PROJECT: TWO STOREY DUPLEX RESIDENTIAL BUILDING Al - Ansari

LOCATION: Jalmudah District, Jubail KSA Engineering & Consultants


OWNER: SAHARA PETROCHEMICALS 19100 Real Estate Development.

SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision


DATE: February 3, 2020 B.O.Q Design Studies-Land Surveying

DIV TOTAL AMOUNT


DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)

DIV-01 GENERAL REQUIREMENTS

1.01 PERMITS & TAXES


Construction Permits LS
Others as required in the Contract LS

SUB TOTAL "1.01"


1.02 OVERHEAD
Project Overhead (Project Manager / Field Staff) LS
Office Overhead Chargeable to the Project LS
Project Consultant LS
Others as required in the Contract LS
SUB TOTAL "1.02"
1.03 TEMPORARY FACILITIES
Contractor's Field/Site Office & Furnishings LS
Project Manager Field Office & Furnishings LS
Temporary Contractor's Warehouse/Fabrication Area LS
Temporary Utility Connection LS
Telephone Consumption Bills MOS
Temporary Water & Electric Bills MOS
Fencing of Temporary Facilities/Project Site LS
Project Construction Billboards/Signage as per RC standard LS
(subject to PM or Architect's approval)
Shop Drawings LS
As-Built Drawings LS
Material testing & Commissioning LS
House keeping LS
Service & support equipment LS
SUB TOTAL "1.03"
1.04 EQUIPMENT (Mobilization & Demobilization) LS
1.05 INSURANCE LS
1.06 BONDS
Bid Bonds LS
Performance Bonds LS
Payment Bonds LS
Guarantee Bonds LS
SUB TOTAL "1.04,1.05 & 1.06"
1.07 HEALTH & SAFETY
Safety Personnel & Health facilities for the project LS
Personal Protective Equipment (PPE) LS
Safety Signages LS
SUB TOTAL "1.07"
1.08 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 01 - "GENERAL REQUIREMENTS"

DUPLEX UNIT - 1 & 2


DIV-02 SITE WORKS

2.01 SITE DEVELOPMENT / EXTERIOR IMPROVEMENTS


Landscaping (includes planters, grass, small trees & shrubs) 90 M²
Pre-cast concrete pavers @ walkway area 192 M²

SUB TOTAL "2.01"


2.02 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 02 - "SITE WORKS"

DIV-03 CONCRETE WORKS

3.01 REFER TO CIVIL-STRUCTURAL B.O.Q


3.02 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 03 - "CONCRETE WORKS"

DIV-04 MASONRY WORKS

4.01 CHB LAYING (CONCRETE MASONRY UNIT)

GENERAL NOTES:
1.The cost of block work shall include supply, testing, placing of approved
blocks, workmanship, mortar, scaffolds, filling mastic for expansion joints
and all other required materials, equipment and tools to complete the work
according to specifications and directions of the Architect or Engineer. The prices should also include B200 protection concrete
round sleeves and pipes of electrical,sanitary and mechanical pipes and ducts where required.

EXTERIOR WALL
FRONT - RIGHT-SIDE - REAR ELEVATION
200mm Concrete masonry wall, bedded and jointed in cement mortar 700 M²
including lintels, reinforcement, anchors, joints complete in all cases.

INTERIOR WALL
Ground Floor Level 240 M²
First Floor Level 196.6 M²
Roof Deck Annex 46 M²
Internal party wall (All floor levels) 141.2 M²
100mm THK. CHB wall @ pipe chase for all floor levels 60 M²

PARTY WALL
Exterior Party wall @ ground floor & roof deck 97 M²

PERIMETER FENCE (WHOLE PROPERTY)


200mm Concrete masonry wall, embedded and jointed in cement mortar 436 M²
including lintels, reinforcement, anchors, joints complete in all cases.

SUB TOTAL "4.01"

4.02 PLASTERING WORKS

19100-BOQ: Architectural SAHARA PETROCHEMICALS 1/5


JAS 02/02/2020
PROJECT: TWO STOREY DUPLEX RESIDENTIAL BUILDING Al - Ansari
LOCATION: Jalmudah District, Jubail KSA Engineering & Consultants
OWNER: SAHARA PETROCHEMICALS 19100 Real Estate Development.

SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision


DATE: February 3, 2020 B.O.Q Design Studies-Land Surveying

DIV TOTAL AMOUNT


DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)
GENERAL NOTES:
1.The cost of plastering shall include supply of all materials, mixing,
scaffolds, curing, galvanised angles (for exposed edges), galvanised mesh (between block walls and concrete), cleaning the site,
required equipment and workmanship to complete the work according to specifications and directions of the Architect.

2. Plastering should be done with cement mortar ratio of 1:3, 1:4, 1:6 etc. as per the requirements of the work. It should be in
straight line, leveled, plumbed and the joint must be in right angle.

EXTERIOR WALL

Plastering on CMU EXTERIOR Wall (W1) - 2 faces smooth 1500 M²


Ground floor Plastering on CMU INTERIOR Wall (W2) - 2 faces smooth 480 M²
First floor Plastering on CMU INTERIOR Wall (W2) - 2 faces smooth 393.2 M²
Roof deck floor Plastering on CMU INTERIOR Wall (W2) - 2 faces smooth 46 M²
Internal party wall (Ground floor to Roof Annex) - 2 faces smooth 565 M²

PERIMETER FENCE (WHOLE PROPERTY)

Plastering on CMU EXTERIOR Perimeter wall - 2 faces smooth 872 M²

SUB TOTAL "4.02"

4.03 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 4 - "MASONRY WORKS"

DIV-05 METALS

5.01 COMMON METALS - REFER TO STRUCTURAL B.O.Q.

5.02 SPECIALTY METALS

Pre-fabricated shop primed Metal gates 1 LOT


Roll up G.I Garage door 1 LOT

SUB TOTAL "5.02"

5.04 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 5 - "METALS"

DIV-06 WOOD & PLASTICS

6.01 Interior Moulding decorations on walls & ceilings 1 LOT


Interior Wood baseboard/skirting 1 LOT

6.02 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 6 - "WOOD & PLASTICS"

DIV-07 THERMAL & MOISTURE PROTECTION

7.01 VAPOR BARRIER / INSULATIONS / WALL COMPONENTS

Roof deck floor waterproofing & insulations 1 LOT

SUB TOTAL "7.01"

7.02 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 7 - "THERMAL & MOISTURE PROTECTION"

DIV-08 DOORS & WINDOWS

8.01 DOORS

GENERAL NOTES:
The following items shall be completed according to drawings, specifications and Architect's instructions.

(a) Door frames shall fit into walls and sizes of door openings, after
considering the thickness of plastering and frames.
(b) The shown dimensions on details are the architectural dimensions of
door leaves without the frames.
(c) All hardware for doors shall be Union type or equivalent approved type.
(d) Doors should be fitted with handles (colour & types as directed and
approved by the Architect)
(e)Steel frames should be filled with fine aggregate mortar concrete, for
fixation.
(f) For aluminum works, contractor shall submit shop drawings for the
Architect's approval before supplying & installation.

DUPLEX UNIT - 1 & 2

a. D1- 1500mm(W) x 2200mm (H) 4 SETS


Double leaf swing metal door with decorative glass panel design on steel
frame w/ complte hardwares & accessories.
b. D2- 1000mm(W) x 2100mm (H) 6 SETS
Single leaf flush door on decorative solid wooden frame with complete
hardwares & accessories (1-hour fire resistant rating)
c. D3- 900mm(W) x 2100mm (H) 12 SETS
Single leaf flush door on decorative solid wooden frame with complete
hardwares & accessories (1-hour fire resistant rating)
d. D4- 700mm(W) x 2100mm (H) 12 SETS
Single leaf hollow core PVC flush door on PVC frame w/ complete
hardwares & accessories
e. D5- 1000mm(W) x 2100mm (H) 4 SETS
Single leaf panel door on decorative solid wooden frame with complete
hardwares & accessories (1-hour fire resistant rating)
f. D6- 800mm(W) x 2100mm (H) 2 SETS

19100-BOQ: Architectural SAHARA PETROCHEMICALS 2/5


JAS 02/02/2020
PROJECT: TWO STOREY DUPLEX RESIDENTIAL BUILDING Al - Ansari
LOCATION: Jalmudah District, Jubail KSA Engineering & Consultants
OWNER: SAHARA PETROCHEMICALS 19100 Real Estate Development.

SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision


DATE: February 3, 2020 B.O.Q Design Studies-Land Surveying

DIV TOTAL AMOUNT


DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)
Single leaf Glass door on aluminum frame

SUB TOTAL "8.01"

8.02 WINDOWS & GLAZINGS

GENERAL NOTES:
All works must be according to drawings, specification and Architect's
instructions. Rates shall include:
(a) Submitting samples for approval of material, accessories, color and fixation method.
(b) All metal works include the fixation for frames and leaves and all required accessories according to the Architect's instructions.

DUPLEX UNIT - 1 & 2

Powder coated aluminum powder double glazed clear SLIDING window on


selected color, solar rated glass to specifications
Glazing: double pane 8mm thk. reflective glass
a. W1- 1500mm (W) x 4580mm (H) 14 SETS
b. W2- 1200mm (W) x 3880mm (H) 2 SETS

Powder coated aluminum powder double glazed clear AWNING window on


selected color, solar rated glass to specifications
Glazing: double pane 8mm thk. reflective glass
c. W3- 600mm (W) x 600mm (H) 12 SETS
d. W4- 600mm (W) x 8000mm (H) 2 SETS

Silicone/ Sealant, Adhesive 1 LOT

SUB TOTAL "8.02"


8.03 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 8 - "DOORS & WINDOWS"

DIV-09 FINISHES

9.01 FLOORING FINISHES

GENERAL NOTES:
All works must be according to drawings, specification and Architect's instructions. Rates shall include :
(a) Prices of Tiles & Marble works shall include supply of all materials, testing, mortar, 5cm sand under tiles or marble or back the
tiles or marble (wall), skirting, workmanship,opening areas and all materials & tools and anywhere else, needed, all according to
drawings, specifications, conditions and directed instructions by the Architect or his representative.

(b) Cleaning, mechanical polishing and pointing using grout.


(c) Plastic angle beads for ceramic wall tiles and Aluminum angle for ceramic of walls at the corners.
(d) Local marble must be Grade (A) free cracks and clay flaws.
(e) Only SASO approved Type of good quality imported porcelain and glazed ceramic tiles (floor & walls) shall be used
(f) Only Grade A for local marble shall be used, free from cracks, holes and pits, homogeneous in the approval color

DUPLEX UNIT - 1 & 2

GROUND TO ROOF DECK FLOOR (ALL FLOORS)

FF-01
ENTRANCE
400mm x 400mm UNGLAZED non-skid marble tiles 16 M²
FF-02
FOYER, FAMILY HALL & DINING ROOM
400mm x 400mm POLISHED marble tiles 95 M²
Refer to floor finishing plan for tile pattern sheet A-21 to A-23
FF-03
GENTLEMEN'S RECEPTION & ALL BEDROOMS
400mm x 400mm POLISHED ceramic floor tiles with 8mm THK. 179 M²
carpet floor rugs on top (OPTIONAL).
FF-04
GROUND FLOOR KITCHEN & LAUNDRY AREA @ ROOF DECK
400mm x 400mm UNGLAZED non-skid ceramic floor tiles 56 M²
FF-05
TOILET & BATHROOM (ALL FLOOR LEVELS)
200mm x 200mm UNGLAZED non-skid ceramic floor tiles 60 M²
FF-06
TERRACE
400mm x 400mm UNGLAZED non-skid TERRAZO floor tiles 6 M²
FF-07
Waterproofing on concrete roof deck with polyurethane flexible coating 149 M²

NOTE: Quantity take-off already includes 10% allowance for wastage,


tile joints & breakage for mishandling.

Field Sample/Mock-up 1 LOT

SUB TOTAL "9.01"

9.02 CEILING FINISHES

DUPLEX UNIT - 1 & 2

GROUND TO ROOF DECK FLOOR (ALL FLOORS)


CF-01
FAMILY HALL & MASTER BEDROOM
12mm thk ordinary gypsum board on metal furring with support accessories. 100 M²
Skirting: Gypsum board mouldings (decorations) 1 LOT
CF-02
KITCHEN, TOILET & BATHROOM
600x600x12mm modular aluminum suspended ceiling w/ silhoutte grid 80 M²
including support accessories.
CF-03
DINING ROOM, RECEPTION & BEDROOM
19100-BOQ: Architectural SAHARA PETROCHEMICALS 3/5
JAS 02/02/2020
PROJECT: TWO STOREY DUPLEX RESIDENTIAL BUILDING Al - Ansari
LOCATION: Jalmudah District, Jubail KSA Engineering & Consultants
OWNER: SAHARA PETROCHEMICALS 19100 Real Estate Development.

SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision


DATE: February 3, 2020 B.O.Q Design Studies-Land Surveying

DIV TOTAL AMOUNT


DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)
Emulsion paint finish on plain cement slab moisture resistant 162 M²
CF-04
TERRACE
Emulsion paint finish on plain cement slab moisture resistant 63 M²

Painted lath plaster or skimcoat 1 LOT

SUB TOTAL "9.02"

9.03 INTERIOR WALL FINISHES

TOILETS @ ALL FLOORS


200x200x6mm Glazed Ceramic Wall tile (IVORY WHITE) 262 M²
Interior mouldings & decorations 1 LOT

SUB TOTAL "9.03"

9.04 EXTERIOR WALL PAINT FINISHES

DUPLEX UNIT - 1 & 2

GROUND TO ROOF DECK FLOOR


CMU Exterior Wall (W1) 1-side 885 M²
a. 1st coat Alkali resistant primer paint or approved equal
b. 2nd coat Acrylic Emulsion paint or approved equal
c. Top coat Acrylic Texture Emulsion paint or approved equal

PARTY WALL 2-sides (3 coats of paint same as the exterior wall) 196 M²

EXTERIOR PERIMETER WALL 2-sides (3 coats) 570 M²

Field Sample/Mock-up 1 LOT

SUB TOTAL "9.04"

9.05 INTERIOR WALL PAINT FINISHES

DUPLEX UNIT - 1 & 2

GROUND TO ROOF DECK FLOOR


CMU Interior Wall 2- sides 1250 M²
a. 1st coat Alkali resistant primer paint or approved equal
b. 2nd coat Acrylic Emulsion paint or approved equal
c. Top coat Acrylic Texture Emulsion paint or approved equal

Field Sample/Mock-up 1 LOT

SUB TOTAL "9.05"

9.06 METAL / STEEL MEMBERS PAINT FINISHES

Paint on Stair METAL railing


a. 1st coat Epoxy polyamide primer paint or approved equal 1 LOT
b. 2nd coat Polyamide epoxy enamel paint or approved equal 1 LOT
c. Top coat Urethane epoxy enamel paint or approved equal 1 LOT

Field Sample/Mock-up 1 LOT

SUB TOTAL "9.06"

9.07 MISCELLANEOUS

Preparation of Concrete Surfaces for painting & finishing 1 LOT


Concrete Neutralizers 1 LOT
Mesh tape for walls & ceilings 1 LOT
Gypsum/Glazing putty & Polituff 1 LOT
Flat Latex paint 1 LOT
Skimcoat (optional) 1 LOT
Sand paper 1 LOT
Paint roller/brush/equipments 1 LOT

SUB TOTAL "9.07"


9.08 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 9 - "FINISHES"

DIV-10 SPECIALTIES

10.01 POLISHED MARBLE / GRANITE

GENERAL NOTES:
Use only adhesives formulated for stone and recommended by the manufacturer for the application shown on the drawings. Water
cleanable epoxy adhesive: ANSI A118.3 with VOC content of 65 g/L or less when calculated according to 40 CFR 59.
Supply & install Polished pre-cast marble stair tread w/ non-skid strips & bullnose 1 LOT
Stair stringer (optional) 1 LOT

3/4" Synthetic granite countertops 1 LOT


Touch-up sealer/ silicone sealant 1 LOT

SUB TOTAL "10.01"

10.02 DRY WALL PARTITIONS FOR PIPE CHASE COVERING

12mm THK. Fiber Cement Board including aluminum C-CHANNEL studs 1 LOT
& fixing attachments @ toilet, tea room & pantry.

Field Sample/Mockup 1 LOT

SUB TOTAL "10.02"

19100-BOQ: Architectural SAHARA PETROCHEMICALS 4/5


JAS 02/02/2020
PROJECT: TWO STOREY DUPLEX RESIDENTIAL BUILDING Al - Ansari
LOCATION: Jalmudah District, Jubail KSA Engineering & Consultants
OWNER: SAHARA PETROCHEMICALS 19100 Real Estate Development.

SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision


DATE: February 3, 2020 B.O.Q Design Studies-Land Surveying

DIV TOTAL AMOUNT


DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)

OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 10 - "SPECIALTIES"

GRAND TOTAL: "DIVISION 1" GENERAL REQ'TS. TO "DIVISION 10" SPECIALTIES SAR

*************** QUANTITY TAKE-OFF FOR UNIT 1 & 2 *****************

NOTE: 1. The above breakdown does not include labor/equipment costs


2. The above unit/quantities/value must be re-checked by the contractor
as per RC approved complete set of plans for verification purposes.

ABBREVIATIONS:
LS - Lump Sum
MOS - Months
M² - Square Meter
LM - Linear Meter
PCS - Pieces
SET - Complete Set
GALS - Gallons
LOT - All

19100-BOQ: Architectural SAHARA PETROCHEMICALS 5/5


JAS 02/02/2020

S-ar putea să vă placă și