PRECIO
CANT U. MED CONCEPTO IMPORTE
UNITARIO
PRELIMINARES
LIMPIA, TRAZO Y NIVELACION DEL TERRENO INCL:RETIRO DE
MATERIAL NO UTILIZABLE FUERA DE LA OBRA.
100 ML $30.00 $ 3,000.00
PRECIO
CANT U. MED CONCEPTO IMPORTE
UNITARIO
PRELIMINARES
LIMPIA, TRAZO Y NIVELACION DEL TERRENO DEL TRAMO CON UN $20.00 $ 2,000.00
100 ML ANCHO DE 1 A 1.5 M INCL:RETIRO DE MATERIAL NO UTILIZABLE
FUERA DE LA OBRA.
LISTA DE MATERIALES
MATERIAL CANTIDAD UNIDAD PRECIO TOTAL
CEMENTO 262 BULTOS $215.00 $56,330.00
MORTERO 36 BULTOS $160.00 $5,760.00
PIEDRA 29 M3 $400.00 $11,600.00
POLVO 36 M3 $390.00 $14,040.00
GRAVA 17 M3 $390.00 $6,630.00
CAL 0 BULTOS $0.00
ALAMBRON 570 KG $23.00 $13,110.00
ALAMBRE 145 KG $27.00 $3,915.00
VARILLA 96 PZA $114.00 $10,944.00
BLOCK 3130 PZA $11.00 $34,430.00
POLVO FINO 16 SACO $41.00 $656.00
TOTAL* $157,415.00
*PRECIO DE CHETUMAL
DESGLOSE
MANO DE OBRA $ 220,250.00
MATERIAL
TÚ GANANCIA DEL 50% $ 204,639.50
DE SOBRE LA MANO DE
OBRA $ 110,125.00
$ 535,014.50