DANGOTE REFINERY
LEKKI, LAGOS, NIGERIA
BY
ENGR. BABAJIDE. A. SOYODE
WEDNESDAY 6TH JUNE, 2018
PANORAMIC VIEW OF THE REFINERY SITE (AERIAL SHOT)
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general 2
populace and high returns to shareholders
PRESENTATION HIGHLIGHTS
1. OBJECTIVE
2. REFINERY LOCATION
3. DESIGN
4. PROCUREMENT
5. CONSTRUCTION
6. LOGISTICS
7 OPERATIONS READINESS
8. NEXT STEPS – COMMENTS AND DISCUSSION
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high
returns to shareholders 3
1. OBJECTIVE OF PRESENTATION
• Factual update on DORC Refinery Project
2. REFINERY LOCATION
• Lekki Free Trade Zone
• Lagos State and Southwest Region
• Crude Import and Products Export Jetty
• RO-RO Jetty
• Site Area
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high
returns to shareholders 4
3. DESIGN
DESIGN CONFIGURATION
Crude Mild
Crude Diesel Blending
Distillation Hydrocracker
Light, Unit & DHDT
Sweet
LPG Splitter
Poly PP
& Prop
Propylene
Recovery
• ENGINEERING PROGRESS
ØOverall Completion ~ 99.5 percent
ØAs – Built Engineering during M & E Works Completion
• FEEDSTOCK
Ø Nigerian Crude Oil Blends
ØNigerian Crude and Foreign Crude Oil Blends
ØNormal Operation on Nigerian Crude Oil Blends
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high
returns to shareholders 6
• PRODUCTS AND SPECIFICATIONS
ØC3/C4 LPG – flexibility in production
• 30/80 – 30/70 NORMAL PRODUCTION
• GASOLINE 91 – 95 OCTANE - EURO V
• AUTOMOTIVE GASOIL, AGO – EURO V
• HOUSEHOLD KEROSENE, HHK
• AVIATION TURBINE KEROSENE, ATK
• POLYPROPYLENE
• SLURRY OIL (CARBON BLACK FEEDSTOCK)
• SOLID SULPHUR
• SULPHURIC ACID
• BUNKER FUEL (FLEXIBLE)
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high
returns to shareholders 7
4. PROCUREMENT
• LONG LEAD ITEMS, > 12 months 100%
Delivery Commences June/July 2018
• EQUIPMENT 6 – 12 months
Delivery already commenced
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high
returns to shareholders 8
• BULK MATERIALS – 95% Ordered
Delivery In full force
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high
returns to shareholders 9
5. CONSTRUCTION
• DANGOTE PROJECT EXECUTION STRATEGY
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high
returns to shareholders 10
• CIVIL CONSTRUCTION
ØPiling and foundation construction progressing round the clock seven
days a week
ØDrainage and sewer construction in progress under engagement of
multiple contractors
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high
returns to shareholders 11
• Underground piping construction in progress by multiple contractors
• Tankage erection has commenced also by multiple contractor.
• Mechanical erection will commence in June/July starting with CDU and RFCC
Blocks
ØMultiple erection contractors will be engaged
Ø22,000 man housing units in Dangote Free Zone are being erected near the
works and are being free-issued to the contractors to provide accommodation for
critical staff of different categories near the job sites.
Ø10,000 units are ready
12 high
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and
returns to shareholders
6. LOGISTICS
• Crude Oil feedstock will be delivered to Refinery by sea only while products will be
distributed via onshore and marine routes.
• Construction of marine facilities has commenced and will be completed within next 12
months.
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high returns
to shareholders 14
8. NEXT STEPS – COMMENTS AND DISCUSSION
Our Mission – Touch the lives of people by providing their basic needs; Our Vision – To be a world class enterprise that is passionate about the quality of the general populace and high returns
to shareholders 15
COMMENTS AND DISCUSSION