PROJECT A Proposed 3-Storey Parking Building

OWNER Bambi G. Tan


LOCATION Subangdaku, Mandaue City
SUBJECT

ITEM SCOPE OF WORK QTY UNIT

1.0 PRE-CONSTRUCTION WORKS


2.0 GENERAL REQUIREMENTS
3.0 MOBILIZATION
4.0 EARTHWORKS
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Building layout / Stakes & batter boards 0.00 lot
Filling Materials ( Anapog ) 189.57 m³
Excavation 234.30 m³
Backfilling & Compaction 189.57 m³
Barrow Fill & Compaction 0.00 m³
Gravel Bedding& Compaction 0.00 m³
Stripping 0.00 m³
Demolition 0.00 m³
Dewatering 0.00 m³
Site Grading 0.00 m³
Soil poisoning (all subsoil level) Termite X or Lentrex Brand 0.00 m²
P.E. sheet ( Footing only ) 0.00 m²
Soil Protection (soil nailing or sheet pile) 0.00 lot
Waterstop (Swellable Waterstop-Bostik) 0.00 m³

OTHER ITEMS:

Sub-Total

5.0 CONCRETE WORKS (2,500, 3,000 & 6,000 psi) Readymix Supplier JLR
Note: all concrete works shall be supplied and installed by Contractor including consumables

Foundation 3,000.00 psi


Footing Column 35.01 m³
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Footing Column 35.01 m³
Portland cement 315.00 bags
G1 Gravel 18.00 m³
Crush Sand 26.00 m³
Water 7,875.00 L
Columns 3,000.00 psi
Foundation to 4th floor 18.38 m³
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Foundation 18.38 m³
Portland cement 165.00 bags
G1 Gravel 9.00 m³
Crush Sand 13.00 m³
Water 4,125.00 L
Slab on Grade 2,500.00 psi
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Site Development and driveway 13.75 m³
Portland cement 110.00 bags
G1 Gravel 8.00 m³
Crush Sand 15.00 m³
Water 2,750.00 L
Equipment Charge m³
Chairs, spacers & others lot
OTHER ITEMS:
Sub-Total

6.0 REBAR WORKS ( G33-G40-60)


Note: all rebar works shall be supplied and installed by Contractor including consumables
Foundation
Footing column
Grade 40 1,449.52 kgs.
Grade 60 0.00 kgs.
Tie wire 21.74 kgs.
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Footing
Grade 40 1,449.52 kgs.
16mm dia x 7.5m 16.00 pcs.
16mm dia x 10.5m 76.00 pcs.
TOTAL 1,449.52 kgs.
Columns
Foundation to 4th floor
Grade 40 6,076.42 kgs.
Grade 60 0.00 kgs.
Tie wire 91.15 kgs.
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
1st Floor
Grade 40 6,076.42 kgs.
10mm dia x 7.5m 457.00 pcs.
TOTAL 2,111.34 kgs.
25mm dia x 10.5m 98.00 pcs.
TOTAL 3,965.08 kgs.
G.I. tie wire #16 112.96 kgs.
Equipment Charge kgs.
Chairs, spacers & others lot
OTHER ITEMS:

Sub-Total

7.0 FORMWORKS / SCAFFOLDINGS


Note: all formworks/scaffoldings shall be supplied and installed by Contractor including consumables
Use: Steel and Phenolic forms
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Column footing (except fence) 68.48 m²
Phenolic Board 24.00 pcs
Formoil 3.00 gals
Concrete Nails 2" 0.00 kgs
Concrete Nails 3" 0.00 kgs
Concrete Nails 4" 0.00 kgs
Common Nails 2" 1.00 kgs
Common Nails 3" 0.00 kgs
Common Nails 4" 0.00 kgs
Soil Poisoning 3.00 gals
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Columns m²
Ground floor 126.00 m²
Phenolic Board 44.00 pcs
Formoil 5.00 gals
Concrete Nails 2" 0.00 kgs
Concrete Nails 3" 0.00 kgs
Concrete Nails 4" 0.00 kgs
Common Nails 2" 2.00 kgs
Common Nails 3" 1.00 kgs
Common Nails 4" 1.00 kgs
Sub-Total

11.0 PAINTING WORKS (see plans for details)


ALL EXTERIOR WALLS use WALL GUARD w/ Plexi bond (see plans for details)
SURFACE PREP. Perimeter Wall for water proofing use
TOPCOAT Perimeter Wall for paint Wall Guard
FRONT Elevation 22.68 m²
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Ground Floor 22.68
Boysen Permacoat Flat Latex (1 coat) 1.00 gal
Boysen Wallguard (2coat) 1.00 gal
Liha #36 1.00 sheets
Liha #80 1.00 sheets
Liha #100 1.00 sheets
7" Roller with handle 1.00 pcs
4" Roller with handle 1.00 pcs
4" Brush 1.00 pcs
2 1/2" Brush 1.00 pcs
1" Brush 1.00 pcs
1" Masking Tape 1.00 pcs
16.0 STEEL WORKS (see plans for details)
Misc. Accessories (Steel works)
Oxygen and Acetylene sets
Welding rod 1/8 ( Fuji weld ) 20kg. 6011 box
Red oxide Primer (Boysen) gals.
Paint Thinner (Mayon) gals.
QDE (Boysen) gals.
Other consumables lot
Equipment charge lot
OTHER ITEMS:
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
COLUMN (GZ1 HM 244x175x7x11) 6,094.83 kg

2ND FLOOR STEEL FRAMING


GL1 HN 346x17x6x9 2,202.33 kg
GL2 HN 248x124x5x8 4,895.52 kg
GL3 HN 298x149x5.5x8 4,896.45 kg
GL4 HN 350x175x7x11 1,024.02 kg
13,018.32
3RD FLOOR STEEL FRAMING
GL1 HN 346x17x6x9 4,748.55 kg
GL2 HN 248x124x5x8 4,910.14 kg
GL3 HN 298x149x5.5x8 5,904.17 kg
GL4 HN 350x175x7x11 1,024.02 kg

Waveboard
First Floor Top Structure 427.28 sqm. 10824 kg
2nd Floor Top Structure 482.13 sqm. 8496.81 kg
Ramp 1 62.05 sqm. 1310.61 kg
Ramp 2 31.39 sqm. 668.01 kg

Railings
Right Elevation 234.24 kg
Left Elevation 188.75 kg
Front Elevation 1,275.93 kg
Rear Elevation 182.29 kg
Stairs 2,464.88 kg

Sub-Total

18.0 ELECTRICAL WORKS (see plans for details)


Note: All panel boards (brand: Allied), breaker (brand: Fuji or G.E.), Mini Breaker (brand: Chint),Boxes GI, Pipes use Neltex brand,
Wires Phelps Dodge brand shall be Supplied & Installed by Contractor

A1 POWER LAY-OUT PANELS and BREAKERS Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Note: All panel boards (brand: Allied), breaker (brand: Fuji or G.E.), Mini Breaker (brand: Chint) shall be Sup Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.

LP GF 1 Assy
Main: 60AT/100AF,3P,18 KAIC,MCCB with NEUTRAL BUS
(with NEMA 1 Enclosure)
Branch : 3x 15AT/32AF,1P,10KAIC MCB
2 x 20AT/32AF,1P,10KAIC MCB
1 x 30AT/32AF,1P,10KAIC MCB
2-SPARE

A2. POWER LAYOUT PIPES AND BOXES


Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Summary
Conduits
25"Ø IMC Pipes 6.00 Lengths
1/2"Ø PVC Pipes, Thick wall (Neltex) 90.00 Lengths

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Ground Floor
25"Ø IMC Pipes 6.00 Lengths
1/2"Ø PVC Pipes, Thick wall (Neltex) 37.00 Lengths

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
2nd Floor Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
25"Ø IMC Pipes Lengths
1/2"Ø PVC Pipes, Thick wall (Neltex) 39.00 Lengths

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
3rd Floor Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
25"Ø IMC Pipes Lengths
1/2"Ø PVC Pipes, Thick wall (Neltex) 14.00 Lengths
Lot

A3 POWER LAYOUT WIRES AND CABLE Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.

Summary
14mm² THHN Wire ( Phelps Dodge ) 72.00 Mtrs
5.5mm² THHN Wire ( Phelps Dodge ) 262.00 Mtrs
3.5mm² THHN Wire ( Phelps Dodge ) 316.00 Mtrs
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
14mm² THHN Wire ( Phelps Dodge ) 72.00 Mtrs
5.5mm² THHN Wire ( Phelps Dodge ) 86.00 Mtrs
3.5mm² THHN Wire ( Phelps Dodge ) 154.00 Mtrs
2.0mm² THHN Wire ( Phelps Dodge ) 120.00 Mtrs
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
2nd Floor
14mm² THHN Wire ( Phelps Dodge ) Mtrs
5.5mm² THHN Wire ( Phelps Dodge ) 92.00 Mtrs
3.5mm² THHN Wire ( Phelps Dodge ) 162.00 Mtrs
2.0mm² THHN Wire ( Phelps Dodge ) 127.00 Mtrs

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
3rd Floor
14mm² THHN Wire ( Phelps Dodge ) Mtrs
5.5mm² THHN Wire ( Phelps Dodge ) 84.00 Mtrs
3.5mm² THHN Wire ( Phelps Dodge ) Mtrs
2.0mm² THHN Wire ( Phelps Dodge ) 42.00 Mtrs

A4. POWER LAY-OUT (Fixtures)


Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Summary
Note: All power fixtures shall be Supplied by Owner Installed by Contractor
Emergency light 1 gang outlet 4.00 Sets
2 gang outlet 3 prong WS universal 7.00 Sets

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Ground Floor
Note: All power fixtures shall be Supplied by Owner Installed by Contractor
Emergency light 1 gang outlet 2.00 Sets
2 gang outlet 3 prong WS universal 2.00 Sets

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
2nd Floor
Note: All power fixtures shall be Supplied by Owner Installed by Contractor
Emergency light 1 gang outlet 2.00 Sets
2 gang outlet 3 prong WS universal 2.00 Sets

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
3rd Floor
Note: All power fixtures shall be Supplied by Owner Installed by Contractor
2 gang outlet 3 prong WS universal 3.00 Sets
B.) LIGHTING LAY-OUT (Boxes, Wires, Pipes)
Note: All boxes, wires, pipes shall be Supplied & Installed by Contractor
Boxes GI, Pipes use Neltex brand, Wires 60.0mm² up use Phelps Dodge brand while 50.0mm² down use Duraflex

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Summary
B1. LIGHTING LAY-OUT PIPES AND BOXES
1/2"Ø PVC Pipes, Thick wall type (Neltex) 86.00 Lengths

Ground Floor
B1. LIGHTING LAY-OUT PIPES AND BOXES
1/2"Ø PVC Pipes, Thick wall type (Neltex) 33.00 Lengths

2nd Floor
B1. LIGHTING LAY-OUT PIPES AND BOXES
1/2"Ø PVC Pipes, Thick wall type (Neltex) 35.00 Lengths

3rd Floor
B1. LIGHTING LAY-OUT PIPES AND BOXES
1/2"Ø PVC Pipes, Thick wall type (Neltex) 18.00 Lengths

B2. LIGHTING LAY-OUT WIRE AND CABLES


Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Summary
2.0mm² THHN Wire ( Phelps Dodge ) 259.00 Mtrs
3.5mm² THHN Wire ( Phelps Dodge ) 518.00 Mtrs

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Ground Floor
2.0mm² THHN Wire ( Phelps Dodge ) 100.00 Mtrs
3.5mm² THHN Wire ( Phelps Dodge ) 200.00 Mtrs

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
2nd Floor
2.0mm² THHN Wire ( Phelps Dodge ) 105.00 Mtrs
3.5mm² THHN Wire ( Phelps Dodge ) 210.00 Mtrs

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
3rd Floor
2.0mm² THHN Wire ( Phelps Dodge ) 54.00 Mtrs
3.5mm² THHN Wire ( Phelps Dodge ) 108.00 Mtrs

B3. LIGHTING LAY-OUT (Fixtures)


Note: All lightings, outlets, tel., duct fun and electrical fixtures shall be Supplied by Owner Installed by Contr Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.

Summary
Circular LED daylight surfaced type 12 watts to 9 watts 2 Sets
T-LED 1 x 14 boxtype daylight 24 sets
3 gang switch ws 2 Sets
Floodlight Metal Halide fixtures 1x250Watts 4 Sets
w/ Magnetic Blast

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
Ground Floor
Circular LED daylight surfaced type 12 watts to 9 watts 1.00 Sets
T-LED 1 x 14 boxtype daylight 12.00 sets
3 gang switch ws 1.00 Sets

Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
2nd Floor
Circular LED daylight surfaced type 12 watts to 9 watts 1.00 Sets
T-LED 1 x 14 boxtype daylight 12.00 sets
3 gang switch ws 1.00 Sets
Approved Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed Ordered Installed
Quantity Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal. Ord. Bal. Inst. Bal.
3rd Floor
Floodlight Metal Halide fixtures 1x250Watts 4.00 Sets
w/ Magnetic Blast
OTHER ITEMS:
USE METER UNIT
CONCRETE WORKS psi
Foundation 3000 4000 5000 6000
Stairs 3000 4000 5000 6000
beam 3000 4000 5000 6000
elev 3000 4000 5000 6000
column 3000 4000 5000 6000
sog 2500 3000 4000
slab 3000 4000 5000 6000
wall footing 2500 3000 4000

Ground Height Qty m3 5th


interior 0.25x0.15 3 4 0.45 interior 0.25x0.15
exterior 0.25x0.20 3 4 0.6 exterior 0.25x0.20
1.05
2nd Height Qty m3 6th
interior 0.25x0.15 3 0 0 interior 0.25x0.15
exterior 0.25x0.20 2 0 0 exterior 0.25x0.20
0
3rd Height Qty m3 7th
interior 0.25x0.15 2 0 0 interior 0.25x0.15
exterior 0.25x0.20 3 0 0 exterior 0.25x0.20
0
4th Height Qty m3 8th
interior 0.25x0.15 3 0 0 interior 0.25x0.15
exterior 0.25x0.20 2 0 0 exterior 0.25x0.20
0

Ground Lm m3 5th Lm
interior 0.25x0.15 555 20.8125 interior 0.25x0.15 3
exterior 0.25x0.20 555 27.75 exterior 0.25x0.20 3
48.5625
2nd Lm m3 6th Lm
interior 0.25x0.15 555 20.8125 interior 0.25x0.15 3
exterior 0.25x0.20 555 27.75 exterior 0.25x0.20 2
48.5625
3rd Lm m3 7th Lm
interior 0.25x0.15 2 0.075 interior 0.25x0.15 555
exterior 0.25x0.20 3 0.15 exterior 0.25x0.20 555
0.225
4th Lm m3 8th Lm
interior 0.25x0.15 3 0.1125 interior 0.25x0.15 3
exterior 0.25x0.20 2 0.1 exterior 0.25x0.20 2
0.2125
STIFFENER COLUMN
Height Qty m3 9th Height Qty m3
3 0 0 interior 0.25x0.15 3 3 0.3375
3 0 0 exterior 0.25x0.20 3 3 0.45
0 0.7875
Height Qty m3 10th Height Qty m3
3 0 0 interior 0.25x0.15 3 3 0.3375
2 0 0 exterior 0.25x0.20 2 3 0.3
0 0.6375
Height Qty m3 11th Height Qty m3
2 0 0 interior 0.25x0.15 2 3 0.225
3 0 0 exterior 0.25x0.20 3 3 0.45
0 0.675
Height Qty m3 12th Height Qty m3
3 3 0.3375 interior 0.25x0.15 3 3 0.3375
2 3 0.3 exterior 0.25x0.20 2 3 0.3
0.6375 0.6375
STIFFENER BEAM
m3 9th Lm m3 13th
0.1125 interior 0.25x0.15 3 0.1125 interior
0.15 exterior 0.25x0.20 3 0.15 exterior
0.2625 0.2625
m3 10th Lm m3 14th
0.1125 interior 0.25x0.15 3 0.1125 interior
0.1 exterior 0.25x0.20 2 0.1 exterior
0.2125 0.2125
m3 11th Lm m3 15th
20.8125 interior 0.25x0.15 555 20.8125 interior
27.75 exterior 0.25x0.20 3 0.15 exterior
48.5625 20.9625
m3 12th Lm m3 16th
0.1125 interior 0.25x0.15 555 20.8125 interior
0.1 exterior 0.25x0.20 2 0.1 exterior
0.2125 20.9125
13th Height Qty m3 17th
interior 0.25x0.15 3 3 0.3375 interior
exterior 0.25x0.20 3 3 0.45 exterior
0.7875
14th Height Qty m3 18th
interior 0.25x0.15 3 3 0.3375 interior
exterior 0.25x0.20 2 3 0.3 exterior
0.6375
15th Height Qty m3
interior 0.25x0.15 2 3 0.225
exterior 0.25x0.20 3 3 0.45
0.675
16th Height Qty m3
interior 0.25x0.15 3 1000 112.5
exterior 0.25x0.20 2 1000 100
212.5

Lm m3 17th Lm m3
0.25x0.15 555 20.8125 interior 0.25x0.15 3 0.1125
0.25x0.20 3 0.15 exterior 0.25x0.20 3 0.15
20.9625 0.2625
Lm m3 18th Lm m3
0.25x0.15 3 0.1125 interior 0.25x0.15 3 0.1125
0.25x0.20 2 0.1 exterior 0.25x0.20 2 0.1
0.2125 0.2125
Lm m3
0.25x0.15 2 0.075
0.25x0.20 3 0.15
0.225
Lm m3
0.25x0.15 555 20.8125
0.25x0.20 2 0.1
20.9125
Height Qty m3
0.25x0.15 3 3 0.3375
0.25x0.20 3 3 0.45
0.7875
Height Qty m3
0.25x0.15 3 3 0.3375
0.25x0.20 2 3 0.3
0.6375
PROJECT
OWNER
LOCATION
SUBJECT

ITEM SCOPE OF WORK QTY UNIT

1.0 PRE-CONSTRUCTION WORKS


2.0 GENERAL REQUIREMENTS
3.0 EARTHWORKS
4.0 CONCRETE WORKS (2,500, 3,000 & 6,000 psi) Readymix Supplier JLR
5.0 REBAR WORKS ( G33-G40-60)
6.0 FORMWORKS / SCAFFOLDINGS
7.0 STEEL DECKING
Note: all steel decking shall be supplied and installed by Contractor including consumables
use : Deck 5 ( 1mm thk. @ 80,000 psi ) by DN Steel
Ground to 2nd floor ramp m²
Mezzanine floor m²
2nd floor m²
2nd to 3rd floor ramp m²
3rd floor m²
3rd to 4th floor ramp m²
4th floor m²
4th to 5th floor ramp m²
5th floor m²
6th to 8th floor m²
9th floor m²
10th to 13th floor m²
14th to 16th floor m²
17th floor m²
Roof deck m²
Machine room m²
OTHER ITEMS:

Sub-Total

8.0 MASONRY WORKS (see plans for details)


9.0 ARCHITECTURAL WORKS (see plans for details)
10.0 PAINTING WORKS (see plans for details)
ALL EXTERIOR WALLS use WALL GUARD w/ Plexi bond (see plans for details)
SURFACE PREP. Perimeter Wall for water proofing use
Exterior Wall Water Proofing Wall Plexibond Textured
FRONT Elevation m²
REAR Elevation m²
RIGHT Elevation m²
LEFT Elevation m²
TOPCOAT Perimeter Wall for paint Wall Guard
FRONT Elevation m²
REAR Elevation m²
RIGHT Elevation m²
LEFT Elevation m²

INTERIOR PAINTING (see plans for details) use: Boysen Brand Acrytex suface prep.
Ground Floor
Wall Latex m²
Ceiling Latex m²
Ceiling Delivery Area Q.D.E. m²
Shadow moulding Lm
Mezzanine Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
2nd Floor
Floor Expoxy Paint m²
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
3rd Floor
Floor Expoxy Paint m²
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
4th Floor
Floor Expoxy Paint m²
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
5th Floor
Floor Expoxy Paint m²
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
6th to 7th Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
8th Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
9th Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
10th Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
11th-12th Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
13th Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
14th-16th Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
17th Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
Roof Deck Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm
Roof Wall Floor
Wall Latex m²
Ceiling Latex m²
Shadow moulding Lm

Painting DOORS (Flush, Cabinet pipe chase, Folding, m²


panic, others)
Louver door (powder Coated) DL8A & DL8B m²
Wooden door (Automotive Paint) DL8A to DW33 m²
Steel door (Automotive Paint) DS37 to DS43 m²
Steel Matting Door (QDE Paint) DS 44 m²
Steel Matting Wall (QDE Paint) IS IT INCLUDED m²
OTHER ITEMS:

Sub-Total

11.0 CARPENTRY WORKS (see plans for details)


Note: all ceiliing works shall be supplied and installed by Contractor including consumables except laminated and veneer
Ceiling: Fiber cement board use Hardiflex 4.5mm thk. and Gypsum use Brand Boral 12mm. thk.
Metal framing must space @ 400x400 B.W. O.C. Jea Maxx By Jea Steel
Ground Floor
Aluminium Cladding m²
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using Laminated or Veneer Ceiling m²
Shadow moulding (see plan for detail) Lm.
Cove lighting, decorative ceiling accent like wave and Lm.
drop ceiling
Mezzanine Floor
Using 12mm thk. Gypsum board (Boral)
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
2nd Floor
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
3rd Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
4th Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
5th Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
6th-7th Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using Laminated or Veneer Ceiling m²
Using 9mm thk. Accoustic board 2'x4' (Boral Shade) m²
in T-Runner Frame
Shadow moulding (see plan for detail) Lm.
8th Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 9mm thk. Accoustic board 2'x4' (Boral Shade)
in T-Runner Frame
Shadow moulding (see plan for detail) Lm.
9th Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
10th Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
11th-12th Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
13th Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
14th-17th Floor
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using 12mm thk. Gypsum board (Boral) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Shadow moulding (see plan for detail) Lm.
Roof Deck
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
Using Wood m²
Shadow moulding (see plan for detail) Lm.
Machine Room
Using 4.5mm thk. Fiber Cement board (Hardiflex) m²
w/ metal furring spaced @ 400x400 mm O.C. B.W.
C.r. Laminated Partition
Gf Common C.r. m²
6th Common C.r. m²
7th Common C.r. m²
OTHER ITEMS:

Sub-Total

12.0 DOORS and WINDOWS (see plans for details)


13.0 HARDWARES AND ACCESSORIES
14.0 WATERPROOFING (see plans for details)
15.0 STEEL WORKS (see plans for details)
Note: All steel must be in thru size and at its high quality PAINTED
STEEL TRUSSES (Supplied & installed by Contractor)
9th floor and Machine room Level
2 1/2 x 2 1/2 x 1/4 Angle Bars kgs.
1 1/2 x 1 1/2 x 1/4 Angle Bars kgs.
2 x 2 x 1/4 Angle Bars kgs.
10mm x 6m Sag rod kgs.
100 x 50 x 25 x 2.mm C- purlins lengths
250 x 350 x 12mm thk Base Plate pcs.
16mm x 300mm Anchor bolts pcs.
38x38x6mm angular cleats pcs.
Sika Leveling Grout pcs.
SEPARATOR BEAM (Supplied & installed by Contractor)
W8x28 kgs.
350mm x 350mm x 16mm base plate pcs
Hilti HY150 pcs
Chemical Tube tube
CANOPY 1 (Supplied & installed by Contractor) Cladding and glass excluded
C4x4 C-Channel kgs.
2 1/2 x 2 1/2 x 1/4 Angle bar kgs.
100 x 50 x 25 x 2.mm C- purlins lengths
10mm x 6m Sag rod kgs.
Cladding m²
CANOPY 2 (Supplied & installed by Contractor) Cladding and glass excluded
C4x4 C-Channel kgs.
2 1/2 x 2 1/2 x 1/4 Angle bar kgs.
100 x 50 x 25 x 2.mm C- purlins lengths
10mm x 6m Sag rod kgs.
Cladding m²
CANOPY 3 (Supplied & installed by Contractor) Cladding and glass excluded
C4x4 C-Channel kgs.
2 1/2 x 2 1/2 x 1/4 Angle bar kgs.
100 x 50 x 25 x 2.mm C- purlins lengths
10mm x 6m Sag rod kgs.
Cladding m²
CANOPY 4 (Supplied & installed by Contractor) Cladding and glass excluded
C4x4 C-Channel kgs.
2 1/2 x 2 1/2 x 1/4 Angle bar kgs.
100 x 50 x 25 x 2.mm C- purlins lengths
10mm x 6m Sag rod kgs.
Cladding m²
CANOPY 5 (Supplied & installed by Contractor) Cladding and glass excluded
C4x4 C-Channel kgs.
2 1/2 x 2 1/2 x 1/4 Angle bar kgs.
100 x 50 x 25 x 2.mm C- purlins lengths
10mm x 6m Sag rod kgs.
VERTICAL ACCENT 1(Supplied & installed by Contractor) Cladding excluded
1 1/2 x 1 1/2 x 1/4 Angle bar kgs.
2 1/2 x 2 1/2 x 1/4 Angle bar kgs.
C6 x13 C-Channel pcs
400 x 650 x 12mm A36 shear plate pcs
150 x 400 x 16mm A36 shear plate pcs
20mm x 300mm A325 anchor bolts pcs
Cladding m²
VERTICAL ACCENT 2(Supplied & installed by Contractor) Cladding excluded
4 x 4 x 1/4 Angle bar kgs.
3 x 3 x 1/4 Angle bar kgs.
C 8x13 C-Channel pcs
420 x 250 x 16mm A36 shear plate pcs
500 x 250 x 16mm A36 shear plate pcs
16mm x 300mm A325 anchor bolts pcs
Cladding m²
LOUVER 3(Supplied & installed by Contractor) Cladding excluded
16mm x 200mm A325 anchor bolt pcs
Tubular 2 x 4 x 3mm thk. length
75 x 6mm flat bar length
AIRCON COVER LOUVER (Supplied & installed by Owner)
16mm x 200mm A325 anchor bolt pcs
Tubular 2 x 6 x 3mm thk. (powder coated finish) length
Tubular 2 x 4 x 3mm thk. (powder coated finish) length
Tubular 2 x 2 x 3mm thk. (powder coated finish) length
75 x 6mm flat bar length
TRANSFORMER LOUVER (Supplied & installed by Owner)
12mm x 200mm A325 anchor bolt pcs
Tubular 2 x 4 (powder coated finish) length
Tubular 2 x 6 (powder coated finish) length
150 x 100X10mm shear plate length
GENSET LOUVER (Supplied & installed by Owner)
12mm x 200mm A325 anchor bolt pcs
Tubular 2 x 4 (powder coated finish) length
Tubular 2 x 6 (powder coated finish) length
150 x 100X10mm shear plate length
PARKING LOUVER (Supplied & installed by Owner)
12mm x 200mm A325 anchor bolt pcs
Tubular 2 x 4 (powder coated finish) length
Tubular 2 x 6 (powder coated finish) length
150 x 100X10mm shear plate length
ACCU 01 LOUVER (Supplied & installed by Owner)
12mm x 200mm A325 anchor bolt pcs
Tubular 2 x 4 (powder coated finish) length
Tubular 2 x 6 (powder coated finish) length
150 x 100X10mm shear plate length
Trans former Pad (Supplied & installed by Contractor)
8x8x3mm tubular length
Cable Ladder lm
Genset Catwalk and Monkey Ladder (Supplied & installed by Contractor)
100x100x10mm thk shear plate length
16m dia. Deformed bars length
12mm dia. X 100mm dyna bolt pcs
1 1/2 x 1 1/2x 1/4 angle bars length
2x 1/4 flat bar length
1/2 x 2 expansion bolt pcs
16mm dia plain round bar length
ACCU 02 LOUVER (Supplied & installed by Owner)
12mm x 200mm A325 anchor bolt pcs
Tubular 2 x 4 (powder coated finish) length
Tubular 2 x 6 (powder coated finish) length
150 x 100X10mm shear plate length
ROOF DECK FRAMING(Supplied & installed by Contractor) Cladding excluded
W21x83 kgs.
W21x147 kgs.
W21x111 kgs.
W16x57 kgs.
W16x40 kgs.
300 x 500 x 16mm A36 shear plate pcs
500 x 800 x 20mm A36 shear plate pcs
350 x 600 x 20mm A36 shear plate pcs
550 x1000 x 20mm A36 shear plate pcs
16mm x 300mm A325 anchor bolts pcs
25mm x 650mm A325 anchor bolts pcs
20mm x 400mm A325 anchor bolts pcs
16 mm stiffiner plate sht
20mm stiffener plate sht
Stainless grab bar Cr and rooms were applicable (Contractor Supplied and Installed)
1" 1/2 stainless . diameter Pipe Lm.

B. STEEL RAILING with appropriate paint application see plan for detail (Contractor Supplied and Installed)
Stair Railing (Fire exit stair 1) GF to Roofdeck w/ paint (Contractor Supplied and Installed)
1" 1/2 B.I. diameter Pipe Lm.
Using 1" diameter B.I. Pipe Lm.
75mm x 4mm THK steel plate pcs.
12mm expansion bolt pcs.
Stair Railing (Fire exit stair 2) GF to Roofdeck w/ paint (Contractor Supplied and Installed)
1" 1/2 B.I. diameter Pipe Lm.
Using 1" diameter B.I. Pipe Lm.
75mm x 4mm THK steel plate pcs.
12mm expansion bolt pcs.
STEEL WORKS (see plans for details) Supplied & installed by Contractor
Note: All steel must be in thru size and at its high quality

B. STEEL RAILING with appropriate paint application see plan for detail (Contractor Supplied and Installed)
Stair Railing (Fire exit stair 1) GF to Roofdeck w/ paint (Contractor Supplied and Installed)
Using 1 ½” diameter B.I. Pipe Lm.
Using 1” diameter B.I. Pipe Lm.
Stair Railing (Fire exit stair 2) NGL to Roofdeck w/ paint (Contractor Supplied and Installed)
Using 1 ½” diameter B.I. Pipe Lm.
Using 1” diameter B.I. Pipe Lm.
Misc. Accessories (Steel works)
Oxygen and Acetylene sets
Welding rod 1/8 ( Fuji weld ) 20kg. 6011 box
Red oxide Primer (Boysen) gals.
Paint Thinner (Mayon) gals.
QDE (Boysen) gals.
Other consumables lot
Equipment charge lot
OTHER ITEMS:

Sub-Total

17.0 ROOFING AND GUTTER WORKS (see plans for details)


Polyvinyl 2mmthk. Corrugated Longspan m²
10mmthk Insulation Double m²
Capping pcs.
Angle Flashing pcs.
Stainless Gutter pcs.
Roof drain strainer (brass) pcs.
Roof strainer pcs.
Consumables and Hangers Lot
OTHER ITEMS:

Sub-Total

18.0 ELECTRICAL WORKS (see plans for details)


19.0 PLUMBING WORKS see plans for details (Note: Aircon drain shall be by Aircon installer)
20.0 MECHANICAL WORKS see plans for details and above Bill of Material (entirely by Owner)
A.) AIRCONDITIONING SYSTEM lot
B.) FIRE SPRINKLER SYSTEM lot
C.) ELEVATOR (Passenger and Service) lot
D.) EXHAUST AND FRESH AIR SYSTEM lot
E.) LIGHTNING SUSTEM lot
F.) STP lot
G.) LANDSCAPING lot
H.) WATER HEATER lot
OTHER ITEMS:

21.0 OTHERS

Sub-Total
ITEM SCOPE OF WORK QTY UNIT

II. SUMMARY
1.0 PRE-CONSTRUCTION WORKS 1.00 lot
2.0 GENERAL REQUIREMENT 1.00 lot
3.0 EARTHWORKS 1.00 lot
4.0 CONCRETE WORKS (2,500, 3,000 & 6,000 psi) 1.00 lot
Readymix Supplier JLR 1.00 lot
5.0 REBAR WORKS ( G33-G40-60) 1.00 lot
6.0 FORMWORKS / SCAFFOLDINGS 1.00 lot
7.0 STEEL DECKING 1.00 lot
8.0 MASONRY WORKS 1.00 lot
9.0 ARCHITECTURAL WORKS
10.0 PAINTING WORKS
11.0 CARPENTRY WORKS
12.0 DOORS & WINDOWS
13.0 HARDWARES AND ACCESSORIES
14.0 WATERPROOFING 1.00 lot
15.0 STEEL WORKS 1.00 lot
17.0 ROOFING and GUTTER WORKS 1.00 lot
18.0 ELECTRICAL WORKS 1.00 lot
19.0 PLUMBING WORKS 1.00 lot
TOTAL INVESTMENT COST

NOTE:
The bidders may add or omit items listed above as long as the format is followed.

Very truly yours,

Company of Bidder :______________________ Designation & Signature :_________________

Name of Bidder :______________________ Date :_________________

Address and Telephone :______________________ Duration (Working Days) :_________________


TOTAL
TOTAL
MATERIAL and TOTAL LABOR, TOOLS
MATERIAL &
CONSUMABLE and EQUIP. COST
LABOR COST
S COST
ed and veneer
PLEASE SEE DETAILS (SPEC DON’T MATCH)
TOTAL
TOTAL
MATERIAL and TOTAL LABOR , TOOL
MATERIAL &
CONSUMABLE and EQUIP. COST
LABOR COST
COST

Php.

tion & Signature :______________________

:______________________

n (Working Days) :______________________


notes : summary of elevator cubic ok

stair psi options ok

checking of concrete formula convesion

lacking column other forms & summary

17th floor beam ok

sog OK

lacking psi formula 4000 6000

no editable at septic to grease ok

consumables / mobilization every item

PLASTERING UPDATE