Documente Academic
Documente Profesional
Documente Cultură
STRUCTURAL WORKS
1 Excavation 37.00 m3 33.00 m3
2 Backfilling 40.00 m3 20.00 m3
3 Compaction 5.00 m2 3.00 m2
4 Lean Concrete 330.00 m3 325.00 m3
5 Structural Renf. Conc. 890.00 m3 1,135.00 m3
6 Blockworks 78.00 m2 91.00 m2
7 vapor Barrier & Damproofing 7.00 m2 8.00 m2
8 Built-up Roof Waterproofing 83.00 m2 148.00 m2
FINISHING WORKS
1 Doors 1,764.00 no. 1,505.00 no.
2 Windows 789.00 no. 1,417.00 no.
3 Lath & Plaster 39.00 m2 21.00 m2
4 Gypsum Drywall 104.00 m2 79.00 m2
5 Ceramic & Mosaic tiles 86.00 m2 106.00 m2
6 Terrazzo tiles 89.00 m2 110.00 m2
7 Acoustical ceiling & Gypsum 106.00 m2 113.00 m2
8 Concrete Screeding 17.00 m2 23.00 m2
9 Painting 21.00 m2 19.00 m2
10 Postal Specialties (mailbox, etc.) 1,000.00 no. 750.00 no.
11 Toilet Accessories 2,666.00 lot 4,783.00 lot
12 Mirror Units 450.00 no. 352.00 no.
MECHANICAL WORKS
1 Kitchen Appliances 17,441.00 lot 16,185.00 lot
2 Plumps (Hwrecir.pump) 846.00 no. 960.00 no.
3 Plumbing Equipment (water heater) 1,096.00 no. 1,457.00 no.
4 Plumbing Fixtures & Trims 26,589.00 lot 39,168.00 lot
5 Exhaust Fan 425.00 no. 976.00 no.
6 Air Cond. System (window type) 2,500.00 no. 2,013.00 no.
ELECTRICAL WORKS
1 Lighting Fixtures 19,199.00 lot 32,687.00 lot
2 Wiring Devices 11,922.00 lot 7,700.00 lot
3 Communication system 5,040.00 lot 6,210.00 lot
4 CATV system 1,947.00 lot 3,569.00 lot
AVERAGE AVERAGE
REMARKS WORK DESCRIPTION
PHASE-I PHASE-VI
73.00 m3
53.00 m3
10.00 m2
269.00 m3
1,415.00 m3
74.00 m2
10.00 m2
84.00 m2
1,906.00 no.
1,065.00 no.
31.00 m2
56.00 m2
74.00 m2
89.00 m2
87.00 m2
19.00 m2
20.00 m2
1,000.00 no.
6,563.00 lot
542.00 no.
17,483.00 lot
940.00 no.
1,075.00 no.
34,426.00 lot
1,488.00 no.
2,053.00 no.
30,291.00 lot
12,698.00 lot
4,743.00 lot
1,853.00 lot
AVERAGE
PHASE-VII
1,534.00 lot
HOUSING CONSTRUCTION
SABIC HADEED HADEED
WORK DESCRIPTION
PHASE-I PHASE-VI PHASE-VII
STRUCTURAL WORKS
1 Excavation 37.00 m3 33.00 m3 73.00 m3
2 Backfilling 40.00 m3 20.00 m3 53.00 m3
3 Compaction 5.00 m2 3.00 m2 10.00 m2
4 Termite Control 903.00 lot 17.00 m2 10.00 m2
5 Lean Concrete 330.00 m3 325.00 m3 269.00 m3
6 Structural Renf. Conc. 890.00 m3 1,135.00 m3 1,415.00 m3
7 Misc. metal not part of fixtures/equipment 1,125.00 lot 12.00 m3 7.00 m3
8 Blockworks 78.00 m2 91.00 m2 74.00 m2
9 Vapor Barrier & Damproofing 7.00 m2 8.00 m2 10.00 m2
10 Built-up Roof Waterproofing 83.00 m2 148.00 m2 84.00 m2
FINISHING WORKS
1 Doors 1,764.00 no. 1,505.00 no. 1,906.00 no.
2 Windows 789.00 no. 1,417.00 no. 1,065.00 no.
3 Lath & Plaster 39.00 m2 21.00 m2 31.00 m2
4 Gypsum Drywall 104.00 m2 79.00 m2 56.00 m2
5 Ceramic & Mosaic tiles 86.00 m2 106.00 m2 74.00 m2
6 Terrazzo tiles 89.00 m2 110.00 m2 89.00 m2
7 Acoustical ceiling & Gypsum 106.00 m2 113.00 m2 87.00 m2
8 Concrete Screeding 17.00 m2 23.00 m2 19.00 m2
9 Special Coating (stain-varnish-polish) 3,100.00 lot 102.00 m2 71.00 m2
10 Painting 21.00 m2 19.00 m2 20.00 m2
11 Postal Specialties (mailbox, etc.) 1,000.00 no. 750.00 no. 1,000.00 no.
12 Toilet Accessories 2,666.00 lot 4,783.00 lot 6,563.00 lot
13 Mirror Units 450.00 no. 352.00 no. 542.00 no.
MECHANICAL WORKS
1 Rough-in Mechanical 10,472.00 lot 61.00 m2 49.00 m2
2 Kitchen Appliances 17,441.00 lot 16,185.00 lot 17,483.00 lot
3 Plumps (Hwrecir.pump) 846.00 no. 960.00 no. 940.00 no.
4 Plumbing Equipment (water heater) 1,096.00 no. 1,457.00 no. 1,075.00 no.
5 Plumbing Fixtures & Trims 26,589.00 lot 39,168.00 lot 34,426.00 lot
6 Exhaust Fan 425.00 no. 976.00 no. 1,488.00 no.
7 Outlets & Inlets 6,603.00 lot 359.00 no. 282.00 no.
8 Air Cond. System (mini split) 6,300.00 no. 120,115.00 lot 86,128.00 lot
9 Air Cond. System (window type) 2,500.00 no. 2,013.00 no. 2,053.00 no.
HOUSING CONSTRUCTION
SABIC HADEED HADEED
WORK DESCRIPTION
PHASE-I PHASE-VI PHASE-VII
ELECTRICAL WORKS
1 Rough-in Electrical 22,625.00 lot 74.00 m2 42.00 m2
2 Lighting Fixtures 19,199.00 lot 32,687.00 lot 30,291.00 lot
3 Wiring Devices 11,922.00 lot 7,700.00 lot 12,698.00 lot
4 Motor Control starter 1,080.00 no. 1,500.00 lot 1,200.00 lot
5 Communication system 5,040.00 lot 6,210.00 lot 4,743.00 lot
6 CATV system 1,947.00 lot 3,569.00 lot 1,853.00 lot
7 Fire Alarm system 2,787.00 lot 3,625.00 lot 1,534.00 lot
I SITE WORK
C. Leveling and Compaction required under foundation. M2 170.18 24.00 4,084.32 170.18 24.00 4,084.32 170.18 2.00
Lean Concrete for foundations, grade beams and slabs
D.
on grade (17.5 Mpa).
M3 17.02 264.00 4,493.28 17.02 264.00 4,493.28 17.02 265.00
A. Cast-In-Place Concrete:
3. Columns from ground floor to roof level M3 18.23 1,400.00 25,522.00 18.23 1,400.00 25,522.00 0.00 0.00
4. Reinforced concrete solid Grade beams. M3 13.59 1,400.00 19,026.00 13.59 1,400.00 19,026.00 0.00 0.00
4.1 First floor M3 8.51 1,400.00 11,914.00 8.51 1,400.00 11,914.00 0.00 0.00
4.2 Roof floor M3 6.38 1,400.00 8,932.00 6.38 1,400.00 8,932.00 0.00 0.00
6. Staircase (riser,tread & landings) M3 11.25 1,400.00 15,750.00 11.25 1,400.00 15,750.00 0.00 0.00
7. Miscellaneous
7.1 Porch slab and entrance steps M3 0.44 1,250.00 550.00 0.44 1,250.00 550.00 0.44 1,250.00
7.2 Window SILL & Header M3 1.30 800.00 1,040.00 1.30 800.00 1,040.00 1.30 800.00
7.3 Lintel beams M3 1.62 800.00 1,296.00 1.62 800.00 1,296.00 1.62 800.00
7.4 Concrete walkway M3 22.58 742.00 16,754.36 22.58 742.00 16,754.36 22.58 742.00
7.5 Splash blocks (under rainwater pipes) EA 11.00 280.00 3,080.00 11.00 280.00 3,080.00 11.00 280.00
MUTRAFIAH HOUSING CONSTRUCTION
B. Floor Slabs:
1. Ground floor solid slab-150mm thk. M2 170.18 120.00 20,421.60 0.00 0.00 0.00 0.00 0.00
First floor - 250mm thick Hordi slab inlcuding rib
2.
and blocks.
M2 179.54 200.00 35,908.00 0.00 0.00 0.00 0.00 0.00
Roof floor Slab - 250mm thick Hordi slab including
3.
rib and blocks.
M2 200.22 200.00 40,044.00 0.00 0.00 0.00 0.00 0.00
Roof outspout weir type overall size 450x400x300
4.
deep w/ galv. Sheet.
EA 11.00 688.00 7,568.00 0.00 0.00 0.00 0.00 0.00
III PRECAST
6
First Floor Internal Precast Concrete Load bearing
wall (150mm)
M2 121.05 265.00
IV MASONRY WORKS
B. Concrete Hollow Block 150mm thick. M2 324.16 72.00 23,339.52 324.16 72.00 23,339.52 0.00 0.00
C. Concrete Hollow Block 100mm thick. M2 79.17 72.00 5,700.24 79.17 72.00 5,700.24 0.00 0.00
V METAL WORK
E. Meranti wood handrail w/ Ballustrade LM 13.77 0.00 13.77 0.00 13.77 836.00
F. Closets for Bedrooms as per drawing. EA 5.00 0.00 5.00 0.00 5.00
IX FINISHES
A. Plastering:
1. Plastering cement for interior and exterior walls. M2 1587.16 31.00 49,201.96 1587.16 31.00 49,201.96 0.00 0.00
Mortar cement for laying interior wall and exterior
2.
walls. M2 64.37 31.00 1,995.47 64.37 31.00 1,995.47 0.00 0.00
B. Screeding:
1. Screeding with cement plaster over slabs. M2 349.72 19.00 6,644.68 349.72 19.00 6,644.68 0.00 0.00
H. Painting:
Two (2) coats of emulsion paint over a coat of
1.
pigmented primer M2 363.29 19.00 6,902.51 363.29 19.00 6,902.51 363.29 11.00
and sealer on ceiling (texture finish).
Two (2) coats of emulsion and/or enamel paint
2.
over a coat of primer M2 680.74 18.00 12,253.32 680.74 18.00 12,253.32 680.74 13.00
and sealer on interior walls.
Two (2) coats of approved exterior paint over
3.
priming coat as per M2 906.42 22.00 19,941.24 906.42 22.00 19,941.24 0.00 0.00
the manufacturer's instruction.
I. Ceiling:
Gypsum board panel false ceiling on metal with
1.
ceiling and acces.
M2 370.36 84.00 31,110.24 370.36 84.00 31,110.24 0.00 0.00
X SPECIALTIES
2.3 Towel bar EA 6.00 94.00 564.00 6.00 94.00 564.00 6.00 49.00
2.4 Clothes hook EA 6.00 56.00 336.00 6.00 56.00 336.00 0.00 0.00
2.4 Clothes hook (Double) EA 6.00 35.00
2.5 Towel bar ring EA 6.00 96.00 576.00 6.00 96.00 576.00 6.00 49.00
2.6 Toilet paper holder EA 6.00 94.00 564.00 6.00 94.00 564.00 6.00 56.00
2.7 Soap Tray (for Battub and Shower) EA 5.00 49.00
XI EQUIPMENTS
1.1 Water Heater: 50 gallons capacity EA 7.00 1075.00 7,525.00 7.00 1075.00 7,525.00 0.00 0.00
1.2 Clothes Washer : 3.2 cu. Ft. capacity EA 1.00 2500.00 2,500.00 1.00 2500.00 2,500.00 0.00 0.00
1.5 Food Waste Disposer: 0.5 HP capacity EA 1.00 800.00 800.00 1.00 800.00 800.00 0.00 0.00
Garbage Disposer GE, Model # GFB Model
# GFB 760
1.00 420.00
Electric Cooking Range: 30" slide in type,
1.6
plug-in coil.
EA 1.00 3350.00 3,350.00 1.00 3350.00 3,350.00 0.00 0.00
XII MECHANICAL
A. Plumbing:
1. Soil, Waste and Vent System:
Supply and installation of soil, waste and vent
system items complete
as specified. The work consist of laying the pipe
line network within
the building including the vertical stacks to the
floor above and vents
and connections to the individual fixtures as
required to complete
the system in a workmanlike manner and testing
the system for
proper functioning.
B. H.V.A.C
1. Air Conditioning Unit:
2.6 Dryer plenum Exchaust Duct EA 1.00 0.00 1.00 0.00 1.00 90.00
A. Lighting Fixtures:
Surface mounted, one piece translucent
1.
polystyrene diffuser, white
stove baking enamel painted surface finish on
sheet steel, 127V,
EA 8.00 151.00 1,208.00 8.00 151.00 1,208.00 0.00 0.00
60HZ, 2x36W, daylight fluorescent lamps, rapid
start and hum free,
or approved equal. For Hall, dining & maid's room
(Type-A).
B. Receptable Outlet:
Duplex receptable outlet, Ivory, straight blade,
1.
20A, 2P, 3W, 240V, EA 12.00 47.00 564.00 12.00 47.00 564.00 0.00 0.00
60HZ, or approved equal.
MUTRAFIAH HOUSING CONSTRUCTION
8. Angle plug for Range & Water heater 50A 4 wires EA 1.00 0.00 1.00 0.00 1.00 15.00
9. Angles plug for Dryer 30A, 4 wires. EA 1.00 0.00 1.00 0.00 1.00 15.00
C. Switches:
1-Gang Switch 20A, 127VAC including cover
1.
plate, quiet operation EA 35.00 56.00 1,960.00 35.00 56.00 1,960.00 0.00 0.00
or approved equal.
7. Rotary Dimmers, 600 watts, 120VA EA 4.00 0.00 4.00 0.00 4.00 90.00
D. Motor Control Starter:
Combination Magnetic Starter with thermal
1.
overload relay in NEMA
3R enclosure for 1/4 HP, 220V, 1PH, 60HZ, EA 1.00 864.00 864.00 1.00 864.00 864.00 1.00 0.00
recirculating pump
including sensor interface.
E. Panel Boards:
Panel Board "PP" flush mount, 22KA interrupting
1.
capacity, complete
with all accessories as per villa load schedule EA 1.00 7100.00 7,100.00 1.00 7100.00 7,100.00 0.00 0.00
drawing and
specification.
F. Feeder Cable:
3 1/2 core 150mm2 XLPE 900C Saudi cable or
1.
approved equal (refer
LM 18.30 90.00 1,647.00 18.30 90.00 1,647.00
to Site Utility Layout to determine length).
I. Telephone:
One gang 2x4 conductors jack outlets, or
1.
approved equal.
EA 12.00 22.00 264.00 12.00 22.00 264.00 12.00 0.00
2. Wirings for all telephone system. LS 1.00 281.00 281.00 1.00 281.00 281.00 1.00 0.00
3. Conduits for all telephone system. LS 1.00 562.00 562.00 1.00 562.00 562.00 1.00 0.00
TTB (Telephone Terminal Cabinet) 12 pairs flush
4.
mounted including LS 2.00 275.00 550.00 2.00 275.00 550.00 2.00 0.00
all accessories.
J. Door Phone (Intercom):
Pick-up handset with door release and extension
1.
(indoor unit).
SET 1.00 678.00 678.00 1.00 678.00 678.00 1.00 0.00
Handsfree door phone (outdoor unit) with push
button call.
2. Wirings for all intercom & chime system. LM 110.00 374.00 41,140.00 110.00 374.00 41,140.00 110.00 0.00
3. Conduits for all intercom & chime system. LS 1.00 655.00 655.00 1.00 655.00 655.00 1.00 0.00
6. Door release lock. EA 1.00 112.00 112.00 1.00 112.00 112.00 1.00 0.00
K. CATV System:
1. TV outlet (75 ohms) complete with all accessories. EA 13.00 61.00 793.00 13.00 61.00 793.00 13.00 11.00
Distribution box surface mounted complete with
2.
accessories, 6
LS 4.00 324.00 1,296.00 4.00 324.00 1,296.00 0.00 0.00
way splitter and change over switch for satellite.
A. External Works:
1. Grade site to required levels. M2 150.07 10.00 1,500.70 150.07 10.00 1,500.70 150.07 8.00
2. Top soil 150mm thick to green areas. M2 349.93 15.00 5,248.95 349.93 15.00 5,248.95 349.93 7.00
Provide perimeter fence to lot, allowing for all
3.
walls, finishings, side
walks, gateways, boundary wall with concrete
topping, porches,
LS 1.00 48213.00 48,213.00 1.00 48213.00 48,213.00 1.00 700.00
4. Villa guest entrance gate at boundary wall. LS 1.00 4574.00 4,574.00 1.00 4574.00 4,574.00 1.00 2850.00
5. Family entrance gate at boundary wall. LS 1.00 1449.00 1,449.00 1.00 1449.00 1,449.00 1.00 0.00
Provide garage - include for foundations,
6.
entrance, ramp, walls,
decorative blocks, roof slab, finishings, electric
fittings & supply,
LS 1.00 755.00 755.00 1.00 755.00 755.00 1.00 5070.00
plumbing requirements, closet and all work as
applicable to a
particular lot.
MUTRAFIAH HOUSING CONSTRUCTION
TOT/UNIT PRIZE
2,857.80
1,050.26
340.36
4,510.30
1,386.95
0.00
10,145.67
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
23,824.50
23,161.60
0.00
0.00
0.00
0.00
0.00
550.00
1,040.00
1,296.00
16,754.36
3,080.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
0.00
0.00
0.00
69,706.46
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
63,858.75
30,856.60
6,514.00
0.00
6,760.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
65,006.25
32,078.25
932.00
0.00
30,058.50
43,709.50
1,912.50
41,045.10
6,781.25
329,512.70
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
0.00
0.00
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
3,750.00
360.00
4,110.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
1,245.30
272.80
16,486.67
2,049.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
2,010.00
1,410.00
0.00
11,511.72
0.00
34,985.49
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
314.35
346.40
23,519.74
1,288.56
25,469.05
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
0.00
0.00
0.00
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
1,519.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
2,738.00
2,400.00
5,064.00
4,458.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
975.00
975.00
4,098.00
3,420.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
1,450.00
700.00
1,380.00
1,350.00
30,527.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
0.00
0.00
5,445.76
6,283.90
2,134.08
9,315.70
0.00
7,684.36
99.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
0.00
0.00
0.00
90.00
246.00
0.00
0.00
441.00
68.00
1,116.16
1,369.86
0.00
1,051.35
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
3,996.19
8,849.62
0.00
0.00
34,813.84
83,004.82
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
1,930.00
0.00
338.00
0.00
552.00
0.00
1,068.00
0.00
638.00
0.00
300.00
0.00
2,544.00
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
713.00
566.00
326.00
1,488.00
1,765.00
1,840.00
326.00
660.00
4,050.00
1,780.00
0.00
922.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
294.00
0.00
210.00
294.00
336.00
245.00
231.00
23,416.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
6,692.00
0.00
1,575.00
0.00
1,200.00
0.00
2,925.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
420.00
0.00
1,575.00
0.00
570.00
14,957.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
2,248.02
2,248.02
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
0.00
0.00
0.00
680.00
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
945.00
408.00
0.00
0.00
420.00
0.00
0.00
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
5,754.00
0.00
3,488.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
983.00
270.00
750.00
248.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
188.00
90.00
75.00
18,795.04
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
992.00
0.00
315.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
0.00
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
1,044.00
0.00
448.00
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
1,350.00
0.00
448.00
0.00
322.00
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
312.00
0.00
150.00
0.00
68.00
0.00
68.00
0.00
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
184.00
1,312.00
15.00
15.00
0.00
385.00
0.00
225.00
0.00
92.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
360.00
0.00
0.00
1,500.00
1,028.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
140.00
115.00
36.60
6.52
7.63
9.81
53.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
838.40
0.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
143.00
0.00
92.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
250.00
2.00
5,136.00
915.00
125.00
250.00
18,752.96
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
1,200.56
2,449.51
700.00
2,850.00
0.00
5,070.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
5,300.00
2,320.00
2,320.00
2,300.00
JALMUDAH
(PRECAST SYSTEM)
TOT/UNIT PRIZE
1,200.00
1,200.00
1,200.00
6,000.00
700.00
3,000.00
1,500.00
39,310.07
702,692.26