8- Laning of Section of NH-1 (New NH-44) from Mukarba Chowk at Km15.500 to Panipat Km 86.000 0N BOT (Toll) basis in the state
of Haryana)
Client National Highways Authority of India
Concessionaire Mukarba Chowk - Panipat Toll Roads Limited
IE SA Infra Pvt.Ltd
Contractor Pan India Infrastructures Pvt. Ltd
@
8- Laning of Section of NH-1 (New NH-44) from Mukarba Chowk at Km15.500 to Panipat Km 86.000 0N BOT (Toll) basis in the state
of Haryana)
Client National Highways Authority of India
Concessionaire Mukarba Chowk - Panipat Toll Roads Limited
IE SA Infra Pvt.Ltd
Contractor Pan India Infrastructures Pvt. Ltd
@
8- Laning of Section of NH-1 (New NH-44) from Mukarba Chowk at Km15.500 to Panipat Km 86.000 0N BOT (Toll) basis in the state
of Haryana)
Client National Highways Authority of India
Concessionaire Mukarba Chowk - Panipat Toll Roads Limited
IE SA Infra Pvt.Ltd
Contractor Pan India Infrastructures Pvt. Ltd
@
8- Laning of Section of NH-1 (New NH-44) from Mukarba Chowk at Km15.500 to Panipat Km 86.000 0N BOT (Toll) basis
in the state of Haryana)
Client National Highways Authority of India
Concessionaire Mukarba Chowk - Panipat Toll Roads Limited
IE SA Infra Pvt.Ltd
Contractor Pan India Infrastructures Pvt. Ltd
Material BITUMEN
Made By Apollo ANP 2000 Date of Calibration 26/06/18
Capacity 160 T/Hr Due date of Calibration 25/12/18
@
8- Laning of Section of NH-1 (New NH-44) from Mukarba Chowk at Km15.500 to Panipat Km 86.000 0N BOT (Toll) basis
in the state of Haryana)
Client National Highways Authority of India
Concessionaire Mukarba Chowk - Panipat Toll Roads Limited
IE SA Infra Pvt.Ltd
Contractor Pan India Infrastructures Pvt. Ltd
0 0 0 0.0 0.00
20.0 20.1 20 20.1 -0.25
40.0 40 40.7 40.4 -0.88
60.0 60.3 60.3 60.3 -0.50
80.0 80.1 81.1 80.6 -0.75
100.0 101 100.6 100.8 -0.80
120.0 121 121 121.0 -0.83
Filler 2
0 0 0 0.0 0.00
20.0 20 20.1 20.1 -0.25
40.0 39.8 40.4 40.1 -0.25
60.0 60 61 60.5 -0.83
80.0 80.2 80.7 80.5 -0.56
100.0 100 100.4 100.2 -0.20