EAST COAST RAILWAY LINK PROJECT SECTION 6

(TENDER NO :- CCCC/ECRL/SC06/2019/___)

SUMMARY OF BILL OF QUANTITIES

SECTION 6 : Construction of Deep Soil Mixing Piling Works from Chainage 322+080 to Chainage 325+110

BILL DESCRIPTION FROM PAGE TOTAL AMOUNT (RM)

1 PRELIMINARIES BQ 1 / 2

2 BILL NO. 2 - DSM Piling Works BQ 2 / 1

3 DAYWORK SCHEDULE BQ 3 / 2 Rate only

GRAND TOTAL TO FORM OF TENDER (RM)

TEN SUM / 1 (A)


EAST COAST RAILWAY LINK PROJECT SECTION 6
(TENDER NO :- CCCC/ECRL/SC06/2019/___)

SECTION 6 : Construction of Deep Soil Mixing Piling Works from Chainage 322+080 to Chainage 325+110

BILL NO. 1 : PRELIMINARIES

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

PRELIMINARIES

A Allow for moving piling frame, plants, equipment and tools on and about site as
often as necessary for execution the Works under this section and all necessary
excavation that may entail for movement of piling frame, plant, equipment and
tools. any other necessary associates filling in and ramming including the
provision of hard standing and platform for the mounting piling frame, plant,
equipment and tools and piling at different shall be included .

Allow to comply with full Statutory Requirement, Employment of Legal Workers,


B CIDB Requlation & Compliances including Levy before and during the Works
execution.

C Provide all working and efficient Plant and Equipment Insurances.

The Main Contractor already have the insurance cover for the Works, etc CAR,
D WC AND TPL. if you feel necessary for your own extra Insurance cover .

E To provide temporary power, water, corrective making good to Works, mechanical


repairs,and consumables etc for the deep soil mixing pile works including the
proper sedimentation tank for the Works

F To submit and provide for all As Built Drawings, piling record, soil and cement
mixing drill depth signed records by the Project Employer.

To provide competent full time management, supervision and construction


G
management for this section of the DSM Piling Works.

--------------------------

H Mobilisation and Demobilisation of all piling equipment, the piling machine shall
minimun requirement of model capacity 280 and above, together with the number
of KD bar requirement at least 1.5 time of drilling pile length, the concrete casting
tremie pipe shall require at least 1.5 time of pile length and the Auger must fullfill
extra set. Allow for the cost of each piling equipment , machines (all including of
site management, plant and labour) necessary to complete the Works, properly as
per approved Construction Drawings, Specification and Bills of Quantities and
Contract Program. ( As a requirement provide sufficient Rigs to compliance with
Contract Program, all within this Subcontract value).

Item

J Allow for temporary Site Office and Off site Accommodation. Item

K The Main Contractor will provide the control point, you have engage PE to
establishment of all necessary bench marks for the setting out of the works
including the pile point & provision of site survey prior to commencement of any
permanent work. Item

L Provide all cost for incurred by complying with all safety, Health and Welfare
regulations appertaining to all workmen (including those employed by niminated
sub-contractors) employed on the site. the contractorshall provide and enfore all
safety measure as stipulated:-
1) Factories and Machinery regulation 1970
2) Occupational Safety and Health Act 1994
3) All other relevent safety at work legislations and regulations Item

M To privide the Performance Bond to the Main Contractor on thier Works Item

BF

BQ1 / 2
EAST COAST RAILWAY LINK PROJECT SECTION 6
(TENDER NO :- CCCC/ECRL/SC06/2019/___)

SECTION 6 : Construction of Deep Soil Mixing Piling Works from Chainage 322+080 to Chainage 325+110

BILL NO. 1 : PRELIMINARIES

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

CF

Other Items ( if any)

N Any other items deem necessary for Works not specified above
but required or implied from Contract Documentation, Drawings and
/or included in the Works Specifications and which are essential for the
proper execution Completion of this Section of the works. Item

TOTAL FOR BILL NO. 1 - CARRIED TO SUMMARY OF BILL OF QUANTITIES

BQ1 / 3
EAST COAST RAILWAY LINK PROJECT SECTION 6
(TENDER NO :- CCCC/ECRL/SC06/2019/___)

SECTION 6 : Construction of Deep Soil Mixing Piling Works from Chainage 322+080 to Chainage 325+110

BILL NO. 2 - DSM Piling Works

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

DEEP SOIL MIXING PILES (PROVISIONAL)

The pay length for drilling of DSM pile shall be measured from
the proposed earthwork platform level to the toe of
irrespective depth

Deep soil mixing pipe as below classified to the works:-

Moving machinery from piling points to another piling points to


form the following diameter deep soil mixing pile including
pumping in approved cement grout to mix with the existing
drilling soil and any other accessories and all fees to complete
on time.

A Forming 500mm diameter not exceeding 8m depth DSM pile


with approved cement grout as mixture to soil including the
drilling machine and together with the length of mixing rod
requirement at least 1.5 time of drilling pile length and the
mixing auger must full fill extra set. Deep Soil Mixing Columns m - Rate Only
shall achieve UCS 1.0Mpa and other standard requirement
according to specification. (Cement Grout
supply and deliver by Main Contractor)

B Forming 500mm diameter exceeding 8m depth DSM pile; m 1,172,443.00


ditto

Trial Columns
C To provide machines, tool and labour to carry out 4
successive trial column test in the field at the proposed
treatment site according to the specification and drawing No. Unit Rate Rate Only
requirement.

Field Testing of Working Columns


D The tests of working columns shall be carried out
according to the specification. No. Unit Rate Rate Only

TOTAL FOR BILL NO. 2 - CARRIED TO SUMMARY OF BILL OF QUANTITIES

BQ2 / 4
EAST COAST RAILWAY LINK PROJECT SECTION 6
(TENDER NO :- CCCC/ECRL/SC06/2019/___)

SECTION 6 : Construction of Deep Soil Mixing Piling Works from Chainage 322+080 to Chainage 325+110

BILL NO. 4 - DAYWORK SCHEDULE

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

A General labourer day Unit Rate Rate Only

B Semi skilled labourer day Unit Rate Rate Only

C Skilled labourer day Unit Rate Rate Only

D Concretor day Unit Rate Rate Only

E Barbender day Unit Rate Rate Only

F Drainlayer day Unit Rate Rate Only

G Carpenter day Unit Rate Rate Only

H Steelworker day Unit Rate Rate Only

J Welder day Unit Rate Rate Only

K Plasterer day Unit Rate Rate Only

L Tiler day Unit Rate Rate Only

M Glazier day Unit Rate Rate Only

N Plumber day Unit Rate Rate Only

O Roofer day Unit Rate Rate Only

P Painter day Unit Rate Rate Only

Q Truck driver day Unit Rate Rate Only

R Crane driver day Unit Rate Rate Only

S Piling equipment operator day Unit Rate Rate Only

T Pneumatic tool operator day Unit Rate Rate Only

BQ4 / 5
EAST COAST RAILWAY LINK PROJECT SECTION 6
(TENDER NO :- CCCC/ECRL/SC06/2019/___)

SECTION 6 : Construction of Deep Soil Mixing Piling Works from Chainage 322+080 to Chainage 325+110

BILL NO. 4 - DAYWORK SCHEDULE

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

A Compressor - Portable (including tools and hose) day Unit Rate Rate Only

B Mobile crane - 25 tons day Unit Rate Rate Only

C Generator - 300 KVA day Unit Rate Rate Only

D Excavator - 200 day Unit Rate Rate Only

E Excavator - 300 day Unit Rate Rate Only

F Roller - 6 tons day Unit Rate Rate Only

G Roller - 10 tons day Unit Rate Rate Only

H Lorries - 6 wheels (licence) day Unit Rate Rate Only

J Lorries - 10 wheels (licence) day Unit Rate Rate Only

K Lorries - 10 wheels (non licence) day Unit Rate Rate Only

L Concrete mixer day Unit Rate Rate Only

M Backhoe day Unit Rate Rate Only

N Back pusher day Unit Rate Rate Only

O Flat compactor - 90kg day Unit Rate Rate Only

P Water pump - 75hp day Unit Rate Rate Only

Q Welding and cutting set - 375 amp day Unit Rate Rate Only

R Vibrator poke - 25mm day Unit Rate Rate Only

S Air Breaker day Unit Rate Rate Only

T Hydraulic Breaker - 300hp day Unit Rate Rate Only

TOTAL FOR BILL NO. 3 - CARRIED TO SUMMARY OF BILL OF QUANTITIES

BQ4 / 6