, PATNA
Regd. Office- Head Office, Vidyut Bhawan, Bailey Road, Patna – 21
CIN – U40102BR2012SGC018889
Criteria References
Transformer Testing and Internal Inspection:- • NTPC operational memorandum
(i)Low voltage test results dated 25.09.07
(ii)Oil analysis test(DGA) results • IEEEelectrical Insulation magazine
(iii) Internal Inspection by OEM @2002IEEE
• General Practices of BSPTCL
If above test indicates major faults and OEM recommends for
factory inspection/repair, then further criteria may be
investigated.
History (Repaired/Non-repaired):- • Decided in Transformer
If transformer runs successfully without any issues and repair committee meeting dated
age is less than 10 years and similar fault occurs again. 19.02.2020
Criteria References
Transformer Age:- • NTPC operational memorandum
Running transformer of any rating less than 20 years may be dated 25.09.07
recommended for transportation after its healthiness check • IEEEelectrical Insulation magazine
and insulation test. @2002IEEE
Transformer Testing:- • NTPC operational memorandum
(i)Low voltage test results dated 25.09.07
(ii)Oil analysis test(DGA) results • IEEE electrical Insulation magazine
@2002IEEE
Furan Analysis/DP test:- • CIGRE A2, 18 20 jan 2003
if transformer age is more than 20 years.(DP value less than • NTPC operational memorandum
200 or Furfural value more than 1.5PPM indicates ends of dated 25.09.07
insulation life) • IEEE electrical Insulation magazine
@2002IEEE
History (Repaired/Non-repaired):- • Decided in Transformer committee
If transformer has a history of Major fault/Repair/Others then meeting dated 19.02.2020
it may not be recommended for transportation