Sunteți pe pagina 1din 1

MultiBooster | 6 MW for Increase production. Now.

Maximized Production
TechnipFMC delivers subsea boosting solutions that improve return on investment,
Qualified subsea boosting solution
250 bar pressure increase at 60% GVF achieve recovery faster and enhance production that is reliable, sustainable
Enabler for deeper water and longer tie-backs and economical through the life of the field.

TechnipFMC.com

AkerSol_OSmaps_1903 1 2/18/19 10:58 AM Intecsea_OSmaps_1903 1 2/20/19 11:58 AM Technip_OSmaps_1903 1 2/18/19 10:56 AM

2019 WORLDWIDE SURVEY


SUBSEA SEPARATION SYSTEM TYPES: Fig. 2: TechnipFMC Conceptual SS Gas/Liquid Fig. 4: Saipem Multipipe Fig. 5: Aker Solutions subsea oil/water SUBSEA SEAWATER TREATMENT AND INJECTION SUBSEA BOOSTING PUMP TYPES GRAPH 1 – GVF vs. DIFFERENTIAL PRESSURE - OPERATIONAL AND CONCEPTUAL CAPABILITIES GRAPH 2 – DIFFERENTIAL PRESSURE vs. THROUGHPUT - SUBSEA PUMP CAPABILITIES
BOOSTING SYSTEM EXAMPLES (CONCEPTUAL & DELIVERED) Fig. 5: Saipem/Curtis Wright
Injection Pump
Separation & Boosting System for Pazflor (Prototype Tested 2-phase separation and injection, featuring 1st and
Gas/liquid Separation and 2nd stage separation, oil boosting and water Fig. 1: Aker Solutions’ Fig. 2: Conceptual Illustration Fig. 3: Subsea water injection 350 350 Fig.1: Installation of the Fig. 2: OneSubsea’s Pump Fig. 3: OneSubsea’s Helico- Fig. 4: OneSubsea’s Centrifugal Pump
1. GRAVITY SEPARATION SYSTEMS TABLE 2 – PUMP TYPES & APPLICATIONS COURTESY OF 5,100 5,100

Differential Pressure (Bar or psi)


OF SUBSEA PROCESSING
Boosting System) injection pumps OneSubsea Pump Module Station with Pump Unit and Axial Pump Module for the Module with handling tool during SIT

Differential Pressure (Bar or psi)


Fig. 3: GE Subsea Separation and Produced Water LiquidBooster™ Subsea Raw of Installation of Tyrihans integrated solution - Aker
Seawater Injection (SRSWI) SRSWI System Solutions LiquidBooster™ 300 SPP - Single Phase Pump 300 SPP - Single Phase Pump into Pump Station during Mixer for CNR’s Lyell project Total GirRi project for the Exxon Julia project
Fig. 1: TechnipFMC Subsea Separation System for the Tordis Project. Reinjection System for Troll C TYPE NORM. CONFIG. APPLICABILITY FOR SUBSEA BOOSTING 4,400 SPP (Centrifugal) TSP - Twin Screw Pump
System for Statoil Tyrihans and NOV 4,400 MPP - Multi-Phase Pump SIT for Exxon Julia
H H ighest differential pressure capability among pump types 250 WGC - Wet Gas Compression SPP ESP - Electrical Submersible Pump
CENTRIFUGAL HORIZONTAL 250
H H andles low Gas Volume Fraction (GVF) < 15% at suction DGC - Dry Gas Compression
STATUS OF COMPLEMENTARY TECHNOLOGIES AND SYSTEMS
(SINGLE PHASE) OR VERTICAL 3,625 3,625
conditions Helico-Axial
H C ombination of helico-axial and centrifugal impeller stages 200 200
2,900

MA RC H 2 0 19
H P rimarily used downstream of separator or in low GOR 2,900
HYBRID VERTICAL
applications where GVF is consistently < 30% at suction 150 Hybrid 150
conditions 2,175 2,175
H Widely deployed technology used for boosting individual 100 TSP Courtesy of Saipem/ Curtiss Wright
100
Prepared By: John Morgan, Lee Thomas, Terry Wood, Matai Wilson, MUDLINE ESP
HORIZONTAL
OR VERTICAL
wells, caissons, flowline risers, and mudline horizontal
boosting applications
1,450 1,450
ESP MPP Courtesy of OneSubsea
Sriram Subramanian, Mac McKee, and Rebecca Roth of INTECSEA, Courtesy of Aker Solutions Courtesy of Aker Solutions NOV and Aker Solutions H Tested for conditions up to 70% GVF
725
50 50
725
Courtesy of OneSubsea Courtesy of OneSubsea
Fig. 9: TechnipFMC MPP
Fig. 10: Seafloor Boosting
Using ESP in Caisson
H A pplicable for higher GVF boosting applications; Capable of
E. Kurt Albaugh, Consulting Engineer & Volunteer Poster Editor, Courtesy of BHGE, a GE company Courtesy of Aker Solutions Fig. 4 & 5: Saipem-Veolia-Total Subsea Fig. 6: NOV’s Seabox™ subsea water treat- HELICO-AXIAL
VERTICAL
operating at 0-95% GVF at suction conditions 0 bar
WGC DGC
0 bar Courtesy of OneSubsea
Fig. 7: GE Boosting Station Fig. 8: OneSubsea’s Pump Modules for
Total GirRi and Shell Draugen prior to SIT
for BC-10
Courtesy of Saipem Sulphate Removal Prototype - deep water ment module for disinfection and particle (MULTIPHASE) HM ost common subsea multiphase pump type 0 psi 0 psi
and David Davis of Offshore Magazine tested at Alima FPU in Congo; whole system settlement for optimizing water injection. HM oderate particulate tolerance
0 10 20 30 40 50 60 70 80 90 100 0 m3/Day 66
0 MBLPD 0.42
133
0.84
199
1.25
264
1.66
331
2.08
397
2.50
464
2.92
530
3.33
596
3.75
662
4.16 Fig. 6: TechnipFMC
industrialization is ongoing; unit capable of % GVF LIQUID GAS
Poster Assembled By: Chris Jones of Xenon Group, Inc. Courtesy of TechnipFMC Fig. 7: Saipem SpoolSep (Laboratory Tested 3-phase
treating and injecting up to 80 kbwpd TWIN SCREW HORIZONTAL
H G ood for handling high GVF - up to 98% GVF at suction
conditions
Throughput (m3/Day or MBLPD) SS Multiphase Pumping
Separation and Produced Water Reinjection System) Notes: 1. For pump applications, the term differential pressure is used. However, for Module with Sulzer Pump
E-Mail Comments, Correction or Additions to: ssp@intecsea.com Fig. 6: Aker Solutions’ Hi-Sep, a robust and flex-
Fig. 8: NOV Produced Water Separator – meeting (MULTIPHASE) OR VERTICAL H P referred technology for high viscosity fluids. Less efficient compressor applications the term pressure ratio is used. 2. Curves are approximate and COURTESY OF
Notes: Curves are approximate and assume a specific liquid throughput, identical for each
COURTESY OF
strict reservoir injection or discharge requirements at lower viscosities. assume a specific liquid throughput, identical for each pump type. pump type. Values are given on a “per pump” basis.
For Archived SS Processing Posters: http://www.offshore-mag.com/maps-posters.html Courtesy of TechnipFMC ible solution for CO2 separation and re-injection by gravity based produced water cleaning
For Educational Videos on SS Processing:  http://www.offshore-mag.com/learning-center.html HORIZONTAL SEPARATOR - This type is more efficient for oil/water separation. An example is the horizontal VERTICAL ESP PUMPS SINGLE PHASE PUMPS (CENTRIFUGAL) HYBRID PUMPS MULTIPHASE PUMPS TWIN SCREW PUMPS
separator for the Tordis Project shown in Fig. 1 above. HORIZONTAL/MUDLINE ESP SYSTEM EXAMPLES Courtesy of GE
(For GVF < 70%) (For GVF < 15%) (For GVF < 30%) (HELICO-AXIAL/ROTODYNAMIC) (For GVF < 95%) (For GVF < 98%) Courtesy of OneSubsea Courtesy of TechnipFMC
VERTICAL SEPARATOR – This type is more efficient for gas/liquid separation. The liquid keeps a fluid blanket on Fig. 11: Jack & St. Malo Pump
Fig. 1: Diagram of Vertically Fig. 2: Horizontal ESP Boosting Station Fig. 4: Vertically Configured Fig. 5: Vertically Configured Fig. 6: Vertically Configured Fig. 7: Vertically Configured Fig. 8: Vertically Configured Fig. 9: Vertically Configured Fig. 10: Twin Screw Pump Cross
the pump and reduces potential pump cavitation. An example is the Pazflor vertical separator shown in Fig. 2. Stations in the Factory Pit for SIT Fig. 12: OneSubsea’s SIT Testing of Fig. 13: Aker Solutions
Configured Gas Handling ESP Centrifugal Single Phase Centrifugal Single Phase Hybrid Pump & Motor Hybrid Pump & Motor Helico-Axial Pump & Motor Semi-Axial Pump Section Diagram Total MoHo Subsea Boosting System MultiBooster™ System -
in a Seabed Caisson Pump & Motor Diagram Pump & Motor Diagram Diagram Diagram Diagram Pump & Motor Diagram
Courtesy of Saipem Courtesy of NOV Dual Pump Station
2. CAISSON SEPARATION Fig. 10: Caisson Separation/ Fig. 11: TechnipFMC
ESP Boosting System Vertical Access Caisson Fig. 8: NOV’s
M A G A Z I N E SYSTEMS INSTALLED with ESP Boosting Courtesy of Aker Solutions Courtesy of Saipem Courtesy of NOV Fig. 7: BHGE conceptual SWIT™ subsea Courtesy of Aker Solutions
Subsea Sulphate Removal water treatment
< 100m INTO SEABED (Gas/ Liquid Separation &
Boosting System) and Injection System, built on technology for Fig. 14: Åsgard Single

INTECSEA, Inc. Offshore Magazine 3. COMPACT/DYNAMIC SEPARATION SYSTEMS Fig. 15: ExxonMobil’s SS Compact Separation,
a combination of ultra-and tailored water Phase Pump
nano-filtration technologies, quality at seabed
Courtesy of Sulzer/
575 North Dairy Ashford St 1455 West Loop South, Suite 400 Fig. 12: OneSubsea Conceptual Fig. 13: OneSubsea Conceptual Fig. 14: TechnipFMC 3-Phase Separation Boosting, and Produced WI System Using scalable to any capacity for IOR / EOR. TechnipFMC
Two-Phase Separation System Three-Phase Separation System System with Produced WI Using In-Line Multiple Technologies for 3-Phase Separation Courtesy of NOV Courtesy of OneSubsea
Houston, TX 77079 USA Houston, TX 77027 USA Separation Technology for the Marlim Project plus Sand Fig. 15: BHGE Pump Rack Courtesy of OneSubsea
Fig. 9: Centrifugal Subsea Submersible Fig. 16: TechnipFMC
Tel: 281-987-0800 Tel: 713-621-9720 Pump (BCSS)
Fig. 10: OneSubsea’s Test- Courtesy of Leistritz
Centrifugal Pump Station Fig. 17: Loadout of the
Courtesy of Aker Solutions
ing of the Albacora Raw Courtesy of TechnipFMC
www.intecsea.com www.offshore-mag.com Seawater Injection System Fig.11: BHGE Modular Compact Pump with Multiphase Pump OneSubsea Pump Station for Fig. 18: OneSubsea – Loadout of 1 of 6,
the Total CLOV Project 2.3MW Hybrid Pumps for Pazflor
during SIT of Pump and Fig. 3: POWERJump Boosting System Cross Section
Filtration System
ACKNOWLEDGEMENT OF THE CONTRIBUTORS
INTECSEA and Offshore Magazine wish to acknowledge the following companies and individuals who continue to support our efforts to educate and
inform the oil & gas industry on the status of subsea processing technologies and systems: Courtesy of Aker Solutions
Courtesy of BHGE, a GE company
ABB: Rita-Wei Fu, Tor-Eivind Moen; ABS: Smarty John, Jessie Lin, Meng-Lung Liu, Hao Song; Aker Solutions: Marco Gabelloni, Jonah Margulis, Kate Winterton; Equinor: Ole Økland; Fig. 22: FSubsea's
FSubsea: Alexander Fuglesang; Baker Hughes, a GE company: Alisdair McDonald; ITP InterPipe: Géraldine Salque, Wayne Grobbelaar; ITT Bornemann: Stefan Ladig; Leistritz: George Courtesy of Schlumberger Omnirise Pump - Barrier
Tarry; MAN Diesel & Turbo: Roberto Rubichi, Domingo Fernandez, Claudine Bargetzi; Nexans: Angéline Afanoukoe; NOV: Grace Bull, Eirik Dirdal, Wouter Van Korven; OneSubsea: Thomas Fig. 9: OneSubsea Raw Seawater fluid less & integrated
Kajander, Phillip Luce, Grant Harris, Lisa Ann Hofmann; Saipem: Alessandro Radicioni, Stephanie Abrand, Chiesa Giovanni, Casotto Marco, Astrid Engesland; Schneider Electric: Kristina Hakala; Courtesy of TechnipFMC Courtesy of OneSubsea Courtesy of OneSubsea
Injection System being installed ESPs can be installed in a caisson VSD function (1.5 MW,
Shell: Chris Shaw; Siemens: Richard Barratt, Kim Smith; Subsea 7: Michael Firmian, Guy Mencarelli, Sigbjorn Daasvatn, Martin Goodlad; Sulzer: Mika Tienhaara; TechnipFMC: Janardhan for Columbia E Field to gather and boost flow from Courtesy of BHGE, a GE 6600V SPP prototype)
Courtesy of Aker Solutions Courtesy of BHGE, a GE company Figs. 2 & 3: Courtesy of OneSubsea
Courtesy Courtesy of OneSubsea
of TechnipFMC CourtesyCourtesy
of OneSubsea
of ExxonMobil Courtesy of Aker Solutions company
Davalath; Teledyne: Justin Kretschmar; Voith: Thomas Taeuber Courtesy of OneSubsea Courtesy of OneSubsea multiple wells. Courtesy of Aker Solutions Courtesy of OneSubsea Courtesy of Aker Solutions Courtesy of OneSubsea Courtesy of Aker Solutions Courtesy of OneSubsea Courtesy of Aker Solutions Courtesy of BHGE, a GE company Courtesy of TechnipFMC Courtesy of OneSubsea Courtesy of OneSubsea

Fig. 19: Seafloor Boosting System Using Fig. 20: Aker Solutions Fig. 21: BHGE Modular Compact
POSTER COLOR CODE KEY INDUSTRY GUIDELINES FOR SUBSEA PROCESSING – EXISTING & PENDING TABLE 1 – 2019 WORLDWIDE SURVEY OF SUBSEA GAS COMPRESSION & PROCESSING , BOOSTING, WATER INJECTION AND SEPARATIONS (AS OF FEB., 2019), See Notes: (1) & (2) COURTESY OF SUBSEA BOOSTING PROJECT TRENDS ESPs in Caissons Pump Module Pump (MCP) Dual Booster Station
GRAPH 6: SUBSEA SHAFT POWER vs. TIME FOR SS BOOSTING SYSTEMS (As of Feb., 2019)
The poster is divided into distinct sections and 1. API 17X – API 17X is expected to have a re-ballot in 2019. Possible release in late 2019 or early 2020. 3.5

CURRENT STATUS
2. The DNV Subsea Processing Guideline is planned to be published in 2019. Moho Phase 1bis

TOTAL POWER
each section is marked by a background color. The GRAPH 3: TIEBACK DISTANCE vs. WATER DEPTH FOR SS BOOSTING SYSTEMS (As of Feb., 2019)

GAS VOLUME
PROCESSING

UNIT POWER
DISCIPLINE

FRACTION
color denotes the type of technology presented in 3. ABS Guide for Classification and Certification of Subsea Production Systems, Equipment and Components with new IN-SERVICE/OPERATING SS Pumps - Conceptual

DEMAND

(GVF) (5)
COUNT

FIELD OR PROJECT CURRENT OWNER/ REGION/ WATER TIEBACK SYSTEM FLOW RATE DIFFERENTIAL SYSTEM NO. OF PUMP TYPE or COMPRESSOR/PUMP 0 (ft) Jack &

Subsea Pump Shaft Power (MW)


SS Pumps - Awarded and in Julia
the section. This color code is carried throughout subsection on boosting systems, to be published in 2019. COMMENTS INFORMATION Prezioso 3.0 St. Malo

(3)

Shallow
0 (m) Brenda/Nicol
the poster. Below are the color code designations 4. ABS’s “Subsea Processing System Advisory”, Updated in August, 2018. Document can be downloaded as a PDF from: (Ordered by Start Date) FIELD OPERATOR BASINS DEPTH DISTANCE (@LINE CONDITIONS) PRESSURE PACKAGER PUMPS UNITS COMPR. TYPE MANUFACTURER Otter
Asgard Manufacturing or Delivered
(As of Mar. 1, 2019) Vigdis
Gulfaks
Greater Enfield
for each of the seven themes. https://ww2.eagle.org/content/dam/eagle/advisories-and-debriefs/sprs-advisory-2018.pdf. 1,640 (ft) SS Pumps - Operational
5. ABS Subsea Inspection, Maintenance and Repair Advisory, to be published in 2019. 500 (m) Vincent Topacio 2.5 Rosa/Girassol
Ceiba C3 & C4 Ceiba FFD
Full Wellstream Subsea Boosting CLOV Dalmation Vigdis
M3/Hr. (37) MBOPD START (12) END or Greater Enfield

Water Depth Feet/(m)


COMPANY Meters Feet Km Miles BAR (4) PSI (4) MW MW % OF VOL. COMPANY PUMPS or COMPR. TYPE COMPANY MTHS Barracuda
MBWPD (Month-Year) PRESENT 3,280 (ft)
Subsea Separation Parque Das
SUBSEA GAS PROCESSING TECHNOLOGIES 1 DEMO 2000 A Equinor K-Lab Test Equinor Offshore Norway 3.60 n/a OneSubsea Counter Axial OneSubsea 2001
1,000 (m)
Jubarte Jubarte Ph. 2
CLOV 2.0
Conchas MPP
Vincent Courtesy of BHGE, a GE company
Subsea Gas Compression
FOR LONG DISTANCE TIEBACKS 2 Ormen Lange Gas Compression Pilot A Testing 1 train @ Nyhamna, Norway Norske Shell Offshore Norway 10 33 0.0 0.0 25,000 3,776 60.0 870 12.50 58.00 n/a Aker Solutions 1 Centrifugal GE Compr/Aker Pump 2011 30-Aug-16 4,920 (ft)
Rosa/Girrasol
Courtesy of Aker Solutions Courtesy of BHGE, a GE company Courtesy of FSubsea
PROCESSING (36)

Golfinho BCSS
COMPRESSION &

3 Åsgard - Midgard & Mikkel Fields (7) O Subsea Gas Compression Equinor (18) Offshore Norway 300 984 40.0 25.0 20,000 3,021 50.0 725 11.50 24.40 n/a Aker Solutions (11) 2+1 Spare +1 Centrifugal MAN compr/Aker pump 6-Sep-15 1-Mar-19 41.7 1,500 (m) Golfinho Field Caissons Dalmation 1.5
Water Injection with Subsea Pumps
SUBSEA GAS

GRAPH 8 – TIEBACK DISTANCE VS. WATER DEPTH FOR SUBSEA GAS PROCESSING OPTIONS 4 Gullfaks South Brent (25) O Subsea Multi-Phase Gas Compression Equinor (18) Offshore Norway 135 443 15.5 9.7 9,600 1,450 30.0 435 5.00 10.00 95% OneSubsea (10) 2+1 Spare Counter Axial OneSubsea 15-Jul-17 1-Mar-19 19.5 Marlim
King Ceiba (FFD)
Subsea Active Heating 6,560 (ft)
0m ACTIVE HEATING SYSTEM TYPES For a list of worldwide Active Heating projects: www.offshore-mag.com/maps-posters.html

Deepwater
0 (ft)
5 Ormen Lange Gas Compression Phase 3 (28) C Subsea Gas Compression Norske Shell Offshore Norway 860 2,822 120.0 75.0 TBD TBD TBD TBD TBD n/a TBD 2 TBD TBD 2021 2,000 (m) 1.0
Power Transmission/Distribution and Controls PDG 6 Peon (35) P/H Subsea Gas Compression Equinor Offshore Norway 385 1,263 TBD TBD TBD TBD Parque Das Conchas Jack & St. Malo Julia TopacioField
500 TYPE 1A: Direct Electrical Heating (DEH) – Wet insulated rigid pipe with piggyback power cable
Water Depth m/(ft)

1,640
WGC 7 Snohvit C Subsea Gas Compression Equinor Barents Sea 345 1,132 143.0 89.4 TBD n/a TBD TBD 2020 8,200 (ft)
Miscellaneous Information/Combination of Technologies DGC DGC - Dry Gas Compression 2,500 (m) Cascade & Chinook
1,000 8 Åsgard Phase 2 C Subsea Gas Compression Equinor (18) Offshore Norway 300 984 40.0 25.0 12,000 60.0 11.50 24.40 n/a TBD 2+1 Spare +1 Centrifugal MAN compr/Aker pump 2021 0.5 Fig. 1: Aker Solutions DEH Cable & Attachment to Flowline
3,280 9 Jansz-Io Subsea Compression Project C Subsea Gas Compression Chevron W. Australia 1,350 4,429 143.0 89.4 Aker Solutions Centrifugal MAN compr/Aker pump Mid-2025 9,840 (ft)

US MMS Definitions:
Stones SS Boosting - Awarded and in Manufacturing/Delivered Montanazo & Lubina
1,500 10 Multiple Stranded Gas Fields C Pseudo Dry Gas System / OGTC (38) OGA / Various UK, North of Shetland 1,650 5,413 200 124 15,000 2,250 70-90 1,015-1,305 0.3/0.05 0.35 95% TBD 4 mini & (1main+1spare) Centrifugal SSP FSubsea TBD 3,000 (m) Fig. 2: Nexans Conceptual DEH Cable Cross-sections & Attachments

Ultra Deepwater
TABLE 3 – ACRONYMS & 4,920 SS Boosting or Compression - Operational 0.0
WGC - Wet Gas Compression 1 Prezioso A MPP at Base of Platform ENI Italy 50 164 0.0 0.0 65.0 10 40.0 580 0.15 30-90% Saipem 1 Twin-Screw Nuovo Pignone (9) 1994 1995 DEH riser cable
ABBREVIATIONS 2,000 11,480 (ft) 1995 2000 2005 2010 2015 2020
Present
2025
6,560 PDG - Pseudo Dry Gas 2 Draugen Field A Hydraulic Drive MPP (17) Norske Shell Offshore Norway 270 886 4.0 2.5 193.0 29 50.0 725 0.75 42% OneSubsea 1 + 1 Spare SMUBS, 1-MPP SPX ClydeUnion Nov-95 15-Nov-96 12.2 3,500 (m) 0 (mi) 5 10 15 20 25 30 35 40
AC Alternating Current 2,500 3 Lufeng 22/1 Field A Tieback to FPSO Equinor South China Sea 330 1,083 1.0 0.6 675.0 102 35.0 508 0.40 3% OneSubsea / TechnipFMC 5+2 Spare Centrifugal (SPP) OneSubsea Jan-98 15-Jul-09 138.0 0 (km) 3.1 6.2 9.3 12.4 15.5 18.6 21.7 24.9 Year
ASD Adjustable Speed Drive 8,200
4 Machar Field (ETAP Project) A Hydraulic Drive MPP BP UK North Sea 85 277 35.2 21.9 1,100.0 166 22.0 319 0.65 64% OneSubsea 2+1 Spare Helico-Axial OneSubsea Oil Subsea Tiebacks: Short Conventional Long Distance Tieback (LDT) COURTESY OF
Armored
BCSS Centrifugal Subsea Submersible Pumps 3,000
9,840 5 Topacio Field O 1 x Dual MPP System ExxonMobil Equatorial Guinea 550 1,805 8.0 5.0 940.0 142 35.0 508 0.86 75% OneSubsea 2+1 Spare Helico-Axial OneSubsea Aug-00 1-Mar-19 197.1 Gas Subsea Tiebacks: Short Conventional Long Distance Tieback (LDT)
DEH riser cable feeder cable
BPD Barrels per Day 0 (km) 100 125 150 175 200 (for heating one or
0 (mi) 62.1 (mi) 77.7 (mi) 93.2 (mi) 108.7 (mi) 124.3 (mi) 6 Ceiba C3 + C4 O Phase 1 SS MPP Project Triton Energy (HESS) Equatorial Guinea 750 2,461 7.0 4.3 600.0 91 45.0 653 0.85 75% OneSubsea 2+1 Spare Helico-Axial OneSubsea Oct-02 1-Mar-19 171.1
BOPD Barrels of Oil per Day Tieback Distance Miles/(km) GRAPH 7: WATER DEPTH vs. INSTALLATION YEAR FOR SS BOOSTING SYSTEMS (As of Feb., 2019) Feeder cable two segments) Piggyback
BWPD Barrels of Water per Day Tieback Distance km/(miles) COURTESY OF 7 Jubarte EWT A Riser lift to Seillean drillship Petrobras Espirito Santo Basin 1,400 4,593 1.4 0.9 145.0 22 140.0 2,000 0.70 22% TechnipFMC 1 ESP Schlumberger (REDA) Dec-02 1-Dec-06 47.9
0 (ft) Gulfaks cable
8 Ceiba Field (FFD) O Full Field Development (FFD) Triton Energy (HESS) Equatorial Guinea 700 2,297 14.5 9.0 2,500.0 378 40.0 580 1.20 75% OneSubsea 6+ 2 Spare Helico-Axial OneSubsea Dec-03 1-Mar-19 157.1 Prezioso

Shallow
COURTESY OF 0 (m) Mutineer/Exeter Brenda/Nicole Asgard Otter
CAPEX Capital Expenditure Draugen
DC Direct Current
9 Mutineer / Exeter O 2 x Single MPP Systems Santos NW Shelf, Australia 145 476 7.0 4.3 1,200.0 181 30.0 435 1.10 0-40% OneSubsea 2 MPP Helico-Axial OneSubsea (16) Mar-05 1-Mar-19 142.1 Schiehallion Vigdis Junction box
GRAPH 9 – GVF VS. DIFFERENTIAL PRESSURE FOR SUBSEA GAS PROCESSING OPTIONS 10 Lyell (Original Install) A SS Tieback to Ninian South CNR UK North Sea 146 479 15.0 9.3 1,100.0 166 18.0 261 1.60 40-70% Aker Solutions 1 Twin Screw Bornemann SMPC 9 Jan-06 Dec-06 11.0 1,640 (ft) Lufeng 22-1 Topacio
Ceiba FFD
Vincent Piggyback cable
DEH Direct Electrical Heating 120 500 (m)
GRAPH 4: TIEBACK DISTANCE vs. TIME FOR SS BOOSTING SYSTEMS (As of Feb., 2019)
Differential Pressure (Bar)

11 Navajo I, N ESP in Flowline Riser Anadarko US GOM 1,110 3,642 7.2 4.5 24.0 4 40.2 583 0.75 57% Baker Hughes 1 ESP Baker Hughes Feb-07 1-Aug-07 5.5 Greater Enfield
DGC Dry Gas Compression Ceiba C3 & C4

Water Depth Feet/(m)


PDG Barracuda Who Dat
EFL Electrical Flying Lead 12 Jubarte Field - Phase 1 A Seabed ESP-MOBO, Uses BCSS (14) Petrobras Espirito Santo Basin 1,350 4,429 4.0 2.5 120.0 18 138.0 2,002 0.90 10-40% TechnipFMC 1 ESP Schlumberger (REDA) Mar-07 Aug-07 5.0 3,280 (ft)
100 WGC 40 1,000 (m) Jubarte Ph. 2
EHTF Electrical Heat Traced Flowline 13 Brenda & Nicol Fields O MultiManifold with 1 MPP Premier Oil UK North Sea 145 476 8.5 5.3 800.0 121 19.0 276 1.10 75% OneSubsea 1+1 Spare Helico-Axial OneSubsea Apr-07 1-Mar-19 117.1 24.9 Rosa/Girrasol
DGC PDG - Pseudo Dry Gas SS Pumps / Compression - Conceptual Dalmation
Jubarte Golfhino Jansz-Lo
King (8)
(NOTE 1. SEABED & RISER ONLY, NOTE 2. EXCLUDES DOWNHOLE ESPs)

ESP Electrical Submersible Pump 80 14 A SS Tieback to Marlin TLP Anadarko US GOM 1,700 5,578 29.0 18.0 496.5 75 50.0 725 1.30 0-95% Aker Solutions 2+1 Spare Twin-Screw ITT Bornemann / Loher Nov-07 15-Feb-09 15.0 4,920 (ft)

(LDT)

(LDT)
35 SS Pumps / Compression - Awarded and in
ETH Electrical Trace Heating 15 Vincent O Dual MPP System Woodside NW Shelf, Australia 475 1,558 3.0 1.9 2,400.0 363 42.0 609 1.80 25-70% OneSubsea 2+2 Spare Helico-Axial OneSubsea Aug-10 1-Mar-19 77.1 21.7 Manufacturing/Delivered 1,500 (m) Dalmation Courtesy of Aker Solutions Courtesy of Nexans
Marlim
FFD Full Field Development 60 16 Marlim A SBMS-500 SS Field Test Petrobras Campos Basin 1,900 6,234 3.1 1.9 500.0 75 60.0 870 1.20 0-100% Curtiss-Wright 1 Twin-Screw Leistritz SS Pumps / Compression - Operational Greater Enfield King Jack & St. Malo Jack & St. Malo MPP Fig. 3: Aker Solutions DEH Riser Cable
30 6,560 (ft)
FULL WELLSTREAM SUBSEA BOOSTING

Deepwater
FPS Floating Production System 17 Golfinho Field BCSS O Seabed ESP-MOBO, Uses BCSS (14) Petrobras Espirito Santo Basin 1,500 4,922 11.0 6.8 146.0 22 138.0 2,002 1.20 10-40% TechnipFMC (33) 2 ESP Schlumberger (REDA)(33) Dec-14 4-Jan-18 37.0 18.6 2,000 (m) Parque Das Conchas Ph. 1 Fig. 4: TYPE 1B: Pipe-In-Pipe DEH for Two Heated Segments/Flowlines

Tieback Distance
FPSO Floating, Production, Storage & Offloading 40 Julia Parque Das Conchas Ph. 2
18 Azurite Field A Dual MPP System Murphy Oil Congo, W. Africa 1,338 4,390 3.0 1.9 350.0 53 41.0 595 0.85 28% OneSubsea 2+1 Spare Helico-Axial OneSubsea Sep-10 1-Oct-13 36.5 Parque Das Conchas
FPU Floating Production Unit DGC - Dry Gas Compression 25 8,200 (ft) Julia MPP Repl. Topside Power

20 19 Golfinho Field Caissons O MOBO BCSS (ESP) Caissons (14) Petrobras Espirito Santo Basin 1,500 4,922 5.0 3.1 146.0 22 138.0 2,002 1.20 10-40% Aker Solutions 2 ESP Schlumberger (REDA)(33) Dec-14 4-Jan-18 36.1 15.5 Otter
Cascade & Chinook
Supply

Conventional
GLR Gas Liquid Ratio Jack & St. Malo 2,500 (m)
WGC - Wet Gas Compression 20 Espadarte (Field Trial) A Horizontal ESP on Skid Petrobras Brazil 1,350 4,429 11.5 7.1 125.0 19 100.0 1,450 0.90 10-40% TechnipFMC 2 ESP Baker Hughes Dec-11 Mar-13 14.5 DEH Cable
GVF Gas Volume Fraction 20 Rosa/Girassol
Wetmate power
0 21 Parque Das Conchas (BC 10) Phase 1 (20) O Caisson / Artifical Non-Separated Shell Campos Basin 2,150 7,054 9.0 5.6 185.0 28 152 2,205 1.10 40% TechnipFMC 2 ESP Baker Hughes Jul-09 1-Mar-19 115.3 12.4 9,840 (ft) Subsea Compression
Current in outer

US MMS Definitions:
connectors
HPHT High Pressure/High Temperature Stones pipe
80 85 90 95 100 22 Parque Das Conchas (BC-10) Phase 2 O 2 additional ESP systems Shell Campos Basin 2,150 7,054 9.0 5.6 185.0 28 152 2,205 1.10 40% TechnipFMC 2 ESP Baker Hughes Oct-13 1-Mar-19 64.4 Ceiba Field(FFD) 3,000 (m) Subsea Pumps

Ultra Deepwater
HSP Hydraulic Submersible Pump 15
HV High Voltage
GVF (%) COURTESY OF 23 Parque Das Conchas (BC-10) MPP Repl. O Replacement MPP system Shell Campos Basin 2,150 7,054 9.0 5.6 185.0 28 1.50 70% TechnipFMC 1 Helico-Axial TechnipFMC Dec-18 1-Mar-19 2.5 9.3 11,480 (ft) Current in inner
pipe
Outer Pipe
24 Jubarte Field - Phase 2 O Tieback to FPSO P-57, Uses BCSS (14) (22) Petrobras Espirito Santo Basin 1,400 4,593 8.0 5.0 1,325.0 200 200 3,000 1.20 30-40% Aker Solutions 15 ESP Schlumberger (REDA) 6-Dec-10 1-Mar-19 98.6 Parque Das Conchas 3,500 (m) Present Insulation
IPB Integrated Production Bundle 10 1990 1995 2000 2005 2010 2015 2020 2025

Short Conventional
IOR Improved (Increased) Oil Recovery Fig. 1: Pseudo Dry Gas (PDG) Inline Liquid Removal Unit. 25 Cascade & Chinook I, N Skid BCSS - Horizontal ESP on Skid (6) Petrobras US GOM 2,484 8,150 8.0 5.0 135.0 20 220.0 3,191 1.10 10% TechnipFMC 4+2 Spare ESP Baker Hughes 14-Jul-12 Unkown 6.2
Inner pipe
26 Barracuda O SS MP High Boost Pump System (30) Petrobras Campos Basin 1,040 3,412 10.5 6.5 280.0 42 70.0 1,015 1.50 35-60% OneSubsea 1 Helico-Axial OneSubsea 14-Jul-12 1-Mar-19 79.4 Vigdis
kW Kilowatt

Short
Km Kilometer
COURTESY OF
27 Montanazo & Lubina O Single MPP System Repsol Mediterranean 740 2,428 12.3 7.6 80.0 12 65.0 943 0.23 10% OneSubsea 1 + 1 Spare Centrifugal (SPP) OneSubsea 15-Jan-14 1-Mar-19 61.3
5
3.1 Stones
Year COURTESY OF
Conducting Bulkhead
Mid-Line Assembly (MLA) CROSS SECTION
Conducting Bulkhead
MBLPD Thousand Barrels of Liquid Per Day 28 Schiehallion I, N 2 x Dual MPP Systems BP UK, West of Shetland 400 1,312 4.0 2.5 2,700.0 408 26.0 377 1.80 74% GE / OneSubsea 4+0 Spare Helico-Axial OneSubsea
0 (mi) Courtesy of Aker Solutions
Courtesy of INTECSEA
29 CLOV (19) O Subsea MPP System Total Angola, Blk 17 1,170 3,839 11.0 6.8 660.0 100 45.0 652 2.30 50% OneSubsea 2+1 Spare Helico-Axial OneSubsea 31-Jul-16 1-Mar-19 30.9
MCP Modular Compact Pump 0 (km)
“GAME CHANGING” SUBSEA BOOSTING TECHNOLOGY

Gas Subsea Tiebacks:


Oil Subsea Tiebacks:
1995 2000 2005 2010 2015 2020 2025
MPP Multiphase Pump 30 Jack & St. Malo O 3 x Single SPP Systems (JSM) Chevron US GOM 2,134 7,000 21.0 13.0 1,191.0 180 241.3 3,500 3.00 10% OneSubsea 3+2 Spare Centrifugal (SPP) OneSubsea 10-May-16 1-Mar-19 33.6 Present
MW Mega Watts 31 Lyell Retrofit O MPP Retrofit System - Tieback to Ninian CNR UK North Sea 145 476 7.0 4.3 700.0 106 21.0 305 1.00 97% OneSubsea 1 Helico-Axial OneSubsea 21-Aug-14 1-Mar-19 54.2 Year Fig. 1: Torque Converter Function – Variable Guide Vane Fig. 5: FSubsea Pump Assembly with TYPE 2: Electrical Trace Heating (ETH) - Pipe-in-Pipe
Voith Torque Converter Fig. 5: TechnipFMC Electrically Trace Heated Pipe-in-Pipe (ETH-PiP) Fig. 6: Subsea 7/ITP InterPipe Electrically Heat Traced Pipe-in-Pipe
OPEX Operational Expenditures 32 Rosa / Girassol (24) O Field Expansion Project Total Angola, Blk 17 1,350 4,429 18.0 11.2 600.0 91 130.0 1,885 2.50 20-50% OneSubsea 4+2 Spare Helico-Axial OneSubsea Q2 2015 1-Mar-19 Torque Converter Function
O/W Oil and Water 33 Draugen Field (Infill Program) O 2 x Dual MPP Station OKEA Offshore Norway 268 879 4.0 2.5 1,710.0 253 47.5 689 2.30 10-31% OneSubsea 2 Helico-Axial OneSubsea 24-Nov-16 1-Mar-19 27.1 Variable Guide Vanes Passive Insulation Specific insulation material with reduced
COURTESY OF Centralizer
PCM Power Control Module 34 Julia O SS Tieback with Dual SPP Systems ExxonMobil US GOM 2,287 7,500 27.2 17.0 331 50 175.0 2,550 3.00 10% OneSubsea 2 Centrifugal (SPP) OneSubsea 18-Apr-16 1-Mar-19 34.3 Guide Vanes Flowline pressure in PiP annulus
PDG Pseudo Dry Gas 35 Moho Phase 1bis O Brownfield Tieback to Alima FPU Total Congo, W. Africa 650 2,133 6.7 4.0 400 60 133.5 1,935 3.50 49% OneSubsea 2 Helico-Axial OneSubsea 2016 Heating Wires
PIP Pipe-in-Pipe 36 Stones O Single Phase HPHT Pump System Shell US GOM 2,927 9,600 5.0 3.1 TBD TBD TBD TBD TBD <10% OneSubsea 2 +1 Spare Centrifugal (SPP) OneSubsea 2018 GRAPH 5: SUBSEA BOOSTING – TOTAL THROUGHPUT vs. DIFFERENTIAL PRESSURE*
PWRI Produced Water Reinjection
37 Appomattox C MPP in future Phases Shell US GOM 2,222 7,290 TBD TBD 3,990 275
RWI Raw Water Injection (psi) (bar) Rotary Vane
38 Parque Das Baleias O Horizontal ESP on Skid Petrobras Espirito Santo Basin 1,500 4,922 10.0 6.2 125.0 19 140 2,058 1.20 10-25% TechnipFMC 5 +1 Spare ESP Schlumberger (REDA) 3/19/14 1-Mar-19 59.3 SS Pumps - Awarded and in
SIT System Integration Test 3,625 250 Jack & St. Malo Actuator Output Shaft
39 Greater Enfield O Dual MPP System Woodside W. Australia 850 2,788 32.0 20.0 959.0 145 110.0 1,595 2.60 5.20 81% OneSubsea 2+1 Spare Helico-Axial OneSubsea Mid-2019 (SPPs) Manufacturing or Delivered TC-Turbine Carrier Pipe
SMUBS Shell Multiphase Underwater Boost Station
40 Dalmatian O Single MPP System SS Tieback to Petronius Murphy E & P Co. US GOM 1,779 5,837 35.0 22.0 231.0 35 150.0 2,176 2.20 2.20 65% OneSubsea (34) 1+1 Spare Helico-Axial OneSubsea (34) Q4-2018 3,265 225 SS Pumps - Operational Trace Heating Cable
SPP Single Phase Pump Input Shaft Outer Pipe
41 Otter Field O MPP System SS Tieback to N. Cormorant Platform TAQA Bratani UK North Sea 184 603 22.0 13.7 853.0 129 48.0 696 2.00 2.00 75% OneSubea 1+1 Spare Helico-Axial OneSubsea Q4-2018 Centralizer
SRSWI Subsea Raw Seawater Injection

Differential Pressure
2,900 200 TC-Impeller Housing
SS Subsea Fig. 2: Field Architecture Locations of Pseudo Dry Gas (PDG) Inline Liquid Removal Units. 42 Vandumbu Field (36) O Dual MPP Pump Station ENI Angola Block 15/06 1,225 4,019 3.0 1.9 430.0 65 190 2,755 3.20 5.00 70% TechnipFMC 2+1 Spare Helico-Axial TechnipFMC 2-Dec-18 1-Mar-19 2.9 Julia (SPPs) Jubarte Field (Phase 2-ESPs) Protection Sheet
43 Vigdis M Subsea Boosting of existing wells OØK - Equinor Offshore Norway 292 958 6.5 4.1 1,500.0 50.0 725 3.20 3.20 20-40% OneSubsea 1+1 spare Helico-Axial OneSubsea Q2, 2019 Courtesy of TechnipFMC/Heat Trace Ltd Fiber Optic Cable
SSP Subsea Processing 2,540 175
COURTESY OF Inner pipe
SSPU Subsea Separation and Pumping Unit Subsea 44 Who Dat M Subsea Boosting LLOG US GOM - MC 503 943 3,094 5.6 3.5 370.0 25 151.7 2,200 2.20 2.60 50-76% TechnipFMC 1 Helico-Axial TechnipFMC Sep-19
Jack & St. Malo MPP 2,175 150
SUBSIS Subsea Separation and Injection System Manifold 45 M MPP for Stage IV Chevron US GOM 2,134 7,000 21.0 13.0 207.0 3,000 3.80 OneSubsea 3+2 Spare Helico-Axial OneSubsea 2020
Rosa/Girrassol (MPPs) Courtesy of Voith
Courtesy of Subsea 7/ITP InterPipe
Fig. 8
TLP Tension Leg Platform M1 46 Lufeng 22/1 Fields (37) C Subsea Boosting CNOOC Ltd. China, Lufeng Fields 1,815 125
1 How How
it‘s done!
it‘s done! How it‘s done! Figs. 7 & 8: Saipem Electrically Heated Pipe-in-Pipe - for
TSP Twin Screw Pump
A Liquid 1 Troll C Pilot (15) A SUBSIS (SS Sep. and WI Sys.) Equinor Offshore Norway 340 1,116 3.5 2.2 250.0 38 151.0 2,190 1.60 0% GE / OneSubsea 1+1 Spare Centrifugal (SPP) OneSubsea Aug-01 1-Mar-19 209.7 Greater Enfield VARIABLE
Conventional
Conventional FREQUENCY/SPEED
Subsea
Subsea
Variable
Variable
SpeedSpeed
Pump DRIVE
Pump
DriveDrive CONFIGUATIONS
Voith Subsea Variable Speed Pump Drive TYPE 3: Flexibles with active heating J-lay/S-lay installation; employs a sliding configuration
INJECTION

TRL Technology Readiness Level 2 Columba E. I, N Dual SPP System CNR Northern North Sea 145 476 7.0 4.3 331.0 50 305.0 4,424 2.30 0% OneSubsea 2+0 Spare Centrifugal (SPP) OneSubsea May-07 1-Oct-13 76.4 1,450 100
SUBSEA

Removal Unit Gas Flowline


WATER

Fig. 9: TechnipFMC Integrated Production Bundle


VASPS  Vertical Annular Separation and Pumping 3 Tyrihans A 3 SPP & SS RWI Filtration System Equinor Offshore Norway 270 886 31.0 19.3 583.0 88 205.0 2,973 2.70 0% FMC/Aker Solutions 2+1 Spare Centrifugal (SPP) Aker Solutions 12-Mar-13 1-Mar-19 71.5 VFD
SS Tree (XT) 1,090 75 (IPB) - Electrically Heat Traced Flexible
System
M2 2 3 4 Gas 4 Albacora L'Este Field (31) O Raw Water Injection to 7 Wells Petrobras Campos Basin, Brazil 400 1,312 4 to 9 2.5-6.0 1125 170 85 1,233 1.2 0% OneSubsea 3+1 Spare Centrifugal (SPP) OneSubsea 14-Mar-14 1-Mar-19 59.4 Draugen (MPPs) Vincent
VSD Variable Speed Drive 725 50 (MPPs)
Treatment 5 Ekofisk Seabox Pilot (R&D) (39) O Subsea Water Treatment, lifted topside for injection ConocoPhillips Offshore Norway 78 256 0.0 0.0 267 40 250 3,626 0% ConocoPhillips / NOV 1 Centrifugal (SPP) Halliburton 1-Oct-18 1-Sep-19 11.0 Ceiba Field
WD Water Depth B C D
Facility (FFD) (MPPs)
WGC Wet Gas Compression
1 Zakum A Shallow Water Test Separation System BP Offshore Abu Dhabi 24 79 1969 1972 36 360 25 Courtesy of FSubsea AS
Liquid Pipeline P1
2 Highlander Field (32) A SS Separator/Slug Catcher Repsol Sinopec (27) UK North Sea 420 1,378 Core of the IPB
WI Water Injection Booster Pump 0 0
3 Argyll A SS Sep. and Pumping Unit (SSPU) Hamilton Bros UK North Sea 80 262 BOET (See Table 3 Def.) 1989 M
SUBSEA SEPARATION

XFMR Transformer Tie-in point (MBLPD) 0 50 100 150 200 250 300 350 400 450 M
4 Marimba Field I, N VASPS Field Test (21) Petrobras Campos Basin 395 1,296 1.7 1.1 60.0 9 52.0 754 0.3 OneSubsea 1 ESP Schlumberger (REDA) Jul-01 1-Jul-08 83.0 M

(m³/hr) 0 330 660 995 1,325 1,655 1,990 2,320 2,650 2,980 Electrical heat
Note: Booster pump (P1) and single phase mini-pumps within each Liquid Removal Unit are proposed to be FSubsea Pumps with integrated 5 Troll C Pilot (15) A Horizontal SUBSIS (SS Sep. & WI Sys.) (23) Equinor Offshore Norway 340 1,116 3.5 2.2 250.0 38 151.0 2,190 1.60 0% GE / OneSubsea 1+1 Spare n/a OneSubsea Aug-01 1-Mar-19 209.7 seafloor seafloor VFD
Figures 2, 3, and 4 Courtesy of Voith trace cables
Voith Torque Converter. See Green Section titled: “Game Changing Subsea Boosting Technology”. 6 Tordis (13) O Separation, MPP Equinor Offshore Norway 210 689 11.0 6.8 1,500.0 227 27.0 392 2.30 10-68% TechnipFMC 1+1 Spare Helico-Axial OneSubsea Oct-07 1-Mar-19 136.2 *(As of Feb., 2019) Throughput
Information Accuracy: We have attempted to use COURTESY OF Fig. 2: Config. 1 Fig. 3: Config. 2 Fig. 4: Config. 3 – Variable Speed Pump Drive is incorporated
7 Parque Das Conchas (BC 10) Phase 1 O Separation Caisson / Artifical Lift Manifold Shell Campos Basin 2,150 7,054 25.0 15.6 185.0 28 152.0 2,205 1.10 15% TechnipFMC 4 ESP Baker Hughes Centrilift Aug-09 1-Mar-19 114.3 Gas lift tubes
correct and current, as of press time, information for the Fig. 3: Pseudo Dry Gas (PDG) Process Flow Diagram VFD on Topsides VFD on Seafloor with the pump assembly which sits on the Seafloor
subsea processing systems and equipment described
8 Perdido O Caisson Separation and Boosting (29) Shell US GOM 2,438 7,999 0.0 0.0 132-264 20 - 40 158.8 2,303 1.20 15% TechnipFMC 5 ESP Baker Hughes Centrilift Mar-10 1-Mar-19 84.0
herein. No installed, sanctioned, or pending application 9 Pazflor O 3 Gas/Liquid Vertical Separation System Total Angola, Blk 17 800 2,625 4.0 2.5 1,800.0 272 105.0 1,523 2.30 <16% TechnipFMC 6+2 Spare Hybrid H-A OneSubsea Aug-11 1-Mar-19 89.8 Thermal insulation
Courtesy of Saipem
Production Umbilical
was intentionally excluded. We have summarized the
capability and operating experience by acting as a neutral Multiphase XT
10 Marlim SSAO - Pilot O In-Line Separation Petrobras Campos Basin 878 2,881 3.8 2.4 135.0 20 245 3,553 1.9 67% TechnipFMC 1 Centrifugal (SPP) OneSubsea Mar-13 1-Mar-19 70.9 SUBSEA POWER CONNECTORS Fig. 3: Teledyne interconnect system: umbilical
terminations, HV wetmate flying leads, and
Fig. 4: Teledyne 10kV, 250A
Electrical Wetmate EFL,
SUBSEA POWER DISTRIBUTION Courtesy of TechnipFMC Courtesy of Saipem
XT 11 Parque Das Conchas (BC 10) Phase 2 M 2 additional ESP systems Shell Campos Basin 2,150 7,054 25.0 15.6 185.0 28 152.0 2,205 1.10 15% TechnipFMC 2 ESP Baker Hughes Centrilift
party and integrator of information. Information has
Gas
Liquid Removal
Unit Inline Skid
Flowline
12 Congro & Corvina (26) CP VASPS w/Horizontal ESP Petrobras Campos Basin 280 919 8.0 5.0 135.0 20 21 305 0.4 <10% TechnipFMC 1 ESP Baker Hughes Centrilift Fig. 1: GE MECON DM 145/700 Dry-Mate Fig. 2: Siemens ElecTRON - Subsea Instru- tubing hanger connections to power ESP’s for Subsea Boosting and EQUIPMENT
been collected from public sources, company brochures, Gas Flowline Processing
personal interviews, phone interviews, press releases, Treatment SS Manifold SUTA
CURRENT STATUS CATEGORIES NOTES: 1. Qualification Status Warning - The qualification status information shown in this achieved 50,000 operating hours with nearly 100% availability as of Dec. 2018. holes in the seabed, 200m from producing wells. MOBO - Modulo de Bombas and Argonauta B-West. Argonauta O-North to be added in Phase 2. Awarded to FMC 26. Congro & Corvina SS Separation/Boosting Project - This project has been canceled. January 2015. 1 of each still has a Baker Hughes ESP as of February 2015.
connectors mentation Feedthrough Connector System TYPE 4: Production Flow Continuous Heating TYPE 5: Hot Water
industry magazines, vendor-supplied information, and Facility table, and throughout the poster, are based on unverified claims from equipment 8. King Field MPP are off line. There are no indications that Anadarko will reactivate (Pumping Module). but installed by Subsea 7. Petrobras has determined commercially of the fields is not feasible. 34. Dalmatian will be the longest subsea tieback in the GOM with SS boosting (35 KMs / Fig. 1: 200 Km 30 MVA Power Station with 145kV Step-down trafoan switch- Heated
web sites. No guarantee is made that information is XT XT C Conceptual Project (Per Public Domain) suppliers and field operators. These qualification status designations are not these pumps in the near future. 15. T roll C Pilot: Abandoned and not in operation. Separation began on Aug. 25, 2001. 21. Marimba VASPS - 2000 - First installation in Marimba (JIP Petrobras / Eni-Agip/ 27. Repsol Sinopec - full Operator name is REPSOL SINOPEC RESOURCES UK LIMITED. 22 Miles). Murphy E & P has awarded the Subsea Integration Alliance (SIA) (OneSubsea gear-less subsea VSDs for up to 2x 12.5 MW Compressors Power Station with Fig. 10: Saipem Local Heating Station – Retrievable
accurate or all-inclusive. Neither INTECSEA nor Offshore necessarily derived using technology readiness level (TRL) assessments per API RP 9. Nuovo Pignone SpA is a subsidiary of GE (General Electric). See 2010 OTC paper 20619, page 10 for Operational experience. ExxonMobil, 2001 - Startup and Operation (July to Dec.) until ESP failure, 2002 End of Repsol acquired the field through the Talisman acquisition. + Subsea 7) an EPCIC contract for the subsea multi-phase boosting system. Fig. 11: Subsea 7 Pipeline Bundle
Mini Pump Q Qualified/Testing 17Q, DNV-RP-A203, or ABS Guidance Notes on Qualifying New Technologies. 10. Gullfaks - 2016 OTC Paper 27224 by OneSubsea provides an overview of the 16. M utineer/Exeter Projects: Manufacturers are: OneSubsea and Centrilift. There are 2 JIP, By-pass production, 2003 - Workover Plan (IWP), 2004 - Workover and Re-start 28. O rmen Lange Gas Compression 2 - Currently Norske Shell is working to simplify the 35. Peon Development - Statoil and partners placed the project on hold.
transformer, switchgear & VSDs for pumps and compressors up to 12.5MW
Magazine guarantees or assumes any responsibility Power <45 kW M Awarded and in Manufacturing or Delivered 2. 
Pumping & Boosting: The terms “Pumping” and “Boosting” are used interchangeably Technology Qualification Program (TQP) completed for Statoil’s Gullfaks Subsea ESPs per well feeding 1 x OneSubsea MPP per asset on seafloor. on May 8, 2004. From 2005 until 2008 VASPS operated well until well failure. design, remove unnecessary redundancy, module size, and weights by more than 50%. with multiple flowlines, controls,
Symbol Key 36. System Flow Rates - Gas flow rates not reported for Boosting or Separation.
or liability for any party’s (See Note 1.) throughout this poster and in the industry. Compression (GSC) project. 17. D raugen MPP - This was the world's first Multiphase Subsea Pump which was 22. Jubarte Field (Phase 2) - Phased installations from 2010 through 2015. Wells were 29. Peridido - Cassion for separation is 350 feet long drilled into the seabed. Read 2011 37. Lufeng Fields - Conceptual study for boosting on Lufeng Fields consist of: Lufeng & active heating inside a carrier
O Installed & Currently Operating
©2019 Offshore

Liquid Flowline 3. 


Unit Motor Power: Is the unit motor power for either a pump or compressor assembly. 11. Å  sgard Project: See 2016 OTC Paper # 27197 by Anders Storstenvik of Aker installed in 1993. It ran successfully from 1995 for 12 Months (1,000 hours) and was connected to the FPSO P-57. All wells will have gas-lift as a backup. OTC paper 21716.
POSTER
use of the information Pump
22-1, Lufeng 14-4/14-8/8-1, Lufeng 15-1. The study is being done by Aker Kvaerner pipe (heating using e.g. inhibited

134
4. 
Differential Pressure values are for individual boosting units. Solutions. decommissioned and abandoned due to change in water injection strategy. 23. SUBSIS - The world's longest operating subsea separation system and first subsea 30. Barracuda - is the first installation of the high boost MPP. See 2013 OTC paper
presented. If any information Liquid Removal Unit I,N Installed & Not Currently Operating or In-Active 5. 
GVF = Gas Volume Fraction at inlet of a boosting assembly. 12. S TART: Month & Year indicates first month and year of operation for the SS 18. E quinor (formerly Statoil) - See 2016 OTC Paper 27201 by by Rune Ramberg & water injection pump system. Abandoned and not in operation. 24217 for addition infomation about the MPP. for CNOOC Ltd.
is found to be incorrect, not Booster Pump 6. 
Cascade & Chinook - Utilizes horizontal ESPs on a skid above mudline. It is an processing system. other for Statoil’s research leading up to the Subsea Factory Compressor Stations. It 24. Rosa/Girassol development project includes the Rosa field with 4 SS boosting 31. Albacora Field - Reference 2013 OTC paper 24167. 38. UK Oil and Gas Technology Centre (OGTC) funded study with multiple operators and potable water, reinjected
XT Subsea Tree A Abandoned, Removed Oil and Gas Authority (OGA) for known basin with significant number of small to medium
current, or has been omitted, Power <300 kW alternative ESP boosting configuration to caisson in the seabed. This technology is 13. T ordis Field: SS Separation, 1+1 Spare Multiphase Boosting Pumps for production, highlights Statoil’s future vision. pumps. 1st set operational in Sept., 2015 & 2nd set operational in April, 2016. 32. Highlander Field - SS Tieback to the Tartan Field which has a SS separator/slug produced water)
CP Canceled Project designed to cover the low GVF and high DeltaP multiphase flow. Single phase pumps for produced water from subsea separator transported to 19. C LOV - Two (2) MPPs are on the sea floor since Dec. 2015. The seabed MP boosting 25. G  ullfaks South Brent - was shut down in Nov. 2015. The root cause has been identified catcher installed for the tie-in to the Tartan Platform. See papers: 1994 OTC #7438- stranded fields over large geographical area.
please send comments to COURTESY OF 7. 
Åsgard is the longest subsea tieback in the world with SS gas compression. MAN Gullfaks C for further processing. pumps will boost flow from 4 fields which are: Cravo, Lirio, Orquidea and Violeta. as “AC corrosion in the umbilicals that led to the leakage, ruling out any fault with the MS, 1987 SPE #13970-PA, 1987 SPE #16532-MS 39. Ekofisk Pilot - Seabox subsea water treatment. Water lifted topside for injection into
ssp@intecsea.com. Note 1: The liquid (condensate) flowline could be part of the umbilical if project specifics allow. P/H Postponed or On Hold Courtesy of Saipem Courtesy of Subsea 7
Energy Solutions’ first subsea compression trains at Equinor’s Åsgard field have 14. B  CSS - Centrifugal Subsea Submersible Pumps: Pumps are placed in protective 20. P arque Das Conchas (BC 10) Phase 1 - Composed of 3 reservoirs: Ostra, Abalone compressors” according to a Statoil spokesman. Gas compressors started in Aug., 2017. 33. Petrobras changed ESP supplier from Baker Hughes to Schlumberger (REDA) dry well. Reference 2019 OTC paper 29552.
Courtesy of BHGE, a GE company Fig. 2: Siemens Conceptual
Courtesy of Siemens Courtesy of Teledyne Subsea Power Grid*
SUBSEA GAS COMPRESSION SYSTEMS Fig. 3: SS Compression Station 2.0 concept
compared to Åsgard SS Compression
Fig. 5: Åsgard Subsea Compression Module
Fig. 6: Åsgard Compressor
module before starting
CHART 1 – SUBSEA SUPPLIER MATRIX (As of Feb., 2019) SUBSEA PROCESSING NOTES:
  1. A ker Solutions and MAN Diesel & Turbo have formed an Courtesy of Aker Solutions & ABB Alliance for
Fig. 3: Siemens SS Transformer
Prototype at Shallow Water Test*
Fig. 4: Siemens Conceptual
SS Variable Speed Drive*
Fig. 5: Siemens Conceptual
SS Switchgear*
Fig. 6: GE 24kV Switchgear
Prototype Tested in Shallow Water
alliance for the next generation of subsea compression Power & Automation
Fig. 1: Ormen Lange Compression Station Test Fig. 2: TechnipFMC Conceptual 2-Train Dry Gas installation systems. Fig. 4
Fig. 5: Siemens DigiTRON+ and Fig. 6: Siemens SpecTRON 45 - 45kV wet mate
Compression Station with Replaceable Modules SUBSEA
SUBSEA SEAWATER SUBSEA
SUBSEA GAS
SUBSEA PARTNERSHIPS /
HV & CONTROL
OTHER
TESTING
  2. Subsea seawater injection refers to only those projects
DigiTRON3 - 1kV and 3kV wet connectors for subsea power distribution Fig. 5
BOOSTING
TREATMENT & SEPARATION
COMPRESSION
ACTIVE ALLIANCES /
AC/DC POWER SYSTEMS
SUPPORTING
FACILITIES
utilizing a subsea pump to inject seawater and does Fig. 7: Åsgard 19 MVA Fig. 3
INJECTION (2) SYSTEMS HEATING (11) COLLABORATIONS SYSTEMS not include typical water injection using a pump on a mate controls connectors Subsea Transformer Module
topside facility. Courtesy of Teledyne
  3. Liestritz have partnered with Rosetti Marino for potential
PUMP ELECTRIC ASDS/VSDS, AKER SOLUTIONS AKER SOLUTIONS AKER SOLUTIONS twin screw marinization.
PUMP SUBSEA TORQUE COMPRESSION POWER HV
SYSTEM MOTOR AKER SOLUTIONS AKER SOLUTIONS (1) COMPRESSORS ABB Aker Solutions/ UMBILICALS X-FORMERS PENETRATORS akersolutions.com akersolutions.com akersolutions.com   4. Deutsch is part of TE Connectivity. Fig. 7: GE MECON WM 36/500
MANUFACTURERS CONVERTER SYSTEM ABB Alliance (14) CABLES CONNECTORS
PACKAGERS MANUFACTURERS akersolutions.com akersolutions.com abb.com & SWITCHGEAR   5. TechnipFMC and Sulzer have formed a long-term and
akersolutions.com
abb.com exclusive collaboration agreement. Wet-mate connectors
BAKER HUGHES ALPHA THAMES BAKER HUGHES
AKER SOLUTIONS AKER SOLUTIONS AKER SOLUTIONS VOITH (17) BAKER HUGHES BAKER HUGHES AKER SOLUTIONS (1) AKER SOLUTIONS ABB AKER SOLUTIONS AKER SOLUTIONS ABB (14) ALSTOM BENESTAD (7) a GE company alpha-thames.co.uk
a GE company   6. PROLAB is a Sulzer company.
Aker Solutions/
Courtesy of Aker Solutions akersolutions.com akersolutions.com akersolutions.com voith.com
a GE company a GE company
akersolutions.com akersolutions.com MAN Diesel & Turbo Alliance abb.com akersolutions.com akersolutions.com abb.com alstom.com benestad.com
geoilandgas.com geoilandgas.com   7. Benestad is an Aker Solutions company.
geoilandgas.com geoilandgas.com
akersolutions.com   8. Diamould is a OneSubsea company.
Courtesy of Siemens Courtesy of Siemens Courtesy of Siemens Courtesy of Siemens
Fig. 4: NOV Passive Cooler – Field proven BAKER HUGHES BAKER HUGHES BAKER HUGHES
mandieselturbo.com TechnipFMC BAKER HUGHES
a GE company
FLOWSERVE   9. ASCOM re-branded as Sulzer Chemtech.
Curtiss-Wright ONESUBSEA (12) ONESUBSEA HEAT TRACE LTD. ALCATEL BICC BERCA CORTLAND AKER SOLUTIONS (14) DEUTSCH (4) DEUTSCH (4) fmctechnologies.com flowserve.com 10. FSubsea (Fuglesangs Subsea AS) and the German pump
technology lowering production temperature Courtesy of Aker Solutions
a GE company
geoilandgas.com
a GE company
geoilandgas.com curtisswright.com onesubsea.com onesubsea.com
a GE company
geoilandgas.com heat-trace.com
Aker Solutions/
Saipem Alliance
alcatel-lucent.com biccberca.com cortlandandcompany.com akersolutions.com te.com te.com
geoilandgas.com
company RuhRPumpen collaborate to develop advanced *The Siemens Subsea Power Grid is shown in Fig. 2, with the main building blocks in Figs. 3, 4, & 5, along with wet-mate 36kV connectors and control system.
Courtesy of GE
(complimentary to compression) akersolutions.com
ONESUBSEA (12) TechnipFMC
subsea centrifugal pump solutions as Fuglesangs Subsea. Courtesy of Siemens
Courtesy of Aker Solutions Fig. 10: BHGE Conceptual Fig. 11: BlueC saipem.com
BAKER HUGHES
SMARTMOTOR
11. Includes system integrators and specialty hardware
Courtesy of Statoil ONESUBSEA ClydeUnion (SPX FLOW) FLOWSERVE SAIPEM SAIPEM ONESUBSEA (12) NEXANS BRUGG FURUKAWA DRAKA
a GE company
DIAMOULD (8) DIAMOULD (8) onesubsea.com smartmotor.no fmctechnologies.com
Fig 14: 200 MW Subsea
Courtesy of TechnipFMC Wet Gas Compression Compressor onesubsea.com spxflow.com flowserve.com saipem.com saipem.com onesubsea.com nexans.com FSubsea/Voith bruggcables.com furukawa.co.jp draka.com
geoilandgas.com
diamould.com diamould.com suppliers. Fig.13: Subsea
Collaboration (17) 12. Subsea Integration Alliance (SIA) is a worldwide Fig. 9: ABB Conceptual Subsea Fig. 10: ABB 19MVA Power Manager Power Hub with 145kV
Fig. 7: OneSubsea Multiphase Compressor Fig. 8: Subsea HOFIM™ Compressor by MAN System (12.5 MW ) Saipem & Curtiss-Wright (18) BAKER HUGHES SAIPEM/VEOLIA (16)
fsubsea.com
voith.com BAKER HUGHES BAKER HUGHES
SCHNEIDER ELECTRIC ITT BORNEMANN ITT BORNEMANN non-incorporated partnership between OneSubsea, Courtesy of Siemens Courtesy of BHGE, a GE company Power Grid Subsea Transformer Output to Shore from 4
FLOWSERVE Sulzer Chemtech (9) TechnipFMC SAIPEM HITACHI JDR JDR ONESUBSEA (12) schneider-electric.com bornemann.com bornemann.com
Fig. 12: Pseudo Dry Gas (PDG) unit saipem.com a GE company saipem.com a GE company a GE company Schlumberger, and Subsea 7. Fig. 8: Åsgard 100 KVA Subsea
Units for GullfaksField Diesel & Turbo for Åsgard curtiss-wright.com flowserve.com
bakerhughes.com veolia.com sulzer.com fmctechnologies.com saipem.com
Liestritz/Rosetti Marino
hitachi.com jdrcables.com jdrcables.com onesubsea.com geoilandgas.com geoilandgas.com 13. Loher is a Siemens company. Offshore Arrays with 20 x 10
(non-compression) reduces back Partnership (3)
SIEMENS LEISTRITZ ONESUBSEA (12) 14. Aker Solutions and ABB have formed an Alliance for Fig. 9: Siemens DigiTRONf - High Control Power Distribution Module ABB Subsea MW Wind Turbines
pressure approx. 60-120 bar; liestritz.com
Power and Automation. Fig. 8: Siemens SpecTRON 10 - 10kV wet mate transformer Fig.11: ABB Conceptual Subsea Fig.12: ABB Conceptual Subsea
TechnipFMC FSUBSEA (10, 15, 17) HAYWARD TYLER SEABOX AS TechnipFMC DRESSER RAND
XXXXXXXXX SIEMENS MITSUBISHI NEXANS MFX DO BRASIL SCHNEIDER ELECTRIC XXXXX
SEACON SIEMENS energy.siemens.com leistritzcorp.com onesubsea.com
optical performance wet mate Fig. 10: Teledyne 5kV, 200A Fig. 11: Teledyne 3kV, 30A Electrical
ABB conceptual
requires 1MW for 1 BScfdsystem fmctechnologies.com fsubsea.com haywardtyler.com nov.com/seabox fmctechnologies.com dresser-rand.com
XXXXXXXXX siemens.com Saipem/Curtiss-Wright Corp. mitsubishielectric.com nexans.com mfx.com.br schneider-electric.com seaconworldwide.com energy.siemens.com 15. FSubsea won the 2017 OTC Spotlight on New Technology connectors for subsea pumping systems variable speed drive Medium Voltage Switchgear Variable Speed Drive
Courtesy of NOV Cooperation Agreement (18) Award for their OMNIRISE MINIBOOSTER subsea connector Electrical Feedthrough and API- Wetmate Connector
saipem.com PETROBRAS ATALAIA PROLAB (6)
ITT BORNEMANN LEISTRITZ (3) LOHER (13) TechnipFMC TWISTER BV BAKER HUGHES SUBSEA 7 / INTERPIPE curtiswright.com NKT NSW NEXANS SIEMENS SIEMENS TELEDYNE D.G.O’BRIEN LAB (Brazil) prolabnl.com processing pump. 6FB Flame-Proof Penetrator
Fig.9: Installation of the OneSubsea bornemann.com leistritzcorp.com automation.siemens.com fmctechnologies.com twisterbv.com
a GE company
geoilandgas.com
subsea7.com
itp-interpipe.com nktcables.com nsw.com nexans.com energy.siemens.com energy.siemens.com dgo.com 16. Saipem worked in cooperation with Veolia to develop
Saipem/Veolia Alliance (16) SPRINGS® Subsea Seawater Treatment system. The
Multiphase Compressor Station for Gulfaks saipem.com SHELL GASMER STATOIL: P-LAB & K-LAB system is a subsea technology for the treatment of sea-
veoliawatertechnologies.com SIEMENS TELEDYNE ODI
ONESUBSEA (12) SCHLUMBERGER ONESUBSEA (12) TechnipFMC / Sulzer (5) MAN Energy Solutions (1) TechnipFMC OKONITE PARKER OCEANEERING TELEDYNE ODI (Houston, TX) (Norway) water utilizing sulphate removal membranes (SR) for the
onesubsea.com slb.com onesubsea.com fmctechnologies.com mandieselturbo.com fmctechnologies.com okonite.com parker.com oceaneering.com energy.siemens.com odi.com odi.com
SUBSEA INTEGRATION removal of sulphates prior to injection into the reservoir.
ALLIANCE (12) SOUTHWEST RESEARCH 17.Voith and Funglesangs Subsea AS (FSubsea) signed a
ONESUBSEA, SUBSEA 7, SULZER (5)
TechnipFMC / INSTITUTE collaborative agreement in May 2016 to develop
TechnipFMC / SULZER (5) ONESUBSEA (12) SCHLUMBERGER PRYSMIAN SCHLUMBERGER REDA PARKER TECHNIP UMBILICAL swri.org sulzer.com
DIRECT DRIVE SYSTEMS
fmctechnologies.com
fmctechnologies.com
onesubsea.com subseaintegration prysmiangroup.com slb.com parker.com technip.com hydrodynamic variable speed drives for advanced subsea ABB conceptual medium
alliance.com
pump applications. voltage switchgear
18. Saipem and Curtiss-Wright Corporation have an exclusive
Courtesy of ABB
SIEMENS INDUSTRIAL TechnipFMC/Sulzer SUMITOMO PRYSMIAN UMBILICALS INTERNATIONAL
TURBO MACHINERY Collaboration Agreement (5) cooperation agreement for the development of pumps for Courtesy of Siemens/ Courtesy of Aker Solutions & ABB
Courtesy of OneSubsea Courtesy of MAN Diesel & Turbo Courtesy of OneSubsea Courtesy of BHGE, a GE company Courtesy of GE Courtesy of INTECSEA COURTESY OF turbomachinerysolutions.com fmctechnologies.com
global-sei.com prysmiangroup.com umbilicals.com
water treatment and injection applications. Courtesy of Siemens Courtesy of Siemens Courtesy of Teledyne Figs. 7 & 8 Courtesy of Aker Solutions Courtesy of ABB Courtesy of ABB Courtesy of ABB Saipem Alliance for Power & Automation
Courtesy of Teledyne

OCEANS COVER 285 BILLION BARRELS OF THE WORLD’S KNOWN OIL RESERVES – OFFSHORE COVERS THEM ALL.
Introducing modular subsea storage
MAN Subsea M A G A Z I N E
In Collaboration with

for oil and condensates.


compression World Trends and Technology Making subsea processing possible. Using our engineering and operations Discover more about NOV’s full system solutions at nov.com/subsea

for Offshore Oil and Gas Operations expertise to help deliver projects once thought impossible.
technology Innovation becomes proven technology:
over 50,000 operation hours achieved
woodplc.com
Free and on demand educational videos, posters, articles, and soon additional supplements, © 2019 National Oilwell Varco | All Rights Reserved
all for learning more about the offshore oil and gas industry at:
www.man-es.com
offshore-mag.com www.offshore-mag.com/learning-center.html

MANEner_OSMaps_1903 1 2/8/19 11:48 AM Wood_OSmaps_1903 1 2/12/19 10:56 AM NOVCom_OSmaps_1903 1 2/19/19 11:05 AM

S-ar putea să vă placă și