PO # 42520 IL # 107000155457 (Completed on 5 July 2019)
1. Introduction of Attendees and Objectives
2. Confirmation of Purchaser Order requirements including applicable Specification, LOA requirements and Code. 3. Communication channel for QC matter and Inspection notice, (MFR, AOC,TPI, & Contractor) 4. Confirmation of Requisition requirement, review of approved NMR, drawings, datasheet etc. 5. Confirmation of Vendor QC documents I. Inspection and Test Plan (ITP), review & final approval, mark-up for H & W point. II. Special Process Procedure (WPS/PQR, PWHT, PMI etc. If applicable) III. Painting/Coating Procedure IV. Packing / Shipping Procedure 6. Review of Vendor’s QA/QC system and Organization 7. Inspection & fabrication requirements I. Material Certification II. Special requirement (Service, Operation Condition etc.) for Material III. Confirmation of Deviation / Waiver related to QC Matter 8. Fabrication schedule 9. Non-Conformance Report (NCR) 10. Inspection Disposition Report (IDR) requirements 11. Notification of Inspection Schedule I. Overall inspection Schedule II. Two Weeks Look Ahead Inspection Schedule 12. Inspection Notification 13. Inspection Release Certificate (IRC) 14. Submission of MDR (Manufacturer Data Record) 15. Others I. Lessons and Learned II. Areas of Concern III. PIM Minute, Attachments, Action Items List 16. Shop Tour (Review of fabrication facilities)