Sunteți pe pagina 1din 1

CONSTRUCTION BAR CHART, S-CURVE & CASH FLOW

PERT - CPM
INSTALLATION OF NEW STAINLESS STEEL GUTTER
REPAIR AND REPLACEMENT OF DOWNSPOUTS
6 10
22 CD 37 94 188 CD 225 282

MOBILIZATION / PPE / OFFICE EQUIPMENT


REPAIR OF ROOF REPAINTING OF EXTERIOR WALLS REPAINTING OF EXTERIOR WALLS DEMOBILIZATION
TEMFACIL REPAIR OF ROOF
1 2 3 7 8 12 13
0 0 7 CD 7 7 8 CD 15 15 22 CD 37 37 158 CD 195 195 87 CD 282 282 8 CD 290 290

REPAIR OF DAMAGED EAVES REPAIR OF DAMAGED EAVES


4 9
7 CD 22 42 188 CD
210 282

REPAINTING OF ROOF EAVES REPAINTING OF ROOF EAVES


5 11
8 CD 232 CD 262 282
30 50

PROJECT TITLE: R.C. MELGAZO BUILDERS


DESIGNED BY: CHECKED BY:
Office of the President SHEET NO.:
DRAWN BY: DATE:
045 Cordillera St. Phase 1 Central Park Subd. Bangkal, Davao City SHEET CONTENT:
NATIONAL HOUSING AUTHORITY
SUBMITTED BY: Elliptical Road, Diliman, Quezon City
PERT CPM
REPAINTING AND MINOR REPAIR WORKS OF TWENTY-ONE (21) FIVE STOREY MRB's BAR CHART / S-CURVE CHECKED/ VERIFIED BY: CONCURRED BY: APPROVED BY:

RIZALDY C. MELGAZO Sr. REVISIONS: DATE:


Arch. DANIEL R. COCJIN Engr. RODRIGO P. ROCILLO LUZ U. EVANGELISTA
Smokey Mountain Development and Reclamation Project (SMDRP) Balut, Tondo, Manila President
Principal Architect A MDO Division Manager A - Program District Manager MDO
West Sector NCR West Sector NCR OIC - West Sector NCR

S-ar putea să vă placă și