2.REFERENCES:
o Specification :
o Shop drawings :
o Vendor’s recommendations/Guide lines – Erico/Eritech Caldweld™
Exothermic Welding Manual
o CADWELD Lightning Protection Connections Catalog Ref -Catalog A1E
o CADWELD® Welded Electrical Connections
o CADWELD® Welded Electrical Connections, Quick Reference Product
Guide, Pocket Catalog Ref. E782C-NAEN
3. SEQUENCE OF WORKS:
3.1 Material and Equipment:
1) Copper earth rods
2) Bare copper cable
3) Cable clamp for earth rod and copper cable
4) Copper tape and clips
5) PVC pipe
6) Concrete grounding pit.
7) Cable lugs
8) Air terminal
9) Earth bar with disconnecting link
10) Exothermic Welding Set
11) Earth Tester
12) Field Tester
c) Working at height:
o Ensure every worker wear safety harness when working at more than 2
m height.
o Safety protected handrail on top layer of scaffolding shall be provided.
o Ensure A ladders are in good condition/quality.
4. STANDARD PROCEDURES:
o Down conductor for air terminal (ESE type) shall be connected to
earthing rods to ensure direct connection to earth of any stroke current
before interconnection with the general Grounding System.
o All equipment connected to power supply must be grounded.
o All metal parts, structural steel, cable trays, piping, reinforced concrete
must be grounded.
o All joints shall be according to shop drawing.
o Safety control:
- To secure an exit entrance whenever it has contingencies.
- Keep water out where is necessary.
- To keep workplace and amenities is always clean.
- Barricade and sign post are available around the site work.
- To pay attention to equipment/ tools as below:
+ Drill machine: insulation and earthing terminal
+ Cylinders: Pressure Gauge Set shall be inspected by authorities
+ Cutting machine: insulation and earthing terminal
Amperes/ Ohms
25 through 50 250000
Four electrodes are driven into the ground, in a straight line with equal
spacing between them. Let the spacing be called 'a'.
Test Procedure:
- Confirm the proposed test locations.
- Insert four electrodes into the ground in a straight line a= 2 meters
spacing. Connect instrument to the electrodes as shown above.
- Perform test and record measured resistance in Soil Resistivity Test
Form.
- Shift electrodes to next spacing a= 4 meters and repeat test.
- Repeat tests a= 6 meters, 8 meters and 10 meters electrode spacing.
- Recorded measurements will be analyzed and presented in Soil
Resistivity Test Report.
6. STATUTE OF COMPLETION:
After finishing the installation works of Grounding and Lightning
Protection System, inspection shall be carried out and approved by
relative parties such as: Consultant, Main contractor. We can ask the
Experiment Center for inspection the whole system and then issue the
Certificate Completion.