0 evaluări0% au considerat acest document util (0 voturi)
276 vizualizări4 pagini
This document appears to be a pre-lift checklist used to ensure all safety protocols and requirements are met before conducting crane operations. It includes sections to confirm the qualifications of the crane operator and rigger, inspect the condition of the crane and lifting gear, verify the load characteristics, and check that the work area is properly prepared. Workers must check over 50 individual items and sign off to confirm all criteria are satisfied before granting approval to proceed with the lift.
This document appears to be a pre-lift checklist used to ensure all safety protocols and requirements are met before conducting crane operations. It includes sections to confirm the qualifications of the crane operator and rigger, inspect the condition of the crane and lifting gear, verify the load characteristics, and check that the work area is properly prepared. Workers must check over 50 individual items and sign off to confirm all criteria are satisfied before granting approval to proceed with the lift.
This document appears to be a pre-lift checklist used to ensure all safety protocols and requirements are met before conducting crane operations. It includes sections to confirm the qualifications of the crane operator and rigger, inspect the condition of the crane and lifting gear, verify the load characteristics, and check that the work area is properly prepared. Workers must check over 50 individual items and sign off to confirm all criteria are satisfied before granting approval to proceed with the lift.
The crane operator holds a current license and is competent in the use of this specific crane? مشغل الرافعة يحمل رخصة حالية وهو مؤهل في استخدام هذه الرافعة المحددة؟ The rigger holds a current license and is competent in required task? المساعد يحمل رخصة حالية وهو مختص في المهمة المطلوبة؟ Has the crane operator and the rigger discussed the task the Risk Assessment? هل ناقش مشغل الرافعة والجهاز المهمة واستعرضوا تقييم المخاطر؟ Will the crane operator have clear view of the load at all times during the lift? هل سيكون لدى مشغل الرافعة رؤية واضحة للحمل في جميع األوقات أثناء الرفع؟ The Crane Yes NO Corrective Actions /Comments Is the calibration certificate reviewed and ensure its validity? هل تم مراجعة شهادة المعايرة والتأكد من صالحيتها وصدورها من شركة حسنة السمعة؟ Has the safety of the exterior of the cab and safety of the glass been confirmed? هل تم التأكد من سالمة الجسم الخارجي لكابينة القيادة وسالمة الزجاج؟ Has the structure of the crane checked from any defects (cracks, rusts, glitches, deformations)? Has the hydraulic and pneumatic system been checked and there is no leakage of oils ? Has the safety brakes of the lifting rotator been confirmed? Has all indicators of the Crane (torque limiter, boom length, lifting angle, wind speed, ground distance, etc.) checked ? Is the motor Checked (fluid level (oil, water))? Has the pre -start and post start operational checks been completed? هل تم االنتهاء من عمليات الفحص التشغيلي قبل البدء ؟ Has the safety of all meters and indicators been confirmed, in addition to the warning indicator for any malfunctions in the motor? Are the lights, signals, and electrical connections detected? Has the tires been detected free from any defects (pressure, odor, and cutting)? Has the main brake and land break Checked? Has all crane mirrors checked? Is there a valid and safe fire extinguisher (the extinguisher is not less than 6 kg)? Has the warning signs used in the lifting process provided? Has all individuals wearing personal protective equipment Have the ground conditions been determined to be adequate? هل تم تحديد ظروف األرض لتكون مناسبة؟ Is the crane set-up with outriggers fully deployed and supported on the correct crane mats? هل تم ثتبيت الرافعة باستخدام ركائز الرفع ووضعها على قواعد صحيحة للرافعة؟ Is the lift within the specific limits of the relevant load charts for the weight and radius? هل الرفع ضمن الحدود المحددة لمخططات التحميل ذات الصلة للوزن ونصف القطر؟ The Lifting Gear Yes NO Corrective Actions /Comments Has all lifting equipment been tested and tagged? Are the tags all in date? ادوات الرفع ووضع عالمات/هل تم اختبار جميع معدات عليها؟ هل العالمات جميعها في التاريخ؟ Have the slings, shackles, Hooks, etc. been checked for the load applied? سالسل الرفع واالقفال والخطافات/هل تم فحص حبال وما إلى ذلك لمعرفة ما إذا كان الحمل مطبقًا؟ Have the angles and rigging method been considered in checking the lifting capacity? هل تم أخذ الزوايا وطريقة الحمل في االعتبار عند فحص قدرة الرفع؟ Are the slings protected from any sharp edges? سالسل الرفع محمية من أي حواف حادة؟/ هل حبال If using a man cage, have all components been inspected? هل تم فحص جميع، في حالة استخدام قفص الرجل المكونات؟ The Load Yes NO Corrective Actions /Comments Has an appropriate load chart for crane present and used? هل يوجد مخطط احمال للونش ويتم استخدامه ؟ Is the over-all lifting weight known? Have all items to be lifted been included? هل الوزن الكلي للرفع معروف؟ هل تم إدراج جميع العناصر المراد رفعها؟ Is the load free of loose unsecured items, Inc. restraints? هل الحمل خالي من العناصر الغير محكمه او له تفاصيل غير منتظمة ؟ Working Area & Environment Yes NO Corrective Actions /Comments Is the wind speed within the safe limits? هل سرعة الرياح ضمن الحدود اآلمنة؟ Is there sufficient light to conduct lift? هل هناك ضوء كاف إلجراء الرفع؟ Has an inspection of work area for underground services been conducted? هل تم إجراء تفتيش على منطقة العمل للخدمات تحت األرض؟ Has proper barricading been installed within the lift zone and slewing area? هل تم تركيب الحواجز المناسبة داخل منطقة الرفع ومنطقة الدوران؟ Is the work area clear of power lines by a ?minimum of 10m هل منطقة العمل خالية من خطوط الطاقة بحد أدنى 10 أمتار؟ Has the weather been assessed for the ?duration of the lift, including lightning هل تم تقييم الطقس خالل عملية الرفع ،بما في ذلك البرق؟