously update any new polymer
they intend to use regardless of any prospective Fitting or Pipe Bid.

2.9. If a new polymer is accepted by Egypt Gas, it is not an obligation to


be inserted in Egypt Gas Polymers approved list until it is deemed to
approve satisfactory performance by Egypt Gas.

2 . 1 0 . For polymers that are not in Egypt Gas approved list, fulfilling the
above mention requirements do not guarantee Egypt Gas acceptance.
The complete assessment of introducing a polymer is Egypt Gas
solely decision.

Doc. No. Document Rev. Issue date Issue for Prepared by APPROVED BY

Technical Requirements: Polyethylene


TC.PE.008 5 29-5-2018 APPROVAL ENG.MAI MOH. ENG.AMR ELZEINY
Polymers
Egypt Gas
Technical Affairs Page 5 of 5

__________________________________________________________________________

Annex (I)

The following are the approved polymers for use in PE pipes, fittings and
valves in Egypt Gas Company

Polymer name
Pipe PE-80 Pipe PE-100 Fitting PE-80 Fitting PE-100
SOLVAY ELTEX TUB Total Petrochemicals PEXS10 FINATNENE 3802 SOLVAY ELTEX TUB
172 YCF YCF 121
Total
BP SOLVAY ELTEX TUB RIGDEX PC2040 INEOS TUB 121
Petrochemicals PE
125N2025 YELLOW BLACK
YELLOW
Borealls BorSafe Basell Hostalen CPR 100 INEOS TUB 172 BP RIGDEX 002-
ME3441 Orange (Dia. Up to 250mm) YELLOW 5O/R102 BLACK
TOTAL
Borealis Borsafe HE3492- PETROCHEMICALS
LSPE100 Orange Resin PE HDPE XRC 20 B
BLACK
TOTAL
TASNEE PE 100 -ORANGE PETROCHEMICALS
PE XS108 BLACK
BorSafe™ HE 3490-LS (black) Basell Hostalen CRP
100 Black

Borsafe™ HE 3490-LS-H Boresafe HE 3490-


(black) IM black

Hostalen CRP 100 (black)

Hostalen CRP 100 Resist CR


(black)

Bp = SOLVAY = BPSOLVAY = INEOS = RIGIDEX


Total petrochemical = FINATHENE = ATOFINA

Doc. No. Document Rev. Issue date Issue for Prepared by APPROVED BY

Technical Requirements: Polyethylene


TC.PE.008 5 29-5-2018 APPROVAL ENG.MAI MOH. ENG.AMR ELZEINY
Polymers

S-ar putea să vă placă și