NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

2-CIRCUIT OHL 2 x TACSR/AS 410/67/67 mm2 per phase

1 CONDUCTORS, INCLUDING ALL JOINT AND JUMPER CONNECTIONS

1.1 Six twin line conductors TACSR/AS 410/67 mm2 5.15 Route km 4,696,800,000.00 234,830,112.00
1.2 One earthwire conductor AS 70 mm2 5.15 Route km 126,175,000.00 3,669,220.50
One earthwire conductor OPGW 70 mm2 24 cores, complete with joint
1.3 5.15 Route km 270,375,000.00 4,403,064.60
boxes, fixing device, fixing clamps and necessary accessories
1.4 Armour rod for line conductor TACSR/AS 410/67 mm2 156 Sets 78,078,000.00 336,804.00
1.5 Armour rod for earthwireconductor AS 70 mm2 13 Sets 3,718,000.00 28,067.00
1.6 Armour rod for earthwireconductor OPGW 70 mm2 13 Sets 4,089,800.00 28,067.00
1.7 FO cable armoured, 24 cores, approx. 200 m per-set 2 Sets 25,000,000.00 94,996.00
1.8 Gantry Joint Box (GB) 2 Sets 25,000,000.00 21,590.00
1.9 Optical Terminal Box (OTB) 2 Sets 20,000,000.00 21,590.00
Subtotal-1 5,249,235,800.000 243,433,511.100

2 DAMPING SYSTEMS : VIBRATION DAMPERS AND CONDUCTOR SPACERS


2.1 Line conductor vibration damper for TACSR/AS 410/67 mm2 600 Sets 263,280,000.00 6,477,000.00
2.2 Line conductor spacer (span) 400 mm for TACSR/AS 410/67 mm2 432 Sets 325,512,000.00 4,663,440.00
2.3 Line conductor spacer (jumper) 200 mm for TACSR/AS 410/67 mm2 144 Sets 47,581,200.00 1,554,480.00
2.4 Earthwire conductor vibration damper for AS 70 mm2. 50 Sets 16,737,500.00 539,750.00
2.5 Earthwire conductor vibration damper for OPGW 70 mm2. 50 Sets 20,997,500.00 539,750.00
Subtotal-2 674,108,200.000 13,774,420.000

Hal : 1 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

3 TOWER EARTHING INCLUDING EXCAVATION, REINSTATEMENT,


COMPRESSION JOINTING AND CONNECTION TO TOWER (GANTRY)
3.1 Earthing angle comprising 4 sets of galvanized steel, lead wire, including all 25 Towers 7,608,563.00 3,125,000.00
3.2 Continuous or cross-connected counterpoise cable 30 m length, 450 mm depth, 3 Sets 7,848,630.00 375,000.00
3.3 Extra to items 3.2 for laying in rock. 0 Each
3.4 Extra to items 3.2 for installing at 1000 mm depth. 0 Each
3.5 Extra to items 3.2 for 2 m earthing rod, including joints. 0 Each
Subtotal-3 15,457,193.000 3,500,000.000

4 INSULATOR STRING SETS AND EARTH CONDUCTOR ATTACHMENTS,


COMPLETE WITH ALL FITTINGS BETWEEN TOWER AND CONDUCTORS
4.1 Single suspension string set 120 kN with normal type 0 Sets N/A N/A
4.2 Single suspension string set 120 kN with fog type 0 Sets N/A N/A
4.3 Double suspension string set 120 kN with normal type (string set min. 240 KN 0 Sets N/A N/A
4.4 Double suspension string set 120 kN with fog type (string set min. 240 KN) 78 Sets 763,620,000.00 12,630,150.00
4.5 Single tension string set 120 kN with normal type 0 Sets N/A N/A
4.6 Single tension string set 120 kN with fog type 12 Sets 101,071,368.00 2,202,180.00
4.7 Double tension string set 120 kN with normal type (string set min. 240 KN) 0 Sets N/A N/A
4.8 Double tension string set 120 kN with fog type (string set min. 240 KN) 156 Sets 2,163,157,932.00 30,312,360.00
4.9 Single suspension jumper insulator string set 120 kN with normal type 0 Sets N/A N/A
4.1 Single suspension jumper insulator string set 120 kN with fog type 24 Sets 145,913,040.00 3,886,200.00

Hal : 2 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

4.11 Single tension inverse insulator string set 120 kN with normal type 0 Sets N/A N/A
4.12 Single tension inverse insulator string set 120 kN with fog type 12 Sets 108,615,216.00 2,072,640.00
4.13 Earthwire suspension clamps for AS 70 mm2 13 Sets 11,720,150.00 140,335.00
4.14 Earthwire tension clamps for AS 70 mm2 26 Sets 43,290,000.00 280,670.00
4.15 Earthwire suspension clamps for OPGW 70 mm2 13 Sets 17,527,900.00 140,335.00
4.16 Earthwire tension clamps for OPGW 70 mm2 26 Sets 46,945,600.00 280,670.00
Note :
Suspension and tension insulator string complete with arching horn
Subtotal-4 3,401,861,206.000 51,945,540.000

5 SURVEY AND TOWER ALLOCATION


5.1 Preliminary survey 0 Route km
5.2 Check survey including checking of profiles and drawing, pegging of tower posit 5 Route km
5.3 Soil investigation in tower location 0 0 - -
a. Sondir 25 Each
b. Boring and lab test 12 Each
5.4 Complete clearance of a strip of land concentric with the transmission line rou 5 Route km
Subtotal-5 - -

6 2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF SUSPENSION


TYPE COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK
FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS :

Hal : 3 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

6.1 Type AA11 - 3 Slim Tower 1 Sets 177,866,653.00 8,018,670.00


6.2 Type AA11 ± 0 Slim Tower (Standard Height) 10 Sets 1,987,466,927.00 89,599,939.00
6.3 Type AA11 + 3 Slim Tower 1 Sets 219,636,310.50 9,901,750.00
6.4 Type AA11 + 6 Slim Tower 1 Sets 242,326,592.50 10,924,684.00
6.5 Type AA11 + 9 Slim Tower 0 Sets N/A N/A
6.6 Type AA11 + 12 Slim Tower 0 Sets N/A N/A
6.7 Type AA11 + 15 Slim Tower 0 Sets N/A N/A

Hal : 4 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended AA11 type Slim Towers.
6.8 Class 1 Pad and Chimney 8 Towers
6.9 Class 2 Pad and Chimney 1 Towers
6.1 Class 3 Pad and Chimney 1 Towers
6.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
6.12 Class 5 Pad and Chimney (Enlarged) or Raft 2 Towers
6.13 Class 6 Piled 0 Towers
6.14 Class 7 Pad and Chimney 1 Towers
Subtotal-6 2,627,296,483.000 118,445,043.000

2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION


TYPE COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK
FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS :
8.1 Type BB11 - 3 Slim Tower 0 Sets N/A N/A
8.2 Type BB11 ± 0 Slim Tower (Standard Height) 3 Sets 796,621,416.00 35,913,670.00
8.3 Type BB11 + 3 Slim Tower 2 Sets 604,550,589.70 27,254,640.00
8.4 Type BB11 + 6 Slim Tower 0 Sets N/A N/A
8.5 Type BB11 + 9 Slim Tower 0 Sets N/A N/A
8.6 Type BB11 + 12 Slim Tower 0 Sets N/A N/A
8.7 Type BB11 + 15 Slim Tower 0 Sets N/A N/A

Hal : 5 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended BB11 type Slim Towers.
8.8 Class 1 Pad and Chimney 1 Towers
8.9 Class 2 Pad and Chimney 0 Towers
8.1 Class 3 Pad and Chimney 1 Towers
8.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
8.12 Class 5 Pad and Chimney (Enlarged) or Raft 2 Towers
8.13 Class 6 Piled 1 Towers
8.14 Class 7 Pad and Chimney 0 Towers
Subtotal-8 1,401,172,005.700 63,168,310.000

9 2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL
AND TACK WELDING BOLT & NUTS FOR TOWERS :
9.1 Type CC11 - 3 Slim Tower 1 Sets 303,839,701.00 13,697,847.40
9.2 Type CC11 ± 0 Slim Tower (Standard Height) 2 Sets 682,017,454.00 30,747,038.40
9.3 Type CC11 + 3 Slim Tower 0 Sets N/A N/A
9.4 Type CC11 + 6 Slim Tower 0 Sets N/A N/A
9.5 Type CC11 + 9 Slim Tower 0 Sets N/A N/A
9.6 Type CC11 + 12 Slim Tower 0 Sets N/A N/A
9.7 Type CC11+ 15 Slim Tower 0 Sets N/A N/A

Hal : 6 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended CC11 type Slim Towers.
9.8 Class 1 Pad and Chimney 2 Towers
9.9 Class 2 Pad and Chimney 1 Towers
9.1 Class 3 Pad and Chimney 0 Towers
9.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
9.12 Class 5 Pad and Chimney (Enlarged) or Raft 0 Towers
9.13 Class 6 Piled 0 Towers
9.14 Class 7 Pad and Chimney 0 Towers
Subtotal-9 985,857,155.000 44,444,885.800

10 2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL
AND TACK WELDING BOLT & NUTS FOR TOWERS :
10.1 Type DD11 - 3 Slim Tower 0 Sets N/A N/A
10.2 Type DD11 ± 0 Slim Tower (Standard Height) 0 Sets N/A N/A
10.3 Type DD11 + 3 Slim Tower 2 Sets 974,472,105.00 43,931,620.00
10.4 Type DD11 + 6 Slim Tower 0 Sets N/A N/A
10.5 Type DD11 + 9 Slim Tower 0 Sets N/A N/A
10.6 Type DD11 + 12 Slim Tower 0 Sets N/A N/A
10.7 Type DD11 + 15 Slim Tower 0 Sets N/A N/A

Hal : 7 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended DD11 type Slim Towers.
10.8 Class 1 Pad and Chimney 2 Towers
10.9 Class 2 Pad and Chimney 0 Towers
10.10 Class 3 Pad and Chimney 0 Towers
10.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
10.12 Class 5 Pad and Chimney (Enlarged) or Raft 0 Towers
10.13 Class 6 Piled 0 Towers
10.14 Class 7 Pad and Chimney 0 Towers
Subtotal-10 974,472,105.000 43,931,620.000

12 2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL
AND TACK WELDING BOLT & NUTS FOR TOWERS :
12.1 Type DDR11 - 3 Slim Tower 0 Sets N/A N/A
12.2 Type DDR11 + 0 Slim Tower 2 Sets 926,013,810.00 41,747,000.00
12.3 Type DDR11 + 3 Slim Tower 0 Sets N/A N/A
12.4 Type DDR11 + 6 Slim Tower 0 Sets N/A N/A
12.5 Type DDR11 + 9 Slim Tower 0 Sets N/A N/A
12.6 Type DDR11 - 12 Slim Tower 0 Sets N/A N/A
12.7 Type DDR11 - 15 Slim Tower 0 Sets N/A N/A

Hal : 8 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended DDR11 type Slim Towers.
12.8 Class 1 Pad and Chimney 0 Towers
12.9 Class 2 Pad and Chimney 1 Towers
12.10 Class 3 Pad and Chimney 0 Towers
12.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
12.12 Class 5 Pad and Chimney (Enlarged) or Raft 0 Towers
12.13 Class 6 Piled 0 Towers
12.14 Class 7 Pad and Chimney 1 Towers
Subtotal-12 926,013,810.000 41,747,000.000

13 2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION


TYPE COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK
FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS :
13.1 Type EE11 - 3 Slim Tower 0 Sets
13.2 Type EE11 ± 0 Slim Tower (Standard Height) 0 Sets
13.3 Type EE11 + 3 Slim Tower 0 Sets
13.4 Type EE11 + 6 Slim Tower 0 Sets
13.5 Type EE11 + 9 Slim Tower 0 Sets
13.6 Type EE11 + 12 Slim Tower 0 Sets
13.7 Type EE11 + 15 Slim Tower 0 Sets

Hal : 9 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended EE11 type Slim Towers.
13.8 Class 1 Pad and Chimney 0 Towers
13.9 Class 2 Pad and Chimney 0 Towers
13.10 Class 3 Pad and Chimney 0 Towers
13.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
13.12 Class 5 Pad and Chimney (Enlarged) or Raft 0 Towers
13.13 Class 6 Piled 0 Towers
13.14 Class 7 Pad and Chimney 0 Towers
Subtotal-13 - -

2-CIRCUIT LOW LEVEL GANTRY (LLG) OF TENSION TYPE COMPLETE


14 WITH ALL .
FITTINGS GANTRY AND FENCE.
14.1 Steel Post Gantry 0 Sets
14.2 Steel Beam Gantry 0 Sets
14.3 Fence BRC with H = 1,90 m inculding barbedwire include foundations 0 m

Subtotal-14 - -

15 MISCELLANEOUS STEEL AND FOUNDATION WORK PRICES FOR


SPECIAL TOWER, SPECIAL EXTENSIONS AND MODIFICATION (TO BE
APPLIED AFTER INSTRUCTED BY ENGINEER)
Hal : 10 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

15.1 Structural mid steel 0 Ton


15.2 Structural HT steel 0 Ton
15.3 Counter Weight 0 kg

Hal : 11 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

15.4 Price of chimney extension


15.5 Tower Type AA11 0 m
15.6 Tower Type BB11 0 m
15.7 Tower Type CC11 0 m
15.8 Tower Type DD11 0 m
15.9 Tower Type DDR11 0 m
15.10 Tower Type EE11 0 m
Subtotal-15 - -

16 MISCELLANEEOUS SLOPE PROTECTION AND TIE BEAM WORKS ( TO


BE APPLIED AFTER INSTRUCTED BY ENGINEER )
16.1 Stone Masonry 1 PC : 3 Sand 0 m3
16.2 Reinforced concrete for Tie Beam 0 m3
16.3 Retaining Wall (Reinforced Concrete K225) 0 m3
Subtotal-16 - -

17 TOWER ACCESSORIES
17.1 Danger Plate with fixing facilities (2 sets per tower) 25 Towers 4,442,500.00 1,250,000.00
17.2 Number Plate & Phase Plate with fixing facilities (2 sets per tower) 25 Towers 4,442,500.00 1,250,000.00
17.3 Anti climbing guards (4 sets per tower) 25 Towers 4,442,500.00 1,250,000.00
17.4 Aircraft warning spheres ball 0 Sets N/A N/A
Subtotal-17 13,327,500.000 3,750,000.000

Hal : 12 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland

18 DISMANTLING MATERIAL AND ACCESSORIES / GOODS PUT IN THE


PLN'S STORAGE
18.1 Dismantling Materials and Accessories Tower 0 Towers
18.2 Dismantling Materials and Accessories Conductor 0 km
18.3 Dismantling Materials and Accessories Fitting 0 Towers
18.4 Dismantling Materials and Accessoreis Insulator 0 Towers
18.5 Dismantling Materials Hardware and Accessories 0 Towers
18.6 Dismantling Tower Foundations 0 Lot
18.7 Steel drum 0 set
Subtotal-18 - -

19 TEST AND COMISSIONING 1 Lot


Subtotal-19 - -

TOTAL 16,268,801,457.700 628,140,329.900

Hal : 13 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

793,854,475.00 5,725,484,587.00 18.518 0.926 - 3.130 22.574


50,721,320.00 180,565,540.50 0.497 0.014 - 0.200 0.712

50,721,320.00 325,499,384.60 1.066 0.017 - 0.200 1.283

32,448,000.00 110,862,804.00 0.308 0.001 - 0.128 0.437


2,704,000.00 6,450,067.00 0.015 0.000 - 0.011 0.025
2,704,000.00 6,821,867.00 0.016 0.000 - 0.011 0.027
5,000,000.00 30,094,996.00 0.099 0.000 - 0.020 0.119
1,500,000.00 26,521,590.00 0.099 0.000 - 0.006 0.105
1,500,000.00 21,521,590.00 0.079 0.000 - 0.006 0.085
- 941,153,115.000 6,433,822,426.100 20.696 0.960 - 3.711 25.366

72,900,000.00 342,657,000.00 1.038 0.026 - 0.287 1.351


54,648,000.00 384,823,440.00 1.283 0.018 - 0.215 1.517
12,816,000.00 61,951,680.00 0.188 0.006 - 0.051 0.244
6,075,000.00 23,352,250.00 0.066 0.002 - 0.024 0.092
6,075,000.00 27,612,250.00 0.083 0.002 - 0.024 0.109
- 152,514,000.000 840,396,620.000 2.658 0.054 - 0.601 3.313 -

Hal : 14 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

10,733,563.00 0.030 0.012 - - 0.042


8,223,630.00 0.031 0.001 - - 0.032
-
-

- - 18,957,193.000 0.061 0.014 - - 0.075 -

N/A -
N/A -
N/A -
13,591,500.00 789,841,650.00 3.011 0.050 - 0.054 3.114
N/A -
2,496,000.00 105,769,548.00 0.398 0.009 - 0.010 0.417
N/A -
32,448,000.00 2,225,918,292.00 8.529 0.120 - 0.128 8.776
N/A -
5,616,000.00 155,415,240.00 0.575 0.015 - 0.022 0.613

Hal : 15 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

N/A -
2,496,000.00 113,183,856.00 0.428 0.008 - 0.010 0.446
1,729,000.00 13,589,485.00 0.046 0.001 - 0.007 0.054
2,483,000.00 46,053,670.00 0.171 0.001 - 0.010 0.182
1,729,000.00 19,397,235.00 0.069 0.001 - 0.007 0.076
2,483,000.00 49,709,270.00 0.185 0.001 - 0.010 0.196

- 65,071,500.000 3,518,878,246.000 13.412 0.205 - 0.257 13.874 -

9,600,000.00 9,600,000.00 - - - 0.038 0.038


- -
100,000,000.00 100,000,000.00 - - - 0.394 0.394
78,000,000.00 78,000,000.00 - - - 0.308 0.308
4,800,000.00 4,800,000.00 - - - 0.019 0.019
- 192,400,000.000 192,400,000.000 - - - 0.759 0.759 -

Hal : 16 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

22,228,688.60 208,114,011.60 0.701 0.032 - 0.088 0.821


248,381,490.00 2,325,448,356.00 7.836 0.353 - 0.979 9.168
27,448,805.45 256,986,865.95 0.866 0.039 - 0.108 1.013
30,284,499.00 283,535,775.50 0.955 0.043 - 0.119 1.118
N/A -
N/A -
N/A -

Hal : 17 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

860,833,771.00 860,833,771.00 - - 3.394 - 3.394


115,135,570.00 115,135,570.00 - - 0.454 - 0.454
176,787,287.50 176,787,287.50 - - 0.697 - 0.697
N/A -
491,167,867.00 491,167,867.00 - - 1.936 - 1.936
N/A -
215,241,205.50 215,241,205.50 - - 0.849 - 0.849
### 328,343,483.050 4,933,250,710.050 10.358 0.467 7.330 1.295 19.450 -

N/A -
99,556,884.00 932,091,970.00 3.141 0.142 - 0.393 3.675
75,553,044.00 707,358,273.70 2.384 0.107 - 0.298 2.789
N/A -
N/A -
N/A -
N/A -

Hal : 18 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

133,823,036.00 133,823,036.00 - - 0.528 - 0.528


N/A -
323,378,164.00 323,378,164.00 - - 1.275 - 1.275
N/A -
1,040,092,832.00 1,040,092,832.00 - - 4.101 - 4.101
499,192,488.00 499,192,488.00 - - 1.968 - 1.968
N/A -
### 175,109,928.000 3,635,936,763.700 5.524 0.249 7.871 0.690 14.335 -

37,972,032.45 355,509,580.85 1.198 0.054 - 0.150 1.402


85,234,380.00 797,998,872.40 2.689 0.121 - 0.336 3.146
N/A -
N/A -
N/A -
N/A -
N/A -

Hal : 19 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

273,482,468.00 273,482,468.00 - - 1.078 - 1.078


247,915,630.00 247,915,630.00 - - 0.977 - 0.977
N/A -
N/A -
N/A -
N/A -
N/A -
521,398,098.000 123,206,412.450 1,674,906,551.250 3.887 0.175 2.056 0.486 6.604 -

N/A -
N/A -
121,783,578.00 1,140,187,303.00 3.842 0.173 - 0.480 4.495
N/A -
N/A -
N/A -
N/A -

Hal : 20 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

675,142,900.80 675,142,900.80 - - 2.662 - 2.662


N/A -
N/A -
N/A -
N/A -
N/A -
N/A -
675,142,900.800 121,783,578.000 1,815,330,203.800 3.842 0.173 2.662 0.480 7.157 -

N/A -
115,727,556.00 1,083,488,366.00 3.651 0.165 - 0.456 4.272
N/A -
N/A -
N/A -
N/A -
N/A -

Hal : 21 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

N/A -
392,716,943.00 392,716,943.00 - - 1.548 - 1.548
N/A -
N/A -
N/A -
N/A -
696,598,145.00 696,598,145.00 - - 2.746 - 2.746
### 115,727,556.000 2,172,803,454.000 3.651 0.165 4.295 0.456 8.567 -

- - - - - -
- - - - - -
- - - - - -

Hal : 22 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

- - - - - -
- - - - - -

- - - - - - - - -

- - - - - - - - -

Hal : 23 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

- - - - - -
- - - - - -
- - - - - -

Hal : 24 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

- - - - - - - - -

- - - - - -
- - - - - -

- - - - - - - - -

3,325,000.00 9,017,500.00 0.018 0.005 - 0.013 0.036


3,325,000.00 9,017,500.00 0.018 0.005 - 0.013 0.036
3,325,000.00 9,017,500.00 0.018 0.005 - 0.013 0.036
N/A -
- 9,975,000.000 27,052,500.000 0.053 0.015 - 0.039 0.107 -

Hal : 25 dari 77
BOBOT MINGGU LALU

Foundation Erection Total Price BOBOT


Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion /
Procurement JUMLAH Procurement
Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work

- - - - - - - - -

100,000,000.00 100,000,000.00 - - - 0.394 0.394


- 100,000,000.000 100,000,000.000 - - - 0.394 0.394 -

### 2,325,284,572.500 25,363,734,667.900 64.142 2.477 24.214 9.168 100.000 -

Hal : 26 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - - -
- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -

Hal : 27 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - - -
- - - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -

Hal : 28 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -

Hal : 29 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -

Hal : 30 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - - -

Hal : 31 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - - -

Hal : 32 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - - -
- - - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - - -

Hal : 33 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - - -

Hal : 34 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - -

Hal : 35 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - -

- - - - - - - - - -

Hal : 36 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

Hal : 37 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -

- - - - - - - - - -

Hal : 38 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

- - - - - - - - - -

- - - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - -

Hal : 39 dari 77
MINGGU KE :
TANGGAL :

U MINGGU INI S/D MINGGU INI

OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test

Site Manager

Hal : 40 dari 77
KETERANGAN

Hal : 41 dari 77
KETERANGAN

Hal : 42 dari 77
KETERANGAN

Hal : 43 dari 77
KETERANGAN

Hal : 44 dari 77
KETERANGAN

Hal : 45 dari 77
KETERANGAN

Hal : 46 dari 77
KETERANGAN

Hal : 47 dari 77
KETERANGAN

Hal : 48 dari 77
KETERANGAN

Hal : 49 dari 77
KETERANGAN

Hal : 50 dari 77
KETERANGAN

Hal : 51 dari 77
KETERANGAN

Hal : 52 dari 77
KETERANGAN

Hal : 53 dari 77
BOQ REFERENCE

EQUIPMENT AND MATERIAL DESCRIPTION QTY

2-CIRCUIT OHL 2 x TACSR/AS 410/67/67 mm2 per phase

CONDUCTORS, INCLUDING ALL JOINT AND JUMPER CONNECTIONS

1.1 Six twin line conductors TACSR/AS 410/67 mm2 5.15


1.2 One earthwire conductor AS 70 mm2 5.15
One earthwire conductor OPGW 70 mm2 24 cores, complete with joint boxes, fixing
1.3 5.15
device, fixing clamps and necessary accessories
1.4 Armour rod for line conductor TACSR/AS 410/67 mm2 156
1.5 Armour rod for earthwireconductor AS 70 mm2 13
1.6 Armour rod for earthwireconductor OPGW 70 mm2 13
1.7 FO cable armoured, 24 cores, approx. 200 m per-set 2
1.8 Gantry Joint Box (GB) 2
1.9 Optical Terminal Box (OTB) 2
Subtotal-1

DAMPING SYSTEMS : VIBRATION DAMPERS AND CONDUCTOR SPACERS


2.1 Line conductor vibration damper for TACSR/AS 410/67 mm2 600
2.2 Line conductor spacer (span) 400 mm for TACSR/AS 410/67 mm2 432
2.3 Line conductor spacer (jumper) 200 mm for TACSR/AS 410/67 mm2 144
2.4 Earthwire conductor vibration damper for AS 70 mm2. 50
2.5 Earthwire conductor vibration damper for OPGW 70 mm2. 50
Subtotal-2

TOWER EARTHING INCLUDING EXCAVATION, REINSTATEMENT,


COMPRESSION JOINTING AND CONNECTION TO TOWER (GANTRY)
3.1 Earthing angle comprising 4 sets of galvanized steel, lead wire, including all clamps. 25
3.2 Continuous or cross-connected counterpoise cable 30 m length, 450 mm depth, includi 3
3.3 Extra to items 3.2 for laying in rock. 0
3.4 Extra to items 3.2 for installing at 1000 mm depth. 0
3.5 Extra to items 3.2 for 2 m earthing rod, including joints. 0
Subtotal-3

INSULATOR STRING SETS AND EARTH CONDUCTOR ATTACHMENTS,


COMPLETE WITH ALL FITTINGS BETWEEN TOWER AND CONDUCTORS
4.1 Single suspension string set 120 kN with normal type 0
4.2 Single suspension string set 120 kN with fog type 0
4.3 Double suspension string set 120 kN with normal type (string set min. 240 KN) 0
4.4 Double suspension string set 120 kN with fog type (string set min. 240 KN) 78
4.5 Single tension string set 120 kN with normal type 0
EQUIPMENT AND MATERIAL DESCRIPTION QTY

4.6 Single tension string set 120 kN with fog type 12


4.7 Double tension string set 120 kN with normal type (string set min. 240 KN) 0
4.8 Double tension string set 120 kN with fog type (string set min. 240 KN) 156
4.9 Single suspension jumper insulator string set 120 kN with normal type 0
4.1 Single suspension jumper insulator string set 120 kN with fog type 24
4.11 Single tension inverse insulator string set 120 kN with normal type 0
4.12 Single tension inverse insulator string set 120 kN with fog type 12
4.13 Earthwire suspension clamps for AS 70 mm2 13
4.14 Earthwire tension clamps for AS 70 mm2 26
4.15 Earthwire suspension clamps for OPGW 70 mm2 13
4.16 Earthwire tension clamps for OPGW 70 mm2 26
Note :
Suspension and tension insulator string complete with arching horn
Subtotal-4

SURVEY AND TOWER ALLOCATION


5.1 Preliminary survey 0
5.2 Check survey including checking of profiles and drawing, pegging of tower positions, d 5
5.3 Soil investigation in tower location 0
a. Sondir 25
b. Boring and lab test 12
5.4 Complete clearance of a strip of land concentric with the transmission line route 10 m 5
Subtotal-5

2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF SUSPENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND TACK
WELDING BOLT & NUTS FOR TOWERS :
6.1 Type AA11 - 3 Slim Tower 1
6.2 Type AA11 ± 0 Slim Tower (Standard Height) 10
6.3 Type AA11 + 3 Slim Tower 1
6.4 Type AA11 + 6 Slim Tower 1
6.5 Type AA11 + 9 Slim Tower 0
6.6 Type AA11 + 12 Slim Tower 0
6.7 Type AA11 + 15 Slim Tower 0

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended AA11 type Slim Towers.
6.8 Class 1 Pad and Chimney 8
6.9 Class 2 Pad and Chimney 1
6.1 Class 3 Pad and Chimney 1
6.11 Class 4 Block or Anchor Foundation (Rock) 0
6.12 Class 5 Pad and Chimney (Enlarged) or Raft 2
EQUIPMENT AND MATERIAL DESCRIPTION QTY

6.13 Class 6 Piled 0


6.14 Class 7 Pad and Chimney 1
Subtotal-6

2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND TACK
WELDING BOLT & NUTS FOR TOWERS :
8.1 Type BB11 - 3 Slim Tower 0
8.2 Type BB11 ± 0 Slim Tower (Standard Height) 3
8.3 Type BB11 + 3 Slim Tower 2
8.4 Type BB11 + 6 Slim Tower 0
8.5 Type BB11 + 9 Slim Tower 0
8.6 Type BB11 + 12 Slim Tower 0
8.7 Type BB11 + 15 Slim Tower 0

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended BB11 type Slim Towers.
8.8 Class 1 Pad and Chimney 1
8.9 Class 2 Pad and Chimney 0
8.1 Class 3 Pad and Chimney 1
8.11 Class 4 Block or Anchor Foundation (Rock) 0
8.12 Class 5 Pad and Chimney (Enlarged) or Raft 2
8.13 Class 6 Piled 1
8.14 Class 7 Pad and Chimney 0
Subtotal-8

2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND TACK
WELDING BOLT & NUTS FOR TOWERS :
9.1 Type CC11 - 3 Slim Tower 1
9.2 Type CC11 ± 0 Slim Tower (Standard Height) 2
9.3 Type CC11 + 3 Slim Tower 0
9.4 Type CC11 + 6 Slim Tower 0
9.5 Type CC11 + 9 Slim Tower 0
9.6 Type CC11 + 12 Slim Tower 0
9.7 Type CC11+ 15 Slim Tower 0

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended CC11 type Slim Towers.
9.8 Class 1 Pad and Chimney 2
9.9 Class 2 Pad and Chimney 1
9.1 Class 3 Pad and Chimney 0
EQUIPMENT AND MATERIAL DESCRIPTION QTY

9.11 Class 4 Block or Anchor Foundation (Rock) 0


9.12 Class 5 Pad and Chimney (Enlarged) or Raft 0
9.13 Class 6 Piled 0
9.14 Class 7 Pad and Chimney 0
Subtotal-9

2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND TACK
WELDING BOLT & NUTS FOR TOWERS :
10.1 Type DD11 - 3 Slim Tower 0
10.2 Type DD11 ± 0 Slim Tower (Standard Height) 0
10.3 Type DD11 + 3 Slim Tower 2
10.4 Type DD11 + 6 Slim Tower 0
10.5 Type DD11 + 9 Slim Tower 0
10.6 Type DD11 + 12 Slim Tower 0
10.7 Type DD11 + 15 Slim Tower 0

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended DD11 type Slim Towers.
10.8 Class 1 Pad and Chimney 2
10.9 Class 2 Pad and Chimney 0
10.10 Class 3 Pad and Chimney 0
10.11 Class 4 Block or Anchor Foundation (Rock) 0
10.12 Class 5 Pad and Chimney (Enlarged) or Raft 0
10.13 Class 6 Piled 0
10.14 Class 7 Pad and Chimney 0
Subtotal-10

2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND TACK
WELDING BOLT & NUTS FOR TOWERS :
12.1 Type DDR11 - 3 Slim Tower 0
12.2 Type DDR11 + 0 Slim Tower 2
12.3 Type DDR11 + 3 Slim Tower 0
12.4 Type DDR11 + 6 Slim Tower 0
12.5 Type DDR11 + 9 Slim Tower 0
12.6 Type DDR11 - 12 Slim Tower 0
12.7 Type DDR11 - 15 Slim Tower 0

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended DDR11 type Slim Towers.
12.8 Class 1 Pad and Chimney 0
EQUIPMENT AND MATERIAL DESCRIPTION QTY

12.9 Class 2 Pad and Chimney 1


12.10 Class 3 Pad and Chimney 0
12.11 Class 4 Block or Anchor Foundation (Rock) 0
12.12 Class 5 Pad and Chimney (Enlarged) or Raft 0
12.13 Class 6 Piled 0
12.14 Class 7 Pad and Chimney 1
Subtotal-12

2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF TENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND TACK
WELDING BOLT & NUTS FOR TOWERS :
13.1 Type EE11 - 3 Slim Tower 0
13.2 Type EE11 ± 0 Slim Tower (Standard Height) 0
13.3 Type EE11 + 3 Slim Tower 0
13.4 Type EE11 + 6 Slim Tower 0
13.5 Type EE11 + 9 Slim Tower 0
13.6 Type EE11 + 12 Slim Tower 0
13.7 Type EE11 + 15 Slim Tower 0

FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended EE11 type Slim Towers.
13.8 Class 1 Pad and Chimney 0
13.9 Class 2 Pad and Chimney 0
13.10 Class 3 Pad and Chimney 0
13.11 Class 4 Block or Anchor Foundation (Rock) 0
13.12 Class 5 Pad and Chimney (Enlarged) or Raft 0
13.13 Class 6 Piled 0
13.14 Class 7 Pad and Chimney 0
Subtotal-13

2-CIRCUIT LOW LEVEL GANTRY (LLG) OF TENSION TYPE COMPLETE WITH


ALL .
FITTINGS GANTRY AND FENCE.
14.1 Steel Post Gantry 0
14.2 Steel Beam Gantry 0
14.3 Fence BRC with H = 1,90 m inculding barbedwire include foundations 0

Subtotal-14

MISCELLANEOUS STEEL AND FOUNDATION WORK PRICES FOR SPECIAL


TOWER, SPECIAL EXTENSIONS AND MODIFICATION (TO BE APPLIED AFTER
INSTRUCTED BY ENGINEER)
15.1 Structural mid steel 0
15.2 Structural HT steel 0
EQUIPMENT AND MATERIAL DESCRIPTION QTY

15.3 Counter Weight 0

15.4 Price of chimney extension


15.5 Tower Type AA11 0
15.6 Tower Type BB11 0
15.7 Tower Type CC11 0
15.8 Tower Type DD11 0
15.9 Tower Type DDR11 0
15.10 Tower Type EE11 0
Subtotal-15

MISCELLANEEOUS SLOPE PROTECTION AND TIE BEAM WORKS ( TO BE


APPLIED AFTER INSTRUCTED BY ENGINEER )
16.1 Stone Masonry 1 PC : 3 Sand 0
16.2 Reinforced concrete for Tie Beam 0
16.3 Retaining Wall (Reinforced Concrete K225) 0
Subtotal-16

TOWER ACCESSORIES
17.1 Danger Plate with fixing facilities (2 sets per tower) 25
17.2 Number Plate & Phase Plate with fixing facilities (2 sets per tower) 25
17.3 Anti climbing guards (4 sets per tower) 25
17.4 Aircraft warning spheres ball 0
Subtotal-17

DISMANTLING MATERIAL AND ACCESSORIES / GOODS PUT IN THE PLN'S


STORAGE
18.1 Dismantling Materials and Accessories Tower 0
18.2 Dismantling Materials and Accessories Conductor 0
18.3 Dismantling Materials and Accessories Fitting 0
18.4 Dismantling Materials and Accessoreis Insulator 0
18.5 Dismantling Materials Hardware and Accessories 0
18.6 Dismantling Tower Foundations 0
18.7 Steel drum 0
Subtotal-18

TEST AND COMISSIONING 1


Subtotal-19

TOTAL
Procurrement Inland Foundation Erection
SAT

Route km 4,696,800,000.00 234,830,112.00 793,854,475.00


Route km 126,175,000.00 3,669,220.50 z

Route km 270,375,000.00 4,403,064.60 50,721,320.00

Sets 78,078,000.00 336,804.00 32,448,000.00


Sets 3,718,000.00 28,067.00 2,704,000.00
Sets 4,089,800.00 28,067.00 2,704,000.00
Sets 25,000,000.00 94,996.00 5,000,000.00
Sets 25,000,000.00 21,590.00 1,500,000.00
Sets 20,000,000.00 21,590.00 1,500,000.00
5,249,235,800.000 243,433,511.100 - 890,431,795.000

Sets 263,280,000.00 6,477,000.00 72,900,000.00


Sets 325,512,000.00 4,663,440.00 54,648,000.00
Sets 47,581,200.00 1,554,480.00 12,816,000.00
Sets 16,737,500.00 539,750.00 6,075,000.00
Sets 20,997,500.00 539,750.00 6,075,000.00
674,108,200.000 13,774,420.000 - 152,514,000.000

Towers 7,608,563.00 3,125,000.00


Sets 7,848,630.00 375,000.00
Each
Each
Each
15,457,193.000 3,500,000.000 - -

Sets N/A N/A N/A


Sets N/A N/A N/A
Sets N/A N/A N/A
Sets 763,620,000.00 12,630,150.00 13,591,500.00
Sets N/A N/A N/A
Procurrement Inland Foundation Erection
SAT

Sets 101,071,368.00 2,202,180.00 2,496,000.00


Sets N/A N/A N/A
Sets 2,163,157,932.00 30,312,360.00 32,448,000.00
Sets N/A N/A N/A
Sets 145,913,040.00 3,886,200.00 5,616,000.00
Sets N/A N/A N/A
Sets 108,615,216.00 2,072,640.00 2,496,000.00
Sets 11,720,150.00 140,335.00 1,729,000.00
Sets 43,290,000.00 280,670.00 2,483,000.00
Sets 17,527,900.00 140,335.00 1,729,000.00
Sets 46,945,600.00 280,670.00 2,483,000.00

3,401,861,206.000 51,945,540.000 - 65,071,500.000

Route km
Route km 9,600,000.00
0 - - - -
Each 100,000,000.00
Each 78,000,000.00
Route km 4,800,000.00
- - - 192,400,000.000

Sets 177,866,653.00 8,018,670.00 22,228,688.60


Sets 1,987,466,927.00 89,599,939.00 248,381,490.00
Sets 219,636,310.50 9,901,750.00 27,448,805.45
Sets 242,326,592.50 10,924,684.00 30,284,499.00
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A

Towers 860,833,771.00
Towers 115,135,570.00
Towers 176,787,287.50
Towers N/A
Towers 491,167,867.00
Procurrement Inland Foundation Erection
SAT

Towers N/A
Towers 215,241,205.50
2,627,296,483.000 118,445,043.000 1,859,165,701.000 328,343,483.050

Sets N/A N/A N/A


Sets 796,621,416.00 35,913,670.00 99,556,884.00
Sets 604,550,589.70 27,254,640.00 75,553,044.00
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A

Towers 133,823,036.00
Towers N/A
Towers 323,378,164.00
Towers N/A
Towers 1,040,092,832.00
Towers 499,192,488.00
Towers N/A
1,401,172,005.700 63,168,310.000 1,996,486,520.000 175,109,928.000

Sets 303,839,701.00 13,697,847.40 37,972,032.45


Sets 682,017,454.00 30,747,038.40 85,234,380.00
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A

Towers 273,482,468.00
Towers 247,915,630.00
Towers N/A
Procurrement Inland Foundation Erection
SAT

Towers N/A
Towers N/A
Towers N/A
Towers N/A
985,857,155.000 44,444,885.800 521,398,098.000 123,206,412.450

Sets N/A N/A N/A


Sets N/A N/A N/A
Sets 974,472,105.00 43,931,620.00 121,783,578.00
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A

Towers 675,142,900.80
Towers N/A
Towers N/A
Towers N/A
Towers N/A
Towers N/A
Towers N/A
974,472,105.000 43,931,620.000 675,142,900.800 121,783,578.000

Sets N/A N/A N/A


Sets 926,013,810.00 41,747,000.00 115,727,556.00
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A
Sets N/A N/A N/A

Towers N/A
Procurrement Inland Foundation Erection
SAT

Towers 392,716,943.00
Towers N/A
Towers N/A
Towers N/A
Towers N/A
Towers 696,598,145.00
926,013,810.000 41,747,000.000 1,089,315,088.000 115,727,556.000

Sets
Sets
Sets
Sets
Sets
Sets
Sets

Towers
Towers
Towers
Towers
Towers
Towers
Towers
- - - -

Sets
Sets
m

- - - -

Ton
Ton
Procurrement Inland Foundation Erection
SAT

kg

m
m
m
m
m
m
- - - -

m3
m3
m3
- - - -

Towers 4,442,500.00 1,250,000.00 3,325,000.00


Towers 4,442,500.00 1,250,000.00 3,325,000.00
Towers 4,442,500.00 1,250,000.00 3,325,000.00
Sets N/A N/A N/A
13,327,500.000 3,750,000.000 - 9,975,000.000

Towers
km
Towers
Towers
Towers
Lot
set
- - - -

Lot 100,000,000.00
- - - 100,000,000.000

16,268,801,457.700 628,140,329.900 6,141,508,307.800 2,274,563,252.500


Total Price

5,725,484,587.00
129,844,220.50

325,499,384.60

110,862,804.00
6,450,067.00
6,821,867.00
30,094,996.00
26,521,590.00
21,521,590.00
6,383,101,106.100

342,657,000.00
384,823,440.00
61,951,680.00
23,352,250.00
27,612,250.00
840,396,620.000

10,733,563.00
8,223,630.00
-
-

18,957,193.000

-
-
-
789,841,650.00
-
Total Price

105,769,548.00
-
2,225,918,292.00
-
155,415,240.00
-
113,183,856.00
13,589,485.00
46,053,670.00
19,397,235.00
49,709,270.00

3,518,878,246.000

9,600,000.00

100,000,000.00
78,000,000.00
4,800,000.00
192,400,000.000

208,114,011.60
2,325,448,356.00
256,986,865.95
283,535,775.50
-
-
-

860,833,771.00
115,135,570.00
176,787,287.50
-
491,167,867.00
Total Price

-
215,241,205.50
4,933,250,710.050

-
932,091,970.00
707,358,273.70
-
-
-
-

133,823,036.00
-
323,378,164.00
-
1,040,092,832.00
499,192,488.00
-
3,635,936,763.700

355,509,580.85
797,998,872.40
-
-
-
-
-

273,482,468.00
247,915,630.00
-
Total Price

-
-
-
-
1,674,906,551.250

-
-
1,140,187,303.00
-
-
-
-

675,142,900.80
-
-
-
-
-
-
1,815,330,203.800

-
1,083,488,366.00
-
-
-
-
-

-
Total Price

392,716,943.00
-
-
-
-
696,598,145.00
2,172,803,454.000

-
-
-

-
-

-
-
Total Price

-
-

9,017,500.00
9,017,500.00
9,017,500.00
-
27,052,500.000

100,000,000.00
100,000,000.000

25,313,013,347.900
Alternative - 1 : Vertical Clearance Check Along Transmission Line - by Without Land Clearing
Table for tower type and number

No. Double sirkuit Angle Fungsion Tower Type Number


in Plan A (m) B (m) H (m) of Tower
1 AA 0o - 2o Suspension 5.50 1.30 33 26
38 4
2 BB 2o - 10o Tension 5.70 1.70 33 3
3 CC 10o - 30o Tension 5.90 2.00 38 1
4 DD 30 - 60
o o
Tension 6.00 2.20 24 2
33 1

Note : The dimensions of tower is required to make more detail in Detail Desain stage

Alternative - 2 : Vertical Clearance Check Along Transmission Line - by Land Clearing


at Required Location on the ROW

Table for tower type and number

No. Double sirkuit Angle Fungsion Tower Type Number


in Plan A (m) B (m) H (m) of Tower
1 AA 0o - 2o Suspension 5.50 1.30 24 20
33 9
38 1
2 BB 2o - 10o Tension 5.70 1.70 24 2
33 1
3 CC 10o - 30o Tension 5.90 2.00 33 1
4 DD 30 - 60
o o
Tension 6.00 2.20 24 2
33 1

Note : The dimensions of tower is required to make more detail in Detail Desain stage
y Without Land Clearing

Remarks

Tower: 9, 30 & 34
Tower: 4
Tower: 1 & 37
Tower: 32

Line - by Land Clearing

Remarks

Tower: 30 & 34
Tower: 9
Tower: 4
Tower: 1 & 37
Tower: 32