1.1 Six twin line conductors TACSR/AS 410/67 mm2 5.15 Route km 4,696,800,000.00 234,830,112.00
1.2 One earthwire conductor AS 70 mm2 5.15 Route km 126,175,000.00 3,669,220.50
One earthwire conductor OPGW 70 mm2 24 cores, complete with joint
1.3 5.15 Route km 270,375,000.00 4,403,064.60
boxes, fixing device, fixing clamps and necessary accessories
1.4 Armour rod for line conductor TACSR/AS 410/67 mm2 156 Sets 78,078,000.00 336,804.00
1.5 Armour rod for earthwireconductor AS 70 mm2 13 Sets 3,718,000.00 28,067.00
1.6 Armour rod for earthwireconductor OPGW 70 mm2 13 Sets 4,089,800.00 28,067.00
1.7 FO cable armoured, 24 cores, approx. 200 m per-set 2 Sets 25,000,000.00 94,996.00
1.8 Gantry Joint Box (GB) 2 Sets 25,000,000.00 21,590.00
1.9 Optical Terminal Box (OTB) 2 Sets 20,000,000.00 21,590.00
Subtotal-1 5,249,235,800.000 243,433,511.100
Hal : 1 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
Hal : 2 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
4.11 Single tension inverse insulator string set 120 kN with normal type 0 Sets N/A N/A
4.12 Single tension inverse insulator string set 120 kN with fog type 12 Sets 108,615,216.00 2,072,640.00
4.13 Earthwire suspension clamps for AS 70 mm2 13 Sets 11,720,150.00 140,335.00
4.14 Earthwire tension clamps for AS 70 mm2 26 Sets 43,290,000.00 280,670.00
4.15 Earthwire suspension clamps for OPGW 70 mm2 13 Sets 17,527,900.00 140,335.00
4.16 Earthwire tension clamps for OPGW 70 mm2 26 Sets 46,945,600.00 280,670.00
Note :
Suspension and tension insulator string complete with arching horn
Subtotal-4 3,401,861,206.000 51,945,540.000
Hal : 3 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
Hal : 4 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended AA11 type Slim Towers.
6.8 Class 1 Pad and Chimney 8 Towers
6.9 Class 2 Pad and Chimney 1 Towers
6.1 Class 3 Pad and Chimney 1 Towers
6.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
6.12 Class 5 Pad and Chimney (Enlarged) or Raft 2 Towers
6.13 Class 6 Piled 0 Towers
6.14 Class 7 Pad and Chimney 1 Towers
Subtotal-6 2,627,296,483.000 118,445,043.000
Hal : 5 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended BB11 type Slim Towers.
8.8 Class 1 Pad and Chimney 1 Towers
8.9 Class 2 Pad and Chimney 0 Towers
8.1 Class 3 Pad and Chimney 1 Towers
8.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
8.12 Class 5 Pad and Chimney (Enlarged) or Raft 2 Towers
8.13 Class 6 Piled 1 Towers
8.14 Class 7 Pad and Chimney 0 Towers
Subtotal-8 1,401,172,005.700 63,168,310.000
Hal : 6 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended CC11 type Slim Towers.
9.8 Class 1 Pad and Chimney 2 Towers
9.9 Class 2 Pad and Chimney 1 Towers
9.1 Class 3 Pad and Chimney 0 Towers
9.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
9.12 Class 5 Pad and Chimney (Enlarged) or Raft 0 Towers
9.13 Class 6 Piled 0 Towers
9.14 Class 7 Pad and Chimney 0 Towers
Subtotal-9 985,857,155.000 44,444,885.800
Hal : 7 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended DD11 type Slim Towers.
10.8 Class 1 Pad and Chimney 2 Towers
10.9 Class 2 Pad and Chimney 0 Towers
10.10 Class 3 Pad and Chimney 0 Towers
10.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
10.12 Class 5 Pad and Chimney (Enlarged) or Raft 0 Towers
10.13 Class 6 Piled 0 Towers
10.14 Class 7 Pad and Chimney 0 Towers
Subtotal-10 974,472,105.000 43,931,620.000
Hal : 8 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended DDR11 type Slim Towers.
12.8 Class 1 Pad and Chimney 0 Towers
12.9 Class 2 Pad and Chimney 1 Towers
12.10 Class 3 Pad and Chimney 0 Towers
12.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
12.12 Class 5 Pad and Chimney (Enlarged) or Raft 0 Towers
12.13 Class 6 Piled 0 Towers
12.14 Class 7 Pad and Chimney 1 Towers
Subtotal-12 926,013,810.000 41,747,000.000
Hal : 9 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended EE11 type Slim Towers.
13.8 Class 1 Pad and Chimney 0 Towers
13.9 Class 2 Pad and Chimney 0 Towers
13.10 Class 3 Pad and Chimney 0 Towers
13.11 Class 4 Block or Anchor Foundation (Rock) 0 Towers
13.12 Class 5 Pad and Chimney (Enlarged) or Raft 0 Towers
13.13 Class 6 Piled 0 Towers
13.14 Class 7 Pad and Chimney 0 Towers
Subtotal-13 - -
Subtotal-14 - -
Hal : 11 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
17 TOWER ACCESSORIES
17.1 Danger Plate with fixing facilities (2 sets per tower) 25 Towers 4,442,500.00 1,250,000.00
17.2 Number Plate & Phase Plate with fixing facilities (2 sets per tower) 25 Towers 4,442,500.00 1,250,000.00
17.3 Anti climbing guards (4 sets per tower) 25 Towers 4,442,500.00 1,250,000.00
17.4 Aircraft warning spheres ball 0 Sets N/A N/A
Subtotal-17 13,327,500.000 3,750,000.000
Hal : 12 dari 77
NO EQUIPMENT AND MATERIAL DESCRIPTION QTY SAT Procurrement Inland
Hal : 13 dari 77
BOBOT MINGGU LALU
Hal : 14 dari 77
BOBOT MINGGU LALU
N/A -
N/A -
N/A -
13,591,500.00 789,841,650.00 3.011 0.050 - 0.054 3.114
N/A -
2,496,000.00 105,769,548.00 0.398 0.009 - 0.010 0.417
N/A -
32,448,000.00 2,225,918,292.00 8.529 0.120 - 0.128 8.776
N/A -
5,616,000.00 155,415,240.00 0.575 0.015 - 0.022 0.613
Hal : 15 dari 77
BOBOT MINGGU LALU
N/A -
2,496,000.00 113,183,856.00 0.428 0.008 - 0.010 0.446
1,729,000.00 13,589,485.00 0.046 0.001 - 0.007 0.054
2,483,000.00 46,053,670.00 0.171 0.001 - 0.010 0.182
1,729,000.00 19,397,235.00 0.069 0.001 - 0.007 0.076
2,483,000.00 49,709,270.00 0.185 0.001 - 0.010 0.196
Hal : 16 dari 77
BOBOT MINGGU LALU
Hal : 17 dari 77
BOBOT MINGGU LALU
N/A -
99,556,884.00 932,091,970.00 3.141 0.142 - 0.393 3.675
75,553,044.00 707,358,273.70 2.384 0.107 - 0.298 2.789
N/A -
N/A -
N/A -
N/A -
Hal : 18 dari 77
BOBOT MINGGU LALU
Hal : 19 dari 77
BOBOT MINGGU LALU
N/A -
N/A -
121,783,578.00 1,140,187,303.00 3.842 0.173 - 0.480 4.495
N/A -
N/A -
N/A -
N/A -
Hal : 20 dari 77
BOBOT MINGGU LALU
N/A -
115,727,556.00 1,083,488,366.00 3.651 0.165 - 0.456 4.272
N/A -
N/A -
N/A -
N/A -
N/A -
Hal : 21 dari 77
BOBOT MINGGU LALU
N/A -
392,716,943.00 392,716,943.00 - - 1.548 - 1.548
N/A -
N/A -
N/A -
N/A -
696,598,145.00 696,598,145.00 - - 2.746 - 2.746
### 115,727,556.000 2,172,803,454.000 3.651 0.165 4.295 0.456 8.567 -
- - - - - -
- - - - - -
- - - - - -
Hal : 22 dari 77
BOBOT MINGGU LALU
- - - - - -
- - - - - -
- - - - - - - - -
- - - - - - - - -
Hal : 23 dari 77
BOBOT MINGGU LALU
- - - - - -
- - - - - -
- - - - - -
Hal : 24 dari 77
BOBOT MINGGU LALU
- - - - - - - - -
- - - - - -
- - - - - -
- - - - - - - - -
Hal : 25 dari 77
BOBOT MINGGU LALU
- - - - - - - - -
Hal : 26 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
Hal : 27 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
Hal : 28 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
Hal : 29 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
Hal : 30 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
Hal : 31 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
Hal : 32 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
Hal : 33 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
Hal : 34 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
Hal : 35 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - -
- - - - - - - - - -
Hal : 36 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
Hal : 37 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
Hal : 38 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
- - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
Hal : 39 dari 77
MINGGU KE :
TANGGAL :
OT BOBOT BOBOT
Erection and
QTY Inland Transfort Foundartion / Erection and
QTY Inland Transfort Foundartion / Erection and
JUMLAH Procurement JUMLAH Procurement JUMLAH
Individual Test Incl. Insurance Other Civil Work Individual Test Incl. Insurance Other Civil Work Individual Test
Site Manager
Hal : 40 dari 77
KETERANGAN
Hal : 41 dari 77
KETERANGAN
Hal : 42 dari 77
KETERANGAN
Hal : 43 dari 77
KETERANGAN
Hal : 44 dari 77
KETERANGAN
Hal : 45 dari 77
KETERANGAN
Hal : 46 dari 77
KETERANGAN
Hal : 47 dari 77
KETERANGAN
Hal : 48 dari 77
KETERANGAN
Hal : 49 dari 77
KETERANGAN
Hal : 50 dari 77
KETERANGAN
Hal : 51 dari 77
KETERANGAN
Hal : 52 dari 77
KETERANGAN
Hal : 53 dari 77
BOQ REFERENCE
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended AA11 type Slim Towers.
6.8 Class 1 Pad and Chimney 8
6.9 Class 2 Pad and Chimney 1
6.1 Class 3 Pad and Chimney 1
6.11 Class 4 Block or Anchor Foundation (Rock) 0
6.12 Class 5 Pad and Chimney (Enlarged) or Raft 2
EQUIPMENT AND MATERIAL DESCRIPTION QTY
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended BB11 type Slim Towers.
8.8 Class 1 Pad and Chimney 1
8.9 Class 2 Pad and Chimney 0
8.1 Class 3 Pad and Chimney 1
8.11 Class 4 Block or Anchor Foundation (Rock) 0
8.12 Class 5 Pad and Chimney (Enlarged) or Raft 2
8.13 Class 6 Piled 1
8.14 Class 7 Pad and Chimney 0
Subtotal-8
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended CC11 type Slim Towers.
9.8 Class 1 Pad and Chimney 2
9.9 Class 2 Pad and Chimney 1
9.1 Class 3 Pad and Chimney 0
EQUIPMENT AND MATERIAL DESCRIPTION QTY
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended DD11 type Slim Towers.
10.8 Class 1 Pad and Chimney 2
10.9 Class 2 Pad and Chimney 0
10.10 Class 3 Pad and Chimney 0
10.11 Class 4 Block or Anchor Foundation (Rock) 0
10.12 Class 5 Pad and Chimney (Enlarged) or Raft 0
10.13 Class 6 Piled 0
10.14 Class 7 Pad and Chimney 0
Subtotal-10
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended DDR11 type Slim Towers.
12.8 Class 1 Pad and Chimney 0
EQUIPMENT AND MATERIAL DESCRIPTION QTY
FOUNDATIONS
Complete foundation (including stubs, cleats and setting) for standard and
extended EE11 type Slim Towers.
13.8 Class 1 Pad and Chimney 0
13.9 Class 2 Pad and Chimney 0
13.10 Class 3 Pad and Chimney 0
13.11 Class 4 Block or Anchor Foundation (Rock) 0
13.12 Class 5 Pad and Chimney (Enlarged) or Raft 0
13.13 Class 6 Piled 0
13.14 Class 7 Pad and Chimney 0
Subtotal-13
Subtotal-14
TOWER ACCESSORIES
17.1 Danger Plate with fixing facilities (2 sets per tower) 25
17.2 Number Plate & Phase Plate with fixing facilities (2 sets per tower) 25
17.3 Anti climbing guards (4 sets per tower) 25
17.4 Aircraft warning spheres ball 0
Subtotal-17
TOTAL
Procurrement Inland Foundation Erection
SAT
Route km
Route km 9,600,000.00
0 - - - -
Each 100,000,000.00
Each 78,000,000.00
Route km 4,800,000.00
- - - 192,400,000.000
Towers 860,833,771.00
Towers 115,135,570.00
Towers 176,787,287.50
Towers N/A
Towers 491,167,867.00
Procurrement Inland Foundation Erection
SAT
Towers N/A
Towers 215,241,205.50
2,627,296,483.000 118,445,043.000 1,859,165,701.000 328,343,483.050
Towers 133,823,036.00
Towers N/A
Towers 323,378,164.00
Towers N/A
Towers 1,040,092,832.00
Towers 499,192,488.00
Towers N/A
1,401,172,005.700 63,168,310.000 1,996,486,520.000 175,109,928.000
Towers 273,482,468.00
Towers 247,915,630.00
Towers N/A
Procurrement Inland Foundation Erection
SAT
Towers N/A
Towers N/A
Towers N/A
Towers N/A
985,857,155.000 44,444,885.800 521,398,098.000 123,206,412.450
Towers 675,142,900.80
Towers N/A
Towers N/A
Towers N/A
Towers N/A
Towers N/A
Towers N/A
974,472,105.000 43,931,620.000 675,142,900.800 121,783,578.000
Towers N/A
Procurrement Inland Foundation Erection
SAT
Towers 392,716,943.00
Towers N/A
Towers N/A
Towers N/A
Towers N/A
Towers 696,598,145.00
926,013,810.000 41,747,000.000 1,089,315,088.000 115,727,556.000
Sets
Sets
Sets
Sets
Sets
Sets
Sets
Towers
Towers
Towers
Towers
Towers
Towers
Towers
- - - -
Sets
Sets
m
- - - -
Ton
Ton
Procurrement Inland Foundation Erection
SAT
kg
m
m
m
m
m
m
- - - -
m3
m3
m3
- - - -
Towers
km
Towers
Towers
Towers
Lot
set
- - - -
Lot 100,000,000.00
- - - 100,000,000.000
5,725,484,587.00
129,844,220.50
325,499,384.60
110,862,804.00
6,450,067.00
6,821,867.00
30,094,996.00
26,521,590.00
21,521,590.00
6,383,101,106.100
342,657,000.00
384,823,440.00
61,951,680.00
23,352,250.00
27,612,250.00
840,396,620.000
10,733,563.00
8,223,630.00
-
-
18,957,193.000
-
-
-
789,841,650.00
-
Total Price
105,769,548.00
-
2,225,918,292.00
-
155,415,240.00
-
113,183,856.00
13,589,485.00
46,053,670.00
19,397,235.00
49,709,270.00
3,518,878,246.000
9,600,000.00
100,000,000.00
78,000,000.00
4,800,000.00
192,400,000.000
208,114,011.60
2,325,448,356.00
256,986,865.95
283,535,775.50
-
-
-
860,833,771.00
115,135,570.00
176,787,287.50
-
491,167,867.00
Total Price
-
215,241,205.50
4,933,250,710.050
-
932,091,970.00
707,358,273.70
-
-
-
-
133,823,036.00
-
323,378,164.00
-
1,040,092,832.00
499,192,488.00
-
3,635,936,763.700
355,509,580.85
797,998,872.40
-
-
-
-
-
273,482,468.00
247,915,630.00
-
Total Price
-
-
-
-
1,674,906,551.250
-
-
1,140,187,303.00
-
-
-
-
675,142,900.80
-
-
-
-
-
-
1,815,330,203.800
-
1,083,488,366.00
-
-
-
-
-
-
Total Price
392,716,943.00
-
-
-
-
696,598,145.00
2,172,803,454.000
-
-
-
-
-
-
-
Total Price
-
-
9,017,500.00
9,017,500.00
9,017,500.00
-
27,052,500.000
100,000,000.00
100,000,000.000
25,313,013,347.900
Alternative - 1 : Vertical Clearance Check Along Transmission Line - by Without Land Clearing
Table for tower type and number
Note : The dimensions of tower is required to make more detail in Detail Desain stage
Note : The dimensions of tower is required to make more detail in Detail Desain stage
y Without Land Clearing
Remarks
Tower: 9, 30 & 34
Tower: 4
Tower: 1 & 37
Tower: 32
Remarks
Tower: 30 & 34
Tower: 9
Tower: 4
Tower: 1 & 37
Tower: 32