Sunteți pe pagina 1din 5

PT PMRC PART & DESCRIPTION SIZE QTY

N NO.
__ ________ __________________
(DN)
____ ___

1 743311096S PIPE A335GR.P11 SMLS BE ASME B36.10M 200 S-60 200 21.0 M
SEE ISO 2 763239457A 90 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 200 6
2500R1-SH-2500-22003 B16.9 200 S-60
20 E 4337995 3 7664793361 FLANGE WN A182GR.F11CL.2 CL.600 RF ASME B16.5 15 1
0N N 5623000
PD 15 S-80
EL +121680 4 772468003A GATE VALVE CL.600 A182GR.F11CL.2/321+ST6 BW - 15 1
305 -/API 602/ASME B16.25 HANDWHEEL ASME
B16.10(LONG PATT.)/ASME B16.25,CLASS B,HIGH
TEMP,LWB,OS&Y 15 S-80
0 2
85 1 PIPE SUPPORTS
5 SUPPORT TR1-270-11-200 200 1
6 SUPPORT GC-2500-0201 200 1
2 7 SUPPORT RS-2500-0219 200 1
8 SUPPORT LH3-A-12-08-200 200 1
9 SUPPORT RS-2500-0218 200 1

2895
S5
TR1-270-11-200

8220
3434
S6
GC-2500-0201

1
2
EL +113460 S7
1 RS-2500-0219

56
59 2

1
2
58
31

S9
1

1375
RS-2500-0218

2
EL +112085

52 1
12 00
91
1
F3 S8
E 4349121 20
LH3-A-12-08-200 0N
N 5618538 PD
15NPD
EL +112347
SEE ISO
SH-2500-22003 SHT 2

90
157 1
2
27

4 1
224 STEM U 30 N
1

SH-2500-22003 15 6L103AQ H/50


GENERAL NOTES SH-2500-22003 200 6L103AQ H/80
SCREWED INSULATED TRACED
1. REFER TO "GENERAL NOTE FOR PIPING ISOMETRIC 8. FOR INSTRUMENT DETAILS, REFER TO INSTRUMENT JOINT PIPE PIPE LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
DRAWING", RAPID-P0005-TYO-PIP-DES-2000-9028. HOOK-UP DRAWING.
2. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN 9. FOR PAINTING AND COATING, REFER TO SERVICE: SH CODE: B31.3
.
MILLIMETER. RAPID-P0005-TYM-MCI-PRC-2000-0001. 49.5
OPERATING Barg C 425
3. ROOT GAPS FOR BUTT WELDING FITTINGS ARE NOT 10. FOR INSUALATION, REFER TO DESIGN 62 455
INCLUDED IN DIMENSION. RAPID-P0005-TYO-MEC-DES-2000-9002
4. DIMENSION MAY BE SLIGHTLY DIFFERENT FROM ACTUAL RAPID-P0005-TYO-PIP-DES-2000-0401, BUTT SOCKET OWNER : PROJECT TITLE:
DIMENSIONS BY 1MM OR 2 MM DUE TO COMPUTER RAPID-P0005-TYO-PIP-DES-2000-0402. WELD WELD PETRONAS RAPID PROJECT, PENGERANG
ROUND-OFF CALCULATION. 11. FOR BRANCH REINFORCEMENT PAD,
5. PLANT COORDINATE SYSTEM DATUM CORRESOPOND TO REFER TO RAPID-P0005-TYO-PIP-STD-2000-0002 1 ISSUED FOR CONSTRUCTION1 DD-MM-17 V.A RYO C.S (P0005)
GEOCENTRRIC CASSINI-SOLDER JOHOR MALAYSIA SYSTEM:
PLANT N = 000.000 CORRESPONDS TO CASSINI LN = -80000.000 P&ID REF: 0 ISSUED FOR CONSTRUCTION 22-Jul-16 V.A RYO C.S ISOMETRIC LINE NO:
PLANT E = 000.000 CORRESPONDS TO CASSINI LE = 61500.000 200-SH-2500-22003-6L103AQ-H
6. EL. 100000 CORRESPONDS TO ELECATION EL. 0.000 LSD
RAPID-P0005-TYO-PRO-PID-2500-1004
ISOMETRIC NOTES REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
(LAND SURVEY DATUM)
7. FOR PIPE SUPPORT STANDARD, REFER TO JOB NO : BA1129 DWG NO : 2500A1-SH-2500-22003 1
RAPID-P0005-TYO-PIP-STD-2000-0003.
STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: HYDRO
LEVEL-3 5A2 (Add) N 100 % TEST PRESSURE: 128.44 Barg AREA : 2500A1 UNIT : 2500 SHT. NO. 1 OF 5 REV. NO. 1
Extraction date: 2/17/2017
PT PMRC PART & DESCRIPTION SIZE QTY
N NO.
__ ________ __________________
(DN)
____ ___

1 743311096S PIPE A335GR.P11 SMLS BE ASME B36.10M 200 S-60 200 8.6 M
2 763239457A 90 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 200 1
B16.9 200 S-60
3 763238077A 45 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 200 3
B16.9 200 S-60
4 7664793361 FLANGE WN A182GR.F11CL.2 CL.600 RF ASME B16.5 15 1
15 S-80
5 772468003A GATE VALVE CL.600 A182GR.F11CL.2/321+ST6 BW - 15 1
-/API 602/ASME B16.25 HANDWHEEL ASME
B16.10(LONG PATT.)/ASME B16.25,CLASS B,HIGH
TEMP,LWB,OS&Y 15 S-80

PIPE SUPPORTS 1
6 SUPPORT GS-2500-0227 200 1
DETAIL A 7 SUPPORT LH3-A-12-08-200 200 1
8 SUPPORT RS-2500-0220 200 1
9 SUPPORT RS-2500-0221 200 1
10 SUPPORT VH-A-07-200 200 2
11 SUPPORT RS-2500-0222 200 1

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
__ ________ __________________ ____ ___

SEE ISO INSTRUMENTS


SH-2500-22003 SHT 3 12 2500FE-1010 2500FE-1010 ORIFICE PLATE ASSEMBLY REFER TO 200 1
127 RAPID-P0005-VBKB-INC-DWG-111X-0001

S10 200NPD
VH-A-07-200 3

90
S10
S9
VH-A-07-200 00 90
RS-2500-0221 20
54
SEE SHT 28
SH-2500-22003 SHT 1 S11
RS-2500-0222
F4 3
E 4349209 5
N 5619446 STEM WEST
180
EL +112347 S6
15NPD GS-2500-0227
1
224
254 427
157 3 0
18
1
90

2500FE
2
1010 27
200NPD S8
12 RS-2500-0220
SEE DETAIL A 72
9 1
12
S7 1
LH3-A-12-08-200 01
39

27
89

SH-2500-22003 15 6L103AQ H/50


GENERAL NOTES SH-2500-22003 200 6L103AQ H/80
SCREWED INSULATED TRACED
1. REFER TO "GENERAL NOTE FOR PIPING ISOMETRIC 8. FOR INSTRUMENT DETAILS, REFER TO INSTRUMENT JOINT PIPE PIPE LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
DRAWING", RAPID-P0005-TYO-PIP-DES-2000-9028. HOOK-UP DRAWING.
2. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN 9. FOR PAINTING AND COATING, REFER TO SERVICE: SH CODE: B31.3
.
MILLIMETER. RAPID-P0005-TYM-MCI-PRC-2000-0001. 49.5
OPERATING Barg C 425
3. ROOT GAPS FOR BUTT WELDING FITTINGS ARE NOT 10. FOR INSUALATION, REFER TO DESIGN 62 455
INCLUDED IN DIMENSION. RAPID-P0005-TYO-MEC-DES-2000-9002
4. DIMENSION MAY BE SLIGHTLY DIFFERENT FROM ACTUAL RAPID-P0005-TYO-PIP-DES-2000-0401, BUTT SOCKET OWNER : PROJECT TITLE:
DIMENSIONS BY 1MM OR 2 MM DUE TO COMPUTER RAPID-P0005-TYO-PIP-DES-2000-0402. WELD WELD PETRONAS RAPID PROJECT, PENGERANG
ROUND-OFF CALCULATION. 11. FOR BRANCH REINFORCEMENT PAD,
5. PLANT COORDINATE SYSTEM DATUM CORRESOPOND TO REFER TO RAPID-P0005-TYO-PIP-STD-2000-0002 1 ISSUED FOR CONSTRUCTION1 DD-MM-17 V.A RYO C.S (P0005)
GEOCENTRRIC CASSINI-SOLDER JOHOR MALAYSIA SYSTEM:
PLANT N = 000.000 CORRESPONDS TO CASSINI LN = -80000.000 P&ID REF: 0 ISSUED FOR CONSTRUCTION 22-Jul-16 V.A RYO C.S ISOMETRIC LINE NO:
PLANT E = 000.000 CORRESPONDS TO CASSINI LE = 61500.000 200-SH-2500-22003-6L103AQ-H
6. EL. 100000 CORRESPONDS TO ELECATION EL. 0.000 LSD
RAPID-P0005-TYO-PRO-PID-2500-1004
ISOMETRIC NOTES REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
(LAND SURVEY DATUM)
7. FOR PIPE SUPPORT STANDARD, REFER TO JOB NO : BA1129 DWG NO : 2500A1-SH-2500-22003 1
RAPID-P0005-TYO-PIP-STD-2000-0003.
STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: HYDRO
LEVEL-3 5A2 (Add) N 100 % TEST PRESSURE: 128.44 Barg AREA : 2500A1 UNIT : 2500 SHT. NO. 2 OF 5 REV. NO. 1
Extraction date: 2/17/2017
PT PMRC PART & DESCRIPTION SIZE QTY
N NO.
__ ________ __________________
(DN)
____ ___

1 743311096S PIPE A335GR.P11 SMLS BE ASME B36.10M 200 S-60 200 5.5 M
2 7433110861 PIPE A335GR.P11 SMLS BE ASME B36.10M 150 S-80 150 0.2 M
3 763268039A CON REDUCER A234GR.WP11CL.2 SMLS BW ASME B16.9 200X150 1
200 S-60 X 150 S-80
4 763238077A 45 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 200 1
B16.9 200 S-60
5 763239457A 90 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 200 3
B16.9 200 S-60
6 7632840671 EQUAL TEE A234GR.WP11CL.2 SMLS BW ASME B16.9 150X150 1
150 S-80 X 150 S-80
7 7632394471 90 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 150 2
B16.9 150 S-80
8 773466114H GLOBE VALVE CL.600 A217GR.WC6/321+ST6 BW 150 1
LBB,OS&Y -/BS 1873/ASME B16.25 HANDWHEEL
ASME B16.10(LONG PATT.)/ASME B16.25,CLASS
B,HIGH TEMP,STEAM 150 S-80
9 772466114H GATE VALVE CL.600 A217GR.WC6/321+ST6 BW 150 1
LBB,OS&Y -/API 600/ASME B16.25 GEAR OP.
ASME B16.10(LONG PATT.)/ASME B16.25,CLASS
B,HIGH TEMP,STEAM 150 S-80

1 PIPE SUPPORTS
S11 10 SUPPORT RS-2500-0223 200 1
TH1-A-06-05-200 11 SUPPORT TH1-A-06-05-200 200 1
5 12 SUPPORT FF-2500-0201 150 1
1

47
5
1
43 5
31 S10
1
RS-2500-0223
1 16
1 98
127

5 00
10

SEE SHT
SH-2500-22003 SHT 2 4

1825
SEE ISO
200NPD 2500A1-SH-2500-10004
E 4353295
PD
N 5631037 0N
15

1
EL +109965
90 90 229 559
1

8
7 STEM WEST
ORIENT HANDLE SOUTH

2 3
200X150NPD

152
50
3
143 9
STEM S 60 W
ORIENT HANDLE SOUTH
143 30° EAST

559
6
150X150NPD 229 SEE ISO
EL +109965 SH-2500-22003 SHT 4
1
150NPD

7
EL +109034
S12
FF-2500-0201
229
1

SH-2500-22003 150 6L103AQ H/80


SH-2500-22003 150 6L103AQ H/80
GENERAL NOTES SH-2500-22003 200 6L103AQ H/80
SCREWED INSULATED TRACED
1. REFER TO "GENERAL NOTE FOR PIPING ISOMETRIC 8. FOR INSTRUMENT DETAILS, REFER TO INSTRUMENT JOINT PIPE PIPE LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
DRAWING", RAPID-P0005-TYO-PIP-DES-2000-9028. HOOK-UP DRAWING.
2. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN 9. FOR PAINTING AND COATING, REFER TO SERVICE: SH CODE: B31.3
.
MILLIMETER. RAPID-P0005-TYM-MCI-PRC-2000-0001. 49.5
OPERATING Barg C 425
3. ROOT GAPS FOR BUTT WELDING FITTINGS ARE NOT 10. FOR INSUALATION, REFER TO DESIGN 62 455
INCLUDED IN DIMENSION. RAPID-P0005-TYO-MEC-DES-2000-9002
4. DIMENSION MAY BE SLIGHTLY DIFFERENT FROM ACTUAL RAPID-P0005-TYO-PIP-DES-2000-0401, BUTT SOCKET OWNER : PROJECT TITLE:
DIMENSIONS BY 1MM OR 2 MM DUE TO COMPUTER RAPID-P0005-TYO-PIP-DES-2000-0402. WELD WELD PETRONAS RAPID PROJECT, PENGERANG
ROUND-OFF CALCULATION. 11. FOR BRANCH REINFORCEMENT PAD,
5. PLANT COORDINATE SYSTEM DATUM CORRESOPOND TO REFER TO RAPID-P0005-TYO-PIP-STD-2000-0002 1 ISSUED FOR CONSTRUCTION1 DD-MM-17 V.A RYO C.S (P0005)
GEOCENTRRIC CASSINI-SOLDER JOHOR MALAYSIA SYSTEM:
PLANT N = 000.000 CORRESPONDS TO CASSINI LN = -80000.000 P&ID REF: 0 ISSUED FOR CONSTRUCTION 22-Jul-16 V.A RYO C.S ISOMETRIC LINE NO:
PLANT E = 000.000 CORRESPONDS TO CASSINI LE = 61500.000 200-SH-2500-22003-6L103AQ-H
6. EL. 100000 CORRESPONDS TO ELECATION EL. 0.000 LSD
RAPID-P0005-TYO-PRO-PID-2500-1004
ISOMETRIC NOTES REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
(LAND SURVEY DATUM)
7. FOR PIPE SUPPORT STANDARD, REFER TO JOB NO : BA1129 DWG NO : 2500A1-SH-2500-22003 1
RAPID-P0005-TYO-PIP-STD-2000-0003.
STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: HYDRO
LEVEL-3 5A2 (Add) N 100 % TEST PRESSURE: 128.44 Barg AREA : 2500A1 UNIT : 2500 SHT. NO. 3 OF 5 REV. NO. 1
Extraction date: 2/17/2017
PT PMRC PART & DESCRIPTION SIZE QTY
N NO.
__ ________ __________________
(DN)
____ ___

1 7433110861 PIPE A335GR.P11 SMLS BE ASME B36.10M 150 S-80 150 1.0 M
2 7433110291 PIPE A335GR.P11 SMLS PE ASME B36.10M 20 S-80 20 0.3 M
3 7632840671 EQUAL TEE A234GR.WP11CL.2 SMLS BW ASME B16.9 150X150 2
150 S-80 X 150 S-80
4 7680313081 NIPPLE OUTLET A182GR.F11CL.2 CL.3000 PE SCH 150X20 1
80 MSS SP-97 S38.090-C BRANCH :20 X 150 -
300 -
5 7632180671 CAP A234GR.WP11CL.2 - BW ASME B16.9 150 S-80 150 1
6 7632394471 90 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 150 1
B16.9 150 S-80
7 768031306A NIPPLE OUTLET(FLAT) A182GR.F11CL.2 PE MSS 20 1
SP-97 S38.090-C 20 S-80
8 7632393871 90 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 20 1
B16.9 20 S-80
9 7664793501 FLANGE WN A182GR.F11CL.2 CL.600 RF ASME B16.5 150 2
150 S-80
10 7664793381 FLANGE WN A182GR.F11CL.2 CL.600 RF ASME B16.5 20 1
20 S-80
11 772466114H GATE VALVE CL.600 A217GR.WC6/321+ST6 BW 150 1
LBB,OS&Y -/API 600/ASME B16.25 GEAR OP.
ASME B16.10(LONG PATT.)/ASME B16.25,CLASS
11 B,HIGH TEMP,STEAM 150 S-80
STEM WEST 12 772468004A GATE VALVE CL.600 A182GR.F11CL.2/321+ST6 BW - 20 1
150X150NPD ORIENT HANDLE NORTH -/API 602/ASME B16.25 HANDWHEEL ASME
SEE ISO 0° B16.10(LONG PATT.)/ASME B16.25,CLASS B,HIGH
2500A1-SH-2500-10004 TEMP,LWB,OS&Y 20 S-80
E 4353798 3 13 7664102121 BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 20 1
N 5632750 150X150NPD B16.5 20
EL +109822 N 5632278 559
PIPE SUPPORTS 1
150NPD 6
229 14 SUPPORT GU-B1-P-150-20 150 1
1
7 1 15 SUPPORT SF-2500-0209 150 1
F9 G16 B18 26
3
PT PMRC PART & DESCRIPTION SIZE QTY
3
NO. (DN)
2500TCV 2 __ ________ __________________ ____ ___
1077A 47
S15
SF-2500-0209 16 8541584241 SPIRAL WOUND GASKET (G214EEQ) CL.600 RF 4.5 MM 150 2
20 143
ASME B16.20 150
1 17 8541584061 SPIRAL WOUND GASKET (G214EEQ) - RF 4.5 MM ASME 20 1
510
B16.20 CL.300/CL.600 20
18 8138303071 STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 1 24
1
EN10269GR.20CRMOVTIB4-10 BS4882 / ASME
4 F9 G16 B18 B18.2.2 - 180 mm Length
87
19 8138300751 STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 5/8 4
EN10269GR.20CRMOVTIB4-10 BS4882 / ASME
SEE ISO B18.2.2 - 90 mm Length
SH-2500-22003 SHT 5
143
INSTRUMENTS 1
20 2500TCV-1077A 2500TCV-1077A INSTRUMENT CONTROL VALVE REFER 150 1
TO RAPID-P0005-VBKE-INC-DWG-102X-0001

3
150X150NPD
N 5630621
SEE SHT 150NPD
4 SH-2500-22003 SHT 3
150X20NPD SEE ISO
2500A1-SH-2500-10009
E 4353798
265

N 5630795
EL +108769

2 EL +108769
3
20NPD
174 E 4353798
13 N 5630621
1

EL +108610
75

5
F10 G17 B19
255
33 89
0 7 S14
12 1
GU-B1-P-150-20
STEM UP
1 38
8
EL +108478

SH-2500-22003 20 6L103AQ H/60


SH-2500-22003 150 6L103AQ H/80
SH-2500-22003 150 6L103AQ H/80
GENERAL NOTES SH-2500-10009 20 6L103AQ H/60
SCREWED INSULATED TRACED
1. REFER TO "GENERAL NOTE FOR PIPING ISOMETRIC 8. FOR INSTRUMENT DETAILS, REFER TO INSTRUMENT JOINT PIPE PIPE LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
DRAWING", RAPID-P0005-TYO-PIP-DES-2000-9028. HOOK-UP DRAWING.
2. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN 9. FOR PAINTING AND COATING, REFER TO SERVICE: SH CODE: B31.3
.
MILLIMETER. RAPID-P0005-TYM-MCI-PRC-2000-0001. 49.5
OPERATING Barg C 425
3. ROOT GAPS FOR BUTT WELDING FITTINGS ARE NOT 10. FOR INSUALATION, REFER TO DESIGN 62 455
INCLUDED IN DIMENSION. RAPID-P0005-TYO-MEC-DES-2000-9002
4. DIMENSION MAY BE SLIGHTLY DIFFERENT FROM ACTUAL RAPID-P0005-TYO-PIP-DES-2000-0401, BUTT SOCKET OWNER : PROJECT TITLE:
DIMENSIONS BY 1MM OR 2 MM DUE TO COMPUTER RAPID-P0005-TYO-PIP-DES-2000-0402. WELD WELD PETRONAS RAPID PROJECT, PENGERANG
ROUND-OFF CALCULATION. 11. FOR BRANCH REINFORCEMENT PAD,
5. PLANT COORDINATE SYSTEM DATUM CORRESOPOND TO REFER TO RAPID-P0005-TYO-PIP-STD-2000-0002 1 ISSUED FOR CONSTRUCTION1 DD-MM-17 V.A RYO C.S (P0005)
GEOCENTRRIC CASSINI-SOLDER JOHOR MALAYSIA SYSTEM:
PLANT N = 000.000 CORRESPONDS TO CASSINI LN = -80000.000 P&ID REF: 0 ISSUED FOR CONSTRUCTION 22-Jul-16 V.A RYO C.S ISOMETRIC LINE NO:
PLANT E = 000.000 CORRESPONDS TO CASSINI LE = 61500.000 200-SH-2500-22003-6L103AQ-H
6. EL. 100000 CORRESPONDS TO ELECATION EL. 0.000 LSD
RAPID-P0005-TYO-PRO-PID-2500-1004
ISOMETRIC NOTES REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
(LAND SURVEY DATUM)
7. FOR PIPE SUPPORT STANDARD, REFER TO JOB NO : BA1129 DWG NO : 2500A1-SH-2500-22003 1
RAPID-P0005-TYO-PIP-STD-2000-0003.
STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: HYDRO
LEVEL-3 5A2 (Add) N 100 % TEST PRESSURE: 128.44 Barg AREA : 2500A1 UNIT : 2500 SHT. NO. 4 OF 5 REV. NO. 1
Extraction date: 2/17/2017
PT PMRC PART & DESCRIPTION SIZE QTY
N NO.
__ ________ __________________
(DN)
____ ___

1 7433110861 PIPE A335GR.P11 SMLS BE ASME B36.10M 150 S-80 150 0.2 M
2 7433110291 PIPE A335GR.P11 SMLS PE ASME B36.10M 20 S-80 20 0.3 M
3 7680313081 NIPPLE OUTLET A182GR.F11CL.2 CL.3000 PE SCH 150X20 1
80 MSS SP-97 S38.090-C BRANCH :20 X 150 -
300 -
4 7632180671 CAP A234GR.WP11CL.2 - BW ASME B16.9 150 S-80 150 1
5 768031306A NIPPLE OUTLET(FLAT) A182GR.F11CL.2 PE MSS 20 1
SP-97 S38.090-C 20 S-80
6 7632393871 90 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 20 1
B16.9 20 S-80
7 7632380151 45 DEG ELBOW A234GR.WP11CL.2 SMLS BW ASME 20 1
B16.9 20 S-80
8 7664793381 FLANGE WN A182GR.F11CL.2 CL.600 RF ASME B16.5 20 1
20 S-80
9 772468004A GATE VALVE CL.600 A182GR.F11CL.2/321+ST6 BW - 20 1
-/API 602/ASME B16.25 HANDWHEEL ASME
B16.10(LONG PATT.)/ASME B16.25,CLASS B,HIGH
SEE SHT TEMP,LWB,OS&Y 20 S-80
SH-2500-22003 SHT 4 10 7664102121 BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 20 1
B16.5 20

PIPE SUPPORTS
1
11 SUPPORT GU-B1-P-150-20 150 1

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
__ ________ __________________ ____ ___

12 8541584061 SPIRAL WOUND GASKET (G214EEQ) - RF 4.5 MM ASME 20 1


B16.20 CL.300/CL.600 20
13 8138300751 STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 5/8 4
EN10269GR.20CRMOVTIB4-10 BS4882 / ASME

150NPD
B18.2.2 - 90 mm Length

122
SEE ISO
2500A1-SH-2500-10010
E 4353625
N 5632278
EL +108769

3
150X20NPD

20NPD

EL +108769
F8 G12 B13 174
1
3 255

75
19
1

10
5 7
22 9
STEM UP
2

20NPD S11
89 1
GU-B1-P-150-20
4
38

E 4353798
5 N 5632278
22 EL +108610
5
31
8

6
EL +108478

SH-2500-22003 20 6L103AQ H/60


SH-2500-22003 150 6L103AQ H/80
GENERAL NOTES SH-2500-10010 20 6L103AQ H/60
SCREWED INSULATED TRACED
1. REFER TO "GENERAL NOTE FOR PIPING ISOMETRIC 8. FOR INSTRUMENT DETAILS, REFER TO INSTRUMENT JOINT PIPE PIPE LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
DRAWING", RAPID-P0005-TYO-PIP-DES-2000-9028. HOOK-UP DRAWING.
2. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN 9. FOR PAINTING AND COATING, REFER TO SERVICE: SH CODE: B31.3
.
MILLIMETER. RAPID-P0005-TYM-MCI-PRC-2000-0001. 49.5
OPERATING Barg C 425
3. ROOT GAPS FOR BUTT WELDING FITTINGS ARE NOT 10. FOR INSUALATION, REFER TO DESIGN 62 455
INCLUDED IN DIMENSION. RAPID-P0005-TYO-MEC-DES-2000-9002
4. DIMENSION MAY BE SLIGHTLY DIFFERENT FROM ACTUAL RAPID-P0005-TYO-PIP-DES-2000-0401, BUTT SOCKET OWNER : PROJECT TITLE:
DIMENSIONS BY 1MM OR 2 MM DUE TO COMPUTER RAPID-P0005-TYO-PIP-DES-2000-0402. WELD WELD PETRONAS RAPID PROJECT, PENGERANG
ROUND-OFF CALCULATION. 11. FOR BRANCH REINFORCEMENT PAD,
5. PLANT COORDINATE SYSTEM DATUM CORRESOPOND TO REFER TO RAPID-P0005-TYO-PIP-STD-2000-0002 1 ISSUED FOR CONSTRUCTION1 DD-MM-17 V.A RYO C.S (P0005)
GEOCENTRRIC CASSINI-SOLDER JOHOR MALAYSIA SYSTEM:
PLANT N = 000.000 CORRESPONDS TO CASSINI LN = -80000.000 P&ID REF: 0 ISSUED FOR CONSTRUCTION 22-Jul-16 V.A RYO C.S ISOMETRIC LINE NO:
PLANT E = 000.000 CORRESPONDS TO CASSINI LE = 61500.000 200-SH-2500-22003-6L103AQ-H
6. EL. 100000 CORRESPONDS TO ELECATION EL. 0.000 LSD
RAPID-P0005-TYO-PRO-PID-2500-1004
ISOMETRIC NOTES REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
(LAND SURVEY DATUM)
7. FOR PIPE SUPPORT STANDARD, REFER TO JOB NO : BA1129 DWG NO : 2500A1-SH-2500-22003 1
RAPID-P0005-TYO-PIP-STD-2000-0003.
STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: HYDRO
LEVEL-3 5A2 (Add) N 100 % TEST PRESSURE: 128.44 Barg AREA : 2500A1 UNIT : 2500 SHT. NO. 5 OF 5 REV. NO. 1
Extraction date: 2/17/2017

S-ar putea să vă placă și