CASE

in.dlink.com June, 2019 STUDY

Deployment of 10G Switching Infrastructure


Backbone For SARDAR PATEL GUJARAT
CRICKET STADIUM AT MOTERA (AHMEDABAD)
EXECUTIVE SUMMARY

Customer Sardar Patel Gujarat Cricket Stadium At Motera

Industry Gujarat Cricket Association ( GCA )

Location Ahmedabad (GUJRAT), INDIA

Challenge To deliver robust and scalable switching infrastructure


that shall integrate with multiple OEM products
providing seamless connectivity to IP cameras, PA
systems, wireless and Biometric.

Solution D-LINK provided 10G Optical Network switching


infrastructure

Results Robust rich scalable infrastructure with high reliability


and redundancy for the worlds largest stadium

As of 2020, it is the largest cricket stadium in the Solution Layer 2 Non PoE switches DGS-1510-52X
world and one of the largest sports venues overall, • Gigabit Stackable Smart Managed Switch with 10G
with a seating capacity of 110,000 spectators.[7] To adhere to the requirement of scalable network, D- Uplinks
Owned by the Gujarat Cricket Association, it is a LINK proposed 10G Optical backbone infrastructure , • Layer 2 management and security with Layer 3
regular venue for Test, ODI, and T20I matches. with Tier - II architecture. capabilities
• Static Routing and MSTP
Layer 3 switch DGS-3630 -28SC switch at core level
Project Requirement shall provide HA Active - Active mode with RPS Layer 2 Non PoE switches DGS-1210-28/ME
redundancy for 24/7 seamless operations. • Metro Ethernet Switches along with Gigabit SFP ports
The Stadium had a requirement for 10G scalable
for improved uplink bandwidth.
switching infrastructure as the backbone of the Layer 2 POE DGS-1510-28P at the distribution level for • Surge protection ensures resilience against unexpected
network. Layer 3 and Layer 2 POE & Non POE with PoE and L2 Multicast feature to integrate electrical spikes, while a full suite of security and
switches for the network were required to facilitate surveillance products . management features keeps your network safe from
connectivity for surveillance cameras & audio
internal and external threats
System that would result in easy access and Layer 2 Non POE switches DGS-1510-52X & DGS-1210-
monitoring. 28/ME
Result
For this availability of switches with VRRP - Virtual Layer 3 switch DGS-3630-28SC switch at core level D-Link provided best in class performance 10G switching
Router Redundancy Protocol, was required which • 28-Port Layer 3 Stackable Managed Gigabit Fiber solution architecture that delivers feature-rich, robust
would increase the availability and reliability of Switch solutions for network connectivity which will improve
routing paths via automatic default gateway • Switch Resource Management (SRM) for ? exible customer infrastructure reliability & redundancy.
selections on an IP subnetwork. management of system resources
• Redundant Power Supply (RPS) support
Products & Services
• MPLS L2VPM/L3 VPN support
Challenge • DGS-3630-28SC - Layer 2 Switch
• Full L3 routing protocol support including OSPF,
BGP, and ISIS for IPv4/IPv6 • DGS-1510-28P - Layer 2 PoE Switch
Smooth and efficient functioning of D-Link devices
• SDN-enabled switch, compatible with Openflow 1.3 • DGS-1510-52X - Layer 2 Non PoE Switch
was expected due to Integration with multiple
• DGS-1210-28/ME - Layer 2 Non PoE Switch
OEM products in the switching infrastructure that
connected IP cameras, PA systems, wireless APs Layer 2 PoE DGS-1510-28P at the distribution level
and Biometric. • Gigabit Stackable Smart Managed Switch with 10G
Uplinks
It was essential to deliver a robust and scalable • Layer 2 management and security with Layer 3 DGS-3630-28SC DGS-1510-28P
switching infrastructure which met all current and capabilities
future needs of the world's biggest cricket stadium. • Static Routing and MSTP
• 193 W PoE budget

DGS-1510-52X DGS-1210-28/ME