BILL NO.

1: MAIN BUILDING
PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX EXCAVATION AND EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/1


EXCAVATION AND EARTHWORK

Excavate basement pits

A Pit excavation not exceeding 1.50 m deep. 834 m3 22.68 18,915.12

B Pit excavation not exceeding 1.50 m - 3.00


m deep. 168 m3 45.36 7,620.48

C Pit excavation not exceeding 3.00 m - 4.50


m deep. 90 m3 68.04 6,123.60

D Trench excavation not exceeding 1.50 m


deep. 28 m3 22.68 635.04

Disposal.

E Backfilling around foundations with


selected excavated materials; laid in layers
of 150 mm thickness, watered, rolled and
compacted to 98% Proctor Value
compaction.
134 m3 28.35 3,798.90

F Remove surplus excavated material from


site. 986 m3 31.75 31,305.50

Filling.

G Approved imported fill material laid in


layers of approved thickness, watered, rolled
and compacted to 98% Proctor Value
compaction. 538 m3 43.09 23,182.42

QDC/1862 BOQ : Page 1/1/2 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX EXCAVATION AND EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 91,581.06

Collection

Page 1/1/1 91,581.06

QDC/1862 BOQ : Page 1/1/3 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX EXCAVATION AND EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

EXCAVATION AND EARTHWORK To Summary QR. 91,581.06

QDC/1862 BOQ : Page 1/1/4 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/2


CONCRETE WORK

CONCRETE-BASEMENT /
SUBSTRUCTURE

Plain in-situ concrete Grade SRC 20 with


gabbro aggregate conforming to BS 882 to
the approval of the ENGINEER; finish to
receive waterproofing membrane/ paint
(measured separately)

A Blinding; 50 mm thick (minimum),


horizontal or sloping not exceeding 15o. 1643 m2 28.35 46,579.05

B Blinding; 50 mm thick (minimum),


exceeding 15o. 2 m2 56.70 113.40

Reinforced in-situ concrete Grade OPC 30


with gabbro aggregate conforming to BS
882 to the approval of the ENGINEER

C Isolated foundation 410 m3 504.63 206,898.30

D Plinth beam 52 m3 504.63 26,240.76

E Columns upto ground floor level 18 m3 515.97 9,287.46

F Beds; 200 mm thick, including thickening to


beds. 174 m3 504.63 87,805.62

G Wall footing 1 m3 1,134.00 1,134.00

H RCC wall 37 m3 515.97 19,090.89


`
J Lift wall 2 m3 515.97 1,031.94

QDC/1862 BOQ; Page 1/2/5 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 398,181.42

CONCRETE-SUPERSTRUCTURE

Reinforced in-situ concrete Grade OPC 30


with gabbro aggregate conforming to BS
882 to the approval of the ENGINEER.

A Columns above Ground Floor level 166 m3 515.97 85,651.02

B Suspended solid floors, roof slab, landings,


etc. horizontal and slopping not exceeding
150 from horizontal
549 m3 504.63 277,041.87

C Beams, tie-beams, cantilever beam and the


like including beam-projections and
thickening; horizontal and slopping not
exceeding 150 from horizontal
278 m3 504.63 140,287.14

D Staircase and strings above Ground Floor


level 34 m3 515.97 17,542.98

E Lift wall 26 m3 515.97 13,415.22

F Roof plinth 12 m3 515.97 6,191.64

Mass in-situ concrete Grade OPC 30 with


gabbro aggregate conforming to BS 882 to
the approval of the ENGINEER

G Ramp & Steps 18 m3 515.97 9,287.46

QDC/1862 BOQ; Page 1/2/6 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 549,417.33

REINFORCEMENT-SUBSTRUCTURE

Steel fabric reinforcement to BS 4449;


include for all laps, cutting and fitting

High yield strength uncoated deformed bars


with a charecteristic strength of 460
N/mm2(QD43) as supplied by Qatar Steel
Company (QASCO), unless otherwise
specified.

A Bars in assorted diameters to concrete 80,225 Kg 3.23 259,126.75

REINFORCEMENT-SUPERSTRUCTURE

High yield strength uncoated deformed bars


with a charecteristic strength of 460
N/mm2(QD43) as supplied by Qatar Steel
Company (QASCO), unless otherwise
specified.

B Bars in assorted diameters to concrete 210,770 Kg 3.23 680,787.10

QDC/1862 BOQ; Page 1/2/7 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 939,913.85

FORMWORK-BASEMENT/
SUBSTRUCTURE.

Wrought formwork; smooth face finish for


concrete to receive waterproofing membrane
/paint

A To vertical or battering sides of isolated


foundations. 352 m2 181.44 63,866.88

B To vertical or battering sides of plinth


beams. 391 m2 49.90 19,510.90

C To vertical or battering sides of columns,


pedestal, etc. 136 m2 48.48 6,593.28

D Sides of wall footing 2 m2 107.73 215.46

E To vertical or battering sides of RCC wall. 230 m2 64.64 14,867.20

F To vertical or battering sides of lift wall. 18 m2 68.04 1,224.72

QDC/1862 BOQ; Page 1/2/8 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 106,278.44

FORMWORK-SUPERSTRUCTURE.

Wrought formwork; smooth face finish for


concrete

A To horizontal soffits of suspended solid slab


over exceeding 3.50 m but, not exceeding
5.00 m high.
2273 m2 89.59 203,638.07

B To risers and strings of steps and stair-case,


ramp 180 m2 70.31 12,655.80

C To sides and soffits of horizontal beams,


cantilever beams, tie-beams, roof beam and
the like including beam-projections etc.
exceeding 3.50 m but, not exceeding 5.00 m
high. 1879 m2 55.00 103,345.00

D To vertical or battering sides of columns,


piers, pilasters etc.
1445 m2 47.63 68,825.35

E To vertical or battering sides of lift wall. 267 m2 43.09 11,505.03

F To vertical or battering sides of roof plinth. 67 m2 43.09 2,887.03

QDC/1862 BOQ; Page 1/2/9 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 402,856.28

PRECAST / IN SITU CONCRETE

Precast reinforced concrete Grade 30 OPC


including reinforcement, fixed in the
positions as shown on drawings, bedded and
jointed in cement-sand mortar as specified.

A Lintel 200 x 200 mm. 193 m 56.70 10,943.10

B Lintel 200 x 300 mm. 26 m 81.65 2,122.90

QDC/1862 BOQ; Page 1/2/10 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 13,066.00

SUNDRIES

Nitoproof 100+' and 'Nitoproof 120'


waterproofing paint, overall thickness 1
mm; apply to concrete surface in accordance
with the manufacturer's recommendation.

A To vertical surfaces of concrete. 1294 m2 9.07 11,736.58

3 mm thick hardboard protection to comply


with the Project Specification and conform
to BS 8102:1990 ; suitably bonded to retain
position.

B To horizontal surfaces of concrete 479 m2 13.61 6,519.19

C To vertical surfaces of concrete. 1294 m2 13.61 17,611.34

Polyethylene sheet to BS 2782 from an


approved manufacturer; laid in accordance
with the manufacturer's recommendation as
specified and to the approval of the
Engineer.

D 1000 guage Polythylene sheet. 1643 m2 3.40 5,586.20

QDC/1862 BOQ; Page 1/2/11 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 41,453.31

Flexcel joints as specified and shown on


Drawing No. QDC/1862-1.

A 12 mm thick korkpak or other approved


board, set vertically between concrete
members. 83 m2 90.72 7,529.76

B 12 x 20 mm approved polysulphide sealant 635 m 9.07 5,759.45

QDC/1862 BOQ; Page 1/2/12 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 13,289.21

Collection

Page 1/2/1 398,181.42

Page 1/2/2 549,417.33

Page 1/2/3 939,913.85

Page 1/2/4 106,278.44

Page 1/2/5 402,856.28

Page 1/2/6 13,066.00

Page 1/2/7 41,453.31

Page 1/2/8 13,289.21

QDC/1862 BOQ; Page 1/2/13 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CONCRETE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

CONCRETE WORK To Summary QR. 2,464,455.84

QDC/1862 BOQ; Page 1/2/14 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
BLOCKWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/3

BLOCKWORKS

Hollow concrete blocks to BS 6073, 7


N/mm2 minimum compressive strength,
bedded and jointed in Class 2 cement mortar
with and including concrete bond,
expansion/movement joints and necessary
fixing and accessories as specified.

A 150 mm thick internal skin of cavity walls. 1121 m2 79.38 88,984.98

B Extra for filling hollow blocks solids with


concrete Grade 20 around openings, at ends
of wall, abutments and the like . 1 Item 5,670.00 5,670.00

C 200 mm thick internal partition walls 1068 m2 81.65 87,202.20

D 200 mm thick external walls to mechanical


room. 45 m2 81.65 3,674.25

E 200 mm thick upstand at technical room in


GF & FF. 36 m2 81.65 2,939.40

F Extra for filling hollow blocks solids with


concrete Grade 20 around openings, at ends
of wall, abutments and the like . 1 Item 396.90 396.90

QDC/1862 BOQ : Page 1/3/15 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
BLOCKWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 188,867.73

Solid concrete blocks to BS 6073, 15


N/mm2 minimum compressive strength,
bedded and jointed in Class 1 cement mortar
with and including concrete bond,
expansion/movement joints and necessary
fixing and accessories as specified.

A 100 mm thick internal partition walls to


toilet and shafts. 220 m2 82.78 18,211.60

B 100 mm thick external skin of cavity walls. 849 m2 86.18 73,166.82

C 150 mm thick shaft for R.W.O. 174 m2 124.74 21,704.76

D 200 mm thick external skin of cavity walls. 550 m2 130.41 71,725.50

E 200 mm thick parapet wall at lower roof &


upper roof level. 236 m2 130.41 30,776.76

F 200 mm thick upstand for shafts & service


shafts at roof level. 20 m2 130.41 2,608.20

Approved precast concrete coping found @


parapet as specified and as per detailed on
Drawing No.1862-AR-B1-5-006 sht 01 of
02.
G Precast concrete coping 209 m 68.04 14,220.36

QDC/1862 BOQ : Page 1/3/16 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
BLOCKWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 232,414.00

SUNDRIES

A 50 mm thick expanded polystyrene wrapped


in polythene sheet insulation with density of
26-28 Kg/m3 as 'Isobond ND' by 'Isofoam'
or other equal and approved. 1121 m2 22.68 25,424.28

QDC/1862 BOQ : Page 1/3/17 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
BLOCKWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 25,424.28

Collection

Page 1/3/1 188,867.73

Page 1/3/2 232,414.00

Page 1/3/3 25,424.28

QDC/1862 BOQ : Page 1/3/18 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
BLOCKWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BLOCK WORK To Summary QR 446,706.01

QDC/1862 BOQ : Page 1/3/19 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO:1: MAIN BUILDING
AT KTC COMPLEX
ROOFING

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/4

ROOFING

BUILT-UP ROOFING

SURFACING

Cement and sand screeded bed as specified.

A Screeded bed; trowelled finished to falls and


cross-falls; minimum 50 mm thick. 928 m2 44.50 41,296.00

B 50 x 50 mm Angle fillet. 447 m 4.45 1,989.15

BITUMINOUS ROOF-COVERING

4 mm thick polymer modified (APP),


reinforced non-woven polyester cored torch
applied waterproofing membrane,
conforming to Clause 2.2.1of the Project
Specification; laid in accordance with the
manufacturer's recommendations.

C Covering on trowelled bed laid to falls. 928 m2 25.59 23,747.52

4 mm thick polymer modified (APP),


reinforced non-woven polyester cored torch
applied waterproofing membrane with
mineral finish, conforming to Clause 2.2.1
Item B of the Project Specification; laid in
accordance with the manufacturer's
recommendations.

D Skirting100-300 mm girth; one end dressed


over angle fillet, other end dressed into and
including 25 x 25 mm groove; sealed with
polysulphide sealant.
447 m 27.81 12,431.07

QDC/1862 BOQ : Page 1/4/1 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO:1: MAIN BUILDING
AT KTC COMPLEX
ROOFING

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 79,463.74

4 mm thick polymer modified (APP),


reinforced non-woven polyester cored torch
applied waterproofing membrane with
mineral finish, conforming to Clause 2.2.1
Item B of the Project Specification; laid in
accordance with the manufacturer's
recommendations.

A Water proofing membrane over roof plinths. 29 m2 38.93 1,128.97

B Water proofing membrane around roof


plinths. 162 m 27.81 4,505.22

C S.S bell mouth render stop 285 m 27.81 7,925.85

D Dress membrane into rainwater gargoyle.


11 No. 278.10 3,059.10

INSULATION AND PROTECTION

Extruded close cell polystyrene rigid foam


board with rebated edges.

E 50 mm thick (Density 32-35 Kg/m3)


Insulation laid loose with tight, staggered
joints on waterproofing membrane.
928 m2 24.47 22,708.16

1000 Gauge polythene sheet filter


membrane from an approved manufacturer.

F Filter membrane laid on insulation. 928 m2 5.56 5,159.68

QDC/1862 BOQ : Page 1/4/2 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO:1: MAIN BUILDING
AT KTC COMPLEX
ROOFING

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 44,486.98

Protecting covering ballast as specified

A 50 mm thick layer of lime stone


chipping(25-30mm ) normal size. 858 m2 20.02 17,177.16

Approved precast concrete slab


hydraulically pressed as specified.

B 500 x 500 x 50 mm thick hydraulically


pressed concrete slab 70 m2 122.36 8,565.20

Construction joints as specified.

C Allow for all necessary construction joints. 1 Item 1,112.40 1,112.40

TESTING

D Water test of the work as per the Project


Specification 1 Item 1,112.40 1,112.40

1000 Gauge polythene sheet filter


membrane from an approved manufacturer.
Filter membrane laid on insulation.

QDC/1862 BOQ : Page 1/4/3 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO:1: MAIN BUILDING
AT KTC COMPLEX
ROOFING

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection 27,967.16

Collection :

Page 1/4/1 79,463.74

Page 1/4/2 44,486.98

Page 1/4/3 27,967.16

QDC/1862 BOQ : Page 1/4/4 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO:1: MAIN BUILDING
AT KTC COMPLEX
ROOFING

Item Description Quantity Unit Rate (QR) Amount (QR)

ROOFING To Summary QR. 151,917.88

QDC/1862 BOQ : Page 1/4/5 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CARPENTRY AND JOINERY

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/5

CARPENTRY AND JOINERY


DOORS

44 mm thick semi solid core laminated


flush doors; lipped all around with 15 mm
thick solid teakdwood and faced with a
minimum 6 mm thick commercial ply-
wood with 1.5mm thick high pressure
laminates; complete with 40 mm thick
meranti hard-wood door-frames to the full
width of the wall inclussive to finishes
with natural colour polished, fixed to
timber ground w/ 8mm dia bolt, bolt holes
pelleted w/ matching timber, 75 x 20 mm
thick meranti hard-wood architraves etc.;
all as shown on Drawing No.
QDC/1862/AR-B1-6-001 sht 01 of 04;
including paint finish as specified; fixing
frames to concrete or blockwork
including softwood packing as necessary.

A Door Type D1, single leaf door; size 1000


x 2200mm, located Penthouse floor in
H.toilet, office rooms & conference room. 6 No. 2,002.32 12,013.92

B Door Type D2, single leaf semi-solid core


wooden flush door faced w/ 6mm thk
commercial plywood finished w/
laminate(colour to the approval); size 900
x 2200mm, located at Penthouse floor in
ladies & gents toilet.
2 No. 2,002.32 4,004.64

C Door type D3, sigle leaf door faced with


water proof plywood laminate finished w/
100mm cut below; size 900 x 2100 mm
located at GF, FF & PF in WC. 12 No. 2,002.32 24,027.84

QDC/1862 BOQ : Page 1/5/1 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CARPENTRY AND JOINERY

Item Description Quantity Unit Rate (QR) Amount (QR)

Total Collection QR 40,046.40

44 mm thick solid core laminated doors


with 1.5 hour fire rated; lipped all around
with 15 mm thick solid hardwood and
faced with a minimum 6 mm thick
laminated commercial ply-wood + 2 layer
6mm thick supalux board ; complete with
40 mm thick meranti hard-wood door-
frames to the full width of the wall
inclussive to finishes with natural colour
polished, fixed to timber ground w/ 8mm
dia bolt, bolt holes pelleted w/ matching
timber, 75 x 20 mm thick meranti hard-
wood architraves etc.; all as shown on
Drawing No. QDC/1862/AR-B1-6-001
sht.01 of 04; icluding paint finished as
specified, fixing frames to concrete or
blockwork including softwood packing as
necessary.

A Door type FD1, double leaf 1.5 hour fire


rated door w/ 6 mm thk supalux board +
vision panel in fire rated glass; size 1500
x 2200 mm located at entrance lobby in
Penthouse floor.
1 No. 7,786.80 7,786.80

B Door type FD2, single leaf 1.5 hour fire


rated door w/ 6 mm thk supalux board +
vision panel in fire rated glass; size 1000
x 2200 mm located at main staircase, fire
staircase & S.S. lobby in GF, FF, PF &
Roof.
8 No. 3,893.40 31,147.20

C Door type FD3, single leaf 1.5 hour fire


rated door / 6 mm thk supalux board +
vision panel in fire rated glass; size 900 x
2200 mm located at ELV room & Pantry
in Penhouse floor.
2 No. 3,893.40 7,786.80

QDC/1862 BOQ : Page 1/5/2 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CARPENTRY AND JOINERY

Item Description Quantity Unit Rate (QR) Amount (QR)

D Door type FD4, double leaf 1.5 hour fire


rated door (to be used as access panel) w/
6 mm thk supalux board w/ lock
provision; size 750 x 600 mm located at
toilet shaft in GF.
1 No. 5,562.00 5,562.00
Total Collection QR 52,282.80

DOOR'S IRONMONGERY

Note: Door's ironmongery shall confirm


to detail specifications and schedules as
detailed on "ANNEXURE 2-
IRONMONGERY SCHEDULE"; from an
approved manufacturer; fixing to wooden
doors with matching screws .

A Ironmongery set for door type; D1 6 Set 1,090.15 6,540.90

B Ironmongery set for door type; D2 2 Set 1,090.15 2,180.30

C Ironmongery set for door type; D3 12 Set 556.20 6,674.40

D Ironmongery set for door type; FD1 1 Set 2,169.18 2,169.18

E Ironmongery set for door type; FD2 8 Set 2,191.43 17,531.44

F Ironmongery set for door type; FD3 2 Set 1,090.15 2,180.30

G Ironmongery set for door type; FD4 1 Set 389.34 389.34

MERANTI WOOD SKIRTING ON THE


WALL

H 100 mm high Meranti Wood Skirting to


office rooms & conference room at GF,
FF & SF. 229 m 72.31 16,558.99

QDC/1862 BOQ : Page 1/5/3 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CARPENTRY AND JOINERY

Item Description Quantity Unit Rate (QR) Amount (QR)

Total Collection QR 54,224.85

KITCHEN/PANTRY CABINETS

BASE UNIT, SINK UNIT & WALL


UNIT

Base, Sink & Wall Units from 'an


approved manufacturer or equal an
approved; comprising 18 mm thick
plywood laminated with melamine on
both sides , drawers, shelves and 15 mm
thick interior carcasing with 8mm
hardwood lipping all around; complete
with base supports, bearers, backings,
framing, skirting, door and drawer
ironmongery, mastic seal etc. fixed to
concrete or blockwork (Worktop and sink
are measured separately); all as per the
drawing No. QDC/1862/AR-B1-5-002
sht.01 of 01.and to the Engineer's
approval.

A Base Unit, Sink unit and Wall Units as


shown in the drawing and detailed in
specifications. 1 Item 10,011.60 10,011.60

QDC/1862 BOQ : Page 1/5/4 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CARPENTRY AND JOINERY

Item Description Quantity Unit Rate (QR) Amount (QR)

Total Collection QR 10,011.60

QDC/1862 BOQ : Page 1/5/5 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CARPENTRY AND JOINERY

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 1/5/1 40,046.40

Page 1/5/2 52,282.80

Page 1/5/3 54,224.85

Page 1/5/4 10,011.60

QDC/1862 BOQ : Page 1/5/6 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX CARPENTRY AND JOINERY

Item Description Quantity Unit Rate (QR) Amount (QR)

CARPENTRY AND JOINERY To Summary QR 156,565.65

QDC/1862 BOQ : Page 1/5/7 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

BILL NO. 1/6

METAL WORK &GLAZING

ALUMINIUM WINDOWS

Aluminium windows in 2mm thick polyester


powder coated finished frame system from
approved manufacturer; complete with 24 mm
thick hermetically sealed double glazing
consisting of 6 mm thick solar reflective glass
to exterior pane, 12 mm thick hermetically
sealed air space and 6 mm thick clear float
glass to interior pane including ironmongery as
specified; fixing frames to concrete or
blockwork and sealing all around with
approved sealant all as specified and shown
on Drawing No. QDC/1862/AR-B1-6-001
sht.03 & 04 of 04 and to the approval of
ENGINEER.

A Window type W1; three panel,double glazed


powder coated aluminium fixed window ,to
suit opening size 2400 x 1800 mm;Located at
office room in Pent House. 1 No. 4,337.03

B Window type W2; three panel,double glazed


powder coated aluminium fixed window ,to
suit opening size 2000 x 1800 mm;Located at
elect'l & fire staircase room in Pent House. 4 No. 3,667.03

C Window type W2A; double glazed powder


coated aluminium combination of fixed &
sliding window ,to suit opening size 2000 x
1800 mm;Located at office & conference room
in Pent House.
15 No. 3,804.41

D Window type W2B; three panel,double glazed


powder coated aluminium fixed window ,to
suit opening size 2000 x 1500 mm;Located at
battery, main s/c, fire staircase & transmission
room in GF & FF.
6 No. 3,593.05

QDC/1862 BOQ : Page 1/6/8 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

To Collection QR.

Aluminium windows in 2mm thick polyester


powder coated finished frame system from
approved manufacturer; complete with 24 mm
thick hermetically sealed double glazing
consisting of 6 mm thick solar reflective glass
to exterior pane, 12 mm thick hermetically
sealed air space and 6 mm thick clear float
glass to interior pane including ironmongery as
specified; fixing frames to concrete or
blockwork and sealing all around with
approved sealant all as specified and shown
on Drawing No. QDC/1862/AR-B1-6-001
sht.03 & 04 of 04 and to the approval of
ENGINEER.

A Window type W2C; three panel,double glazed


powder coated aluminium fixed window ,to
suit opening size 2000 x 800 mm;Located at
main staircase in Pent House. 1 No. 1,955.04

B Window type W3; three panel,double glazed


powder coated aluminium fixed window ,to
suit opening size 1400 x 4050 mm;Located at
entrance lobby in FF. 2 No. 5,812.29

C Window type W3A; three panel,double glazed


powder coated aluminium fixed window ,to
suit opening size 1400 x 4450 mm;Located at
entrance lobby in Penhouse. 2 No. 6,446.36

D Window type W4; two panel,double glazed


powder coated aluminium conbination of fixed
and top hung outside openable window ,to suit
opening size 1000 x 600 mm;Located at WC
in GF, FF & PH.
12 No. 686.91

QDC/1862 BOQ : Page 1/6/9 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

E Window type SG1; five panel,double glazed


powder coated aluminium,structural glazing
,to suit opening size 4100 x 9100 mm;Located
at entrance lobby in FF. 1 No. 52,839.00

To Collection

ALUMINIUM DOOR

Aluminium doors in 2mm thick polyester


powder coated finished frame system from
approved manufacturer; complete with 24 mm
thick hermetically sealed double glazing
consisting of 6 mm thick tinted solar reflective
float glass to exterior pane, 12 mm thick
hermetically sealed air space and 6 mm thick
clear float glass to interior pane including
ironmongery as specified; fixing frames to
concrete or blockwork and sealing all around
with approved sealant all as specified and
shown on Drawing No. QDC/1862/AR-B1-6-
001 sht.02 of 04 and to the approval of
ENGINEER.

A Door type AD1; Double leaf double glazed


powder coated Aluminium door with fixed
glazed panels on sides and top to suit opening
size 3200 x 2700 mm;located at main entrance
in G.F.
1 No. 12,013.92

B Door type AD2; Single leaf double glazed


powder coated Aluminium door to suit
opening size 1000 x 2200 mm;located at side
entrance & fire staircase in G.F. 1 No. 6,340.68

QDC/1862 BOQ : Page 1/6/10 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

To Collection QR.
Aluminium doors in 2mm thick polyester
powder coated finished frame system;
complete with 24 mm thick aluminium
sandwich panel consists of 2 mm thick
aluminium sheet on both faces with
polyurethane insulation in between; including
ironmongery as specified; fixing frames to
concrete or blockwork and sealing all around
with approved sealant all as specified and
shown on Drawing No. QDC/1862/AR-b1-6-
001 sht.04 of 04 and to the approval of the
ENGINEER.

A Door type AD2A; Single leaf powder coated


aluminium sandwich panel door to suit
opening size 1000 x 2200 mm;located at main
Stair lobby on Roof. 2 No. 4,755.51

QDC/1862 BOQ : Page 1/6/11 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

To Collection QR.
FIRE RATED STEEL DOOR

45 mm Thick proprietary fire rated flush steel


doors in factory applied store enamelled finish
by manufacturer; constructed in two skins of
1.5 mm thick 18 gauge hot dipped galvanized
steel sheets on both faces, lock, seam joint as
edges on steel channel section bonded core of
impregnated honeycomb insulation as
specified; complete with steel door frames
with 2mm zinc coated steel sheet bent to shape
and ironmongery ; including required
accessories as specified;fixing frames to
concrete or blockwork and sealing all around
with approved sealant as specified and shown
on Drawing QDC/1862/AR-B1-6-001 sht.02
of 04 and to the approval of the ENGINEER

A Door type SD1; double leaf 1.5 hr fire rated


paint finished steel door w/ vision panel in fire
rated glass to suit opening size 2000 x 2200
mm; located at unpacking room in GF & FF.
1 No. 6,451.92

B Door type SD2; double leaf 1.5 hr fire rated


paint finished steel door w/ vision panel in fire
rated glass to suit opening size 1500 x 2200
mm; located at entrance lobby, transmission
room in GF & FF.
2 No. 6,118.20

QDC/1862 BOQ : Page 1/6/12 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

C Door type SD3; single leaf 1.5 hr fire rated


paint finished steel door w/ vision panel in fire
rated glass to suit opening size 1000 x 2200
mm; located at cable chamber, battery,
rectifier, MDF, SS lobby, Mech'l, Elect'l &
H.Toilet in BF, GF, FF, PH & Roof.
12 No. 3,448.44

To Collection QR.
45 mm Thick proprietary fire rated flush steel
doors in factory applied store enamelled finish
by manufacturer; constructed in two skins of
1.5 mm thick 18 gauge hot dipped galvanized
steel sheets on both faces, lock, seam joint as
edges on steel channel section bonded core of
impregnated honeycomb insulation as
specified; complete with steel door frames
with 2mm zinc coated steel sheet bent to shape
and ironmongery ; including required
accessories as specified;fixing frames to
concrete or blockwork and sealing all around
with approved sealant as specified and shown
on Drawing QDC/1862/AR-B1-6-001 sht.02
of 04 and to the approval of the ENGINEER.

A Door type SD4; single leaf 1.5 hr fire rated


paint finished steel door w/ vision panel in fire
rated glass to suit opening size 900 x 2200
mm; located at Gent's & Ladies toilet, Fm-200
& ELV in GF & FF.
4 No. 3,448.44

B Door type SD5; double leaf 1.5 hr fire rated


paint finished steel door w/ lock provision to
suit opening size 750 x 600 mm; located from
ELV for Elev shaft in GF. 1 No. 2,224.80

QDC/1862 BOQ : Page 1/6/13 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

To Collection QR.

ROLLING SHUTTER

Electrical operated rolling shutter as per


Manufacturer's details as specified and shown
in the Drawings and to the approval of the
ENGINEER.

A Roller Shutter Ref.RS1; overall size 2400 x


4000 mm High 1 No. 22,758.59

B Roller Shutter Ref.RS4; overall size 2400 x


3550 mm High 0 No. 20,432.56

HANDRAILS AND BALUSTRADES

QDC/1862 BOQ : Page 1/6/14 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

Stainless steel handrails and balustrades as


shown on Drawing No. QDC/1862/AR-B1-5-
006 sht 01 of 02; comprising 65 mm dia. S.S.
toprail, 35 mm dia.S.S. balusters at 300 mm
c/c, rose & base plate screwed with stainless
steel counter sunk screws; complete with
fixing accessories as specified; fixing to
concrete or blockworks in accordance with the
manufacturer's recommendations and to the
approval of the ENGINEER.

C 1 m high stainless steel handrail and baluster


in entrance lobby at FF & PH. 7 m 1,390.50

To Collection QR.

HANDRAILS AND BALUSTRADES


(Cont'd…..)

QDC/1862 BOQ : Page 1/6/15 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

Stainless steel handrails and balustrades as


shown on Drawing No. QDC/1862/AR-B1-5-
003 sht 01 of 02; comprising 50 mm diameter
3 mm thick stainless steel corner post fixtures,
25 x 25 square section balusters at 300 mm
centres, chrome plated rose, base plate,
stainless steel counter sunk screws etc.;
complete with fixing accessories as specified;
fixing to concrete or blockworks in accordance
with the manufacturer's recommendations and
to the approval of the ENGINEER.

A Stainless steel handrail and balustrades for 30 m 1,390.50


Main staircase; 1000 mm high, horizontal and
raking.
Galvanized steel epoxy powder coated
handrails and balustrades as shown on
Drawing No. QDC/1862/AR-B1-5-003 sht 02
of 02; comprising 50 mm diameter hollow
tubular section handrail, 25 x 25 square section
balusters at 300 mm centres, rose, base plate,
stainless steel counter sunk screws etc.;
complete with fixing accessories as specified;
allow for surface preparation and epoxy
powder coating of the galvanised steel member
as specified ; fixing to concrete or blockworks
in accordance with the manufacturer's
recommendations and to the approval of the
ENGINEER.

B Galvanized steel epoxy powder coated


handrail and balustrades for Fire escape
staircase; 1000 mm high, horizontal and 30 m 667.44
raking.

To Collection QR.

QDC/1862 BOQ : Page 1/6/16 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Item Description Quantity Unit Rate (QR)

Collection:

Page 1/6/1

Page 1/6/2

Page 1/6/3

Page 1/6/4

Page 1/6/5

Page 1/6/6

Page 1/6/7

Page 1/6/8

METAL WORKS & GLAZING To Summary QR.

QDC/1862 BOQ : Page 1/6/17 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

4,337.03 1 4,433.00 4,433.00

14,668.12 4 3,694.00 14,776.00

57,066.15 15 3,694.00 55,410.00

21,558.30 6 3,078.00 18,468.00

QDC/1862 BOQ : Page 1/6/18 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

97,629.60 93,087.00

1,955.04 1 1,642.00 1,642.00

11,624.58 2 5,818.00 11,636.00

12,892.72 2 6,392.00 12,784.00

8,242.92 12 1,026.00 12,312.00

QDC/1862 BOQ : Page 1/6/19 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

52,839.00 1 43,515.00 43,515.00

87,554.26 81,889.00

12,013.92 1 9,850.00 9,850.00

6,340.68 1 2,508.00 2,508.00

QDC/1862 BOQ : Page 1/6/20 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

18,354.60 12,358.00

9,511.02 2 2,508.00 5,016.00

QDC/1862 BOQ : Page 1/6/21 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

9,511.02 To Col QR. 5,016.00

6,451.92 1 4,598.00 4,598.00

12,236.40 2 4,541.00 9,082.00

QDC/1862 BOQ : Page 1/6/22 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

41,381.28 12 2,890.00 34,680.00

60,069.60 48,360.00

13,793.76 4 3,061.00 12,244.00

2,224.80 1 1,425.00 1,425.00

QDC/1862 BOQ : Page 1/6/23 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

16,018.56 13,669.00

22,758.59 1 5,130.00 5,130.00

0.00 0 4,902.00 0.00

QDC/1862 BOQ : Page 1/6/24 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

9,733.50 7 969.00 6,783.00

32,492.09 11,913.00

QDC/1862 BOQ : Page 1/6/25 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

41,715.00 30 969.00 29,070.00

20,023.20 30 570.00 17,100.00

61,738.20 46,170.00

QDC/1862 BOQ : Page 1/6/26 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX METAL WORKS AND GLAZING

Amount (QR) Quantity Rate (QR) Amount (QR)

97,629.60 93,087.00

87,554.26 81,889.00

18,354.60 12,358.00

9,511.02 5,016.00

60,069.60 48,360.00

16,018.56 13,669.00

32,492.09 11,913.00

61,738.20 46,170.00

383,367.93 312,462.00

QDC/1862 BOQ : Page 1/6/27 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/7

PLUMBING AND DRAINAGE WORK

RAINWATER INSTALLATION.

uPVC pipes and fittings to BS 4514 with


solvent welded joints ; exposed, clipped to
wall or hangged from soffit on and
including supports

A 110 mm diameter pipes and fittings 130 m 33.37 4,338.10

B Extra ; bends 1 Lot 1,112.40 1,112.40

C Extra ; shoe with wire meshed end


including 135° bend (for free
discharge at roof level).
2 Nos 55.62 111.24

Accessories installed complete as


specified.

D Cast aluminium roof rainwater outlet; deck


drain type with gravel guard; jointing to
110 mm diameter pipework 11 No. 667.44 7,341.84

QDC/1862 BOQ : Page 1/7/28 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 12,903.58

SANITARY AND FOUL WATER


DRAINAGE INSTALLATION

MuPVC Pipes and fittings to BS 5255 with


solvent welded joints; embedded in
concrete or floor screed.

A 32 mm Diameter pipes including fittings. 27 m 33.37 900.99

B 50 mm Ditto. 36 m 44.50 1,602.00

uPVC pipes and fittings to BS 4660 with


solvent welded joints ;encased in concrete
or burried under ground.

C 110 mm diameter soil, and waste pipes


and fittings 82 m 66.74 5,472.68

D Extra ; branches / tees 1 Lot 778.68 778.68

E Extra ; connections to floor gulley 21 No. 66.74 1,401.54

F Extra ; connections to W.C 15 No. 66.74 1,001.10

G Extra ; connections to rodding eye 12 No. 66.74 800.88

H Extra ; connections to Clean Out 66.74


6 No. 400.44

QDC/1862 BOQ : Page 1/7/29 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 12,358.31

uPVC pipes and fittings to BS 4514 with


solvent welded joints ; exposed, clipped to
wall or hangged from soffit on and
including supports

A 110 mm diameter soil, and waste pipes


and fittings 42 m 44.50 1,869.00
0.00
B 75 mm diameter vent pipes and fittings. 48 m 38.93 1,868.64
0.00
Vent cowls, uPVC type sloted cap for
solvent welding, Key-Terrain 100 or equal
and approved, nominal bore 0.00
0.00
C Vent cowl; 75 mm 2 No. 122.36 244.72
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/7/30 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 3,982.36

Rodding eye, uPVC screwed cap type with


treaded an gasketed joints, Key-Terrain
150 or equal and approved 0.00
0.00
A Rodding eye; 110 mm diameter 12 No. 155.74 1,868.88
0.00
B Rodding eye; 75 mm diameter 8 No. 139.05 1,112.40
0.00
Floor clean out; stainless steel body;
complete with stainless steel cover, frames
and other accessories; jointing drain
pipeworks.
0.00
0.00
C Floor Clean Out; 110 mm diameter 4 No. 278.10 1,112.40
0.00
Trapped floor gulley; uPVC body, with
waste inlet and oulet complete with 'P' or
'S' trap, 150 x 150 mm cast stainless steel
frame and cover as specified; jointing to
waste and drain pipework. 0.00
0.00
D Floor gulley, 110 mm outlet; Type FG 22 No. 389.34 8,565.48
0.00
E 200 x 150 mm Trench Grating as specified
8 m 139.05 1,112.40
0.00

Submersible Sewage Pump set with Duck


foot bend, Lifting Chain, Guide Rail Etc.
as specified complete with all necessary
fittings and accessories.
0.00

QDC/1862 BOQ : Page 1/7/31 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

0.00
F Submersible Sewage pump with 2.0 LPS
and 4.0M Head 1 Set 33,372.00 33,372.00
0.00
0.00
0.00

To Collection QR. 47,143.56

SANITARY WARE FITTINGS AND


ACCESSORIES.

Sanitary wares shall be from "Armitage


Shanks" or equal and approved installed
complete acceessaries as specified.
0.00
0.00
A Ref SW1 - Seville-back-to-wall water
closet (Model no. S 3050) w/ dual flush
cistern (Model no. S 3823) and "Seville"
seat cover (Model no. S 4010). 8 No 1,446.12 11,568.96
0.00
B Ref SW2 - Approved vitreous China
counter top vanity wash basin 560mm size
(Built-in) w/ overflow slot, (Marlow - S
2560). 8 No 1,112.40 8,899.20
0.00
C Ref: SW3 - Wash basin vitreous China
Cameo wash basin 590mm single tophole
(Model no. S 2041 '122224E') Cameo
pedestal Model no. S 2920 (132408S). 8 No 1,223.64 9,789.12
0.00
D DSW1 - Ventura BTW WC pan (Model no.
S 3465) 2 No 2,224.80 4,449.60
0.00
E DSW2 - Ventura Wash basin central
tophole (Model no. S 2785) 2 No 2,224.80 4,449.60
0.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/7/32 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

0.00
0.00
0.00
0.00

To Collection QR. 39,156.48

Sanitary ware accessories shall be from


"Armitage Shank" or equal or approved
and installed complete as specified.

A Ref:SWA1 - Clear view liquid soap


dispenser, 1000 ml capacity plastic
reservoir, hand operation (Model no.
0302007). 6 No 222.48 1,334.88
0.00
B Ref:SWA2 - Mirror concealed fixing
(1400x800, 400x800). 14 No 500.58 7,008.12
0.00
C Ref:SWA3 - Paper roll holder in polished
stainless steel (Model no. 0302002). 14 No 139.05 1,946.70
0.00
D Ref:SWA4 - Toilet roll holder 'Richmond'
in polished aluminium (Model no. S 5040). 10 No 194.67 1,946.70
0.00
E Ref:SWA5 - Towel rail chrome plated
'Richmond' (Model no. S 5044). 8 No. 194.67 1,557.36
0.00
F Ref:SWA6 - Hand spray with trigger
control complete with wall holder hose and
angle valve. 10 No. 333.72 3,337.20
0.00
G Ref:SWA7 - Hinged support rail for
disabled (Model no. 7797100). 2 No 278.10 556.20
0.00

QDC/1862 BOQ : Page 1/7/33 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

H Ref:SWA8 - 600mm grab rail (Model


7788400). 4 No 278.10 1,112.40
0.00
J Ref:SWA9- Hand Dryer automatic
operation high output and single nozzle for
both face (Model no. 0302005). 4 No 2,224.80 8,899.20
0.00
K Ref: SWA10 - Vitreous china soap dish
'Richmond' rang (Model no. 5027) 8 No 222.48 1,779.84
0.00

To Collection QR. 29,478.60

Sanitary ware accessories shall be from


"Armitage Shank" or equal or approved
and installed complete as specified.

A Ref.SWA11 - Piccolo 2 wash basin


monoblock mixer w/ 'Chrome Plated' body
only (Model no. B1984AA). 8 No 278.10 2,224.80

KITCHENWARE

Stainless steel kitchen sinks with drain


board installed complete with 1/2"
momoblock mixer, with swivel nozzle size
as approved single bowl single drain board
by "CARRON" or equal and approved.

E Kitchen sink, single bowl, single drain;


size 600 mm x 1300 mm 1 No. 2,002.32 2,002.32

QDC/1862 BOQ : Page 1/7/34 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 4,227.12

POTABLE WATER SUPPLY


INSTALLATION

DOMESTIC COLD WATER SUPPLY

Copper pipes to BS 2871, Part 1 Table X;


and fittings to BS 864 Part 2; exposed ;
with capillary joints; fixed with brackets,
clips on and including supports, plugged
and screwed to concrete/ blockwork or
hanged from slab.

A 15 mm Diameter pipes including fittings. 112 m 27.81 3,114.72


0.00
B 22 mm Ditto. 52 m 44.50 2,314.00
0.00
C 28 mm Ditto. 40 m 61.18 2,447.20
0.00
D 35 mm Ditto. 28 m 88.99 2,491.72
0.00
E 42mm Ditto. 26 m 122.36 3,181.36
0.00

QDC/1862 BOQ : Page 1/7/35 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

0.00
0.00

To Collection QR. 13,549.00

Copper pipes to BS 2871, Part 1 Table Y


and fittings to BS 864 Part 2 with capillary
joints; covered with factory bonded
polythene sleeve; concealed in wall or
running through floor screed; fixed with
brackets, clips on and including supports,
plugged and screwed to concrete or
blockwork.

A 15 mm Diameter pipes including fittings. 34 m 50.06 1,702.04

B 22 mm Ditto 32 m 77.87 2,491.84


0.00

QDC/1862 BOQ : Page 1/7/36 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 4,193.88

Isolating valve and the like complete as


specified with screwed / flanged ends;
jointing to copper pipeworks

A 15 mm diameter gate valve 27 No. 55.62 1,501.74


0.00
B 22 mm Ditto 3 No. 105.68 317.04
0.00
C 28 mm Ditto 3 No. 133.49 400.47
0.00
D 35mm Ditto 4 No. 155.74 622.96
0.00
E 42mm Ditto 3 No. 189.11 567.33
0.00
Non return valve and the like complete as
specified with screwed ends; jointing to
copper pipeworks 0.00

QDC/1862 BOQ : Page 1/7/37 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

0.00
F 22 mm non-return valve 3 No. 222.48 667.44
0.00
Water hammer arrestor as specified 0.00
0.00
G Water hammer arrester 9 No. 222.48 2,002.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00

To Collection QR. 6,079.30

GRP Roof water storage tanks (located in


Roof) as specified, hinged access cover ;
including low / high level interlock
switches and associated cabling including
connections to local outlets ; complete
with air vent with insect guard, combined
drain / overflow with insect guard as
specified ; allow for connections to cold
water supply and discharge pipework;
installed on prepared bases (measured
separately).

0.00
A 1500 Gallons GRP Roof Water Tank 1 No. 13,348.80 13,348.80
0.00

QDC/1862 BOQ : Page 1/7/38 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

Horizontal / Vertical, split-case pump,


complete with stainless steel impeller,
stainless steel shaft, carbon shaft seal and
T.E.F.C electric motor and controls
complete with suction and delivery
manifolds, expansion vessel, pressure
switch, gauges and factory wired control
panel, isolating valves, non-return valves,
strainers, flexible connections including all
necessary accessories; connecting to cold
water suction and delivery pipework.

0.00
0.00
B Booster pump set comprising 1 No. duty
and 1 No. standby pump, 100 litres
capacity pressure vessel; flow rate 3.0 lps
at 2 Bar located at Roof.
1 Set 20,023.20 20,023.20
0.00
0.00

To Collection QR. 33,372.00

DOMESTIC HOT WATER SUPPLY

Copper pipes to BS 2871, Part 1 Table Y


and fittings to BS 864 Part 2 covered with
factory bonded polythene sleeve;
concealed in wall with capillary joints;
fixed with brackets, clips on and including
supports, plugged and screwed to concrete
or blockwork.
0.00
0.00

QDC/1862 BOQ : Page 1/7/39 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

A 15 mm Diameter pipes including fittings. 69 m 50.06 3,454.14


0.00
B 22 mm Ditto 68 m 77.87 5,295.16
0.00

Rigid preformed fibre glass insulation 25


mm thick, 96 kg/m3 density ; wrapped
with 8 oz canvass cloth and finished with
two coats weatherproof coating ; to hot
water pipework.
0.00
0.00
C 15 mm Diameter pipes including fittings. 69 m 22.25 1,535.25
0.00
D 22 mm Ditto 68 m 22.25 1,513.00
0.00
0.00
0.00

To Collection QR. 11,797.55

WATER HEATER

QDC/1862 BOQ : Page 1/7/40 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

Electric water heater; thermal storage,


cylindrical type comprising inner water
container, pressure gauges, thermometers,
safety thermostart, anti vacuum valve,
temparature /pressure relief valve, safety
valves, including drainage to nearest floor
drain, outer casing and end covers,electric
immersion heater and ceiling mounting
brackets; connection to local cold feed, hot
water supply and; electrical connections to
local outlets

A Pressurized water heater, horizontal,


ceiling mounted; storage capacity 50 liters
and heater capacity 1.5 KW.
7 No. 1,334.88 9,344.16

To Collection QR. 9,344.16

QDC/1862 BOQ : Page 1/7/41 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

FIRE PROTECTION INSTALLATION.

Portable fire extinguishers complete as


specified, including supports and fixing
brackets where necessary.

A Dry powder fire extinguisher, wall


mounted; 6 Kg. 18 No 333.72 6,006.96
0.00
Fire blankets as specified. 0.00
0.00
B Fire blankets. 1 No 222.48 222.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/7/42 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 6,229.44

Collection

Page 1/7/1 12,903.58

Page 1/7/2 12,358.31

Page 1/7/3 3,982.36

Page 1/7/4 47,143.56

Page 1/7/5 39,156.48

Page 1/7/6 29,478.60

Page 1/7/7 4,227.12

Page 1/7/8 13,549.00

Page 1/7/9 4,193.88

Page 1/7/10 6,079.30

Page 1/7/11 33,372.00

Page 1/7/12 11,797.55

Page 1/7/13 9,344.16

Page 1/7/14 6,229.44

QDC/1862 BOQ : Page 1/7/43 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

PLUMBING AND DRAINAGE


INSTALLATIONS To Summary QR. 233,815.34

QDC/1862 BOQ : Page 1/7/44 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

130 36.00 4,680.00

1 949.00 949.00

2 59.00 118.00

11 679.00 7,469.00

QDC/1862 BOQ : Page 1/7/45 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

13,216.00

27 14.00 378.00

36 17.00 612.00

82 36.00 2,952.00

1 823.00 823.00

21 59.00 1,239.00

15 59.00 885.00

12 216.00 2,592.00

6 59.00 354.00

QDC/1862 BOQ : Page 1/7/46 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

9,835.00

42 36.00 1,512.00
0.00
48 32.00 1,536.00
0.00

0.00
0.00
2 177.00 354.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/7/47 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

3,402.00

0.00
0.00
12 216.00 2,592.00
0.00
8 183.00 1,464.00
0.00

0.00
0.00
4 940.00 3,760.00
0.00

0.00
0.00
22 940.00 20,680.00
0.00

8 424.00 3,392.00
0.00

0.00

QDC/1862 BOQ : Page 1/7/48 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

0.00

1 31,265.00 31,265.00
0.00
0.00
0.00

63,153.00

0.00
0.00

8 2,376.00 19,008.00
0.00

8 2,115.00 16,920.00
0.00

8 1,822.00 14,576.00
0.00

2 2,441.00 4,882.00
0.00

2 2,115.00 4,230.00
0.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/7/49 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

0.00
0.00
0.00
0.00

59,616.00

6 556.00 3,336.00
0.00

14 483.00 6,762.00
0.00

14 451.00 6,314.00
0.00

10 418.00 4,180.00
0.00

8 386.00 3,088.00
0.00

10 582.00 5,820.00
0.00

2 386.00 772.00
0.00

QDC/1862 BOQ : Page 1/7/50 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

4 516.00 2,064.00
0.00

4 1,723.00 6,892.00
0.00

8 320.00 2,560.00
0.00

41,788.00

8 1,822.00 14,576.00

1 3,616.00 3,616.00

QDC/1862 BOQ : Page 1/7/51 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

18,192.00

112 22.00 2,464.00


0.00
52 32.00 1,664.00
0.00
40 38.00 1,520.00
0.00
28 57.00 1,596.00
0.00
26 68.00 1,768.00
0.00

QDC/1862 BOQ : Page 1/7/52 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

0.00
0.00

9,012.00

34 32.00 1,088.00

32 38.00 1,216.00
0.00

QDC/1862 BOQ : Page 1/7/53 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

2,304.00

27 94.00 2,538.00
0.00
3 118.00 354.00
0.00
3 142.00 426.00
0.00
4 191.00 764.00
0.00
3 229.00 687.00
0.00

0.00

QDC/1862 BOQ : Page 1/7/54 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

0.00
3 132.00 396.00
0.00
0.00
0.00
9 346.00 3,114.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

8,279.00

0.00
1 35,781.00 35,781.00
0.00

QDC/1862 BOQ : Page 1/7/55 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

0.00
0.00

1 37,531.00 37,531.00
0.00
0.00

73,312.00

0.00
0.00

QDC/1862 BOQ : Page 1/7/56 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

69 32.00 2,208.00
0.00
68 38.00 2,584.00
0.00

0.00
0.00
69 61.00 4,209.00
0.00
68 64.00 4,352.00
0.00
0.00
0.00

13,353.00

QDC/1862 BOQ : Page 1/7/57 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

7 1,070.00 7,490.00

7,490.00

QDC/1862 BOQ : Page 1/7/58 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

18 353.00 6,354.00
0.00
0.00
0.00
1 255.00 255.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/7/59 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

6,609.00

13,216.00

9,835.00

3,402.00

63,153.00

59,616.00

41,788.00

18,192.00

9,012.00

2,304.00

8,279.00

73,312.00

13,353.00

7,490.00

6,609.00

QDC/1862 BOQ : Page 1/7/60 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX PLUMBING AND DRAINAGE WORK

Quantity Rate (QR) Amount (QR)

329,561.00

QDC/1862 BOQ : Page 1/7/61 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/8

AIR-CONDITIONING AND
VENTILATION WORKS

Chilled Water Air Handling Units

Chilled Water Air handling Unit with chilled


water Cooling Coils, Centrifugal Fans, Filters
as specified with all necessary fittings,
supports and accessories.

A Air Handling Unit; Total Capacity 111.20KW,


Sensible Capacity 79.77KW and Fresh air
intake 503LPS 1 No 66,744.00 66,744.00

Chilled Water Fan Coil Unit

Horizontal Ceiling Suspended Chilled Water


Fan Coil Units with Centrifugal type Forward
Curved fan and Cooling Coils with all
necessary fittings, suppports and accessories.

B Fan coil unit; Total Capacity 16.0KW and


sensible 12.2KW 1 No 9,121.68 9,121.68
0.00
C Fan coil unit; Total Capacity 7.41KW and
sensible 5.68KW 0 Nos 4,227.12 0.00
0.00
D Fan coil unit; Total Capacity 5.31KW and
sensible 4.11KW 3 Nos 3,003.48 9,010.44
0.00
E Fan coil unit; Total Capacity 4.69KW and
sensible 4.00KW 1 No 2,669.76 2,669.76
0.00
F Fan coil unit; Total Capacity 2.62KW and
sensible 1.99KW 2 Nos 1,668.60 3,337.20
0.00

QDC/1862 BOQ : Page 1/8/62 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 90,883.08

A Split DX Air conditioning Unit with indoor


and out door unit; total Capacity 9.6KW and
sensible 7.1KW including refrgerent pipes
and electrical connections 2 No 5,562.00 11,124.00
0.00
B Split DX Air conditioning Unit with indoor
and out door unit; total Capacity 6.1KW and
sensible 4.5KW including refrgerent pipes
and electrical connections 2 Nos 3,559.68 7,119.36
0.00
C Split DX Air conditioning Unit with indoor
and out door unit; total Capacity 5.6KW and
sensible 4.2KW including refrgerent pipes
and electrical connections 1 No 3,337.20 3,337.20
0.00
0.00
0.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/8/63 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 21,580.56

AIRCONDITIONING DUCTWORKS 0.00


0.00
Galvanised sheet metal ventilation ductwork
and fittings conforming to the latest HVAC
/ASHREA /SMACNA duct construction
standards complete as specified and indicated
on the drawings; including test holes, turning
vanes, splitters, stiffeners, transformation
pieces, access, panels and doors, plenum
chambers etc. on and including supports.
0.00
0.00
A Over 200mm but not exceeding 500mm wide
###
ducts including fittings. 276 m2 100.12 27,633.12
0.00
B Extra for bend 13 No. 88.99 1,156.87###
0.00
C Extra for diminishing piece 15 No. 33.37 500.55###
0.00
D Extra for branch 12 No. 88.99 1,067.88
0.00
E Extra for end piece 3 No. 44.50 133.50
0.00
F Over 500 mm but not exceeding 750 mm
wide ducts including fittings. ###
68 m2 100.12 6,808.16
0.00
G Extra for branch 4 No. 55.62 222.48###
0.00
H Extra for diminishing piece 2 No. 77.87 155.74###

J Extra for bend 4 No. 111.24 444.96


0.00
K Over 750 mm but not exceeding 1000 mm
wide ducts including fittings. 148 m2 88.99 13,170.52

QDC/1862 BOQ : Page 1/8/64 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

0.00
L Extra for branch 4 No 55.62 222.48
0.00
M Extra for diminishing piece 3 No 44.50 133.50

0.00
To Collection QR. 51,649.76
0.00
VENTILATION EQUIPMENT.

Wall mounted extract fans, switch operated


propeller type; complete with automatic wall
shutter as specfied and indicated on the
drawings; connections to local power outlets. 0.00
0.00
A Exhaust fan ; air flow 257 lps, @100 pa Ref.
EF-01 1 No. 556.20 556.20
0.00
Roof mounted extract fans, switch operated
propeller type; complete with automatic wall
shutter as specfied and indicated on the
drawings; connections to local power outlets. 0.00
0.00
B Exhaust fan;air flow 516lps, @ 150 pa Ref.
EF-02. 1 No. 3,337.20 3,337.20
0.00
BELL MOUTH CONNECTIONS 0.00
0.00
C Bell mouth 1000 x 600mm neck size with
aluminium screen. 1 No. 556.20 556.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/8/65 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 4,449.60

VENTILATION DUCT WORKS

A Over 200mm but not exceeding 500mm wide


ducts including fittings.
52 m2 88.99 4,627.48
0.00
B Extra for bend 9 No 66.74 600.66
0.00
C Extra for branch 12 No 66.74 800.88
0.00
FIRE DAMPER 0.00
0.00
Fire damper, galvanized steel curtain type
including all accessories complete as
specified and indicated on the drawings;
jointing to ductwork. 0.00
0.00
D Fire Damper to duct work (size 1000 x 600
mm) 2 No. 389.34 778.68
0.00
Variable Air Volume Boxes 0.00
0.00
E 600 mm x 350 mm 2 No. 278.10 556.20
0.00
F 500 mm x 300 mm 3 No. 278.10 834.30
0.00
SOUND ATTENUATOR 0.00
0.00
G 1000 mm x 600 mm 1 No. 5,562.00 5,562.00
0.00

QDC/1862 BOQ : Page 1/8/66 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

VOLUME CONTROL DAMPER 0.00


0.00
H 150 mm x 100 mm 15 No. 111.24 1,668.60
0.00
J 300 mm x 300 mm 21 No. 166.86 3,504.06
0.00
K 500 mm x 300 mm 3 No. 194.67 584.01
0.00
L 600 mm x 350 mm 1 No. 222.48 222.48
0.00

To Collection QR. 19,739.35

AIR CONDITIONING AND


VENTILATION AIR INLETS AND 0.00
OUTLETS
0.00
Exhaust air diffusers as specified, extruded
aluminium construction with powder coated
finish to approved colour ; complete with
supports, plenum boxes and flexible
connections; fixing in position including
connections to ductwork.
0.00
0.00
A Exhaust air diffusers with 150 x 150 mm
oppose blade dampers, square ceiling ###
diffuser, 4-way. 15 No. 88.99 1,334.85
0.00
B Supply air diffuser with 300 x 300 mm 2 No. 155.74 311.48
0.00
C Return air diffuser with 300 x 300 mm 2 No. 111.24 222.48
0.00
D Supply air diffuser with 375 x 375 mm 7 No. 211.36 1,479.52
0.00
E Return air diffuser with 375 x 375 mm 7 No. 161.30 1,129.10
0.00
F Supply air diffuser with 450 x 450 mm 14 No. 122.36 1,713.04
0.00
G Return air diffuser with 450 x 450 mm 14 No. 200.23 2,803.22

QDC/1862 BOQ : Page 1/8/67 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
To Collection QR. 8,993.69

AIR CONDITIONING DUCTWORK


0.00
INSULATION
0.00
Rigid fibre glass insulation 96 kg / m³
density ; 25 mm thick wrapped with
reinforced aluminium foil and covered with
high quality canvass cloth 200 gm/m³ soaked
in weatherproofing compound and sealed
with vapour barrier

0.00
A Insulation to airconditioning ductworks
within the building 528 m2 55.62 29,367.36
0.00
Rigid fibre glass insulation 96Kg/m³ density
50 mm thick wrapped with reinforced
aluminium foil and covered with high quality
glass cloth 200 gm/m³ with two coats vapour
seal

0.00
B Insulation to airconditioning ductworks on
roof top. 46 m2 111.24 5,117.04
0.00
MOTORISED VOLUME DAMPER 0.00
0.00

QDC/1862 BOQ : Page 1/8/68 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

C 1000 mm x 600 mm 1 No. 2,224.80 2,224.80


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
To Collection QR. 36,709.20

Collection
###
Page 1/8/1 90,883.08
###
Page 1/8/2 21,580.56
###
Page 1/8/3 51,649.76
###
Page 1/8/4 4,449.60
###
Page 1/8/5 19,739.35
###
Page1/8/6 8,993.69
###
Page 1/8/7 36,709.20
###

QDC/1862 BOQ : Page 1/8/69 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

###

###

AIR-CONDITIONING AND
###VENTILATION INSTALLATION To Summary QR. 234,005.24###

QDC/1862 BOQ : Page 1/8/70 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Quantity Rate (QR)Amount (QR)

1 63,550.00 63,550.00

1 11,909.00 11,909.00
0.00

0 6,092.00 0.00
0.00

3 4,369.00 13,107.00
0.00

1 4,035.00 4,035.00
0.00

2 2,963.00 5,926.00
0.00

QDC/1862 BOQ : Page 1/8/71 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Quantity Rate (QR)Amount (QR)

98,527.00

2 6,039.00 12,078.00
0.00

2 5,516.00 11,032.00
0.00

1 3,167.00 3,167.00
0.00
0.00
0.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/8/72 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Quantity Rate (QR)Amount (QR)

26,277.00

0.00
0.00

0.00
0.00

276 71.00 19,596.00


0.00
13 71.00 923.00
0.00
15 71.00 1,065.00
0.00
12 71.00 852.00
0.00
3 71.00 213.00
0.00

68 76.00 5,168.00
0.00
4 76.00 304.00
0.00
2 76.00 152.00

4 76.00 304.00
0.00

148 84.00 12,432.00

QDC/1862 BOQ : Page 1/8/73 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Quantity Rate (QR)Amount (QR)

0.00
4 109.00 436.00
0.00
3 109.00 327.00

0.00
41,772.00
0.00

0.00
0.00

1 1,975.00 1,975.00
0.00

0.00
0.00

1 11,996.00 11,996.00
0.00
0.00
0.00

1 659.00 659.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/8/74 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Quantity Rate (QR)Amount (QR)

14,630.00

52 71.00 3,692.00
0.00
9 71.00 639.00
0.00
12 71.00 852.00
0.00
0.00
0.00

0.00
0.00

2 884.00 1,768.00
0.00
0.00
0.00
2 1,379.00 2,758.00
0.00
3 1,197.00 3,591.00
0.00
0.00
0.00
1 1,535.00 1,535.00
0.00

QDC/1862 BOQ : Page 1/8/75 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Quantity Rate (QR)Amount (QR)

0.00
0.00
15 106.00 1,590.00
0.00
21 136.00 2,856.00
0.00
3 170.00 510.00
0.00
1 203.00 203.00
0.00

19,994.00

0.00

0.00

0.00
0.00

15 120.00 1,800.00
0.00
2 156.00 312.00
0.00
2 156.00 312.00
0.00
7 212.00 1,484.00
0.00
7 212.00 1,484.00
0.00
14 314.00 4,396.00
0.00
14 314.00 4,396.00

QDC/1862 BOQ : Page 1/8/76 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Quantity Rate (QR)Amount (QR)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14,184.00

0.00

0.00

0.00

528 56.00 29,568.00


0.00

0.00

46 79.00 3,634.00
0.00
0.00
0.00

QDC/1862 BOQ : Page 1/8/77 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Quantity Rate (QR)Amount (QR)

1 1,532.00 1,532.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34,734.00

98,527.00

26,277.00

41,772.00

14,630.00

19,994.00

14,184.00

34,734.00

QDC/1862 BOQ : Page 1/8/78 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
AIRCONDITIONING AND VENTILATION WORKS

Quantity Rate (QR)Amount (QR)

250,118.00

QDC/1862 BOQ : Page 1/8/79 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Bill No. 1/9

ELECTRICAL WORKS

MAIN AND SUB-MAIN


INSTALLATION
A Co-ordinate with Kahramaa/ Kahramaa
Appointed Contractor for Sub Station
Inspections, Testing & Commissioning 0 Item 111,918.36 -

QDC/1862 BOQ : Page 1/9/ 80 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. -
Supply and install Submain switch board
in dust and vermin proof enclosure,
including busbars (Fault rating 25ka for
3sec), main incoming and outgoing
moulded case interrupter/circuit
breakers, instrumentation, fuses,
switches, earthing, fixing bracket and all
necessary provisions for incoming and
outgoing cable terminations, Ammeter,
Voltmeter, Selector switch and Phase
Indicator lamps and also provision for
integrating with BMS system etc.; all as
specified including support frame. as
detailed on Drawing no:1862-EL-B0-6-
002 SHTS. 01/ 02 & 03. (Cont'd.....)

A 8 way-TPN Sub Main Switch Board Ref


SMB-G1 located in Ground Floor,
Ele.Room, with 200 amp TP MCCB for
incoming supply and 200 amp 4P+E
copper bus bar with;
1 No 8,899.20 8,899.20

B 100 amp TP MCCB outgoing 2 No 166.86 333.72

C 63 amp TP MCCB outgoing 1 No 111.24 111.24

D 40 amp TP MCCB outgoing 3 No 77.87 233.61

E 16 amp SP MCCB outgoing 6 No 33.37 200.22

QDC/1862 BOQ : Page 1/9/ 81 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 9,777.99

(Cont'd……...)

A 6 way-TPN Sub Main Switch Board Ref


SMB-G3(E) located in Ground Floor,
Ele.Room, with 200 amp TP MCCB for
incoming supply and 200 amp 4P+E
copper bus bar with;
1 No 8,899.20 8,899.20
-
B 160 amp TP MCCB outgoing 2 No 222.48 444.96
-
C 40 amp TP MCCB outgoing 1 No 77.87 77.87
-
D 32 amp TP MCCB outgoing 1 No 66.74 66.74
-
E 32 amp SP MCCB outgoing 6 No 44.50 267.00

QDC/1862 BOQ : Page 1/9/ 82 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 9,755.77

(Cont'd………….)

A 8 way- TPN Sub Main Switch Board


Ref SMB-F2 located in First Floor,
Ele.Room, with 200 amp TP MCCB for
incoming supply and 200 amp 4P+E
copper bus bar with;
1 No 8,899.20 8,899.20
-
B 100 amp TP MCCB outgoing 2 No 166.86 333.72
-
C 63 amp TP MCCB outgoing 2 No 111.24 222.48
-
D 40 amp TP MCCB outgoing 2 No 77.87 155.74
-
E 16 amp TP MCCB outgoing 1 No 55.62 55.62
-
F 16 amp SP MCCB outgoing 3 No 33.37 100.11

QDC/1862 BOQ : Page 1/9/ 83 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 9,766.87

(Cont'd………………)

A 10 way-TPN Sub Main Switch Board


Ref SMB-S located in Pent House,
Ele.Room, with 250 amp TP MCCB for
incoming supply and 250 amp 4P+E
copper bus bar with;
1 No 8,899.20 8,899.20
-
B 100 amp TP MCCB outgoing 6 No 166.86 1,001.16
-
C 40 amp TP MCCB outgoing 1 No 77.87 77.87
-
D 20 amp TP MCCB outgoing 1 No 55.62 55.62
-
E 16 amp SP MCCB outgoing 6 No 33.37 200.22

QDC/1862 BOQ : Page 1/9/ 84 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 10,234.07

(Cont'd………………)

A 6 way-TPN Main Switch Board Ref.


MSB-1, located in UPS Room, with 630
amp TP MCCB for incoming supply and
630 amp 4P+E copper bus bar with; 1 No 16,686.00 16,686.00

B 400 amp TP MCCB outgoing 6 No 1,334.88 8,009.28

C 6 way-TPN Main Switch Board Ref.


MSB-2, located in UPS Room, with 630
amp TP MCCB for incoming supply and
630 amp 4P+E copper bus bar with; 1 No 16,686.00 16,686.00

D 400 amp TP MCCB outgoing 6 No 1,334.88 8,009.28

QDC/1862 BOQ : Page 1/9/ 85 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 49,390.56

(Cont'd………………)

A 6 way-TPN Sub Main Switch Board Ref.


SMB-UPS1(G1), located in Ground
Floor Electrical Room, with 400 amp TP
MCCB for incoming supply and 400
amp 4P+E copper bus bar with;
1 No 8,899.20 8,899.20

B 200 amp TP MCCB outgoing 5 No 333.72 1,668.60

C 100 amp TP MCCB outgoing 1 No 166.86 166.86

D 6 way-TPN Sub Main Switch Board Ref.


SMB-UPS1(F1), located in First Floor
Electrical Room, with 400 amp TP
MCCB for incoming supply and 400
amp 4P+E copper bus bar with;
0 No 8,899.20 -

E 200 amp TP MCCB outgoing 0 No 333.72 -


-
F 100 amp TP MCCB outgoing 0 No 166.86 -

QDC/1862 BOQ : Page 1/9/ 86 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 21,469.32

(Cont'd………………)

A 4 way-TPN Sub Main Switch Board Ref


SMB-ADDN1 located in Technical
Room, Ground Floor, with 400 amp TP
MCCB for incoming supply and 400
amp 4P+E copper bus bar with;
1 No 8,899.20 8,899.20

B 100 amp TP MCCB outgoing 4 No 166.86 667.44

C 4 way-TPN Sub Main Switch Board Ref 1 No 8,899.20 8,899.20


SMB-ADDN2 located in Technical
Room, First Floor, with 400 amp TP 4 No 166.86 667.44
D 100 amp TP MCCB outgoing
MCCB for incoming supply and 400
amp 4P+E copper bus bar with;

QDC/1862 BOQ : Page 1/9/ 87 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 19,133.28

Supply & install Distribution boards in


dust and vermin proof enclosure,
complete with busbars, incoming MCCB
with outgoing MCB's, ELCB's and spare
MCB's as specified including
connection, fixing accessories, earthing
etc.as shown on Drawings. All with
12KA, 3SCC ISC Rating. (Contd..)

A 16 way TPN distribution board, Ref. DB-


G, located in Electrical Room, Ground
Floor with 100 Amp TP isolator for
incoming supply feeding from SMB-G1 1 No. 5,562.00 5,562.00

B 12 way TPN distribution board, Ref. DB-


EQPT, for Telecom Equipment, Ground
Floor with 63 Amp TP isolator for
incoming supply feeding from SMB-
G1(See Also Note no:3 1862-EL-B0-6-
002 SHT 01 OF 03).
1 No. 5,562.00 5,562.00

C 12 way TPN distribution board, Ref. DB-


SITE, located in Guard Room, with 40
Amp TP isolator for incoming supply
feeding from SMB-G1 1 No. 5,562.00 5,562.00

QDC/1862 BOQ : Page 1/9/ 88 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 16,686.00


(Cont'd……………...)

A 12 way TPN distribution board, Ref. DB-


EQPT, for Telecom Equipment, First
Floor with 63 Amp TP isolator for
incoming supply feeding from SMB-
F2(See Also Note no:3 1862-EL-B0-6-
002 SHT 02 OF 03)
1 No. 5,562.00 5,562.00

B 12 way TPN distribution board, Ref. DB-


F, located in Electrical Room, First Floor
with 100 Amp TP isolator for incoming
supply feeding from SMB-F2 1 No. 5,562.00 5,562.00

QDC/1862 BOQ : Page 1/9/ 89 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 11,124.00

(Cont'd……………...)

A 16 way TPN distribution board, Ref. DB-


S1, located in Electrical Room,
Penthouse with 100 Amp TP isolator for
incoming supply feeding from SMB-S. 1 No. 5,562.00 5,562.00

B 16 way TPN distribution board, Ref. DB-


S2, located in Electrical Room,
Penthouse with 63 Amp TP isolator for
incoming supply feeding from SMB-S. 1 No. 5,562.00 5,562.00

C 12 way TPN distribution board, Ref. DB-


EQPT, for Telecom Equipment,
Penthouse with 40 Amp TP isolator for
incoming supply feeding from SMB-
S(See Also Note no:3 1862-EL-B0-6-002
SHT 03 OF 03).
1 No. 5,562.00 5,562.00

QDC/1862 BOQ : Page 1/9/ 90 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 16,686.00

(Cont'd……………...)

A 12 way TPN distribution board, Ref. DB-


UPS(G), located in Electrical Room,
Ground floor with 100 Amp TP isolator
for incoming supply feeding from SMB-
UPS1(G1)
1 No 5,562.00 5,562.00

B 12 way TPN distribution board, Ref. DB-


UPS(F), located in Electrical Room,first
floor with 100 Amp TP isolator for
incoming supply feeding from SMB-
UPS1(F1)
0 No 5,562.00 -

C 12 way TPN distribution board, Ref. DB-


UPS(S), located in Electrical Room,
Penthouse with 100 Amp TP isolator for
incoming supply feeding from SMB-
UPS2(G2)
1 No 5,562.00 5,562.00

QDC/1862 BOQ : Page 1/9/ 91 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 11,124.00

(Cont'd……………...)

A 8 way SPN distribution board, Ref. DB-


HV, located in HV Room, with 40 Amp
DP isolator for incoming supply feeding
from MV.Panel-2.
1 No. 5,562.00 5,562.00

B 10 way TPN distribution board, Ref. DB-


MV, located in MV Room, with 40 Amp
TP isolator for incoming supply feeding
from MV.Panel-2.
1 No. 5,562.00 5,562.00
.

QDC/1862 BOQ : Page 1/9/ 92 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 11,124.00


CABLE NETWORK
600/1000 volts, copper conductors,
XLPE insulated, PVC oversheated,
pulled inside sleeves or installed on cable
tray and clipped to wall or in PVC duct
complete with all jointing and
termination kits, glands, keys, earthing,
sleeves, conduits, laying of marker tape
and protection tiles including all
associated civil works etc as specified
and as shown on Drawing no:1862-EL-
BO-6-003 SHT 01 OF 02 (Contd..)

QDC/1862 BOQ : Page 1/9/ 93 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Note: Electrical cable length shown in


the SLD drawings are for calculation
purpose only. Contractor to follow the
length given in the BOQ for pricing.

A 2 x 4C-300 mm2 XLPE/PVC +1C-300


mm2 PVC/ECC cables for UPS-1
maintanance bypass feeding from
M.V.Panel-1 12 Mtrs 889.92 10,679.04

B 2x4C-300 mm2 XLPE/PVC+1C-300


mm2 PVC/ECC cables for UPS-1
feeding from M.V.Panel-1 12 Mtrs 889.92 10,679.04

C 2x4C-300 mm2 XLPE/PVC +1C-300


mm2 PVC/ECC cables for UPS-1
feeding from M.V.Panel-1 12 Mtrs 889.92 10,679.04

D 2 x 4C-300 mm2 XLPE/PVC +1C-300


mm2 PVC/ECC cables for UPS-2
maintanance bypass feeding from
M.V.Panel-2 12 Mtrs 889.92 10,679.04

E 2x4C-300 mm2 XLPE/PVC+1C-300


mm2 PVC/ECC cables for UPS-2
feeding from M.V.Panel-2 12 Mtrs 889.92 10,679.04

F 2x4C-300 mm2 XLPE/PVC+1C-300


mm2 PVC/ECC cables for UPS-2
feeding from M.V.Panel-2 12 Mtrs 889.92 10,679.04
To Collection 64,074.24

QDC/1862 BOQ : Page 1/9/ 94 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

600/1000 volts, copper conductors,


XLPE insulated, steel wires armoured,
PVC oversheated, pulled inside sleeves
or installed on cable tray and clipped to
wall or in PVC duct complete with all
jointing and termination kits, glands,
keys, earthing, sleeves, conduits, laying
of marker tape and protection tiles
including all associated civil works etc
as specified and as shown on Drawing
no:1862-EL-BO-6-003 SHT 01 OF 02
(Contd..)

Note: Electrical cable length shown in


the SLD drawings are for calculation
purpose only. Contractor to follow the
length given in the BOQ for pricing.

A 2x4C-240 mm2 XLPE/SWA/PVC +1C-


240 mm2 PVC/ECC cables serving
MCC-G2(E) feeding from M.V.Panel-1 29 Mtrs 667.44 19,355.76

B 4C-185 mm2 XLPE/SWA/PVC +1C-95


mm2 PVC/ECC cables serving MCC-
G4(E) feeding from M.V.Panel-1 29 Mtrs 278.10 8,064.90

C 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving SMB-
G3(E) feeding from M.V.Panel-1 29 Mtrs 166.86 4,838.94

D 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving MCC-
ROOF feeding from M.V.Panel-1 49 Mtrs 166.86 8,176.14

QDC/1862 BOQ : Page 1/9/ 95 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 40,435.74

(Cont'd……………..)

A 2x4C-240 mm2 XLPE/SWA/PVC +1C-


240 mm2 PVC/ECC cables serving
Chiller (1)(Duty) feeding from
M.V.Panel-1 73 Mtrs 667.44 48,723.12

B 2x4C-240 mm2 XLPE/SWA/PVC +1C-


240 mm2 PVC/ECC cables serving
Chiller (1)(Duty) feeding from
M.V.Panel-1 73 Mtrs 667.44 48,723.12

C 2x4C-240 mm2 XLPE/SWA/PVC +1C-


240mm2 PVC/ECC cables serving
Chiller (Standby) feeding from 73 Mtrs 667.44 48,723.12
M.V.Panel-1 -
D 2x4C-240 mm2 XLPE/SWA/PVC +1C-
240mm2 PVC/ECC cables serving
Chiller (3) (Standby) feeding from 73 Mtrs 667.44 48,723.12
M.V.Panel-1 -
E 4C-50 mm2 XLPE/SWA/PVC +1C-25
mm2 PVC/ECC cables serving DB-
UPS(G) feeding from SMB-UPS1(G1). 11 Mtrs 111.24 1,223.64
-
F 4C-50 mm2 XLPE/SWA/PVC +1C-25
mm2 PVC/ECC cables serving DB-
UPS(F) feeding from SMB-UPS1(F1). 11 Mtrs 111.24 1,223.64
-
G 4C-50 mm2 XLPE/SWA/PVC +1C-25
mm2 PVC/ECC cables serving DB-
UPS(S) feeding from SMB-UPS2(G2). 11 Mtrs 111.24 1,223.64

QDC/1862 BOQ : Page 1/9/ 96 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 198,563.40

(Cont'd……………..)

A 2x4C-300 mm2 XLPE/SWA/PVC +1C-


300 mm2 PVC/ECC cables serving
MSB-1 feeding from UPS-1 14 Mtrs 889.92 12,458.88

B 2x4C-300 mm2 XLPE/SWA/PVC +1C-


300 mm2 PVC/ECC cables serving
MSB-2 feeding from UPS-2 14 Mtrs 889.92 12,458.88

C 4C-240 mm2 XLPE/SWA/PVC +1C-120


mm2 PVC/ECC cables serving SMB-
UPS1(G1) feeding from MSB-1 31 Mtrs 333.72 10,345.32
-
D 4C-240 mm2 XLPE/SWA/PVC +1C-120
mm2 PVC/ECC cables serving SMB-
UPS1(F1) feeding from MSB-1 0 Mtrs 333.72 -
-
E 4C-240 mm2 XLPE/SWA/PVC +1C-120
mm2 PVC/ECC cables serving SMB-
UPS2(G2) feeding from MSB-2 31 Mtrs 333.72 10,345.32
-
F 4C-240 mm2 XLPE/SWA/PVC +1C-120
mm2 PVC/ECC cables serving SMB-
UPS2(F2) feeding from MSB-2 0 Mtrs 333.72 -

QDC/1862 BOQ : Page 1/9/ 97 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 70,971.12

(Cont'd……………..)

A 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-1 feeding from SMB-
UPS1(G1). 21 Mtrs 166.86 3,504.06

B 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-2 feeding from SMB-
UPS1(G1). 21 Mtrs 166.86 3,504.06

C 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-3 (Alternative Service
Line) feeding from SMB-UPS1(G1). 0 Mtrs 166.86 -

D 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-4 (Alternative Service
Line) feeding from SMB-UPS1(G1). 0 Mtrs 166.86 -

QDC/1862 BOQ : Page 1/9/ 98 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 7,008.12

(Cont'd……………..)

A 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-5, feeding from SMB-
UPS1(F1). 0 Mtrs 166.86 -

B 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-6, feeding from SMB-
UPS1(F1). 0 Mtrs 166.86 -

C 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-7 (Alternative Service
Line) feeding from SMB-UPS1(F1). 0 Mtrs 166.86 -

D 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-8 (Alternative Service
Line) feeding from SMB-UPS1(F1). 0 Mtrs 166.86 -

QDC/1862 BOQ : Page 1/9/ 99 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. -

(Cont'd……………..)

A 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-1 feeding from SMB-
UPS2(G2).(Alternative service Line)
0 Mtrs 166.86 -

B 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-2 feeding from SMB-
UPS2(G2).(Alternative Service Line)
0 Mtrs 166.86 -

C 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-3 feeding from SMB-
UPS2(G2).
46 Mtrs 166.86 7,675.56

D 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-4 feeding from SMB-
UPS2(G2).
46 Mtrs 166.86 7,675.56

QDC/1862 BOQ : Page 1/9/ 100 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 15,351.12

(Cont'd……………..)

A 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-5 feeding from SMB-
UPS2(F2)(Alternative Service Line).
0 Mtrs 166.86 -

B 4C-120 mm2 XLPE/SWA/PVC+1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-6 feeding from SMB-
UPS2(F2)(Alternative Service Line).
0 Mtrs 166.86 -

C 4C-120 mm2 XLPE/SWA/PVC+1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-7 feeding from SMB-
UPS2(F2). 0 Mtrs 166.86 -

D 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving Power
Precision Unit-8 feeding from SMB-
UPS2(F2).
0 Mtrs 166.86 -

QDC/1862 BOQ : Page 1/9/ 101 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. -

(Cont'd……………..)

A 4C-150 mm2 XLPE/SWA/PVC +1C-95


mm2 PVC/ECC cables serving SMB-S
feeding from M.V.Panel-2. 49 Mtrs 222.48 10,901.52

B 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving SMB-G1
feeding from M.V.Panel-2. 29 Mtrs 166.86 4,838.94

C 2x4C-240 mm2 XLPE/SWA/PVC +1C-


240 mm2 PVC/ECC cables serving
MCC-F1 feeding from M.V.Panel-2. 0 Mtrs 667.44 -

D 2x4C-240 mm2 XLPE/SWA/PVC +1C-


240 mm2 PVC/ECC cables serving
MCC-F3 feeding from M.V.Panel-2. 0 Mtrs 667.44 -

E 4C-120 mm2 XLPE/SWA/PVC +1C-70


mm2 PVC/ECC cables serving SMB-F2
feeding from M.V.Panel-2. 39 Mtrs 166.86 6,507.54

QDC/1862 BOQ : Page 1/9/ 102 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 22,248.00

(Cont'd……………..)

A 4C-25 mm2 XLPE/SWA/PVC +1C-16


mm2 PVC/ECC cables serving Isolator
for Lift Control Panel feeding from
M.V.Panel-2. 83 Mtrs

B 2x4C-240 mm2 XLPE/SWA/PVC +1C-


240 mm2 PVC/ECC cables serving
Chiller (2)duty feeding from M.V.Panel- 79 Mtrs
2.
C 2x4C-240 mm2 XLPE/SWA/PVC +1C-
240 mm2 PVC/ECC cables serving
Chiller (2)duty feeding from M.V.Panel- 79 Mtrs
2.
D 4C-16 mm2 XPLE/SWA/PVC +1C-16
mm2 PVC/ECC cables serving
Distribution Board Ref: DB-SITE,
feeding from Sub Main Board Ref:
SMB-G1 located in Electrical Room
Ground Floor 83 Mtrs

QDC/1862 BOQ : Page 1/9/ 103 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

E 4C-16 mm2 XLPE/SWA/PVC +1C-16


mm2 PVC/ECC cables serving 40 Amp
TPN Isolator for Crane feeding from
SMB-G1. 59 Mtrs

To Collection QR. -

(Cont'd……………..)

A 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 160 amp
TPN Isolator in Rectifier Room feeding
from SMB-G3(E). 39 Mtrs 155.74 6,073.86

B 4C-16 mm2 XLPE/SWA/PVC +1C-16


mm2 PVC/ECC cables serving 40 Amp
TPN Isolator for Crane feeding from
SMB-F2. 59 Mtrs 55.62 3,281.58

C 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 100 Amp
TPN Isolator for AHU on Roof feeding
from SMB-S 21 Mtrs 155.74 3,270.54

QDC/1862 BOQ : Page 1/9/ 104 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

D 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for G-ECU-1 in Technical
Room G.F feeding from MCC-G2(E) in
Electrical Room G.F
32 Mtrs 155.74 4,983.68

E 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for G-ECU-3 in Technical
Room G.F feeding from MCC-G2(E) in
Electrical Room G.F
48 Mtrs 155.74 7,475.52

To Collection QR. 25,085.18

(Cont'd……………..)

A 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for G-ECU-6 in Technical
Room G.F feeding from MCC-G2(E) in
Electrical Room G.F
37 Mtrs 155.74 5,762.38

B 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for G-ECU-8 in Technical
Room G.F feeding from MCC-G2(E) in
Electrical Room G.F
54 Mtrs 155.74 8,409.96

QDC/1862 BOQ : Page 1/9/ 105 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

C 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for G-ECU-2 in Technical
Room G.F feeding from MCC-G4(E) in
Electrical Room G.F
40 Mtrs 155.74 6,229.60

D 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for G-ECU-4 in Technical
Room G.F feeding from MCC-G4(E) in
Electrical Room G.F
57 Mtrs 155.74 8,877.18

To Collection QR. 29,279.12

(Cont'd……………..)

A 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for G-ECU-5 in Technical
Room G.F feeding from MCC-G4(E) in
Electrical Room G.F
32 Mtrs 155.74 4,983.68

QDC/1862 BOQ : Page 1/9/ 106 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

B 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for G-ECU-7 in Technical
Room G.F feeding from MCC-G4(E) in
Electrical Room G.F
42 Mtrs 155.74 6,541.08

C 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for F-ECU-1 in Technical
Room F.F feeding from MCC-F1 in
Electrical Room F.F
0 Mtrs 155.74 -

D 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for F-ECU-3 in Technical
Room F.F feeding from MCC-F1 in
Electrical Room F.F
0 Mtrs 155.74 -

E 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for F-ECU-6 in Technical
Room F.F feeding from MCC-F1 in
Electrical Room F.F
0 Mtrs 155.74 -

To Collection QR. 11,524.76

(Cont'd……………..)

QDC/1862 BOQ : Page 1/9/ 107 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

A 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for F-ECU-8 in Technical
Room F.F feeding from MCC-F1 in
Electrical Room F.F
0 Mtrs 155.74 -

B 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for F-ECU-2 in Technical
Room F.F feeding from MCC-F3 in
Electrical Room F.F
0 Mtrs 155.74 -

C 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for F-ECU-4 in Technical
Room F.F feeding from MCC-F3 in
Electrical Room F.F
0 Mtrs 155.74 -

D 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for F-ECU-5 in Technical
Room F.F feeding from MCC-F3 in
Electrical Room F.F
0 Mtrs 155.74 -

E 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for F-ECU-7 in Technical
Room F.F feeding from MCC-F3 in
Electrical Room F.F
0 Mtrs 155.74 -

To Collection QR. -

QDC/1862 BOQ : Page 1/9/ 108 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

(Cont'd……………..)

A 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for F-ECU-9 in
Transmission Room F.F feeding from
MCC-F3 in Electrical Room F.F
0 Mtrs 155.74 -

B 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for Chiller Water Pump-CP
in Mech. Room feeding from MCC-
Roof(E) in Roof
51 Mtrs 155.74 7,942.74

C 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for Chiller Water Pump-CP
in Mech. Room feeding from MCC-
Roof(E) in Roof
51 Mtrs 155.74 7,942.74

D 4C-70 mm2 XLPE/SWA/PVC +1C-35


mm2 PVC/ECC cables serving 125 amp
TPN Isolator for Chiller Water Pump-
CP(Standby) in Mech. Room feeding
from MCC-Roof(E) in Roof
51 Mtrs 155.74 7,942.74

QDC/1862 BOQ : Page 1/9/ 109 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 23,828.22

Fire Rated cables as specified pulled


inside sleeves or installed on cable tray
and clipped to wall or in PVC duct
complete with all jointing and
termination kits, sleeves, conduits, laying
of marker tape and protection tiles
including all associated civil works etc
as specified and as shown on Drawing
no:1862-EL-B0-6-003 SHT 01 OF 02 &
1862-EL-B0-6-003 SHT 02 OF 02.

Note: Electrical cable length shown in


the SLD drawings are for calculation
purpose only. Contractor to follow the
length given in the BOQ for pricing.

A 4C-120 mm2 +1C-70 mm2 Fire Rated


(FP 400) cables serving Fire Pump
Control Panel feeding from M.V.Panel-1 68 Mtrs 166.86 11,346.48

B 2C-10 mm2 +1C-10 mm2 Fire Rated


(FP 400) cables serving Jocky Pump
Control Panel feeding from M.V.Panel-1 68 Mtrs 22.25 1,513.00

C 2C-10 mm2 +1C-10 mm2 Fire Rated


MICC cables serving DB-HV in
Substation feeding from M.V.Panel-2. 23 Mtrs 22.25 511.75

D 2C-10 mm2 +1C-10 mm2 Fire Rated


MICC cables serving DB-MV in
Substation feeding from M.V.Panel-2. 13 Mtrs 22.25 289.25

QDC/1862 BOQ : Page 1/9/ 110 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 13,660.48


600/1000 volts, copper conductors, PVC
insulated, steel wires armoured, PVC
oversheated, pulled inside sleeves or
installed on cable tray and clipped to
wall or in PVC duct complete with all
jointing and termination kits, sleeves,
conduits, laying of marker tape and
protection tiles including all associated
civil works etc as specified and as
shown on Drawing no:1862-EL-BO-6-
002 SHT 01 OF 03 (Contd..)

Note: Electrical cable length shown in


the SLD drawings are for calculation
purpose only. Contractor to follow the
length given in the BOQ for pricing.

A 4C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps TPN isolator for Pressurization
Unit-CP in Mech. Room feeding from
MCC-Roof(E) located in Roof
51 Mtrs 44.50 2,269.50

B 4C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 20
Amps TPN isolator for Booster Pump-
CP in Roof feeding from MCC-Roof(E)
located in Roof 26 Mtrs 44.50 1,157.00

C 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for Sewage Pump -cp
feeding from SMB-G1 located in
Electrical Room Ground floor
11 Mtrs 22.25 244.75

QDC/1862 BOQ : Page 1/9/ 111 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

D 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for G-FCU-2 in office
room feeding from SMB-G1 located in
Electrical Room Ground floor
71 Mtrs 22.25 1,579.75

E 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for G-FCU-1 in
Entrance lobby feeding from SMB-G1
located in Electrical Room Ground floor
47 Mtrs 22.25 1,045.75
To Collection QR. 6,296.75

(Cont'd……………..)

A 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 32
Amps DP isolator for G-IU-2/G-OU-2 in
Rectifier Room feeding from SMB-
G3(E) located in Electrical Room
Ground floor 34 Mtrs 22.25 756.50

B 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 32
Amps DP isolator for G-IU-3/G-OU-3 in
Battery Room feeding from SMB-G3(E)
located in Electrical Room Ground floor
39 Mtrs 22.25 867.75

C 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 32
Amps DP isolator for G-IU-1/G-OU-1 in
MDF Room feeding from SMB-G3(E)
located in Electrical Room Ground floor
39 Mtrs 22.25 867.75

D 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 32
Amps DP isolator for G-IU-1/G-OU-1 in
MDF Room feeding from SMB-G3(E)
located in Electrical Room Ground floor
30 Mtrs 22.25 667.50

QDC/1862 BOQ : Page 1/9/ 112 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 3,159.50

(Cont'd……………..)

A 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for F-FCU-2 in Office
Room feeding from SMB-F2 located in
Electrical Room First floor
0 Mtrs 22.25 -

B 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for F-FCU-1 in
Entrance Lobby feeding from SMB-F2
located in Electrical Room First floor
0 Mtrs 22.25 -

C 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for S-FCU-1 in
Entrance Lobby feeding from SMB-S
located in Electrical Room Pent House
47 Mtrs 22.25 1,045.75

D 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for S-FCU-4 in Office
Room feeding from SMB-S located in
Electrical Room Pent House
64 Mtrs 22.25 1,424.00

QDC/1862 BOQ : Page 1/9/ 113 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 2,469.75

(Cont'd……………..)

A 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for S-FCU-3 in Office
Room feeding from SMB-S located in
Electrical Room Pent House
60 Mtrs 22.25 1,335.00

B 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for S-FCU-2 in Office
Room feeding from SMB-S located in
Electrical Room Pent House
57 Mtrs 22.25 1,268.25

C 2C-10mm2 PVC/SWA/PVC +1C-


10mm2 PVC/ECC cables serving 16
Amps DP isolator for Transfer pump CP
in Pump room feeding from SMB-G1
located in Electrical Room GF
66 Mtrs 22.25 1,468.50

QDC/1862 BOQ : Page 1/9/ 114 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 4,071.75

600/1000 volts, copper conductors, PVC


insulated, PVC oversheated, pulled
inside sleeves or installed on cable tray
and clipped to wall or in PVC duct
complete with all jointing and
termination kits, sleeves, conduits, laying
of marker tape and protection tiles
including all associated civil works etc
as specified and shown on drawing
No:1862-EL-B0-6-002 SHT 02 OF
03&1862-EL-B0-6-002 SHTS. 01, 02 &
03 (contd...)

Note: Electrical cable length shown in


the SLD drawings are for calculation
purpose only. Contractor to follow the
length given in the BOQ for pricing.

QDC/1862 BOQ : Page 1/9/ 115 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

A 4C-25 mm2 PVC/PVC +1C-16 mm2


PVC/ECC cables serving Distribution
Board Ref: DB-EQPT(F) feeding from
Sub Main Board Ref: SMB-F2 located at
Electrical Room, First Floor.
14 Mtrs 66.74 934.36

B 4C-50 mm2 PVC/PVC +1C-25 mm2


PVC/ECC cables serving Distribution
Board Ref: DB-F, feeding from Sub
Main Board Ref: SMB-F2 located at
Electrical Room, First Floor.
14 Mtrs 111.24 1,557.36

C 4C-10 mm2 PVC/PVC +1C-10 mm2


PVC/ECC cables serving Distribution
Board Ref: DB-EQPT(S) feeding from
Sub Main Board Ref: SMB-S located at
Electrical Room, Pent House.
14 Mtrs 44.50 623.00

To Collection QR. 3,114.72

(Cont'd……………..)

A 4C-50 mm2 PVC/PVC +1C-25 mm2


PVC/ECC cables serving Distribution
Board Ref: DB-G feeding from Sub
Main Board Ref: SMB-G1 located at
Electrical Room, Ground Floor.
14 Mtrs 111.24 1,557.36

B 4C-25 mm2 PVC/PVC +1C-16 mm2


PVC/ECC cables serving Distribution
Board Ref: DB-EQPT(G) feeding from
Sub Main Board Ref: SMB-G1 located at
Electrical Room, Ground Floor.
14 Mtrs 66.74 934.36

QDC/1862 BOQ : Page 1/9/ 116 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

C 4C-50 mm2 PVC/PVC +1C-25 mm2


PVC/ECC cables serving Distribution
Board Ref: DB-S1 feeding from Sub
Main Board Ref: SMB-S located at
Electrical Room, Pent House.
14 Mtrs 111.24 1,557.36

D 4C-50 mm2 PVC/PVC +1C-25 mm2


PVC/ECC cables serving Distribution
Board Ref: DB-S2 feeding from Sub
Main Board Ref: SMB-S located at
Electrical Room, Pent House.
14 Mtrs 111.24 1,557.36

To Collection QR. 5,606.44

BONDING

A Allow for complete bonding to trunking,


water heaters, pumps, equipment etc. in
full compliance to KAHRAMAA
standards. 1 Item 11,124.00 11,124.00

EARTHING SYSTEM (EXTERNAL)

QDC/1862 BOQ : Page 1/9/ 117 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Earthing System (TN-S), completely


installed including earth electrodes, earth
pits, excavation, test links, clips,
conduits, fittings, builder's work in
connection and all related accessories.
-

B Complete earthing system for


electromechanical installation and
structure. 0 Item 100,116.00 -

C Complete Earthing System for Raised


Floor Earthing and Earthing of Telecom
Equipments as detailed in drawings. 0.5 Item 11,124.00 5,562.00

LIGHTNING PROTECTION
SYSTEM

Supply & install Lightning protection to


the building to BS 6651:1999 as per
drawings specifications, complete with
25mm x 3mm PVC covered down
conductors, 25 x 3mm bare copper roof
conductors, earth electrodes, earth pits
with concrete inspection chambers
including clips, clamps, all associated
accessories and builder's work.
Contractor to submit shop drawing
before installation.

D Earth Pit 8 Nos 1,001.16 8,009.28

E 25 x 3 mm PVC covered 152 Mtrs 66.74 10,144.48

F 25 x 3 mm bare copper 220 Mtrs 55.62 12,236.40

To Collection QR. 152,754.16


CABLE TRAYS

QDC/1862 BOQ : Page 1/9/ 118 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Supply & install Galvanized steel cable


trays and fittings complete with purpose
made sunshade/ protection covers, bends
and junctions as specified and shown on
drgs, including supports, fixings and
associated builders works as necessary as
detailed in drawings.

A Cable tray - 1000x50mm 25 Mtrs 389.34 9,733.50

B Cable tray - 600x50mm 100 Mtrs 333.72 33,372.00

C Cable tray - 400x50mm 113 Mtrs 255.85 28,911.05

D Cable tray - 300x50mm 30 Mtrs 161.30 4,839.00

E Cable tray - 200x50mm 50 Mtrs 133.49 6,674.50

F Cable tray - 100x50mm 90 Mtrs 94.55 8,509.50

To Collection QR. 92,039.55

QDC/1862 BOQ : Page 1/9/ 119 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

GI TRUNKING

Supply & install Galvanized steel cable


trunking & fitting complete with
protection covers as specified including
supports, fixings, junction boxes and
assocaited builder's work as necessary as
detailed in drawings

A Allow for 6" GI trunking above false


ceiling 80 Mtrs 103.45 8,276.00

Supply,installation of flush floor 3


compartment trunking including
accessories

B 3 compartment trunking including all


accessories ; size 100x100mm 200 Mtrs 103.45 20,690.00

C 3 compartment junction box incuding


flyover 29 No. 222.48 6,451.92

QDC/1862 BOQ : Page 1/9/ 120 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 35,417.92


CONTRACTOR TO CONSIDER
FOLLOWING ITEMS WHILE
PRICING (NOT SHOWN IN
DRAWINGS).

UPS Power Distribution for Equipment


Racks

Supply and Install Wire Tray Cable


carrier ;50mm X 50mm wire Grid
Spacing; tray depth of 50 mm Zinc Plate
and Passivate finish complete with all
necessary couplers, brackets, hold down
clamp, bonding link etc to have a
complete installation ( As MK C 2542 or
Equal & Approved).

A 420 mmX 50 mm Trays 25 Mtrs 259.19 6,479.75

Wiring in 450/750 Volt grade Heat


Resistant PVC insulated flexible copper
cable laid in Wire Trays under raised
floor and terminated to Precicion Power
unit breakers on 1 side and the inductrial
socket unit on the other.

B 3C X 4 mm cable to 16 Amp Sockets 100 Mtrs 22.25 2,225.00

C 5C X 6 mm cable to 32 Amp Sockets 25 Mtrs 44.50 1,112.50

Approved accessories as described.

Industrial Socket Outlet, Surface type,


Angled, IP44, 380 -415 V, complete with
Suitable Plug.

D 16 Amps 2P + E 40 Nos 166.86 6,674.40

QDC/1862 BOQ : Page 1/9/ 121 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

5 32 Amps 3 P+ N+E 5 Nos 166.86 834.30

To Collection QR. 17,325.95


LIGHTING INSTALLATION

Supply & install Luminaries complete as


specified including all lamps, tubes,
fittings, supports, control gear, diffusers,
flexible connections, ceiling roses and
the like as necessary ; fixing in position
including final connections and
terminations as [er luminaire schedule
detailed in specifications.

A Type A 260 No 556.20 144,612.00

B Type A +E 47 No 834.30 39,212.10

C Type A1+E 12 No 834.30 10,011.60

D Type B 18 No 556.20 10,011.60

E Type B +E 6 No. 834.30 5,005.80

F Type C 83 No 556.20 46,164.60

G Type A1 23 No 556.20 12,792.60

QDC/1862 BOQ : Page 1/9/ 122 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 267,810.30

(Cont'd............................)

A Type G1 17 No 556.20 9,455.40

B Type G1 +E 41 No 834.30 34,206.30

C Type N 7 No 556.20 3,893.40

D Type N +E 3 No 834.30 2,502.90

E Type N1 2 No 556.20 1,112.40

F Type N1+E 2 No 834.30 1,668.60

G Type N2 3 No 556.20 1,668.60

QDC/1862 BOQ : Page 1/9/ 123 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 54,507.60

(Cont'd............................)

A Type O 3 No 556.20 1,668.60

B Type M 10 No 556.20 5,562.00

C Photo cell, Contactor 1 No 1,112.40 1,112.40

D Timer contactor 1 No 1,112.40 1,112.40

E Over ride switch 1 No 1,112.40 1,112.40

F Exit Light - Single Sided 8 No 834.30 6,674.40

QDC/1862 BOQ : Page 1/9/ 124 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 17,242.20


Supply & install 240 volt flush mounted
accessories / lighting switches,
completely installed including boxes,
plates, conduit boxes, accessories etc.; all
as specified.

A General lighting switch, one way, one


gang 36 No. 166.86 6,006.96

B General lighting switch, one way, one


gang,Weatherproof 2 No 166.86 333.72

C General lighting switch, one way, one


gang, Explosion proof 2 No. 667.44 1,334.88

D General lighting switch, one way, two


gang 4 No. 166.86 667.44

E General lighting switch, one way, three


gang 6 No. 166.86 1,001.16

F General lighting switch, two way, one


gang 9 No 166.86 1,501.74

G General lighting switch, two way, two


gang 12 No. 166.86 2,002.32

H General lighting switch, two way, four


gang 12 No 166.86 2,002.32

QDC/1862 BOQ : Page 1/9/ 125 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 14,850.54


Wiring to the following points with 450 /
600 volt PVC insulated cable in
concealed or exposed conduit trunking
complete as specified with necessary
earthing.(contd…)

A To General lighting Luminaries 611 No. 166.86 101,951.46

B To Luminaire with Emergency facilities 169 No 166.86 28,199.34

C To Emergency light 1 No 166.86 166.86

D To EXIT lights 11 No 166.86 1,835.46

E To General lighting switch, one way, one


gang 36 No. 166.86 6,006.96

F To General lighting switch, one way, one


gang(Weather Proof) 2 No 166.86 333.72

G To General lighting switch, one way, one


gang, Explosion proof 2 No. 166.86 333.72

H To General lighting switch, one way, two


gang 4 No. 166.86 667.44

QDC/1862 BOQ : Page 1/9/ 126 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

J To General lighting switch, one way,


three gang
6 No. 166.86 1,001.16

K To General lighting switch, two way, one


gang 9 No 166.86 1,501.74

L To General lighting switch, two way, two


gang 12 No. 166.86 2,002.32

M To General lighting switch, two way,


four gang 12 No 166.86 2,002.32

To Collection QR. 146,002.50


Wiring to the following points with 450 /
600 volt PVC insulated cable in
concealed or exposed conduit or through
floor trunking complete as specified
with necessary earthing

A To Photo cell, Contactor 1 No. 166.86 166.86

B To Timer contactor 1 No 166.86 166.86

C To Over ride switch 1 No 166.86 166.86

QDC/1862 BOQ : Page 1/9/ 127 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 500.58


SMALL POWER INSTALLATION

Supply & install 240 Volt flush mounting


accessories as specified (contd…).

A 13 amp switched single socket outlet


with neon indicator&brushed stainless
steel fornt plate . 31 No 166.86 5,172.66

B 13 amp switched single socket outlet


with neon indicator&brushed stainless
steel fornt plate ., w/proof. 12 No. 166.86 2,002.32

C 13 amp switched twin socket outlet with


neon indicator&brushed stainless steel
front plate 34 No. 166.86 5,673.24

D 20 Amp DP switch 18 No 166.86 3,003.48

E 30 Amp DP switch 9 No 166.86 1,501.74

QDC/1862 BOQ : Page 1/9/ 128 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

F 20 Amp Flex outlet 2 No 166.86 333.72

G 45 Amp Flex Outlets 27 No 166.86 4,505.22

H 13/5 amp Switched spur unit 3 No 166.86 500.58

J 13/5 amp Unswitched spur unit 27 No 166.86 4,505.22

K 3 compartment raised floor box


300mmx300mm completely fitted out
with 2x(2x13Amp) switched socket
outlet twin RJ45 data outlet and twin
telephone outlets.
72 No 166.86 12,013.92

To Collection QR. 39,212.10

Supply & install for 415V/240V,


isolators as specified complete with
necessary supports, cable tray, sunshade
etc. so as to have a complete installation.

A 16 Amp DP weather proof Isolators 14 No 166.86 2,336.04

B 16 Amp DP Isolators 12 No 166.86 2,002.32

C 16 Amp TPN Isolators 1 No 166.86 166.86

D 20 Amp DP weather proof Isolator 10 No 166.86 1,668.60

E 32 Amp DP weather proof metallic


Isolator 5 No 166.86 834.30

F 40 Amp TPN Isolator 2 No 166.86 333.72

G 63 Amp TPN Isolator 1 No 166.86 166.86

QDC/1862 BOQ : Page 1/9/ 129 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

H 100 Amp TPN weather proof Isolator 1 No 166.86 166.86

J 125 Amp TPN Isolator 8 No 166.86 1,334.88

K 125 Amp TPN weather proof Isolator 3 No 166.86 500.58

L 160 Amp TPN Isolator 1 No 166.86 166.86

M 200 Amp TPN weather proof Isolator 1 No 166.86 166.86

N 630 Amp TPN Isolator 4 No 166.86 667.44

To Collection QR. 10,512.18

Wiring to the following points with 450 /


600 volt PVC insulated cable to BS 6004
in concealed or exposed conduit and
fittings to BS 4607or through floor
trunking complete as specified with
necessary earthing.

A To 13 amp switched single socket outlet 43 No 166.86 7,174.98

B To 13 amp switched twin socket outlet 34 No. 166.86 5,673.24

C To Floor Mounted Box with 2 Nos 2 x


13amp switched socket outlet 72 No 166.86 12,013.92

D To 20 Amp DP switch 18 No 166.86 3,003.48

E To 30 Amp DP switch 9 No 166.86 1,501.74

QDC/1862 BOQ : Page 1/9/ 130 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

F To 20 Amp Flex outlet 2 No 166.86 333.72

G To 45 Amp Flex Outlet 27 No 166.86 4,505.22

H To 13/5 amp Switched spur unit 3 No 166.86 500.58

J To 13/5 amp Unswitched spur unit 27 No 166.86 4,505.22

To Collection QR. 39,212.10

Wiring to the following points with 450 /


600 volt PVC insulated cable to BS 6004
in concealed or exposed conduit and
fittings to BS 4607or through floor
trunking complete as specified with
necessary earthing (cont'd………).

A To 16 Amp DP weather proof Isolators 14 No 166.86 2,336.04

B To 16 Amp DP Isolators 3 No 166.86 500.58

C To 20 Amp DP weather proof Isolator 8 No 166.86 1,334.88

D To 32 Amp DP weather proof Isolator 5 No 166.86 834.30

QDC/1862 BOQ : Page 1/9/ 131 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 5,005.80


FIRE ALARM SYSTEM

QDC/1862 BOQ : Page 1/9/ 132 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

The works include under this section


shall comprise design, development,
supply, installation, testing,
commissioning and setting to work for
all items which are necessary for a
complete operational fire alarm system
as outlined in the drawings No.1862-EF-
B1-1-001 SHT 01 OF 01 TO 1862-EF-
B1-1-005 SHT 01 OF 01, 1862-EF-B2-
1-001 SHT 01 OF 01, 1862-EF-B3-1-
001 SHT 01 OF 01 & 1862-EF-B0-6-001
SHT 01 OF 01and in the specifications
and shall be carried out by a specialized
sub contractor.

A 4-Loop analogue addressable fire alarm


control panel complete with zone chart,
printer, battery, battery charger and all
accessories including wiring, conduiting
and connection to the power supply. Ref.
FACP located in Entrance Lobby
1 No 33,372.00 33,372.00

Supply & install Fire alarm fittings and


accessories complete as specified and
indicated in the drawings.

B Mimic Panel 1 No 8,899.20 8,899.20

C Fire Alarm Repeater Panel and all


accessories including wiring &
connections to the power supply, Ref RP
located in Guard Room 1 No 8,899.20 8,899.20

D Addressable heat detector 6 No 556.20 3,337.20

E Addressable smoke detector 25 No 556.20 13,905.00

F Addressable duct mounted smoke


detector 1 No 556.20 556.20

QDC/1862 BOQ : Page 1/9/ 133 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 68,968.80

FIRE ALARM SYSTEM (Cont'd…….)

A Addressable Hydrogen Detector 2 No 556.20 1,112.40

B Addressable Manual Call Point 10 No 556.20 5,562.00

10 Addressable Sounder. 10 No 556.20 5,562.00

D Addressable Sounder with flasher. 2 No 556.20 1,112.40

E Addressable Sounder with flasher, w/p. 3 No 556.20 1,668.60

F Fire Alarm Junction Box 4 No 556.20 2,224.80

G 4 Channel interface to FM-200 2 No 556.20 1,112.40

H Single channel to interface to shut down


AHU, activate exhaust fans, Chiller Unit,
Lift Control panel, Auto Dialling System,
Access Control, BMS with all necessory
accessories.
12 No 556.20 6,674.40

Supply & install 2 x 1.5 mm2 FP-200 in


PVC conduits / cable trunking with draw
wires complete with glands and
terminations as specified to the
following.(contd..)

J To Mimic Panel ( Cable as specified by


the specialist system contractor / 1 No 333.72 333.72
supplier)
K To Fire Alarm Repeater Panel ( Cable as
specified by the system contractor /
specialist ) 1 No 333.72 333.72

L To Addressable heat detector 6 No 333.72 2,002.32

M To Addressable smoke detector 25 No 333.72 8,343.00

QDC/1862 BOQ : Page 1/9/ 134 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

N To Addressable duct mounted smoke


detector 1 No 333.72 333.72
To Collection QR. 36,375.48

Supply & install 2 x 1.5 mm2 FP-200 in


PVC conduits / cable trunking with draw
wires complete with glands and
terminations as specified to the
following.(contd..)

A To Addressable Hydrogen Detector 2 No 333.72 667.44

B To Addressable Manual Call Point 10 No 333.72 3,337.20


(Break Glass)
C To Addressable Sounder. 10 No 333.72 3,337.20

D To Addressable Sounder with flasher. 2 No 333.72 667.44

E To Addressable Sounder with flasher,


w/p. 3 No 333.72 1,001.16

F To Interface to shut down ECU with all


necessory accessories 17 No 333.72 5,673.24

QDC/1862 BOQ : Page 1/9/ 135 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 14,683.68

TELEPHONE INSTALLATION

Note : The works include under this


section shall comprise supply,
installation, testing, commissioning and
setting to work for all items which are
necessary for a complete operational
voice system as outlined in the Drawing
no. 1862-ET-B0-G-001 SHT 01 OF 01,
1862-ET-B1-1-001 SHT 01 OF 01 TO
1862-ET-B1-1-003 SHT 01 OF 01, 1862-
ET-B2-1-001 SHT 01 OF 01, 1862-ET-
B0-6-001 SHT 01 of 01 and in the
specifications and shall be carried out by
a Q-Tel approved specialized Sub-
Contractor as per Q-Tel's standard and
regulations.

A Co-ordinate with Q-Tel for obtaining


connection to the premises. Allow for Q-
Tel's supervision fees pertaining to
complete telephone installation. Item 16,686.00 16,686.00

Telephone installation devices, fittings,


accessories complete with fascia plate
cover as specified including 25 mm
diameter PVC conduits and draw wires
(as shown on drawings)

B Twin Data outlet box for IP Telephon


including cover plate matching with
other electrical wiribng accessories, at
450mmheight from AFFL
14 No 278.10 3,893.40

QDC/1862 BOQ : Page 1/9/ 136 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

C 150x150x100mm Telephone/Data
Junction Box 1 No 556.20 556.20

To Collection QR. 21,135.60


TELEPHONE WIRING

Telecommunication cable as specified, in


pvc conduits or in cable trunking/cable
tray with draw rope inside, complete as
specified in strict compliance with IT
Networking cabling standard and shown
on drawings

A Cables serving each twin data outlet for


IP telephone from Data Rack 14 No 333.72 4,672.08

B Cables serving each twin data outlet for


IP telephone in FMB from data rack 72 No 333.72 24,027.84

QDC/1862 BOQ : Page 1/9/ 137 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 28,699.92


DATA INSTALLATION

Note : The works include under this


section shall comprise supply,
installation, testing, commissioning and
setting to work for all items which are
necessary for a complete operational
data system as outlined in the drawings
1862-ET-B0-G-001 SHT 01 OF 01,
1862-ET-B1-1-001 SHT 01 OF 01 TO
1862-ET-B1-1-003 SHT 01 OF 01, 1862-
ET-B2-1-001 SHT 01 OF 01, 1862-ET-
B0-6-001 SHT 01 of 01 and in the
specifications and shall be carried out by
a Q-Tel approved specialized Sub-
Contractor as per Q-Tel's standard and
regulations.

A 19" Data Rack 2 No 3,893.40 7,786.80

B Main Distribution Frame 1 No 11,124.00 11,124.00

C Transmission ODF single mode 2 No 3,337.20 6,674.40

D Fiber patch panel 3 No 2,224.80 6,674.40

E 1x24 Voice Patch Panel 2 No 2,224.80 4,449.60

F 1x24 Port RJ45 Patch Panel 4 No 2,224.80 8,899.20

QDC/1862 BOQ : Page 1/9/ 138 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

G 1x48 Port Patch Panel 1 No 3,893.40 3,893.40

H 1x48 Port Voice Patch Panel 1 No 3,893.40 3,893.40

J 4x48 Port RJ45 Patch Panel 2 No 13,348.80 26,697.60

To Collection QR. 80,092.80


Data installation devices, fittings,
accessories complete with fascia plate
cover as specified including 25 mm
diameter PVC conduits and draw wires
(as shown on drawings).

A Twin Data outlet boxes including cover


plate matching with other electrical
wiring accessories, at 450mm high from
AFFL 32 No 278.10 8,899.20

QDC/1862 BOQ : Page 1/9/ 139 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 8,899.20

DATA WIRING

Data cable as specified, in pvc conduits


or in cable trunking/cable tray with draw
rope inside, complete as specified in
strict compliance with IT Networking
cabling standard and shown on drawings.

A Cables serving each Twin data socket


outlet from Data Rack 32 No 333.72 10,679.04

B Cables serving Twin Data socket in FMB


from Data Rack 72 No 333.72 24,027.84

C Single Mode Optic Fiber Cable from


QTEL MDF to Transmission ODF single
mode in GF ELV room 50 Mtrs 100.12 5,006.00

D Multi Mode Optic Fiber Cable from fiber


patch panel in GF ELV room to Fiber
patch panel in FF ELV room & Fiber
patch panel in penthouse ELV room
25 Mtrs 100.12 2,503.00

QDC/1862 BOQ : Page 1/9/ 140 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

E 25 pair copper cable from Qtel MDF to


24 port voice patch panel in GF ELV
room, FF ELV room, penthouse ELV
room
75 Mtrs 100.12 7,509.00

To Collection QR. 49,724.88


BUILDING MANAGEMENT SYSTEM

The work included in this section shall


comprisedesign,configuration,developme
nt, supply, installation, cabling, testing,
commissioning and setting to work of all
items which are necessary for the
complete operational Building
Management System detailed in
specification and Drawing No. 1862-EC-
B0-6-003 SHT 01 OF 01 TO 1862-EC-
B0-6-005 SHT 01 OF 01 (contd....).

Note: 1. BMS Subcontractor shall


provide the scheme drawing.
2. No. of Monitoring
Points shall be as per the Equipment
Manufacturers.

QDC/1862 BOQ : Page 1/9/ 141 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

A Workstation with all necessory softwares


and accessories for fully automated
control of all individual
equipments/systems including LCD
monitors, keyboards, mouse, printers etc.
0 No 166,860.00 -

B Direct Digital Controllers (DDC) for


monitoring and Controlling all the
specfred electromechanical equipments
through MicroProcessors with all
necessry softwares, complete as detailed
in Drawings and Specifications..
0 No 22,248.00 -
0
B1 Interface with AHU. 0 No. 556.20 -

B2 Interface with AC Splits. 0 No. 556.20 -

B3 Interface with ECU. 0 No. 556.20 -

B4 Interface with Chiller Units 0 No. 556.20 -

To Collection QR. -

B5 Interface with Fire Pumps No. 556.20 -

B6 Interface with Portable Water Transfer


Pumps. 0 No. 556.20 -

B7 Interface with Sump Pump 0 No. 556.20 -

B8 Interface with Booster Pump. 0 No. 556.20 -

B9 Interface with Chilled Water Pumps 0 No. 556.20 -

B10 Interface with Fire Alarm panel 0 No. 556.20 -

B11 Interface with UPS 0 No. 556.20 -

B12 Interface with Rectifiers 0 No. 556.20 -

QDC/1862 BOQ : Page 1/9/ 142 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

B13 Interface with Extinguishing Panels. 0 No. 556.20 -

B14 Interface with Precission power units 0 No. 556.20 -

B15 Interface with Access control system 0 No. 556.20 -

B16 Interface with CCTV 0 No. 556.20 -

C Include here for the cost of any matter


not identified in the above and which is
necessory for the complete installation of
a fully opertional Building Management
system.

Item - -

D Cabling in conduits as required for


connecting the above equipments to
DDC and complete BMS Item - -

To Collection QR. -
ACCESS CONTROL SYSTEM

Note: The work included in this section


shall comprise design, development,
supply, installation, cabling, testing,
commissioning and setting to work of all
items which are necessary for the
complete operational Access Control
System inclluding all necessary licenses
and system requirements as appliacable
and as detailed in specification and
drawings (see also notes).

QDC/1862 BOQ : Page 1/9/ 143 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Access control system equipment


including necessory fixing and placing,
all as shown in the Drawings.

A Card Reader 0 No 556.20 -

B Long Range Card Reader 0 No 889.92 -

C Magnetic Door Contactor 0 No 889.92 -

D Door Controller 0 No 889.92 -

E Break Glass Unit 0 No 889.92 -

F Electro Magnetic Lock 0 No 889.92 -

G 19" color Mointor 0 No 11,124.00 -

H Server 0 No 11,124.00 -

J Printer (Laser) 0 No 3,337.20 -

To Collection QR. -
CLOSED CIRCUIT TELEVISION
SYSTEM

Note: The work included in this section


shall comprise design, development,
supply, installation, cabling, testing,
commissioning and setting to work of all
items which are necessary for the
complete operational Closed Circuit
Television System detailed in
specification and drawings (contd...)

QDC/1862 BOQ : Page 1/9/ 144 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Equipments, fittings and accessories as


specified.

A Outdoor CDD Camera, w/p. 0 No 10,011.60 -

B Analog CCD camera (INDOOR) 0 No 8,899.20 -

C PTZ camera w/p (OUTDOOR) 0 No 10,011.60 -

D 19"" Mointor and Keypad with Joystick 0 No 16,686.00 -

E 16 channel Digital Video Recorder with


DVD RW 0 No 8,899.20 -

F Supply & Install Custom Made Console


to accommodate 6 Monitors & 6 CPU Item - -

To Collection QR. -
BUILDERS WORK IN CONNECTION
WITH ALL ELECTRICAL & LOW
VOLTAGE INSTALLATIONS.

QDC/1862 BOQ : Page 1/9/ 145 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Excavating trenches for cables or ducts


not exceeding 1.5 m total depth including
grading bottom, earth work supports,
part back filling with selected excavated
material, compacting and removal of
surplus excavated material from site as
indicated in Drawings.

Plain in-situ concrete Grade SRC 20.

A Beds and surrounds 150 mm thick for


150 mm diameter ducts Item 16,686.00 16,686.00

PVC rigid pipe ducts and fittings


including draw wires left in; laid in
trenches.

B 150 mm Diameter ducts for Electrical


cables 200 Mtrs 66.74 13,348.00

C 50 mm Diameter ducts for ELV cables 0 Mtrs 33.37 -

D Manhole with heavy duty ductile iron


covers with service identification and
frames to BS 497 ; including prepared
openings for ELV service cables / duct
passing.
0 Nos 4,449.60 -

To Collection QR. 30,034.00

BUILDERS WORK FOR TELEPHONE


CABLE DUCT INSTALLATIONS.

QDC/1862 BOQ : Page 1/9/ 146 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Excavating trenches for telephone cables


or ducts exceeding 1.5 m total depth
including grading bottom, earth work
supports, part back filling with selected
excavated material, compacting and
removal of surplus excavated material
from site.

A Trench average 600 mm depth for 9 Nos.


150 mm diameter ducts in 3 layers, Ref.
Drawing No.1862-AR-B0-G-005 sht 01
of 01. 37 m 166.86 6,173.82

Dune sand as specified.

B For 9 Nos. ducts 150 mm diameter in 3


layers, Ref. Drawing No. 1862-AR-B0-
G-005 sht 01 of 01. 37 m 90.10 3,333.70

Plain in-situ concrete Grade SRC 20.

C Beds and surrounds 100 mm thick to 9


Nos.ducts 150 mm diameter in layers,
Ref. Drawing No. 1862-AR-B0-G-005
sht 01 of 01. 37 m 278.10 10,289.70

PVC rigid pipe ducts and fittings


including draw wires left in; laid in
trenches.

D 150 mm diameter ducts 37 m 600.70 22,225.90

To Collection QR. 42,023.12

QDC/1862 BOQ : Page 1/9/ 147 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Allow for the following.

A Holes, chases, cutting back, building in,


provision of pipe sleeves, fire barriers
and making good finishes as necessary. Item 2,224.80 2,224.80

B Allow for sleeves/ducts for encasing


electrical cables passing beneath roads,
paved areas and structures. Item 2,224.80 2,224.80

QDC/1862 BOQ : Page 1/9/ 148 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 4,449.60

SUNDRIES IN CONNECTION WITH


ALL ELECTRICAL ELECTRICAL &
LOW VOLTAGE INSTALLATIONS.

Allow for the following

A Loose keys, tools and spare parts as


specified.
Item 556.20 556.20

B Provide Installation Drawings. Item 556.20 556.20

C Provide Operating and Maintenance


Manuals. Item 556.20 556.20

D Warranties and Guarantees Item 556.20 556.20

E Testing, Commissioning and setting to


work of all Electrical and ELV
Equipments which is not covered under
the BOQ descriptions. Item 556.20 556.20

QDC/1862 BOQ : Page 1/9/ 149 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 2,781.00

spare part list

Allow for the following

A Consider Lumpsum amount for spare


parts as described in specification section
9.7/10.12/18.5/20.7 Item - -

QDC/1862 BOQ : Page 1/9/ 150 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. -

Collection

Page 1/9/1 -

Page 1/9/2 9,777.99

Page 1/9/3 9,755.77

Page 1/9/4 9,766.87

Page 1/9/5 10,234.07

Page 1/9/6 49,390.56

Page 1/9/7 21,469.32

Page 1/9/8 Missing Page

Page 1/9/8A 19,133.28

Page 1/9/9 16,686.00

Page 1/9/10 11,124.00

Page 1/9/11 11,686.00

Page 1/9/12 11,124.00

Page 1/9/13 11,124.00

Page 1/9/14 64,074.24

Page 1/9/15 40,435.74

QDC/1862 BOQ : Page 1/9/ 151 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Page 1/9/16 198,563.40

Page 1/9/17 70,971.12

Page 1/9/18 7,008.12

ELECTRICAL WORKS C/F QR. 572,324.48

572,324.48

Page 1/9/19 -

Page 1/9/20 15,351.12

Page 1/9/21 -

Page 1/9/22 22,248.00

Page 1/9/23 Page missing

Page 1/9/23A 36,041.76

Page 1/9/24 25,085.18

Page 1/9/25 29,279.12

Page 1/9/26 11,524.76

Page 1/9/27 -

Page 1/9/28 23,828.22

Page 1/9/29 13,660.48

Page 1/9/30 6,296.75

Page 1/9/31 3,159.50

Page 1/9/32 2,469.75

QDC/1862 BOQ : Page 1/9/ 152 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Page 1/9/33 4,071.75

Page 1/9/34 3,114.72

Page 1/9/35 5,606.44

Page 1/9/36 152,754.77

ELECTRICAL WORKS C/F QR 926,816.80

B/F QR 926,816.80

Page 1/9/37 92,039.55

Page 1/9/38 35,417.92

Page 1/9/39 17,325.95

Page 1/9/40 267,810.30

Page 1/9/41 54,507.60

Page 1/9/42 17,242.20

Page 1/9/43 14,850.54

Page 1/9/44 146,002.50

Page 1/9/45 500.58

Page 1/9/46 39,212.10

Page 1/9/47 10,512.18

Page 1/9/48 39,212.10

Page 1/9/49 5,005.80

Page 1/9/50 68,968.80

QDC/1862 BOQ : Page 1/9/ 153 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Page 1/9/51 36,375.48

Page 1/9/52 14,683.68

Page 1/9/53 21,135.60

Page 1/9/54 28,699.92

Page 1/9/55 80,092.80

ELECTRICAL WORKS C/F QR 1,916,412.40

B/F QR 1,916,412.40

Page 1/9/56 8,899.20

Page 1/9/57 49,724.88

Page 1/9/58 -

Page 1/9/59 -

Page 1/9/60 -

Page 1/9/61 -

Page 1/9/62 30,034.00

Page 1/9/63 42,023.12

Page 1/9/64 4,449.60

Page 1/9/65 2,781.00

Page 1/9/66 -

QDC/1862 BOQ : Page 1/9/ 154 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

ELECTRICAL WORKS To Summary QR. 2,054,324.20

QDC/1862 BOQ : Page 1/9/ 155 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

0 20,495.00 -

QDC/1862 BOQ : Page 1/9/ 156 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

1 15,414.00 15,414.00

2 -
-
1 -

3 -

6 -

QDC/1862 BOQ : Page 1/9/ 157 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

15,414.00

1 15,100.00 15,100.00

2 -

1 -

1 -

6 -

QDC/1862 BOQ : Page 1/9/ 158 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

15,100.00

1 14,562.00 14,562.00
-
2 -

2 -

2 -

1 -

3 -

QDC/1862 BOQ : Page 1/9/ 159 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

14,562.00

1 16,949.00 16,949.00
-
6 -

1 -

1 -

6 -

QDC/1862 BOQ : Page 1/9/ 160 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

16,949.00

1 39,371.00 39,371.00

6 - -

1 39,371.00 39,371.00

6 - -

QDC/1862 BOQ : Page 1/9/ 161 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

78,742.00

1 19,908.00 19,908.00

5 -

1 -

0 19,909.00 -

0 -

0 -

QDC/1862 BOQ : Page 1/9/ 162 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

19,908.00

1 10,700.00 10,700.00

1 10,700.00 10,700.00

4 - -

QDC/1862 BOQ : Page 1/9/ 163 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

21,400.00

1 6,707.00 6,707.00

1 8,173.00 8,173.00

1 8,538.00 8,538.00

QDC/1862 BOQ : Page 1/9/ 164 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

23,418.00

1 7,885.00 7,885.00

1 5,814.00 5,814.00

QDC/1862 BOQ : Page 1/9/ 165 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

13,699.00

1 6,707.00 6,707.00

1 11,061.00 11,061.00

1 7,885.00 7,885.00

QDC/1862 BOQ : Page 1/9/ 166 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

25,653.00

1 35,132.00 35,132.00

0 35,132.00 -

1 35,132.00 35,132.00

QDC/1862 BOQ : Page 1/9/ 167 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

70,264.00

1 2,664.00 2,664.00

1 3,578.00 3,578.00
.

QDC/1862 BOQ : Page 1/9/ 168 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

6,242.00

QDC/1862 BOQ : Page 1/9/ 169 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

12 3,061.00 36,732.00

12 3,061.00 36,732.00

12 3,061.00 36,732.00

12 3,061.00 36,732.00

12 3,061.00 36,732.00

12 3,061.00 36,732.00
220,392.00

QDC/1862 BOQ : Page 1/9/ 170 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

29 1,449.00 42,021.00

29 510.00 14,790.00

29 370.00 10,730.00

49 346.00 16,954.00

QDC/1862 BOQ : Page 1/9/ 171 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 84,495.00

73 1,325.00 96,725.00

73 1,325.00 96,725.00

73 1,325.00 96,725.00
-

73 1,325.00 96,725.00
-

11 132.00 1,452.00
-

11 132.00 1,452.00
-

11 132.00 1,452.00

QDC/1862 BOQ : Page 1/9/ 172 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

391,256.00

14 2,136.00 29,904.00

14 2,136.00 29,904.00

31 666.00 20,646.00
-

0 615.00 -
-

31 745.00 23,095.00
-

0 615.00 -

QDC/1862 BOQ : Page 1/9/ 173 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

103,549.00

21 313.00 6,573.00

21 313.00 6,573.00

0 313.00 -

0 313.00 -

QDC/1862 BOQ : Page 1/9/ 174 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

13,146.00

0 313.00 -

0 313.00 -

0 313.00 -

0 313.00 -

QDC/1862 BOQ : Page 1/9/ 175 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

0 313.00 -

0 313.00 -

46 313.00 14,398.00

46 313.00 14,398.00

QDC/1862 BOQ : Page 1/9/ 176 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

28,796.00

0 313.00 -

0 313.00 -

0 313.00 -

0 313.00 -

QDC/1862 BOQ : Page 1/9/ 177 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

49 375.00 18,375.00

29 313.00 9,077.00

0 1,217.00 -

0 1,217.00 -

39 313.00 12,207.00

QDC/1862 BOQ : Page 1/9/ 178 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 39,659.00

83 97.00 8,051.00

79 1,217.00 96,143.00

79 1,217.00 96,143.00

83 80.00 6,640.00

QDC/1862 BOQ : Page 1/9/ 179 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

59 80.00 4,720.00

To Collectio QR. 211,697.00

39 194.00 7,566.00

59 80.00 4,720.00

21 194.00 4,074.00

QDC/1862 BOQ : Page 1/9/ 180 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

32 194.00 6,208.00

48 194.00 9,312.00

To Collectio QR. 31,880.00

37 194.00 7,178.00

54 194.00 10,476.00

QDC/1862 BOQ : Page 1/9/ 181 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

40 194.00 7,760.00

57 194.00 11,058.00

To Collectio QR. 36,472.00

32 194.00 6,208.00

QDC/1862 BOQ : Page 1/9/ 182 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

42 194.00 8,148.00

0 194.00 -

0 194.00 -

0 194.00 -

To Collectio QR. 14,356.00

QDC/1862 BOQ : Page 1/9/ 183 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

0 194.00 -

0 194.00 -

0 194.00 -

0 194.00 -

0 194.00 -

To Collectio QR. -

QDC/1862 BOQ : Page 1/9/ 184 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

0 194.00 -

51 194.00 9,894.00

51 194.00 9,894.00

51 194.00 9,894.00

QDC/1862 BOQ : Page 1/9/ 185 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 29,682.00

68 1,092.00 74,256.00

68 103.00 7,004.00

23 103.00 2,369.00

13 103.00 1,339.00

QDC/1862 BOQ : Page 1/9/ 186 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 84,968.00

51 52.00 2,652.00

26 52.00 1,352.00

11 44.00 484.00

QDC/1862 BOQ : Page 1/9/ 187 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

71 44.00 3,124.00

47 44.00 2,068.00
To Collectio QR. 9,680.00

34 44.00 1,496.00

39 44.00 1,716.00

39 44.00 1,716.00

30 44.00 1,320.00

QDC/1862 BOQ : Page 1/9/ 188 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 6,248.00

0 44.00 -

0 44.00 -

47 44.00 2,068.00

64 44.00 2,816.00

QDC/1862 BOQ : Page 1/9/ 189 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 4,884.00

60 44.00 2,640.00

57 44.00 2,508.00

66 44.00 2,904.00

QDC/1862 BOQ : Page 1/9/ 190 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 8,052.00

QDC/1862 BOQ : Page 1/9/ 191 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

14 97.00 1,358.00

14 135.00 1,890.00

14 52.00 728.00

To Collectio QR. 3,976.00

14 132.00 1,848.00

14 132.00 1,848.00

QDC/1862 BOQ : Page 1/9/ 192 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

14 132.00 1,848.00

14 132.00 1,848.00

To Collectio QR. 7,392.00

1 58,743.00 58,743.00

QDC/1862 BOQ : Page 1/9/ 193 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

0 89,551.00 -

0.5 16,579.00 8,289.50

8 2,428.00 19,424.00

152 76.00 11,552.00

220 51.00 11,220.00

To Collectio QR. 109,228.50

QDC/1862 BOQ : Page 1/9/ 194 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

25 665.00 16,625.00

100 411.00 41,100.00

113 333.00 37,629.00

30 219.00 6,570.00

50 191.00 9,550.00

90 140.00 12,600.00

To Collectio QR. 124,074.00

QDC/1862 BOQ : Page 1/9/ 195 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

80 421.00 33,680.00

200 309.00 61,800.00

29 896.00 25,984.00

QDC/1862 BOQ : Page 1/9/ 196 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 121,464.00

25 271.00 6,775.00

100 22.00 2,200.00

25 34.00 850.00

40 281.00 11,240.00

QDC/1862 BOQ : Page 1/9/ 197 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

5 390.00 1,950.00

To Collectio QR. 23,015.00

260 599.00 155,740.00

47 860.00 40,420.00

12 716.00 8,592.00

18 527.00 9,486.00

6 788.00 4,728.00

83 794.00 65,902.00

23 455.00 10,465.00

QDC/1862 BOQ : Page 1/9/ 198 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 295,333.00

17 546.00 9,282.00

41 885.00 36,285.00

7 468.00 3,276.00

3 664.00 1,992.00

2 2,047.00 4,094.00

2 2,439.00 4,878.00

3 1,401.00 4,203.00

QDC/1862 BOQ : Page 1/9/ 199 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 64,010.00

3 1,251.00 3,753.00

10 736.00 7,360.00

1 259.00 259.00

1 174.00 174.00

1 148.00 148.00

8 533.00 4,264.00

QDC/1862 BOQ : Page 1/9/ 200 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 15,958.00

36 71.00 2,556.00

2 111.00 222.00

2 311.00 622.00

4 86.00 344.00

6 127.00 762.00

9 75.00 675.00

12 95.00 1,140.00

12 161.00 1,932.00

QDC/1862 BOQ : Page 1/9/ 201 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 8,253.00

611 202.00 123,422.00

169 214.00 36,166.00

1 214.00 214.00

11 214.00 2,354.00

36 202.00 7,272.00

2 202.00 404.00

2 397.00 794.00

4 202.00 808.00

QDC/1862 BOQ : Page 1/9/ 202 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

6 202.00 1,212.00

9 202.00 1,818.00

12 202.00 2,424.00

12 202.00 2,424.00

To Collectio QR. 179,312.00

1 268.00 268.00

1 268.00 268.00

1 214.00 214.00

QDC/1862 BOQ : Page 1/9/ 203 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 750.00

31 174.00 5,394.00

12 390.00 4,680.00

34 213.00 7,242.00

18 64.00 1,152.00

9 83.00 747.00

QDC/1862 BOQ : Page 1/9/ 204 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

2 43.00 86.00

27 64.00 1,728.00

3 87.00 261.00

27 87.00 2,349.00

72 1,251.00 90,072.00

To Collectio QR. 113,711.00

14 232.00 3,248.00

12 232.00 2,784.00

1 254.00 254.00

10 278.00 2,780.00

5 446.00 2,230.00

2 446.00 892.00

1 605.00 605.00

QDC/1862 BOQ : Page 1/9/ 205 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

1 1,596.00 1,596.00

8 1,969.00 15,752.00

3 1,969.00 5,907.00

1 2,497.00 2,497.00

1 2,753.00 2,753.00

4 4,567.00 18,268.00

To Collectio QR. 59,566.00

43 227.00 9,761.00

34 227.00 7,718.00

72 227.00 16,344.00

18 227.00 4,086.00

9 227.00 2,043.00

QDC/1862 BOQ : Page 1/9/ 206 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

2 227.00 454.00

27 227.00 6,129.00

3 227.00 681.00

27 227.00 6,129.00

To Collectio QR. 53,345.00

14 729.00 10,206.00

3 729.00 2,187.00

8 1,066.00 8,528.00

5 1,066.00 5,330.00

QDC/1862 BOQ : Page 1/9/ 207 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 26,251.00

QDC/1862 BOQ : Page 1/9/ 208 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

1 19,795.00 19,795.00

1 6,955.00 6,955.00

1 8,025.00 8,025.00

6 268.00 1,608.00

25 295.00 7,375.00
-

1 1,338.00 1,338.00

QDC/1862 BOQ : Page 1/9/ 209 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 45,096.00

2 600.00 1,200.00

10 482.00 4,820.00

10 696.00 6,960.00

2 1,338.00 2,676.00

3 1,980.00 5,940.00

4 268.00 1,072.00

2 4,815.00 9,630.00

12 2,675.00 32,100.00

1 267.00 267.00

1 267.00 267.00

6 267.00 1,602.00

25 267.00 6,675.00

QDC/1862 BOQ : Page 1/9/ 210 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

1 267.00 267.00
To Collectio QR. 73,476.00

2 267.00 534.00

10 267.00 2,670.00

10 267.00 2,670.00

2 267.00 534.00

3 267.00 801.00

17 870.00 14,790.00

QDC/1862 BOQ : Page 1/9/ 211 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 21,999.00

- -

14 185.00 2,590.00

QDC/1862 BOQ : Page 1/9/ 212 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

1 925.00 925.00

To Collectio QR. 3,515.00

14 729.00 10,206.00

72 729.00 52,488.00

QDC/1862 BOQ : Page 1/9/ 213 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 62,694.00

2 10,465.00 20,930.00

1 31,304.00 31,304.00

2 6,136.00 12,272.00

3 11,802.00 35,406.00

2 2,894.00 5,788.00

4 3,546.00 14,184.00

QDC/1862 BOQ : Page 1/9/ 214 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

1 4,921.00 4,921.00

1 5,313.00 5,313.00

2 9,347.00 18,694.00

To Collectio QR. 148,812.00

32 224.00 7,168.00

QDC/1862 BOQ : Page 1/9/ 215 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 7,168.00

32 729.00 23,328.00

72 729.00 52,488.00

50 55.00 2,750.00

25 70.00 1,750.00

QDC/1862 BOQ : Page 1/9/ 216 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

75 160.00 12,000.00

To Collectio QR. 92,316.00

QDC/1862 BOQ : Page 1/9/ 217 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

0 601,529.00 -

0 - -

0 - -

0 - -

0 - -

0 - -

To Collectio QR. -

0 - -

0 - -
-
0 - -
-
0 - -

0 - -

0 - -

0 - -

0 - -

QDC/1862 BOQ : Page 1/9/ 218 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

0 - -

0 - -

0 - -

0 - -

- -

- -

To Collectio QR. -

QDC/1862 BOQ : Page 1/9/ 219 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

0 2,311.00 -

0 6,354.00 -

0 1,082.00 -

0 821.00 -

0 487.00 -

0 1,217.00 -

0 2,623.00 -

0 178,815.00 -

0 4,616.00 -

To Collectio QR. -

QDC/1862 BOQ : Page 1/9/ 220 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

0 9,154.00 -

0 7,470.00 -

0 18,011.00 -

0 8,580.00 -

0 95,400.00 -

- -

To Collectio QR. -

QDC/1862 BOQ : Page 1/9/ 221 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

10,700.00 10,700.00

200 75.00 15,000.00

0 24.00 -

0 3,745.00 -

To Collectio QR. 25,700.00

QDC/1862 BOQ : Page 1/9/ 222 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

37 428.00 15,836.00

37 803.00 29,711.00

37 1,070.00 39,590.00

37 856.00 31,672.00

To Collectio QR. 116,809.00

QDC/1862 BOQ : Page 1/9/ 223 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

QDC/1862 BOQ : Page 1/9/ 224 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. -

1 Included

1 22,845.00 22,845.00

1 11,749.00 11,749.00

1 Included

1 69,550.00 69,550.00

QDC/1862 BOQ : Page 1/9/ 225 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. 104,144.00

- -

QDC/1862 BOQ : Page 1/9/ 226 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Collectio QR. -

15,414.00

15,100.00

14,562.00

16,949.00

78,742.00

19,908.00

41,035.00

21,400.00

23,418.00

13,699.00

25,653.00

70,264.00

6,242.00

220,392.00

84,495.00

QDC/1862 BOQ : Page 1/9/ 227 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

391,256.00

103,549.00

13,146.00

C/F QR. 1,175,224.00

1,326,296.00

28,796.00

39,659.00

211,697.00

40,230.00

31,880.00

36,472.00

37,054.00

43,650.00

37,248.00

84,968.00

9,680.00

6,248.00

4,884.00

QDC/1862 BOQ : Page 1/9/ 228 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

8,052.00

3,976.00

7,392.00

109,228.50

C/F QR 2,067,410.50

B/F QR 2,067,410.50

124,074.00

121,464.00

23,015.00

295,333.00

64,010.00

15,958.00

8,253.00

179,312.00

750.00

113,711.00

59,566.00

53,345.00

26,251.00

45,096.00

QDC/1862 BOQ : Page 1/9/ 229 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

73,476.00

21,999.00

3,515.00

62,694.00

148,812.00

C/F QR 3,508,044.50

B/F QR 3,508,044.50

7,168.00

92,316.00

25,700.00

116,809.00

104,144.00

QDC/1862 BOQ : Page 1/9/ 230 GEN/1180/22-2009


BILL NO.1: MAIN BUILDING
PROPOSED TELECOM BUILDING
ELECTRICAL WORKS
AT KTC COMPLEX

Quantity Rate (QR) Amount (QR)

To Summary QR. 3,854,181.50

QDC/1862 BOQ : Page 1/9/ 231 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/10

FLOOR, WALL AND CEILING


FINISHES

Two coats render comprising cement and


sand (1: 4.5) under coat, and cement, sand
(1: 6 ) finish coat, to concrete or
blockwork include all necessary beads,
expanded metal lathing and control joints;
all as specified.

A 15 mm thick minimum to internal walls


and columns. 2,500 m2 39.69 99,225.00

B 15 mm thick minimum to internal slab


soffits,beams, etc. 123 m2 39.69 4,881.87

C 12 mm thick (minimum) backing to wall


tiles (measured separately) in all Toilets &
Pantry rooms. 315 m2 34.02 10,716.30
###

D 12 mm thick (minimum) backing to wall


cladding (measured separately) in entrance
lobby. 152 m2 34.02 5,171.04

Two coats render comprising cement and


sand (1: 4.5) under coat, and cement, sand
(1: 6) finish coat, to concrete or blockwork
and all necessary beads, expanded metal
lathing and control joints; all as specified.

E 20 mm thick (minimum) to external walls,


columns, projections, soffit, parapet etc.
1,513 m2 47.63 72,064.19

F Extra for decorative features; comprising


recess and projected angular surfaces as
shown on the drawings. 1 Item 5,670.00 5,670.00

QDC/1862 BOQ : Page 1/10/232 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 197,728.40

SCREEDS & FLOOR TOPPINGS

Cement and sand (1:3) screed as specified,


trowelled finish ; to concrete base.

A Screeded bed to receive 20mm thick


Granite tiles(measured separately) ;
average 80 mm thick 111 m2 36.29 4,028.19

B Screeded bed to receive granite treads ;


average 30 mm thick 34 m2 17.01 578.34

C Screeded backing to receive granite riser ;


average 20 mm thick 20 m2 17.01 340.20

D Screeded bed to receive 200x200mm Non


slip ceramic tiles (measured separately);
average 92mm thick
99 m2 41.96 4,154.04
###

E Screeded bed to receive carpet tiles


(measured separately); average 92.5 mm
thick. 647 m2 47.63 30,816.61

F Screeded bed mixed with surface hardener


to receive epoxy paint (measured
separately); average100 mm thick for the
floor. 174 m2 51.03 8,879.22

G Screeded bed to receive dust proof and


acid resistant floor hardener over ground
floor slab. 43 m2 113.40 4,876.20

H Overall 100 mm thick cement sand screed. 101 m2 51.03 5,154.03

QDC/1862 BOQ : Page 1/10/233 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 58,826.83

Surface hardener and dust proofer over


fairfaced finished concrete surface.

A Surface hardener and dust proofer over


fairfaced concrete surface of fire escape
staircase and side entrance and ramp. 78 m2 51.03 3,980.34

RIGID TILES AND SLAB FINISHES

Granite tile/slab from an approved


manufacturer laid in grouting mortar on
screed bed (measured separately) including
edge strips,corners etc. laid to pattern
along the boarder of the room all as
specified and to the approval of the
ENGINEER.

B 20 mm thk Granite flooring; laid in pattern


to entrance looby, main entrance and main
stair landings. 111 m2 453.60 50,349.60
###

Granite slabs/tiles from an approved


manufacturer, with 2 nos. 5x5 mm
carborandum strips and nosing, complying
with the Project Specification ; bedded in
slurry, grouted with cement and sand; laid
on screeded bed (measured separately), all
as specified and to the approval of the
ENGINEER.

C 30 mm thick and 300 mm wide Granite


Treads to entrance steps and main 113 m 266.49 30,113.37
staircase.

D 20 mm thick and 150 mm high Granite


risers to entrance steps and main staircase. 93 m 102.96 9,575.28

QDC/1862 BOQ : Page 1/10/234 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

E 20 mm thick and 155 mm high Granite


risers to main staircase. 36 m 107.73 3,878.28

To Collection QR. 97,896.87

Granite coved skirting to match floor tiles


including backing,grouting and sealing
joints; all as specified.

A 100 mm high coved Granite skirting to


entrance lobby. 134 m 107.73 14,435.82
###

200 x 200 x 8 mm thick non-slip, ceramic


tiles to BS 6431: Part 3 from an approved
manufacturer, complying with the Project
Specification; fix to floor with waterproof
adhesive on screed (measured separately),
joints grout with epoxy based tile grout;
complete with movement joints including
corners, edge strips etc. all as specified and
to the approval of the ENGINEER.

B To floors of toilet and pantry. 99 m2 192.78 19,085.22

400 x 400 mm Carpet Tiles, tufted, surface


textured loop graphics carpet tiles with
decorative border and stitched edges
complete with adhesive fixing, laid to
manufacturer's recommendation on cement
sand trowelled bed (measured separately).

C To floors of all office area and conference


room. 600 m2 175.77 105,462.00

QDC/1862 BOQ : Page 1/10/235 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 138,983.04

Raised Floor System

Supply & Install Raised Floor System


comprising of 600 x 600mm electrostatic
discharge (ESD) vinyl finish,fully
interchangeable high density chipboard
with steel galvanized tray and top sheet for
uniform load of 36 KN/m2, complete with
500 mm High Pedestal, Heavy duty
galvanized MS with welded bases and
25mm height adjustment and heavy duty
stringers so as to have a complete raised
system floor leveled to +/- 2.0mm per
12m. and the maximum gap between
adjacent tiles of 0.5mm.forming an
accessible under floor cavity to
accommodate electrical & mechanical
services; all as specified and to the
approval of the engineer.

A 600 x 600 mmX 38.5 mm Heavy Duty


flexible anti-static vinyl floor. 668 m2 408.24 272,704.32

B 600 x 600 mm X 38.5 mm Heavy Duty


perforated tiles 27 m2 453.60 12,247.20

WALL TILING

QDC/1862 BOQ : Page 1/10/236 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

200 x 300 x 7 mm thick glazed ceramic


tiles to BS 6431: Part 3 from an approved
manufacturer, complying with the Project
Specification; fix to wall with waterproof
adhesive on rendered surfaces (measured
separately), joints grout with epoxy based
tile grout; complete with movement joints
including coves, corners, edge strips etc.
all as specified and to the approval of the
ENGINEER.

C Ceramic tiles to internal walls of Toilets


###
and Pantries 315 m2 147.42 46,437.30

To Collection QR. 331,388.82

STONE CLADDING AND STONE


FINISH PANEL

20 mm thick polished granite stone


cladding from an approved manufacturer;
fix to wall with approved mechanical
restraint cramp and dowel with sliding
sleeve, consists of stainless steel expansion
bolts to anchor stainless steel support &
bracket by "HELFEN DEHA" or equal
approved fixed to blockwork as shown on
drawing No.QDC/1862-AR-B1-2-001 sht.
01 & 02; allow for jointing and pointing
with approved sealant including decorative
finished; all as specified and to the
approval of the ENGINEER.

A 20 mm thick polished granite stone


cladding to external walls. 829 m2 612.36 507,646.44

QDC/1862 BOQ : Page 1/10/237 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

20 mm thick granite wall cladding


procured from an approved manufacturer
in colour and texture as specified and to
the approval of the engineer; fixing with
an approved tile adhesive on and including
cement and sand backings; grouting joints
with approved grout.

B 20 mm thick granite wall cladding to


internal walls in entrance lobby. 152 m2 635.04 96,526.08

To Collection QR. 604,172.52

SUSPENDED CEILINGS

600 x 600 x 0.7 mm thick galvanized


powder coated false ceiling system from an
approved manufacturer; suspended on 'T'
grid system comprising of main and cross
runners in grid form with suspension wires
of 6 mm minimum diameter adjusting
springs and post installed anchors to soffit
of structural slab; allow for additional
supports and hangers to accommodate
services and associated fittings including
access panel; fixing to concrete all as
shown on drawings and to the approval of
the ENGINEER.

A Metal false ceilings suspended at various


heights below concrete soffits. 1500 m2 136.08 204,120.00

QDC/1862 BOQ : Page 1/10/238 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 204,120.00

Decorative GRC ceiling from an approved


manufacturer as specified; fixed on
concealed cornice suspension system
including GRC cornice mouldings as
required; complete with metal framework
and adjustable suspension system;
including bulkheads, vertical panels and
access panels; allow for additional
suspension, perforation, supports and
hangers to accommodate services and
associated fittings; fixing to concrete.

A Linings to ceilings (measured flat);


suspended at various heights below
concrete soffits. 44 m2 226.80 9,979.20

QDC/1862 BOQ : Page 1/10/239 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

B Extra; for vertical lining as required Item 1,134.00 1,134.00

C Extra; for Decorative GRC cornice; design,


supply and install to the approval of the
Engineer. Item. 1,134.00 1,134.00

To Collection QR. 12,247.20

WORK TOP

30 mm thick Granite work tops with


rounded edge of approved color fixed on
cabinet made of 18 mm thick Hardboard
with 1mm thick pressure laminate on face
and 8 mm thick hardboard lipping all
around with SS upstand with corner stops,
seamless water proof mastic to form a seal
along tiled wall surface as specified.
(measured separately).

QDC/1862 BOQ : Page 1/10/240 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

A Work top with 1 No. aperture for sink in


pantry room; size (1550+1900) mm L x
600 mm D; L-shape. 1 No. 2,608.20 2,608.20

COUNTER TOP

25 mm thick granite counter tops with


rounded edges, including 100mm high
back splash, 12 mm thick granite fascia
fixed on 12 mm thick marine plywood
with POLYFIX RM adhesive and screwed
to 50x50x3mm thick MS angle frame as
specified; complete with end stops, corners
and all other accessories fixing to concrete
or blockwork.

B Counter top with 2 No. aperture sink for


wash hand basin; overall size 1600 mm x
600 mm. 7 No. 2,608.20 18,257.40

To Collection QR. 20,865.60

Waterproofing

Solvent free SBS elastometric bitumen


emulsion from an approved manufacturer
or equal and aproved; applied in wet areas.

A Water-proofing membrane paint under


floor finishes (measured separately) 99 m2 51.03 5,051.97

QDC/1862 BOQ : Page 1/10/241 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 5,051.97

Collection

Page 1/10/1 197,728.40

Page 1/10/2 58,826.83

QDC/1862 BOQ : Page 1/10/242 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Item Description Quantity Unit Rate (QR) Amount (QR)

Page 1/10/3 97,896.87

Page 1/10/4 138,983.04

Page 1/10/5 331,388.82

Page 1/10/6 604,172.52

Page 1/10/7 204,120.00

Page 1/10/8 12,247.20

Page 1/10/9 20,865.60

Page 1/10/10 5,051.97

FLOOR, WALL AND CEILING


FINISHES To Summary QR. 1,671,281.25

QDC/1862 BOQ : Page 1/10/243 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

2,500 31.00 77,500.00

123 31.00 3,813.00

315 23.00 7,245.00

152 23.00 3,496.00

1,513 38.00 57,494.00

1 0.00

QDC/1862 BOQ : Page 1/10/244 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

To Collection 149,548.00

111 49.00 5,439.00

34 25.00 850.00

20 21.00 420.00

99 54.00 5,346.00

647 54.00 34,938.00

174 57.00 9,918.00

43 57.00 2,451.00

101 57.00 5,757.00

QDC/1862 BOQ : Page 1/10/245 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

To Collection 65,119.00

78 35.00 2,730.00

111 567.00 62,937.00

113 382.00 43,166.00

93 129.00 11,997.00

QDC/1862 BOQ : Page 1/10/246 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

36 132.00 4,752.00

To Collection 125,582.00

134 112.00 15,008.00

99 132.00 13,068.00

600 177.00 106,200.00

QDC/1862 BOQ : Page 1/10/247 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

To Collection 134,276.00

668 456.00 304,608.00

27 1,266.00 34,182.00

QDC/1862 BOQ : Page 1/10/248 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

315 120.00 37,800.00

To Collection 376,590.00

829 513.00 425,277.00

QDC/1862 BOQ : Page 1/10/249 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

152 513.00 77,976.00

To Collection 503,253.00

1500 114.00 171,000.00

QDC/1862 BOQ : Page 1/10/250 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

To Collection 171,000.00

44 285.00 12,540.00

QDC/1862 BOQ : Page 1/10/251 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

1 3,990.00 3,990.00

1
4,788.00 4,788.00

To Collection 21,318.00

QDC/1862 BOQ : Page 1/10/252 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

1 1,368.00 1,368.00

7 969.00 6,783.00

To Collection 8,151.00

99 19.00 1,881.00

QDC/1862 BOQ : Page 1/10/253 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

To Collection 1,881.00

149,548.00

65,119.00

QDC/1862 BOQ : Page 1/10/254 GEN/1180/22-2009


PROPOSED TELECOM BUILDING
BILL NO.1: MAIN BUILDING
AT KTC COMPLEX
FLOOR, WALL CEILING FINISHES

Quantity Rate (QR) Amount (QR)

125,582.00

134,276.00

376,590.00

503,253.00

171,000.00

21,318.00

8,151.00

1,881.00

To Summary 1,556,718.00

QDC/1862 BOQ : Page 1/10/255 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX PAINTING AND DECORATING

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/11

PAINTING AND DECORATING

Prepare and apply 3 coats of acrylic


emulsion paint overfiller over sealer/primer
over plaster from an approved manufacturer
as specified.

A To render internal walls and columns. 700 m2 24.47 17,129.00

Prepare and apply 3 coats of exterior


textured silicon based paint over sealer &
primer from an approved manufacturer as
specified.

B To render internal walls and columns. 1,000 m2 27.81 27,810.00

Prepare and apply 2 coats of acrylic over


skin coat over primer over plaster.

C To the slab soffits, beams, etc. 115 m2 27.81 3,198.15

Prepare and apply Exterior quality silicon


based paint on fair faced concrete slab
ceiling as specified.
D To the fair faced concrete slab ceiling. 311 m2 32.26 10,032.86

Prepare and apply external paint system


comprising one coat acrylic primer and two
coats of antique quality textured paint
applied with trowel and one top coat of matt
external quality emulsion and one coat of
acrylic water based glaze coating by
approved manufacturers as specified.

E To external walls, columns, projections,


soffit, parapet etc. 1,513 m2 32.26 48,809.38

QDC/1862 BOQ : Page 1/11/256 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX PAINTING AND DECORATING

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 106,979.39


Epoxy paint on 100mm thick concrete
screed with surface hardner as specified

A Epoxy paint on screed finished flooring. 174 m2 44.50 7,743.00

Epoxy paint on fair faced concrete floor slab


as specified.

B Epoxy paint on fair faced concrete floor 78 m2 44.50 3,471.00


slab.
C 100 mm high epoxy paint skirting to fire
escape staircase. 78 m 16.69 1,301.82

Epoxy paint on plaster to walls and upstand


below raised flooring system.

D Epoxy paint on plaster to walls & upstand 270 m2 44.50 12,015.00

GRC DECORATION WORK


29 No. 1612.98 46,776.42
GRC panel/screen fixed to concrete or
blockwork with stainless steel dowels, bolts
and knots, including finishes as specified
and as shown on drawing, pattern to the
approval of the ENGINEER.

2 No. 3225.96 6,451.92


E GRC panel size; 2000 mm x 1800 mm as
per elevation-E1 to E4 on Drawing No.
QDC/1862-AR-B1-2-001 SHT.01 & 02.
65 No. 100.12 6,507.80
F GRC panel size; 2400 mm x 3000 mm as
per elevation-E2 on Drawing No.
QDC/1862-AR-B1-2-001 SHT.01.

G Decorative GRC type of size; 400 x 400 x


100 mm thick for elevation purpose as
shown on E1 to E4 on Drawing
no.QDC/1862-AR-B1-2-001 SHT.01 & 02.

QDC/1862 BOQ : Page 1/11/257 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX PAINTING AND DECORATING

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 84,266.96


Collection

Page 1/11/1 106,979.39

Page 1/11/2 84,266.96

QDC/1862 BOQ : Page 1/11/258 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX PAINTING AND DECORATING

Item Description Quantity Unit Rate (QR) Amount (QR)

PAINTING AND DECORATING To Summary QR. 191,246.35

QDC/1862 BOQ : Page 1/11/259 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX PAINTING AND DECORATING

Quantity Rate (QR)Amount (QR)

700 21.00 14,700.00

1,000 21.00 21,000.00

115 21.00 2,415.00

311 26.00 8,086.00

1,513 43.00 65,059.00

QDC/1862 BOQ : Page 1/11/260 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX PAINTING AND DECORATING

Quantity Rate (QR)Amount (QR)

To Collection 111,260.00

174 30.00 5,220.00

78 30.00 2,340.00

78 15.00 1,170.00

270 30.00 8,100.00

29 1847.00 53,563.00

2 3694.00 7,388.00

65 83 5,395.00

QDC/1862 BOQ : Page 1/11/261 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX PAINTING AND DECORATING

Quantity Rate (QR)Amount (QR)

To Collection 83,176.00

111,260.00

83,176.00

QDC/1862 BOQ : Page 1/11/262 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX PAINTING AND DECORATING

Quantity Rate (QR)Amount (QR)

To Su QR. 194,436.00

QDC/1862 BOQ : Page 1/11/263 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO.1/12

MISCELLANEOUS, SUNDRIES AND


BUILDER'S WORK

MISCELLANEOUS

LIFT INSTALLATION

Lifts; manufactured by a specialized and


approved manufacturer strictly in
accordande with relevance British Standards
and Qatar Elevator Codes; complete with
motor, hoist, counter weights, guides and
assossiated accessories; lift cars complete
with ventilation, lighting, doors, floor, wall
and ceiling finishings,ceiling access hatches,
indicator panels, emergency device, safety
systems and additional features as specified;
include for electrical connections to local
isolators / controls; assembling and fixing in
vertical lift shaft. (Machine Roomless Type
Elevator)

###

A Passenger lifts, with 3 No. Stops and 3 No.


Openings in the same line, total travel 10m
approximately, car size 1100 (W) x 1400
(D) x 2200mm high internally. 1 No. 164,190.34 164,190.34

QDC/1862 BOQ : Page 1/12/264 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 164,190.34


###

CRANE

Electric overhead travelling Monorail Hoist


Crane with Telescopic Hoist Beam as
manufactured by " Demag" or equal and
approved manufacturer, comprising crane
wheels, hoist motor and components, hook
block, rope guide etc, including painting,
testing and connection to local power outlets
complete all as specified and mentioned in
the drawings and specifications.

A Monorail hoist crane with Telescopic hoist


beam, 3.0 Tonne capacity 1 No. 305,910.00 305,910.00

QDC/1862 BOQ : Page 1/12/265 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 305,910.00


###

SUNDRIES (Applicable to all Buildings)

SUNDRIES IN CONNECTION WITH ALL


BLOCKWORKS

A Allow for all movement joints as required in


accordance with the Project Specifications. Item 4,449.60 4,449.60

ANTI-TERMITE (Applicable to all


Buildings)
B Anti - termite treatment ( if so required ) to
all places as specified Item 13,348.80 13,348.80

SUNDRIES

Allow for the following

C Marking the position of holes, mortises,


chases and the like in the structure. 1 Item 1,112.40 1,112.40

D Plates, discs, labels, and charts for


identification of plant, equipment, pipes
valves and the like. 1 Item 1,112.40 1,112.40

E Loose keys, tools and spare parts as


specified. 1 Item 1,112.40 1,112.40

QDC/1862 BOQ : Page 1/12/266 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 21,135.60


###

QDC/1862 BOQ : Page 1/12/267 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BUILDER'S WORK (Applicable to all


Buildings)

BUILDER'S INSTALLATIONS

Allow for the following.

A Paint finishing to exposed pipework


including supports as specified. 1 Item 1,112.40 1,112.40

B PVC ducts / sleeves including concrete beds


and surrounds for pipes passing beneath
structures, beds and the like. 1 Item 1,112.40 1,112.40

C Allow for all other builder's work deemed


necessary for the completion of Plumbing
and Engineering Installation. 1 Item 1,112.40 1,112.40

QDC/1862 BOQ : Page 1/12/268 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 3,337.20


###

QDC/1862 BOQ : Page 1/12/269 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 1/12/1 164,190.34

Page 1/12/2 305,910.00

Page 1/12/3 21,135.60

Page 1/12/4 3,337.20

QDC/1862 BOQ : Page 1/12/270 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

MISCELLANEOUS, SUNDRIES AND


BUILDER'S WORK To Summary QR. 494,573.14

QDC/1862 BOQ : Page 1/12/271 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Quantity Rate (QR) Amount (QR)

1 197,950.00 197,950.00

QDC/1862 BOQ : Page 1/12/272 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Quantity Rate (QR) Amount (QR)

To Co QR. 197,950.00

1 85,600.00 85,600.00

QDC/1862 BOQ : Page 1/12/273 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Quantity Rate (QR) Amount (QR)

To Co QR. 85,600.00

1 10,700.00 10,700.00

1 11,235.00 11,235.00

1 0.00

1 0.00

1 0.00

QDC/1862 BOQ : Page 1/12/274 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Quantity Rate (QR) Amount (QR)

To Co QR. 21,935.00

QDC/1862 BOQ : Page 1/12/275 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Quantity Rate (QR) Amount (QR)

1 0.00

1 0.00

1 0.00

QDC/1862 BOQ : Page 1/12/276 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Quantity Rate (QR) Amount (QR)

To Collection 0.00

QDC/1862 BOQ : Page 1/12/277 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Quantity Rate (QR) Amount (QR)

197,950.00

85,600.00

21,935.00

0.00

QDC/1862 BOQ : Page 1/12/278 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MISCELLANEOUS, SUNDRIES AND BUILDER'S WORK

Quantity Rate (QR) Amount (QR)

To S QR. 305,485.00

QDC/1862 BOQ : Page 1/12/279 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/13

EXTERNAL WORKS WITHIN THE


PLOT CURTILEDGE

Site Preparation

A Dismantle and remove any existing


redundant structures, features, trees, shrubs,
asphalt areas, kerbs,covered carparks,
reroute and terminate the existing
underground services etc. and clear the
Work-Site, approximately 2084 sq.m.with
in the scope limit. 1 Item 75,087.00 75,087.00

Excavation and Earthworks

Site grading, filling, disposal and compact


ground level to achieve reference 0.00 m
level site formation for all civil, hard and
soft landscaping, and infrastructure work in
accordance with the Drawing
No.QDC/1862/AR-B0-G-002 sht.01 of 01
and as per specifications.

B Filling to achieve the formation level above


the existing ground level as shown in
drawing.( Approximate height 750 mm) 1,429 m3 35.60 50,872.40

QDC/1862 BOQ: Page 1/13/1 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 125,959.40

HARD LANDSCAPING AND


FEATURES

CONCRETE PAVIOURS

200 x 100 x 60 mm thick coloured


interlocking type precast concrete paviours
set to patterns as shown on drawings and /
or specified in specifications; laid on and
including 50 mm washed sand bed over
well compacted desert fill as specified.

A Pavement laid on compacted fill 347 m2 83.43 28,950.21

Hydraulically pressed precast concrete


Grade SRC 20 road kerb as specified;
bedding and jointing in Class 1 cement
mortar bed on and including mass concrete
foundation; haunched both sides; include
for blinding, waterproofing, excavation,
disposal of surplus excavted materials from
site etc. as specified and shown on drawing
No.1862/AR-B0-5-001 sht.01 of 01.

B Road Kerbs; 150 x 300 mm 76 m 77.87 5,918.12

Hydraulically pressed precast concrete


Grade SRC 20 garden kerb as specified;
bedding and jointing in Class 1 cement
mortar bed on and including mass concrete
foundation; haunched both sides; include
for blinding, waterproofing, excavation,
disposal of surplus excavated materials
from site etc. as specified and shown on
drawing No.1862/AR-B0-5-001 sht.01 of
01.

C Edging Kerbs; 150 x 300 mm 37 m 77.87 2,881.19

QDC/1862 BOQ: Page 1/13/2 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 37,749.52

Hydraulically pressed precast concrete


Grade SRC 20 flush kerb as specified;
bedding and jointing in Class 1 cement
mortar bed on and including mass concrete
foundation; haunched both sides; include
for blinding, waterproofing, excavation,
disposal of surplus excavated materials
from site etc. as specified and shown on
drawing No.1862/AR-B0-5-001 sht.01 of
01.

A Flush kerb; 250 x 150 mm 5 m 72.31 361.55

PLANTERS BOX

Solid concrete blocks 20 N/mm2 minimum


compressive strength, bedded and jointed in
Class 2 cement mortar with and including
concrete bond, expansion joints and
necessary fixing and accessories as
specified.

B 100 mm solid blockwork for planters box. 5 m2 278.10 1,390.50

C 100 x 100 mm concrete coping laid over


100 mm solid blockwork for planters box. Item 278.10 278.10

QDC/1862 BOQ: Page 1/13/3 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 2,030.15

SOFT LANDSCAPING

EXCAVATION

Open excavation including disposal of


excavated materials and preparation of
formation levels to receive planting medium
as per Drawing No.1862-AR-B0-G-003.

A Reduce existing level to receive sweet soil;


average 300 mm deep for Ground Cover
and Grass. 73 m2 22.25 1,624.25

PLANTING MEDIUM

Agricultural sweet soil mixed with


industrial compost or vegetable multch as
specified; laid on compacted formation
level.
B For ground covers and grassing areas.; 300
mm deep. 22 m3 155.74 3,426.28

Agricultural sweet soil mixed with


industrial compost or vegetable multch as
specified; filled inside planter boxes.

C Sweet soil inside planters. Item. 556.20 556.20

GROUND COVER

Supply and plant following ground cover &


grasses as specified.

QDC/1862 BOQ: Page 1/13/4 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

D Ground cover and grasses 73 m2 77.87 5,684.51

E Ground cover & shrubs on planters box Item 556.20 556.20

To Collection QR. 11,847.44

WALL, FENCE AND GATES

EXTERNAL BOUNDARY WALL

EXCAVATION AND EARTHWORK

Excavate foundation trench

A Excavation 79 m3 22.25 1,757.75

Disposal.

B Remove surplus excavated material from


site.
21 m3 33.37 700.77

Filling.

C Filling with imported fill materials ; laid in


layers of 150 mm thickness, watered, rolled
and compacted to 95% Proctor Value
compaction. 58 m3 44.50 2,581.00

QDC/1862 BOQ: Page 1/13/5 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 5,039.52

(External Boundary Wall - Cont'd)

CONCRETE WORK

Plain in-situ concrete Grade SRC 20 with


gabbro aggregate conforming to BS 882.

A Blinding; 50 mm thick (minimum),


horizontal or sloping not exceeding 15o. 82 m2 27.81 2,280.42

Reinforced in-situ concrete Grade OPC 40


with gabbro aggregate conforming to BS
882.
B Wall & Column foundation 17 m3 495.02 8,415.34

C Columns 27 m3 506.14 13,665.78

D Column-necks 11 m3 506.14 5,567.54

E Copping beam 8 m3 506.14 4,049.12

REINFORCEMENT

High yield steel Bar reinforcement to


ASTM A615 Grade 60

F Bars in assorted diameters 10870 Kg 3.17 34,457.90

QDC/1862 BOQ: Page 1/13/6 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 68,436.10

(External Boundary Wall - Cont'd)

FORMWORK

Wrought formwork; smooth face finish for


concrete to receive waterproofing
membrane/paint.

A To vertical or battering sides of foundations 42 m2 100.12 4,205.04

B To vertical sides of columns 74 m2 46.72 3,457.28

C To vertical sides of copping beam 78 m2 28.92 2,255.76

SUNDRIES

Nitoproof 100+' and 'Nitoproof 120' water


proofing paint; apply on concrete surfaces
or blockwork wall as per the manufacturer's
recommendations

D To horizontal surfaces of concrete and


blockwork 64 m2 8.90 569.60

E To vertical surfaces of concrete and


blockwork 299 m2 8.90 2,661.10

QDC/1862 BOQ: Page 1/13/7 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

3 mm thick hardboard protection to comply


with the Project Specification and conform
to BS 8102:1990 ; suitably bonded to retain
position.

F To horizontal surfaces of concrete and


blockwork 64 m2 13.35 854.40

G To vertical surfaces of concrete and


blockwork 299 m2 13.35 3,991.65

To Collection QR. 17,994.83

(External Boundary Wall - Cont'd)

Polyethylene sheet to BS 2782 from an


approved manufacturer; laid in accordance
with the manufacturer's recommendation as
specified and to the approval of the
Engineer.

A 1000 guage Polythylene sheet. 82 m2 3.34 273.88

Expansion joints as specified and and


indicated in drawing no.QDC/1862/ST-B0-
5-001-sht.01.

B 12 mm thick korkpak or other approved


board, set vertically between concrete
members. 8 m2 88.99 711.92

QDC/1862 BOQ: Page 1/13/8 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 985.80

(External Boundary Wall - Cont'd)

BLOCKWORK

Solid concrete blocks 20 N/mm2 minimum


compressive strength, bedded and jointed in
Class 2 cement mortar with and including
concrete bond, expansion joints and
necessary fixing and accessories as
specified.

A 200 mm thick wall below ground level 96 m2 127.93 12,281.28

Hollow concrete blocks 7 N/mm2 minimum


compressive strength, bedded and jointed in
Class 2 cement mortar with and including
concrete bond, expansion joints and
necessary fixing and accessories as
specified.

B 200 mm thick wall above ground level 126 m2 81.21 10,232.46

QDC/1862 BOQ: Page 1/13/9 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

C Extra for filling hollow blocks solids


with concrete Grade OPC 20 at ends of
wall, abutments and the like Item 778.68 778.68

To Collection QR. 23,292.42

(External Boundary Wall - Cont'd)

PLASTER AND RENDERING

Two coats render comprising cement sand


(1: 3.5-4) and lime (15 - 20%) base coat,
and cement, sand, lime (1: 3 : 0.75-1.5)
finish coat, to concrete or blockwork
include forming grooves, all necessary
beads, expanded metal lathing and control
joints; all as specified

A 20 mm thick (minimum) to blockwork. 272 m2 42.27 11,497.44


.
B Extra; for gross projective bad as shown
on drawings Item 1,112.40 1,112.40

QDC/1862 BOQ: Page 1/13/10 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

C 20 mm thick (minimum) to both sides and


top of concrete coping beam and around &
top of precast conrete coping on top of
columns. 103 m2 42.27 4,353.81

D Backing to wall cladding of columns 163 m2 33.37 5,439.31

STONE CLADDING

20 mm thick stone cladding procured from


an approved manufacturer in colour and
texture as specified and to the approval of
the engineer; fixing with an approved tile
adhesive on and including cement and sand
backings; grouting joints with approved
grout.

E 20 mm thick stone cladding to columns on


boundary wall. 0 m2 406.03 0.00

To Collection QR. 22,402.96

(External Boundary Wall - Cont'd)

PAINTNING AND DECORATING

Prepare and apply 'Medium Texure Paint'


system comprising one coat of Jotasheild
penetrating primer and one coat of
penetrating sealer and two finishings coats
of external quality paint from an approved
manufacturer or equal approved as
specified.

A To rendered walls 272 m2 33.37 9,076.64

QDC/1862 BOQ: Page 1/13/11 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

B To rendered on concrete coping and precast


concrete coping. 103 m2 33.37 3,437.11

GATES AND STEEL GRILL TYPE FENCE

FENCE

Steel grill fixing type fence from an


approved manufacturer comprising 18 x 18
mm vertical sq.bar welded with M.S flat
and 20x20 mm horizontal sq.bar including
paint finished and screwed to RCC columns
and concrete coping for the fixing of fence;
all as specified and as shown on Drawing
No.QDC/1862/AR-B0-G-003 sht.01 of 01.

C Steel grill fixing type fence screwed to RCC


columns and concrete coping. 97 m 645.19 62,583.43

To Collection QR. 75,097.18

(External Boundary Wall - Cont'd)

GATES

Proprietary make approved design paint


finished steel sliding gates with sliding gate
roller support complete with electrical
operated system from an aprroved
manufacturer as specified;including all
fixing supports as shown on Drawing
no.QDC/1862/AR-B0-G-003 sht.01 of 01
and to the approval of the Engineer.

QDC/1862 BOQ: Page 1/13/12 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

A Steel sliding gate to main entrance gate-G2;


overall size 3600 x 2700 mm. 1 No 12,792.60 12,792.60

B Steel sliding gate to main exit gate-G2;


overall size 3600 x 2700 mm. 1 No 12,792.60 12,792.60

C Steel sliding gate to service entrance;


overall size 6000 x 2700 mm. 1 No 18,910.80 18,910.80

To Collection QR. 44,496.00

SITE DRAINAGE SERVICES

MANHOLE AND THE LIKES IN


CONNECTION WITH SANITARY
DRAINAGE INSTALLATION

QDC/1862 BOQ: Page 1/13/13 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Manhole for sewage disposal; installed


complete with SRC 25 insitu concrete base
and concrete wall as Drawings No.
QDC/1862-MD-B1-1-001 ; including
blinding, waterproofing, benching, channels
and prepared openings for pipe connections;
allow for excavation, disposal etc. and all
builder's works.

A Manholes with double sealed recessed type


heavy duty ductile iron covers and frames
to EN 124 internal size 600x600 mm Depth
not greater than 0.5meter
1 No. 3114.72 3,114.72

B Manholes with double sealed recessed type


Light duty ductile iron covers and frames
to EN 124 internal size 600x600 mm Depth
not greater than 0.5meter
2 No 3337.20 6,674.40

C Manholes with double sealed recessed type


heavy duty ductile iron covers and frames
to EN 124 internal size 600x600 mm Depth
greater than 0.5 meter and not exceeding
1.00meter.
2 No 3448.44 6,896.88

To Collection QR. 16,686.00

QDC/1862 BOQ: Page 1/13/14 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

A Manholes with double sealed recessed type


Light duty ductile iron covers and frames
to EN 124 internal size 600x600 mm Depth
greater than 0.5 meter and not exceeding
1.00meter.
3 No 3448.44 10,345.32

B Manholes with double sealed recessed type


Light duty ductile iron covers and frames
to EN 124 internal size 1200x600 mm
Depth greater than 0.5 meter and not
exceeding 1.00meter.
1 No 5673.24 5,673.24

C Manholes with double sealed recessed type


heavy duty ductile iron covers and frames
to EN 124 internal size 900mm dia and
Depth greater than 1.00 meter and not
exceeding 2.00 meter.
6 No 5562.00 33,372.00

D Gully trap with double sealed,recessed type


medium duty ductle iron covers and
frames ; internal size 450x450mm and
cover size 300x300
1 No 3337.20 3,337.20

QDC/1862 BOQ: Page 1/13/15 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 52,727.76

GRAVITY SEWER DRAIN RUNS &


OILY WATER DISPOSAL SYSTEM.

Excavating trenches for pipes not exceeding


200 mm diameter and over 1.50 m but not
exceeding 3.00 m total depth including
grading bottom, earthwork supports, part
backfilling with selected fill material,
compacting and removal of surplus
excavated material from site.

A Trenches, average 2000 mm deep. 132 m 72.31 9,544.92

B Trenches, average 1000 mm deep. 54 m 44.50 2,403.00

Granular material as specified.

C Beds and surrounds ; 150 mm thick to 1 No.


150 mm diameter pipe. 186 m 44.50 8,277.00

ESVC pipes and fittings to BS EN 295


including all necessary accessories; laid in
trenches.

D 150 mm Diameter pipes. 186 m 77.87 14,483.82

QDC/1862 BOQ: Page 1/13/16 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 34,708.74

SURFACE WATER DRAINAGE


INSTALLATION.

ROAD GULLEY

Road gullies in GRP complete with heavy


duty ductile iron frames and hinged gratings
to BS EN 124, Class D-400 as shown on
Drawing No. QDC/1688/DR-04-01 ,
include for bedding and surrounds in plain
in-situ concrete or cement sand mortar with
adhesive, prepared openings for pipe
connections etc. and all associated builder's
works.

A Road gullies; embedded in concrete/ burried


underground; internal size 450 x 450 mm
with 110 mm outlet. 12 No. 1946.70 23,360.40

Soakaways installed complete with precast


concrete perforated chamber rings on insitu
concrete footings, precast concrete cover
slab with in-situ haunching; all as specified
and indicated on drawings; including
prepared openings for pipe connections,
insitu concrete blinding, gravel surround
geotextile fabric external lining; allow for
excavation, disposal etc. and all builder's
works.

QDC/1862 BOQ: Page 1/13/17 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

B Soak away for surface water complete with


heavy duty ductile iron covers and frames to
EN 124; internal size 1800 mm diameter
and not exceeding 5000mm depth WITH
250mm dia bore hole upto 2m below
summer water table.
3 No 10011.60 30,034.80

To Collection QR. 53,395.20

Excavating trenches for pipes not exceeding


200 mm diameter and not exceeding 1.0m
total depth including grading bottom,
earthwork supports, part backfilling with
selected fill material, compacting and
removal of surplus excavated material from
site.

A Trenches, average 1000 mm deep. 180 m 44.50 8,010.00

CONNECTION TO EXISTING
MANHOLE

B Allow for extending the 150 mm diameter


ESVC sewage drainage pipe from the plot
boundary towards the existing manhole and
providing end-cap as shown on Drawing
No. QDC/1862/MD/B0-G-001 including all
associated builder's works.
Item 11124.00 11,124.00

Septic Tank as Specified

QDC/1862 BOQ: Page 1/13/18 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

C Septic Tank Type D for sweage disposal;


installed complete with SRC 25 insitu
concrete base and block/ concrete wall as
Drawing No. QDC/1862/MD/B0/1/002
including blinding, waterproofing,
benching, channels and prepared openings
for pipe connections; allow for excavation,
disposal etc. and all builder's works.

1 Item 50058.00 50,058.00

To Collection QR. 69,192.00

WATER SUPPLY AND DISTRIBUTION

POTABLE WATER (DOMESTIC COLD


WATER) SUPPLY NETWORK.

Copper pipes to BS 2871, Part 1 Table X;


and fittings to BS 864 Part 2; exposed ; with
capillary joints; fixed with brackets, clips on
and including supports, plugged and
screwed to concrete/ blockwork.

A 35 mm Diameter pipes 138 m 133.49 18,421.62

B Extra; 90 degree bend 1 lot 1,112.40 1,112.40

C Extra; end cap for future connection 1 lot 1,112.40 1,112.40

D 28 mm Diameter pipes 52 m 1,112.40 57,844.80

QDC/1862 BOQ: Page 1/13/19 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

E Extra; 90 degree bend 1 lot 1,112.40 1,112.40

Isolating valves complete with screwed or


flanged ends as specified ; jointing to
pipework in valve chamber or services
trenches (measured separately)

F 35 mm Diameter valve. 6 No. 222.48 1,334.88

G 28 mm Diameter valve. 2 No. 222.48 444.96

To Collection QR. 81,383.46

Collection

Page 1/13/1 125,959.40

Page 1/13/2 37,749.52

Page 1/13/3 2,030.15

Page 1/13/4 11,847.44

Page 1/13/5 5,039.52

Page 1/13/6 68,436.10

Page 1/13/7 17,994.83

Page 1/13/8 985.80

QDC/1862 BOQ: Page 1/13/20 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

Page 1/13/9 23,292.42

Page 1/13/10 22,402.96

Page 1/13/11 75,097.18

Page 1/13/12 44,496.00

Page 1/13/13 16,686.00

Page 1/13/14 52,727.76

Page 1/13/15 34,708.74

Page 1/13/16 53,395.20

EXTERNAL WORKS C/F QR. 592,849.02

B/F QR. 592,849.02

Page 1/13/17 81,383.46

Page 1/13/18 81,383.46

QDC/1862 BOQ: Page 1/13/21 GEN/1180/22-2009


BILL NO. 1: MAIN BUILDING
PROPOSED TELECOM BUILDING
EXTERNALWORKS
AT KTC COMPLEX

Item Description Quantity Unit Rate (QR) Amount (QR)

EXTERNAL WORKS To Summary QR. 755,615.94

QDC/1862 BOQ: Page 1/13/22 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/14

FIRE FIGHTING MAIN WORKS

Fire Suppression System

Clean agent Fire Extinguishing System, 3M


Novec 1230 as specified including the Agent
cylinder, Nozzles, Manifolds complete with
all necessary pipes, fittings, valves, supports,
accessories as per the hydraulic calculations
submitted by the contractor.

NOTE: Allow for Inspection of the factory


facilities, refilling station(UL Approved), pre
dispatch inspection of all the filled Fire
Extinguishing agent Cylinders and other
accessories required for the project ( 2 Persons).

A Fire Supression Agent for Basement Cable


Chamber room (4.6m x 8.3m x 3.0m High),
MDF Room including Raised floor area(4.7m
x 8.3m x 4.1m High), and Rectifier Room
including raised floor area (4.0m x 5.6m x
4.1m High)
1 Item 111,240.00 111,240.00

B Fire Supression Agent for Ground Floor


Technical room Room Space (32.6m x 19.8m
x 3.5m High) 1 Item Included 211,356.00

C Fire Supression Agent for Ground Floor


Technical room raised floor space(32.6m x
19.8m x 0.6m High) 1 Item Included 211,356.00

D Fire Supression Agent for First Floor


Transmission Room including the raised floor
area (16.7m x 8.4m x 4.1m High) 0 Item Included -

QDC/1862 BOQ : Page 1/14/23 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 533,952.00

A Fire Supression Agent for First Floor


Technical room Room Space (32.6m x 19.8m
x 3.5m High) 1 Item 200232 -

B Fire Supression Agent for First Floor


Technical room raised floor space(32.6m x
19.8m x 0.6m High) 1 Item 200232 -

C Schedule 40 Galvanized Iron Pipes as


specified including all pipe supports,
accessories and fittings as per the Hydraulic
Calculations Submitted by the Contractor. 0.5 Item 111,240.00 55,620.00

QDC/1862 BOQ : Page 1/14/24 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 55,620.00

A Fire Extinguishing Panel as Specified 2 No 5,562.00 11,124.00

B Fire System Status Indicator Panel as 2 No 10,011.60 20,023.20


Specified
C Conventional Smoke Detector for Room
Space 18 No 222.48 4,004.64

D Conventional Smoke Detector for Raised


Floor Space 14 No 222.48 3,114.72

E Alarm Sounders as specified 6 No 500.58 3,003.48

F Xenon Flasher as Specified 6 No 6,674.40 40,046.40

G Manual Alarm Call Point 6 No 222.48 1,334.88

H Response Indicator for Raised Floor 28 No 778.68 21,803.04


Detectors
I Door Lock Assembly as Specified 6 No 1,668.60 10,011.60

QDC/1862 BOQ : Page 1/14/25 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 114,465.96

FIRE PROTECTION INSTALLATION.

Hot dip galvanized steel schedule 40 ASTM


A795 and fittings as specified with screwed
or grooved / flanged joints; include for
surface preparation and painting as specified;
on and including supports.

A 25 mm Diameter pipes including fittings. 138 m 38.93 5,372.34

Extra : for Bends 1 Lot 889.92 889.92

Extra : for Branches 1 Lot 889.92 889.92

B 32 mm Ditto 35 m 50.06 1,752.10

Extra : for Tees 1 Lot 222.48 222.48

C 40 mm Ditto 36 m 61.18 2,202.48

Extra : for Tees 1 Lot 222.48 222.48

D 50 mm Ditto 32 m 66.74 2,135.68

Extra : for Tees 1 Lot 222.48 222.48

E 65 mm Ditto 12 m 94.55 1,134.60

Extra : for Tees 1 Lot 222.48 222.48

Extra : for Branches 1 Lot 222.48 222.48

QDC/1862 BOQ : Page 1/14/26 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 15,489.44

A 80 mm Ditto 16 m 139.05 2,224.80

Extra : for Bends 1 Lot 889.92 889.92

Extra : for Branches 1 Lot 889.92 889.92

B 100 mm Ditto 47 m 200.23 9,410.81

Extra : for Bends 1 Lot 1,112.40 1,112.40

Extra : for Branches 1 Lot 1,112.40 1,112.40

QDC/1862 BOQ : Page 1/14/27 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 15,640.25

Isolating valve with screwed or flanged


joints; jointing to pipeworks

A 100 mm Diameter gate valve 2 No 4,227.12 8,454.24

Zone control valves with flanged joints;


connected to the wet riser system, including
fire alarm control valve with supervisory
switch, pressure gauge, flow switch wirh
mechanical tee, inspector test and drain valve
and non-return valve etc. as specified and
jointing to pipework.

B Zone control valve 1 No 3,337.20 3,337.20

Automatic air vent with all necessary fittings


and aessories connected to the pipe work.

C Automatic air vent 25mm diameter 1 No 3,337.20 3,337.20

Sprinkler head, bulb type as mentioned,


designed to operate at 68 0C; complete with
two pieces adjustable escutcheon in polished
stainless steel plate; jointing to pipeworks

D Recessed sprinkler head 60 Nos 88.99 5,339.40

QDC/1862 BOQ : Page 1/14/28 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 20,468.04

Sprinkler alarm valve assembly as specified ;


complete with alarm check valve, by-pass
check valve, alarm drain check valve, alarm
isolating valve, main drain valve, alarm test
valve, flow switch, pressure gauges,
strainers, and other ancillaries as specified.

Sprinkler alarm valve connected to 100 mm


A 1 No 2,224.80
diameter pipework 2,224.80

Test drain valves complete with drain pipe as


specified and detailed on drawings ; jointing
to pipework.

B Test valve, 25 mm. 2 Nos 2,892.24 5,784.48

FIRE FIGHTING WORKS EXTERNAL TO


THE BUILDING

Galvanized steel pipe to ASTM A 795 and


fittings as specified with screwed or
welding / flanged joints; include for surface
preparation and painting as specified; on and
including supports.

C 150 mm Diameter pipes including fittings. 82 m 278.10 22,804.20

QDC/1862 BOQ : Page 1/14/29 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

D Extra; bend 90°. 1 lot 2,224.80 2,224.80

E Extra; tee. 1 lot 2,781.00 2,781.00

F 100 mm Diameter pipes including fittings. 98 m 233.60 22,892.80

G Extra; bend 90°. 1 lot 2,224.80 2,224.80

H Extra; tee. 1 lot 2,224.80 2,224.80

To Collection QR. 63,161.68

Approved accessories as specified

A Fire hydrant as specified 3 No. 8,899.20 26,697.60

B Breaching inlet 2way 1 No. 4,449.60 4,449.60

QDC/1862 BOQ : Page 1/14/30 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 31,147.20

Skid/Packaged type fire water pump,


complete with stainless steel impeller,
stainless steel shaft, carbon shaft seal and
T.E.F.C electric motor and controls complete
with suction and delivery manifolds,
expansion vessel, pressure switch, gauges
and factory wired control panel, isolating
valves, non-return valves, strainers, flexible
connections including all necessary
accessories; connecting to cold water suction
and delivery pipework.

A Fire water pump Ref.FP-01 & DP-01 pump


set comprising 2 pumps 1 No.Electric and 1
No. Diesel engine driven pump; flow rate
500GPM @110 PSI complete with control
panel and inteconnectinfg pipe works and
valves.
1 Set 278100.00 278,100.00

QDC/1862 BOQ : Page 1/14/31 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

B Jockey pump set Ref JP-01 with high press


split case pump; flow rate 25 GPM @ 110
PSI complete with control panel and
inteconnectinfg pipe works and valves
1 Set 33,372.00 33,372.00

BUILDER'S WORK IN CONNECTION


WITH FIRE FIGHTING INSTALLATIONS

C Allow for all builder's work deemed


necessary for the completion of Fire Fighting
Installations 1 Item 5,562.00 5,562.00

SUNDRIES IN CONNECTION WITH FIRE


FIGHTING INSTALLATIONS

D Testing and Commissioning. 1 Item 22,248.00 22,248.00

To Collection QR. 339,282.00

Collection

Page 1/14/1 533,952.00

Page 1/14/2 55,620.00

Page 1/14/3 114,465.96

Page 1/14/4 15,489.44

Page 1/14/5 15,640.25

Page 1/14/6 20,468.04

Page 1/14/7 63,161.68

QDC/1862 BOQ : Page 1/14/32 GEN/1180/22-2009


PROPOSED TELECOM BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX FIRE FIGHTING MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Page 1/14/8 31,147.20

Page 1/14/9 339,282.00

FIRE FIGHTING MAIN WORKS To Summary QR. 1,189,226.57

QDC/1862 BOQ : Page 1/14/33 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1/15

HVAC MAIN WORKS

AIR COOLED WATER CHILLERS

Microprocessor controlled packaged air


cooled chiller chiller, R-134a; consisting of
Screw type compressors, air cooled
condensers, fans, DX evaporators as
specified; complete with anti vibration
mountings, controls, instrumentation,
ancillaries and associated accessories;
include for connections to chilled water
pipework and electrical connections to local
isolators/control panels; installed on
prepared bases at roof in accordance with
the manufacturer's recommendations
including all associated builder's work.

A Air cooled screw compressor Water


Chillers; total cooling capacity 934 KW,
water flow rate 39.84 lps, Ref. CH-01,02 ###
and 03.
2 Nos. 723,060.00 2,169,180.00
0.00

QDC/1862 BOQ : Page 1/15/34 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 2,169,180.00

Chilled Water Pumps 0.00 ###


0.00 ###
Chilled water pumps, in-line centrifugal
vertical or horizontal mounted, multi stage,
direct driven end suction type as specified
mounted on a chassis ; complete with
valves, suction and delivery manifolds,
expansion vessels, strainers, gauges, flexible
connections and factory wired control
panel ; connections to chilled water supply
and return pipework and electrical
connections to local outlets / control panel ;
installed on prepared bases at Chilled Water
Pump Room at Roof.

A Horizontal split case cetrifugal chilled water


pumps ; water flow 43.70 liters/sec at 45.00
m head (per pump); Ref: CHWP-
01/CHWP-02/CHWP-03. 2 Nos 44,496.00
### 88,992.00

Chemical dosing equipment as specified


complete with chemical tank, automatic
feed including all associated pipework and
valves as detailed on Drawing No.
QDC1862-MH-B1-1-004

B Chemical dosing equipment. 1 No 22,248.00


### 22,248.00

QDC/1862 BOQ : Page 1/15/35 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 111,240.00

Packaged chilled water pressurisation and


make-up water unit comprising duty and
standby make-up pumps, expansion vessel,
automatic change over panel with manual
selector complete with valves,
interconnecting pipework and other
associated ancillaries as specified ;
connections to chilled water pipework and
electrical connections to local isolators /
control panel including all associated
builder's work.

A Packaged chilled water pressurisation unit;


with expansion vessel capacity 200 liters
each, fill pressure 5.50 bar 1 No 22,248.00 22,248.00

QDC/1862 BOQ : Page 1/15/36 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 22,248.00

CHILLED WATER PIPE WORKS

Black seamless mild steel to BS 1387-2957


and BS 1336 Grade B with Welded Joints as
Specified Complete with all necessary
fittings, accessories, pipe supports.

A 200 mm Dia pipe including Fittings and


Supports 46 m 500.58 23,026.68
0.00
B Extra: Tee 1 Lot 2,781.00 2,781.00
0.00
C Extra: Reducer 1 Lot 2,781.00 2,781.00
0.00
D 150 mm Ditto 132 m 333.72 44,051.04
0.00
E Extra: Tee 1 Lot 6,118.20 6,118.20
0.00
F Extra: Reducer 1 Lot 5,339.52 5,339.52
0.00
G 125 mm Ditto 42 m 244.73 10,278.66
0.00
H Extra: Tee 1 Lot 889.92 889.92
0.00
J Extra: Reducer 1 Lot 1,668.60 1,668.60
0.00
K 100 mm Ditto 238 m 233.60 55,596.80
0.00
L Extra: Tee 1 Lot 6,118.20 6,118.20
0.00
M Extra: Reducer 1 Lot 7,230.60 7,230.60
0.00
N 80 mm Ditto 65 m 166.86 10,845.90
0.00

QDC/1862 BOQ : Page 1/15/37 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

P Extra: Tee 1 Lot 889.92 889.92


0.00
Q Extra: Reducer 1 Lot 1,668.60 1,668.60

To Collection QR. 89,642.32

A 50 mm Ditto 18 m 80.09 1,441.62


0.00
B 40 mm Ditto 12 m 61.18 734.16
0.00
C 32 mm Ditto 26 m 50.06 1,301.56
0.00
D 25 mm Ditto 17 m 38.93 661.81
0.00
E 20 mm Ditto 22 m 33.37 734.14
0.00

QDC/1862 BOQ : Page 1/15/38 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 4,873.29

Isolating valves with insulation and


cladding and the like complete with
screwed/flanged ends as specified; jointing
to pipework.

0.00
A 80 mm Diameter valve. 20 No 667.44 13,348.80
0.00
B 100 mm Ditto 6 No 1,112.40 6,674.40
0.00
C 125 mm Ditto 2 No 1,334.88 2,669.76
0.00
D 150 mm Ditto. 8 No 1,612.98 12,903.84
0.00
E 200 mm Ditto. 6 No 2,447.28 14,683.68
0.00
F 200 mm Non return valve 3 No 2,781.00 8,343.00
0.00
0.00

QDC/1862 BOQ : Page 1/15/39 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 29,311.74

Double regulating valves complete with


screwed / flanged ends as specified; jointing
to pipework.

A 80 mm Diameter valve. 17 No 444.96 7,564.32


0.00
B 100 mm Ditto 3 No 1,168.02 3,504.06
0.00
C 150 mm Ditto 3 No 1,668.60 5,005.80
0.00
Strainers 'Y' type including drain cocks as
specified complete with flanged joints;
jointing to pipework. 0.00
0.00
D 80 mm Ditto 17 No 1,612.98 27,420.66
0.00
E 150 mm Ditto 3 No 2,847.74 8,543.22
0.00
Automatic air vents as specified; installed
on chilled water pipework. 0.00
0.00
F 80 mm Ditto 1 No 205.79 205.79
0.00

QDC/1862 BOQ : Page 1/15/40 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

G 150 mm Ditto 3 No 266.98 800.94


0.00
Drain cocks complete with pressure gauges/
temparature gauge as specified; installed on
chilled water pipework.
0.00
0.00
H 80 mm Ditto 17 No 278.10 4,727.70
0.00
J 150 mm Ditto 3 No 333.72 1,001.16
0.00

To Collection QR. 29,386.83

Flow switches as specified; installed on


chilled water pipework.

A Flow switch; on 150 mm diameter pipework 3 No 667.44 2,002.32


0.00
B Temperature sensors as specified; installed
on chilled water pipework. 3 No 444.96 1,334.88
0.00
Modular diverter valves complete with
screwed or flanged ends as specified;
jointing to pipework.
0.00
0.00
C 150 mm Ditto 2 No 1,779.84 3,559.68
0.00
D 80 mm Ditto 1 No 889.92 889.92
0.00
0.00

QDC/1862 BOQ : Page 1/15/41 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 7,786.80

CHILLED WATER PIPE INSULATION

Aluminium, foil faced preformed sectional


glass fibre pipe insulation, density not less
than 96 Kg/m3 fixed with approved
adhesive and joints sealed as specified;
wrapped with heavy duty glass cloth,
density 200 g/m2 and sealed with approved
vapour seal followed by two coats of anti-
fungus anti-rodent weather proofing
compound.

A 200 mm Dia pipe work 46 m 0.00 0.00


0.00
B 150 mm Ditto 132 m 0.00 0.00
0.00 0.00
C 125 mm Ditto 42 m 0.00
0.00
D 100 mm Ditto 238 m 0.00

QDC/1862 BOQ : Page 1/15/42 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

0.00
E 80 mm Ditto 65 m 0.00
0.00
F 50 mm Ditto 18 m 0.00
0.00
G 40 mm Ditto 12 m 0.00
0.00
H 32 mm Ditto 26 m 0.00
0.00
J 25 mm Ditto 17 m 0.00
0.00
K 20 mm Ditto 22 m 0.00
0.00
0.00
0.00

To Collection QR. 0.00

Aluminium sheet cladding as specified

A 0.60 mm thick aluminium cladding to 80


mm diameter pipeworks
46 m 100.12 4,605.52
0.00
B Ditto; to 100 mm diameter pipeworks 132 m 111.24 14,683.68
0.00
C Ditto; to 125 mm diameter pipeworks 42 m 122.36 5,139.12
0.00
D Ditto; to 150 mm diameter pipeworks 238 m 133.49 31,770.62
0.00
E Ditto to 200 mm diameter pipeworks 65 m 144.61 9,399.65
0.00
0.00

QDC/1862 BOQ : Page 1/15/43 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

To Collection QR. 32,799.30

Floor Mounted Down Flow Type


Environmental Control Air Conditioning
Units Operating on Chilled Water Complete
with Elecctrical Panel, Electronic Control
Sysetm, Centrefugal type Fan, humidifier,
Electric Reheat, Filters, Chilled Water
Cooling Coil as specified Complete with all
necessary fittings, accessories and supports
as shown in the Drawings

A Environmental Control Air Conditioning


Units; Total Capacity 121.2KW and
Sensible 99.9 KW with a flow rate of 8070 8 Nos 85,654.80 685,238.40
lps
0.00
B Liquid Leak Detection System as specified 1 Item 0.00 0.00
0.00

QDC/1862 BOQ : Page 1/15/44 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BUILDER'S WORK IN CONNECTION


WITH HVAC MAIN WORKS 0.00
0.00
C Allow for all builder's work deemed
necessary for the completion of HVAC
MAIN WORKS 0.5 Item 22,248.00 11,124.00
0.00
SUNDRIES IN CONNECTION WITH
HVAC MAIN WORKS 0.00
0.00
D Testing and Commissioning. 0.66 Item 27,810.00 18,354.60
0.00
0.00

To Collection QR. 714,717.00

Collection
###
Page 1/15/1 2,169,180.00
###
Page 1/15/2 111,240.00
###
Page 1/15/3 22,248.00

Page 1/15/4 89,642.32

Page 1/15/5 4,873.29

QDC/1862 BOQ : Page 1/15/45 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Page 1/15/6 29,311.74

Page 1/15/7 29,386.83

Page 1/15/8 7,786.80

Page 1/15/9 0.00

Page 1/15/10 32,799.30

Page 1/15/11 714,717.00

###

###

HVAC MAIN WORKS To Summary QR. 3,211,185.27###

QDC/1862 BOQ : Page 1/15/46 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

2 672,750.00 1,345,500.00
0.00

QDC/1862 BOQ : Page 1/15/47 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

To Collection 1,345,500.00

0.00
0.00

2 89,616.00 179,232.00

1 33,810.00 33,810.00

QDC/1862 BOQ : Page 1/15/48 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

To Collection 213,042.00

1 27,283.00 27,283.00

QDC/1862 BOQ : Page 1/15/49 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

To Collection 27,283.00

46 481.00 22,126.00
0.00
1 0.00 0.00
0.00
1 0.00
0.00
132 327.00 43,164.00
0.00
1 0.00
0.00
1 0.00
0.00
42 264.00 11,088.00
0.00
1 0.00
0.00
1 0.00
0.00
238 195.00 46,410.00
0.00
1 0.00 0.00
0.00
1 0.00
0.00
65 136.00 8,840.00
0.00

QDC/1862 BOQ : Page 1/15/50 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

1 0.00
0.00
1 0.00

179285.51To Collection 65,814.00

18 78.00 1,404.00
0.00
12 53.00 636.00
0.00
26 45.00 1,170.00
0.00
17 40.00 680.00
0.00
22 37.00 814.00
0.00

QDC/1862 BOQ : Page 1/15/51 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

4873.42 To Collection 4,704.00

0.00
20 773.00 15,460.00
0.00
6 1,046.00 6,276.00
0.00
2 1,283.00 2,566.00
0.00
8 1,627.00 13,016.00
0.00
6 2,406.00 14,436.00
0.00
3 3,209.00 9,627.00
0.00
0.00

QDC/1862 BOQ : Page 1/15/52 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

To Collection 30,690.50

17 1,472.00 25,024.00
0.00
3 1,875.00 5,625.00
0.00
3 3,192.00 9,576.00
0.00

0.00
0.00
17 349.00 5,933.00
0.00
3 1,104.00 3,312.00
0.00

0.00
0.00
1 285.00 285.00
0.00

QDC/1862 BOQ : Page 1/15/53 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

3 309.00 927.00
0.00

0.00
0.00
17 819.00 13,923.00
0.00
3 1,822.00 5,466.00
0.00

To Collection 35,035.50

3 777.00 2,331.00
0.00

3 623.00 1,869.00
0.00

0.00
0.00
2 12,200.00 24,400.00
0.00
1 4,160.00 4,160.00
0.00
0.00

QDC/1862 BOQ : Page 1/15/54 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

To Collection 32,760.00

46 182.00 8,372.00
0.00
132 139.00 18,348.00
0.00
42 128.00 5,376.00
0.00
238 106.00 25,228.00

QDC/1862 BOQ : Page 1/15/55 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

0.00
65 91.00 5,915.00
0.00
18 86.00 1,548.00
0.00
12 61.00 732.00
0.00
26 57.00 1,482.00
0.00
17 55.00 935.00
0.00
22 53.00 1,166.00
0.00
0.00
0.00

To Collection 34,551.00

46 43.00 1,978.00
0.00
132 49.00 6,468.00
0.00
42 67.00 2,814.00
0.00
238 72.00 17,136.00
0.00
65 97.00 6,305.00
0.00
0.00

QDC/1862 BOQ : Page 1/15/56 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

To Collection 17,350.50

8 132,629.00 1,061,032.00
0.00
1 26,435.00 26,435.00
0.00

QDC/1862 BOQ : Page 1/15/57 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

0.00
0.00

1 - 0.00
0.00

0.00
0.00
0.66 155,343.00 102,526.38
0.00
0.00

To Collection 1,189,993.38

1,345,500.00

213,042.00

27,283.00

179285.51 65,814.00

4,704.00

QDC/1862 BOQ : Page 1/15/58 GEN/1180/22-2009


PROPOSED TELECOM
BILL NO.1: MAIN BUILDING
BUILDING AT KTC COMPLEX
HVAC MAIN WORKS

Quantity Rate (QR) Amount (QR)

30,690.50

35,035.50

32,760.00

34,551.00

17,350.50

1,189,993.38

To Summary 2,996,723.88

QDC/1862 BOQ : Page 1/15/59 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

Bill No. 1/16

MAIN POWER DISTRIBUTION

Note : The works included hereunder shall


comprise supply, installation, testing,
comissioning and setting to work for all
items which are necessary for a complete
operational system as outlined in the
Drawings and in the specifications.

Oil filled hermetically sealed transformer as


per specifications and Kahramaa approval;
supply, install and commission as per Kahra-
Maa regulations including all accessories to
the approval of Engineer at site

A Transformer: 1600 KVA, 11 KV/0.433 K.V.,


DYN 11, 50 Hz step down 2 No 111,240.00 222,480.00

B Allow for 7 Nos. 1C x 800 mm2


CU/XLPE/CWA/PVC power cables from
Transformer to M.V. Panel-1 including
connections,terminations&protection etc. for
complete operational system
Item 93,441.60 93,441.60

C Allow for 7 Nos. 1C x 800 mm2


CU/XLPE/CWA/PVC power cables from
Transformer to M.V. Panel-2 including
connections terminations &protection etc. for
complete operational system
Item 93,441.60 93,441.60

QDC/1862 BOQ : Page 1/16/ 60 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

To Collection QR. 409,363.20


Note : The works included hereunder shall
comprise supply, installation, testing,
comissioning and setting to work for all
items which are necessary for a complete
operational system .

Capacitor Bank with all the necessery


incoming & outgoing terminals, controls and
all associated accessories as required.

A Automatic Power Factor Capacitor Bank -


200 KVAR,Cubicle type.Floor Standing with
400 Amp MCCB with Harmonic filtering 1 No 55,620.00 55,620.00

B Automatic Power Factor Capacitor Bank-


150 KVAR, 400 Amp MCCB (Trip at 320
Amp) with Harmonic filtering 1 No 44,496.00 44,496.00

C Allow for 4C x 240 mm2 XLPE/SWA/PVC


+1c-120 mm2 PVC/ECCpower cables
including terminations with Capacitor Banks. 20 M 333.72 6,674.40

QDC/1862 BOQ : Page 1/16/ 61 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

To Collection QR. 106,790.40


Medium Voltage Switch Board complete as
described including all erection ,inter
connection and instrumentation as shown in
Drawing No. 1862-EL-BO-6-003 SHT 01 of
02.

A MV Panel - 1 : 18 way TPN, complete with


2500 amp withdrwable type 3P motorized
ACB with S/C+O/C release with 30V DC
shunt trip with Low Voltage/High Voltage
trip facility for incoming QGEWC
(Kahramaa) supply, 2500 amp withdrawable
type 4P motorized ACB with S/C+O/C
release with 30V DC shunt trip for Generator
incomer, 2500 amp 4P+E copper bus bar
(Fault rating 44ka for 3 seconds & comply
with IEC 60439-1/1999), including earthing,
electro mechanical interlock through
automatic transfer facility, include for
metering kits, CT's, selector switches, earth
fault relays, indication lamp, trunking,
ammeters,voltmeter, control fuse, battery &
battery charger,provision for integrating to
BMS etc (Form 4B-Type 5) with:

1 No 200,232.00 200,232.00

B 630 amp TP MCCB outgoing 9 No 11,124.00 100,116.00

C 400 amp TP MCCB outgoing 3 No 8,899.20 26,697.60

D 200 amp TP MCCB outgoing 4 No 6,674.40 26,697.60

E 63 amp TP MCCB outgoing 1 No 2,224.80 2,224.80

F 20 amp TP MCCB outgoing 1 No 1,112.40 1,112.40

QDC/1862 BOQ : Page 1/16/ 62 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

To Collection QR. 357,080.40


Medium Voltage Switch Board complete as
described including all erection ,inter
connection and instrumentation as shown in
Drawing No. 1862-EL-BO-6-003 SHT 02 of
02.

A MV Panel - 2 : 18 way TPN, complete with


2500 amp withdrwable type 3P motorized
ACB with S/C+O/C release with 30V DC
shunt trip with Low Voltage/High Voltage
trip facility for incoming QGEWC
(Kahramaa) supply, 2500 amp withdrawable
type 4P motorized ACB with S/C+O/C
release with 30V DC shunt trip for Generator
incomer 2500 amp 4P+E copper bus bar
(Fault rating 44ka for 3 seconds & comply
with IEC 60439-1/1999), electro mechanical
interlock through automatic transfer facility,
include for metering kits, CT's, selector
switches, earth fault relays, indication lamp,
trunking, ammeters, control fuse, battery &
battery charger,provision for integrating to
BMS etc (Form 4B-Type 5) with:

1 No 200,232.00 200,232.00

B 630 amp TP MCCB outgoing 8 No 11,124.00 88,992.00

C 250 amp TP MCCB outgoing 1 No 7,789.80 7,789.80

D 200 amp TP MCCB outgoing 5 No 6,674.00 33,370.00

E 400 amp TP MCCB outgoing 1 No 8,899.20 8,899.20

F 40 amp TP MCCB outgoing 2 No 1,668.60 3,337.20

QDC/1862 BOQ : Page 1/16/ 63 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

G 400 AF/320AT TP MCCB outgoing 1 No 8,899.20 8,899.20

To Collection QR. 351,519.40

EMERGENCY POWER SYSTEM.

Diesel driven Generators and all other


associated accessories as specified and as
shown in drawing; installed in Generator
Room including all associated builder's
work.

A Prime Generator, diesel driven; capacity


1600 KVA complete with control panel,
silencer piping, day tank etc as Specified 1 No. 834,300.00 834,300.00

Fuel tanks in mild steel welded construction


suitably coated to the Engineer's approval;
complete with discharge pump, level
indicators, fill pipe, vent, overflow, drain,
dip stick and access hole ; including filling
cabinets and inter connecting fuel pipes,
final connections, supports and associated
builder's works as necessary.

B Fuel tank; storage capacity for 5000 liters,


continuous diesel engine operation without
refill.as per WOQUODstandards and
shallincluding all necessary controls and
piping so as to have a complete functional
system. ( Shop drawing to be submitted for
approval)

1 Nos. 27,810.00 27,810.00

QDC/1862 BOQ : Page 1/16/ 64 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

C Allow for 7 Nos. 1C x 800 mm2


CU/XLPE/CWA/PVC power cables
including terminations as specified with
proper mechanical protection fixing to cable
trays, drawn in ducts or laid in cable
trenches. from Generator/Control panel to
M.V. Panel-1. 16 Item 667.44 10,679.04

To Collection QR. 872,789.04


Supply and install Uninterrupted Power
Supply as specified and as shown in drawing

A 300 KVA UPS with 30 minutes battery back


up, outputs to be synchronized and
appropriate Load Bus Synchronization
Module (LBS) to be included with
maintenance bypass and change over switch
withinterlock facility as shown in drawing
2 Nos. 55,620.00 111,240.00

Supply and install Precision Power Center as


specified and as shown in drawings

B 100KVA Precision Power Center, as


specified. 2 Nos 22,248.00 44,496.00

QDC/1862 BOQ : Page 1/16/ 65 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

To Collection QR. 155,736.00


Supply & Install Motor control center, floor
standing type; in dust and vermin proof
enclosure including busbars, main incoming
and outgoing moulded case interrupter/circuit
breakers with starters (as applicable),
instrumentation, fuses, switches, motor
controllers, shutdown contactors, earthing,
fixing bracket and all necessary provisions
for incoming and outgoing cable
terminations, Ammeter, Voltmeter, Selector
switch and Phase Indicator lamps and also
provision for integrating with BMS system
etc.; all as specified including support frame.
as detailed on DrawingNo:1862-EL-B0-6-
002 SHT 01 OF 03 (Cont'd.......)

A 8 way- TPN Motor Control Center Ref


MCC-G2(E) located in Ground Floor,
Ele.Room, with 630 amp TP MCCB for
incoming supply and 630 amp 4P+E copper 1 No 22,248.00 22,248.00
bus bar with;

B 125 amp TP MCCB outgoing 8 No 1,112.40 8,899.20

QDC/1862 BOQ : Page 1/16/ 66 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

To Collection QR. 31,147.20

Supply & Install Motor control center, floor


standing type; in dust and vermin proof
enclosure including busbars, main incoming
and outgoing moulded case interrupter/circuit
breakers with starters (as applicable),
instrumentation, fuses, switches, motor
controllers, shutdown contactors, earthing,
fixing bracket and all necessary provisions
for incoming and outgoing cable
terminations, Ammeter, Voltmeter, Selector
switch and Phase Indicator lamps and also
provision for integrating with BMS system
etc.; all as specified including support frame.
as detailed on DrawingNo:1862-EL-B0-6-
002 SHT 02 OF 03(Cont'd.......)

A 6 way-TPN Motor Control Center Ref MCC-


G4(E) located in Ground Floor, Ele.Room,
with 400 amp TP MCCB for incoming
supply and 400 amp 4P+E copper bus bar 1 No 22,248.00 22,248.00
with;

B 125 amp TP MCCB outgoing 6 No 1,112.40 6,674.40

QDC/1862 BOQ : Page 1/16/ 67 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

To Collection QR. 28,922.40


Supply & Install Motor control center, floor
standing type; in dust and vermin proof
enclosure including busbars, main incoming
and outgoing moulded case interrupter/circuit
breakers with starters (as applicable),
instrumentation, fuses, switches, motor
controllers, shutdown contactors, earthing,
fixing bracket and all necessary provisions
for incoming and outgoing cable
terminations, Ammeter, Voltmeter, Selector
switch and Phase Indicator lamps and also
provision for integrating with BMS system
etc.; all as specified including support frame.
as detailed on DrawingNo:1862-EL-B0-6-
002 SHT 02 OF 03(Cont'd.......)

A 8 way-TPN Motor Control Center Ref MCC-


F1 located in First Floor, Ele.Room, with 630
amp TP MCCB for incoming supply and
630 amp 4P+E copper bus bar with; No 22,248.00 -

B 125 amp TP MCCB outgoing No 1,112.40 -

QDC/1862 BOQ : Page 1/16/ 68 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

To Collection QR. -
Supply & Install Motor control center, floor
standing type; in dust and vermin proof
enclosure including busbars, main incoming
and outgoing moulded case interrupter/circuit
breakers with starters (as applicable),
instrumentation, fuses, switches, motor
controllers, shutdown contactors, earthing,
fixing bracket and all necessary provisions
for incoming and outgoing cable
terminations, Ammeter, Voltmeter, Selector
switch and Phase Indicator lamps and also
provision for integrating with BMS system
etc.; all as specified including support frame.
as detailed on DrawingNo:1862-EL-B0-6-
002 SHT 02 OF 03(Cont'd.......)

A 8 way- TPN Motor Control Center Ref


MCC-F3 located in First Floor, Ele.Room,
with 630 amp TP MCCB for incoming
supply and 630 amp 4P+E copper bus bar 0 No 22,248.00 -
with;

QDC/1862 BOQ : Page 1/16/ 69 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

B 125 amp TP MCCB outgoing 0 No 1,112.40 -

To Collection QR. -
Supply & Install Motor control center, floor
standing type; in dust and vermin proof
enclosure including busbars, main incoming
and outgoing moulded case interrupter/circuit
breakers with starters (as applicable),
instrumentation, fuses, switches, motor
controllers, shutdown contactors, earthing,
fixing bracket and all necessary provisions
for incoming and outgoing cable
terminations, Ammeter, Voltmeter, Selector
switch and Phase Indicator lamps and also
provision for integrating with BMS system
etc.; all as specified including support frame.
as detailed on DrawingNo:1862-EL-B0-6-
002 SHT 03 OF 03(Cont'd.......)

QDC/1862 BOQ : Page 1/16/ 70 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

A 8 way- TPN Motor Control Center Ref


MCC-ROOF(E) located in Second Floor,
Ele.Room, with 200 amp TP MCCB for
incoming supply and 200 amp 4P+E copper 1 No 22,248.00 22,248.00
bus bar with;

B 125 amp TP MCCB outgoing 3 No 1,112.40 3,337.20

C 100 amp TP MCCB outgoing 1 No 556.20 556.20

D 40 amp TP MCCB outgoing 2 No 556.20 1,112.40

E 20 amp TP MCCB outgoing 1 No 556.20 556.20

F 16 amp TP MCCB outgoing 1 No 556.20 556.20

To Collection QR. 28,366.20

BUILDER'S WORK IN CONNECTION


WITH ELECTRICAL MAIN POWER
DISTRIBUTION SYSTEM

A Allow for all builder's work deemed


necessary for the completion of Electrical
Main Power Distribution System 1 Item 33,372.00 33,372.00

SUNDRIES IN CONNECTION WITH


ELECTRICAL MAIN POWER
DISTRIBUTION SYSTEM

B Testing and Commissioning. 1 Item 55,620.00 55,620.00

QDC/1862 BOQ : Page 1/16/ 71 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

To Collection QR. 88,992.00

Collection

Page 1/16/1 409,363.20

Page 1/16/2 106,790.40

Page 1/16/3 357,080.40

Page 1/16/4 351,519.40

QDC/1862 BOQ : Page 1/16/ 72 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX MAIN POWER DISTRIBUTION WORKS

Item Description QuantityUnit Rate (QR) Amount (QR)

Page 1/16/5 872,789.04

Page 1/16/6 155,736.00

Page 1/16/7 31,147.20

Page 1/16/8 28,922.40

Page 1/16/9 -

Page 1/16/10 -

Page 1/16/11 28,366.20

Page 1/16/12 88,992.00

MAIN POWER DISTRIBUTION To Summary QR. 2,430,706.24

QDC/1862 BOQ : Page 1/16/ 73 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX SUMMARY

Item Description Page Reference Amount (QR)

BILL NO.1/17

BUILDING 1

EXCAVATION AND EARTHWORKS Page 1/1/2 91,581.06

CONCRETE WORK Page 1/2/9 2,461,378.21

BLOCK WORK Page 1/3/4 446,703.71

ROOFING Page 1/4/4 151,909.53

CARPENTARY & JOINERY Page 1/5/5 156,565.65

METAL WORKS Page 1/6/9 443,179.37

PLUMBING AND DRAINAGE Page 1/7/15 269,243.94

AIR-CONDITIONING AND
VENTILATION WORK Page 1/8/8 242,459.48

ELECTRICAL INSTALLATIONS
(Bldg1,Bldg2,Bldg3 & Bldg4) Page 1/9/70 3,577,533.25

FLOOR,WALL,CEILING FINISHES Page 1/10/11 1,671,281.25

PAINTING AND DECORATING Page 1/11/3 191,246.35

MISCELLANEOUS WORKS Page 1/12/5 494,573.14

EXTERNAL WORKS Page 1/13/20 755,615.94

FIRE FIGHTING MAIN WORKS Page 1/14/10 1,189,226.57

HVAC MAIN WORKS Page 1/15/12 3,211,185.27

MAIN POWER DISTRIDUTION Page 1/16/13 2,430,706.24

QDC/1862 BOQ : Page 1/17/74 GEN/1180/22-2009


PROPOSED TELECOM BUILDING BILL NO.1: MAIN BUILDING
AT KTC COMPLEX SUMMARY

BUILDING 1 To General Summary QR. 17,784,388.96

QDC/1862 BOQ : Page 1/17/75 GEN/1180/22-2009


Item Description Quantity Unit Rate (QR) Amount (QR)

(Cont'd……………..)

A 4C-240 mm2 XLPE/SWA/PVC +1C-120


mm2 PVC/ECC cables serving SMB-
ADDN1 feeding from M.V.Panel-1. 25 Mtrs

B 4C-240 mm2 XLPE/SWA/PVC +1C-120


mm2 PVC/ECC cables serving SMB-
ADDN2 feeding from M.V.Panel-2. 29 Mtrs
To Collection QR.
Item Description Quantity Unit Rate (QR) Amount (QR)

(Cont'd………………)

A 4 way-TPN Sub Main Switch Board Ref


SMB-ADDN1 located in Technical
Room, Ground Floor, with 400 amp TP
MCCB for incoming supply and 400
amp 4P+E copper bus bar with;
1 No

B 100 amp TP MCCB outgoing 4 No

C 4 way-TPN Sub Main Switch Board Ref


SMB-ADDN2 located in Technical
Room, First Floor, with 400 amp TP
MCCB for incoming supply and 400
amp 4P+E copper bus bar with;
1 No

D 100 amp TP MCCB outgoing 4 No

To Collection QR.