328,705.00
b. Architectural Plans, shop drawings, architects professional fee lot 1.00 25,000.00 25,000.00 25,000.00
SUB-TOTAL 37,000.00
I. BASEMENT
a. demolition of existing toilet and bath lot 1.00 7,000.00 7,000.00 7,000.00
b. demolition of walls for doors and windows lot 1.00 7,000.00 7,000.00 7,000.00
c. demilition of unused room (beside Tin's bedroom) lot 1.00 7,000.00 7,000.00 7,000.00
d. demolition of existing toilet and bath flooring (ground floor) lot 1.00 7,000.00 7,000.00 7,000.00
e. demolition of existing stair going to the bathroom lot 1.00 7,000.00 7,000.00 7,000.00
SUB-TOTAL 35,000.00
I. BASEMENT
a. supply and installation of windows pcs 6.00 3,200.00 19,200.00 960.00 5,760.00 24,960.00
b. supply and installation of doors (main and laundry) pcs 2.00 8,000.00 16,000.00 2,400.00 4,800.00 20,800.00
c.1. reinforcement bars lot 1.00 4,100.00 4,100.00 2,050.00 2,050.00 6,150.00
c.2. concrete aggregates fill (cement,gravel,sand) lot 1.00 3,100.00 3,100.00 1,550.00 1,550.00 4,650.00
d. toilet and pantry plastered wall (smooth finish ready to paint/tiles) lot 1.00 1,480.00 1,480.00 740.00 740.00 2,220.00
e. septic tank on the laundry area lot 1.00 3,000.00 3,000.00 1,500.00 1,500.00 4,500.00
a. toilet and bath wall (new wall/reduce the exiting size due to stairs) lot 1.00 6,500.00 6,500.00 3,250.00 3,250.00 9,750.00
b. concrete ceiling of new toilet and bath (basement0 lot 1.00 10,000.00 10,000.00 5,000.00 5,000.00 15,000.00
c. stairs relocation to bedrooms lot 1.00 1,500.00 1,500.00 750.00 750.00 2,250.00
SUB-TOTAL 90,280.00
4.00 PLUMBING WORKS
I. BASEMENT
a. new plumbing for water supply (toilet and bath) lot 1.00 1,000.00 1,000.00 500.00 500.00 1,500.00
b. new plumbing for waste water (toilet and bath) lot 1.00 1,000.00 1,000.00 500.00 500.00 1,500.00
c. new plumbing for water supply (kitchen) lot 1.00 1,500.00 1,500.00 750.00 750.00 2,250.00
d. new plumbing for waste water (kitchen) lot 1.00 1,450.00 1,450.00 725.00 725.00 2,175.00
e. new plumbing for water supply (laundry) lot 1.00 750.00 750.00 375.00 375.00 1,125.00
f. new plumbing for waste water (laundry) lot 1.00 750.00 750.00 375.00 375.00 1,125.00
h. supply and installation of water closet/ shower head/ lavatory lot 1.00 0.00 0.00 0.00 0.00
a. new plumbing for water supply (toilet and bath) lot 1.00 3,000.00 3,000.00 1,500.00 1,500.00 4,500.00
b. new plumbing for waste water (toilet and bath) lot 1.00 3,000.00 3,000.00 1,500.00 1,500.00 4,500.00
c. supply and installation of water closet/ shower head/ lavatory lot 1.00 0.00 0.00 0.00 0.00
SUB-TOTAL 18,675.00
I. FIRST FLOOR
a. supply and installation of kitchen overhead cabinet (LAMINATED) lot 1.00 4,000.00 4,000.00 2,000.00 2,000.00 6,000.00
b. supply and installation of kicthen under-counter cabinet (LAMINATED) lot 1.00 8,000.00 8,000.00 4,000.00 4,000.00 12,000.00
c. supply and installation of dining foldable dining table (PURE MAHOGANY) lot 1.00 5,000.00 5,000.00 2,500.00 2,500.00 7,500.00
d. supply and installation of pantry shelves (LAMINATED) lot 1.00 1,000.00 1,000.00 500.00 500.00 1,500.00
SUB-TOTAL 27,000.00
I. BASEMENT
a. Waterproofing all sides flooding walls lot 1.00 4,000.00 4,000.00 2,000.00 2,000.00 6,000.00
b. Painting of walls (exterior- interior) lot 1.00 8,000.00 8,000.00 4,000.00 4,000.00 12,000.00
SUB-TOTAL 27,750.00
I. BASEMENT
a. supply and installation of basement floor tiles lot 1.00 25,000.00 25,000.00 12,500.00 12,500.00 37,500.00
b. supply and installation of toilet and bath tiles lot 1.00 10,000.00 10,000.00 5,000.00 5,000.00 15,000.00
c. supply and installation of paver blocks- stairs (main door access way) lot 1.00 3,000.00 3,000.00 1,500.00 1,500.00 4,500.00
d. supply and installation of mahogany wooden stairs (economical than tiles) lot 1.00 5,000.00 5,000.00 2,500.00 2,500.00 7,500.00
a. supply and installation of new toilet and bath tiles lot 1.00 12,000.00 12,000.00 6,000.00 6,000.00 18,000.00
SUB-TOTAL 82,500.00
a. Repairs/Relocation of existing convenience outlet lot 1.00 2,000.00 2,000.00 1,000.00 1,000.00 3,000.00
b. Repairs/Relocation of existing lighting outlet lot 1.00 5,000.00 5,000.00 2,500.00 2,500.00 7,500.00
SUB-TOTAL 10,500.00
Prepared By:
``
ARCHITECT/OWNER