Documente Academic
Documente Profesional
Documente Cultură
1. Light saving All RM offices/depots to have • Relatively easy to carry out +5 Health and safety – poorly lit –2 +3 1st
campaigns reduced power lighting • No need to light empty areas areas may mean more accidents
with auto shut-off • Quite cheap to install
2. Relax delivery times Use fewer lorries by delivering • Saves on fuel +3 Inconvenient to get post –4 –1 3rd
non-essential post every 3 days • Employ fewer drivers irregularly
Saves on overall costs
3. Use LPG in all All lorries and vans to be • Saves on fuel +4 Not all stations have LPG – –3 +1 2nd
delivery vehicles fuelled by low emission liquefied • Reduces CO2 may make journeys longer if
petroleum gas • Saves on overall costs lorries have to travel further
to fill up
Royal Mail Climate Change Challenge Pack: UNIT 5