Commissioning Report
Commissioning:
Check:
Date:
-1-
#1 Generator Protection System I Commissioning Report (10CHA01)
I. Objective
This report is specially set for the designed of 2X300MW TTHERMAL POWER PLANT YAMUNA
NAGAR HARYANA-INDIA #1 Generator Protection System I(10CHA01) as a verification plan for
inspection of system and performance of device.
-2-
#1 Generator Protection System I Commissioning Report (10CHA01)
4.6 The testing capacity cannot exceed the limit number specified in the technical datasheet for every device.
V. Testing Contents
5.1 Machinery appearance and configuration inspection
5.2 Equipment and connections
5.3 Insulation property
5.4 Electric property
-3-
#1 Generator Protection System I Commissioning Report (10CHA01)
(MΩ)
1 DC circuit to earth >100MΩ
2 AC circuit to earth >100MΩ
3 Open circuit to earth >100MΩ
4 Out circuit to earth >100MΩ
5 DC circuit to AC circuit >100MΩ
6 DC circuit to open circuit >100MΩ
7 DC circuit to out circuit >100MΩ
8 AC circuit to out circuit >100MΩ
9 AC circuit to out circuit >100MΩ
10 Open circuit to out circuit >100MΩ
Note: not less than 5 MΩ with secondary circuit, not less than 10 MΩ without secondary circuit.
Code /Model ANSI Code setting value function Setting value Remarks
Address
-4-
#1 Generator Protection System I Commissioning Report (10CHA01)
-5-
#1 Generator Protection System I Commissioning Report (10CHA01)
Check if the magnitude and polarity of voltage meet the requirement by multimeter before the equipment
electrified with DC. Check the DC control voltage of input circuit on relay according to the design requirement
1. DC input:
2. Press the LED reset button to check if the light on the panel bright and the testing finished: Press the B10
black button the check if the yellow and red light are bright and the testing finished.
Test result: OK
F11 (7UM6225-5EB92-0CA0):
Sampling value of currentM1(side1) IA IB IC
IE
0.6 0.6 0.6
0.1A
3 3.01 3
0.5A
6.02 6 6.02
1A
12.02 12.01 12.01
2A
Sampling value of Current M2 IA IB IC
(side2) IE
0.6 0.6 0.6
0.1A
3.01 3 3.01
0.5A
6.01 6.01 6
1A
12.01 12 12.01
2A
Sampling value of voltage UAB UBC UCA Uen
0.91 0.909 0.91 0.91
5V
1.82 1.818 1.82 1.82
10V
3.636 3.64 3.636 3.64
20V
-6-
#1 Generator Protection System I Commissioning Report (10CHA01)
Note: reading is first value Unit: kA; kV. Transformation ratio CT is set as 30000/5A; Transformation ration
PT is set as 20kV/110V.
F12 (7UM6115-5EB90-0AA0):
Sampling value of current IA IB IC
0.6 0.6 0.6
0.1A
3 3.01 3.01
0.5A
6.01 6.02 6.02
1A
12.01 12.02 12
2A
Sampling value of voltage UAB UBC UCA Uen
0.909 0.91 0.909 0.909
5V
1.818 1.8 1.82 1.818
10V
3.636 3.64 3.64 3.636
20V
Test result:OK
-7-
#1 Generator Protection System I Commissioning Report (10CHA01)
ct
Slope 2 S2=0.5 SIDE1 A & S2 A SIDE1 B & SIDE2 B SIDE1 C & SIDE2 C
io 16.453A/9.01A 16.453A/9A 16.453A/8.98A
Basic point
n 2.5 I/In0
8
7
G
Protection Setting value Operated value Setting time (s) Operated time (s)
10V 10.01V 0.3 0.301
59N>
Protection Setting value Operated value Setting time (s) Operated time (s)
2V 2.01V 0.5 0.501
59TN>
Protection Setting value Operated value Setting time (s) Operated time (s)
0.11 Ohm 0.11 Ohm 0.3 0.3
Z1
0.19 Ohm 0.19 Ohm 0.3 0.3
Z1B
0.19 Ohm 0.19 Ohm 3.5 3.501
Z2
Protection Setting value Operated value Setting time (s) Operated time (s)
120V 119.85V 3 3.02
U>
130V 129.73V 0.5 0.501
U>>
-8-
#1 Generator Protection System I Commissioning Report (10CHA01)
Protection Setting value Operated value Setting time (s) Operated time (s)
2.2V 2.2V 0.5 0.501
95
Protection Setting value Operated value Setting time (s) Operated time (s)
75V 74.99V 3 3.01
U<
65V 64.95V 0.5 0.502
U<<
Protection Setting value Operated value Setting time (s) Operated time (s)
7A 7.01A 3.5 3.499
I>
80V 79.9V 8 8.01
U<
-9-
#1 Generator Protection System I Commissioning Report (10CHA01)
(109.55MW,-189.63MVAR)
60°
(177.75MW,-177.81MVAR)
45°
Oerated time(s) Operated time t1=10.02 Operated time t2 Operated time t3 t3=2.03
t2=0.505
Φ1 80° Φ2 90° Φ3 110°
Setting value
Φ1=arctg[(177.75-109.55)/(-177.81+189.63)]= 80.167°
Calculate
Φ2=arctg[(50.26-0)/(-187.46+187.38)]= 89.94°
Φ3=arctg[(129.35-0)/(-505.93+458.78)]=110°
Protection Setting value Operated value Setting time (s) Operated time (s)
1.07 1.07 10 10.242
24-1
1.2 1.2 60 60.21
24-2
12. Test data of frequency protection (81):
Protection Setting value (HZ) Operated value (HZ) Setting time (s) Operated time (s)
48.0 47.9 1 1.01
81-1
47.0 46.8 6 5.99
81-2
49.5 49.46 20 20.03
81-3
52 52.1 10 10.08
81-4
Protection Setting value Operated value Setting time (s) Operated time (s)
96.6% 482.69W 10 9.98
P>
7.7% 73.83W 2 1.99
P<
Protection Setting value Operated value Setting time (s) Operated time (s)
10% 0.504A 20 19.89
46-1
- 10 -
#1 Generator Protection System I Commissioning Report (10CHA01)
Protection Setting value Operated value Setting time (s) Operated time (s)
-3.62% -11.49W 5 5.08
P>
Test result: OK
- 11 -
#1 Generator Protection System I Commissioning Report (10CHA01)
Unit transformer#1 zero- Short circuit between X130-21 and X130-32 BI12 √
sequence differential
protection on low voltage
Unit transformer#1 Short circuit between X130-21 and X130-33 BI13 √
instantaneous current
protection on the high
voltage side
unit transformer#2 Short circuit between X130-21 and X130-34 BI14 √
instantaneous current
protection on the high
voltage side
Main transformer on the Short circuit between X130-21 and X130-35 BI15 √
side of high voltage backup
earth fault protection
- 12 -
#1 Generator Protection System I Commissioning Report (10CHA01)
- 13 -
#1 Generator Protection System I Commissioning Report (10CHA01)
- 14 -
#1 Generator Protection System I Commissioning Report (10CHA01)
X160:30-31 OPEN √
X160:33-34 OPEN √
Close L101 X160:35-37 CLOSE √
Close L102 X160:39-41 CLOSE √
Close L103 X160:43-45 CLOSE √
Close L104 X160:47-49 CLOSE √
Close L105 X160:51-53 CLOSE √
Close L106 X160:55-57 CLOSE √
Close L107 X160:59-61 CLOSE √
Close L108 X160:63-65 CLOSE √
Close L111 X160:67-69 CLOSE √
Close L112 X160:71-73 CLOSE √
Close L113 X160:75-77 CLOSE √
X170:15-16 CLOSE √
X171:7-8 CLOSE √
X172:7-8 CLOSE √
X173:3-4 CLOSE √
X100:3-9 CLOSE √
F11 X160:21-22 OPEN √
GEN.LOW IMPEDANCE PROT X160:24-25 OPEN √
21G
X160:27-28 OPEN √
X160:30-31 OPEN √
X160:33-34 OPEN √
Close L101 X160:35-37 CLOSE √
Close L102 X160:39-41 CLOSE √
Close L103 X160:43-45 CLOSE √
Close L104 X160:47-49 CLOSE √
Close L105 X160:51-53 CLOSE √
Close L106 X160:55-57 CLOSE √
Close L107 X160:59-61 CLOSE √
Close L108 X160:63-65 CLOSE √
Close L111 X160:67-69 CLOSE √
Close L112 X160:71-73 CLOSE √
- 15 -
#1 Generator Protection System I Commissioning Report (10CHA01)
- 16 -
#1 Generator Protection System I Commissioning Report (10CHA01)
- 17 -
#1 Generator Protection System I Commissioning Report (10CHA01)
X172:7-8 CLOSE √
X173:3-4 CLOSE √
X100:3-9 CLOSE √
F11 X160:21-22 OPEN √
GEN. UNBLANCED LOAD PROT X160:24-25 OPEN √
I2>>TRIP
46-2
X160:27-28 OPEN √
X160:30-31 OPEN √
X160:33-34 OPEN √
Close L101 X160:35-37 CLOSE √
Close L102 X160:39-41 CLOSE √
Close L103 X160:43-45 CLOSE √
Close L104 X160:47-49 CLOSE √
Close L105 X160:51-53 CLOSE √
Close L106 X160:55-57 CLOSE √
Close L107 X160:59-61 CLOSE √
Close L108 X160:63-65 CLOSE √
Close L111 X160:67-69 CLOSE √
Close L112 X160:71-73 CLOSE √
Close L113 X160:75-77 CLOSE √
X170:15-16 CLOSE √
X171:7-8 CLOSE √
X172:7-8 CLOSE √
X173:3-4 CLOSE √
X100:3-9 CLOSE √
F11 Close L111 X160:67-69 CLOSE √
GEN. UNDER FREQUENCY PROT. X170:17-18 CLOSE √
F<47HZ
81U-3
X171:9-10 CLOSE √
X172:9-10 CLOSE √
X173:5-6 CLOSE √
X100:3-9 CLOSE √
F11 Close L111 X160:67-69 CLOSE √
GEN. OVEREXCETION PROT. X170:17-18 CLOSE √
STAGE-II
X171:9-10 CLOSE √
- 18 -
#1 Generator Protection System I Commissioning Report (10CHA01)
X172:9-10 CLOSE √
X173:5-6 CLOSE √
X100:3-9 CLOSE √
F11 EXTERNAL BINARY INPUT X160:21-22 OPEN √
BI: GT OVERALL DIFFERENTIAL X160:24-25 OPEN √
PROT
BI: UAT #1 DIFFERENTIAL PROT
X160:27-28 OPEN √
BI: UAT #1 DIFFERENTIAL PROT X160:27-28 OPEN √
BI: UAT #1 LV RESTRICTED E/F X160:30-31 OPEN √
PROT
X160:33-34 OPEN √
BI: UAT #1 HV HIGH SET INST.O/C
PROT Close L101 X160:35-37 CLOSE √
+ LOW SET INVERSE O/C PROT Close L102 X160:39-41 CLOSE √
BI: UAT #1 HV HIGH SET INST.O/C
Close L103 X160:43-45 CLOSE √
PROT
+ LOW SET INVERSE O/C PROT Close L104 X160:47-49 CLOSE √
BI: GT HV IDMT STANDBY E/F Close L105 X160:51-53 CLOSE √
PROT
Close L106 X160:55-57 CLOSE √
- 19 -
#1 Generator Protection System I Commissioning Report (10CHA01)
- 20 -
#1 Generator Protection System I Commissioning Report (10CHA01)
- 21 -
#1 Generator Protection System I Commissioning Report (10CHA01)
- 22 -
#1 Generator Protection System I Commissioning Report (10CHA01)
PROT. ALARM
F11 OVER EXCITATION PROT. 1 X171:23-24 CLOSE √
ALARM X172:23-24 CLOSE √
F11 LOSS OF SYNCHRONISM X171:25-26 CLOSE √
PROTECTION CHARACTERISTIC X172:25-26 CLOSE √
2 ALARM
F11 WATER CUT-OFF PROT. T1 X171:27-28 CLOSE √
ALARM X172:27-28 CLOSE √
F11 VT1 LINE BREAKAGE X171:29-30 CLOSE √
X172:29-30 CLOSE √
Close L116 X160:95-97 CLOSE √
F11 WINDING TEMP. HIGH X171:33-34 CLOSE √
X172:33-34 CLOSE √
F11 WINDING TEMP. HIGH-HIGH X171:35-36 CLOSE √
X172:35-36 CLOSE √
F12 REVERSE POWER PROT. X171:31-32 CLOSE √
ALARM X172:31-32 CLOSE √
F11 PROT. 1 7UM622 TRIP X170:11-12 CLOSE √
F12 PROT. 1 7UM611 TRIP X170:13-14 CLOSE √
PROT. SYSTEM FAULT X171:1-2 CLOSE √
X172:1-2 CLOSE √
PROT. SYSTEM 1 TRIP X171:5-6 CLOSE √
X172:5-6 CLOSE √
PROT. CABINET POWER BUS X171:3-4 CLOSE √
DISAPPEAR X172:3-4 CLOSE √
Test result:OK
- 23 -
#1 Generator Protection System I Commissioning Report (10CHA01)
- 24 -