WHEREAS, the Owner is desirous that the Contractor execute 19CG0165:
Construction / Completion of Bridge at Maliwalu, Bacolor, Pampanga (R.A. 9506-
Bacolor Rehabilitation Act) and has accepted the bid for TWENTY THREE
MILLION TWO HUNDRED SEVENTY FIVE THOUSAND PESOS (₱23,275,000.00) by
the Contractor for the execution and completion of such Works, within the contract
duration of ONE HUNDRED EIGHTY (180) days, and the remedying of any defects
therein. The calculated unit bid prices shown in the attached Bill of Quantities are
tabulated hereunder:

SCOPE OF WORK
Item Description Quantity Unit Unit Cost Total
Number Amount
PART A FACILITIES FOR
THE ENGINEER
PART OFFICE AND
A.1.1 LABORATORY FOR
THE ENGINEER
A1.1(8) Provision of Field 6.00 Mo. 29,400.00 176,400.00
Office for the
Engineer (Rental
Basis)
PART B OTHER GENERAL
REQUIREMENTS
B.5 Project Billboard/ 3.00 Ea. 5,292.00 15,876.00
Signboard
B.7(2) Occupational Safety 1.00 l.s 134,907.35 134,907.35
and Health Program
B.8(1) Traffic Management 6.00 Mo. 13,608.00 81,648.00
B.9 Mobilization/ 1.00 l.s 189,756.00 189,756.00
Demobilization
B.12 Removal and 1.00 l.s 277,200.00 277,200.00
Relocation of Utilities
B.15(1) Detour 1.00 l.s 1,577.375.0 1,577.375.00
0
PART C EARTHWORK
101(1) Removal of Structures 1.00 l.s 278,360.00 278,360.00
and Obstruction
101(3)b6 Removal of Actual 240.70 Sq.m 141.80 34,131.26
Structures/
Obstruction (0.30m.
thick PCCP
Unreinforced)
103(1)a Structure Excavation 128.50 Cu. 227.30 29,208.05
(Common Soil) m
103(5)b Shoring, Cribbing and 1.00 l.s 133,567.00 133.567.00
Related Works
(Cribbing
/Cofferdamming)
104(2)a Embankment from 447.00 Cu. 795.45 355,566.15
borrow (Common m
Soil)
104(7) Embankment from 90.00 Cu. 95.15 8,563.50
structure excavation m
PART D SUBBASE AND
BASE COURSE
200(1) Aggregate Subbase 44.30 Cu. 725.80 32,152.94
Course m
PART E SURFACE
COURSES
311(1)c1 PCC Pavement 125.30 Sq.m 1,450.00 181,685.00
(Unreinforced) 0.23m
thick, 14 days
311(2)f1 PCC Pavement 59.00 Sq.m 5,387.00 317,833.00
(Reinforced) 0.30m
thick, 14 days
400(17)c Concrete Piles cast in 140.00 m. 35,485.42 4,967,958.80
Drilled Holes (1.00m)
400(23)c Permanent Casing 24.00 m. 23,205.00 556,920.00
1 (1.00m, 10mm thick)
400(26)b Pile Integrity Testing 2.00 Ea. 44,100.00 88,200.00
(Low Strain)
400(27) High Strain Dynamic 2.00 Ea. 243,886.00 487,772.00
Testing (P.D.A)
401(2)a Concrete Railing 24.00 m. 5,749.00 137,976.00
(Standard, Double)
PART F BRIDGE
CONSTRUCTION
404(1)a Reinforcing Steel 2381.00 Kg. 75.35 179,408.35
Grade 40
404(1)b Reinforcing Steel 26,962.00 Kg. 76.20 2,056,028.40
Grade 60
405(1)b3 Structural Concrete 150.00 Cu. 10,890.95 1,633,642.50
(27.58 Mpa, Class A) m
411(2) Paint 351.70 Sq.m 103.45 36,383.36
FOR ABUTMENT
CONCRETE SLOPE
PROTECTION
404(1)a Reinforcing Steel 306.90 Kg. 76.20 23,385.78
Grade 40
405(1)b3 Structural Concrete 5.20 Cu. 7,845.00 40,794.00
(20.68 Mpa, Class A) m
509(1)b1 Sheet Piles (U-Type) 504.00 l.m 3,912.00 1,971,774.00
510(2) Concrete Slope 57.40 Cu. 10,472.35 601,112.89
Protection m
PART G DRAINAGE AND
SLOPE
PROTECTION
STRUCTURES
404(1)a Reinforcing Steel 790.20 Kg. 76.20 60,213.24
Grade 40
405(1)a3 Structural Concrete 13.40 Cu. 7,845.00 105,123.00
(20.68 Mpa, Class A) m
509(1)b1 Sheet Piles (U-Type) 1,320.00 l.m 3,791.30 5,003,516.00
510(2) Concrete Slope 143.70 Cu. 10,383.70 1,492,137.69
Protection m
PART H MISCELLANEOUS
STRUCTURE
612(1) Reflectorized 4.30 Sq.m 931.15 4,003.94
Thermoplastic
Pavement Markings
(White)
612(2) Reflectorized 3.20 Sq.m 1,068.75 3,420.00
Thermoplastic
Pavement Markings
(Yellow)
GRAND TOTAL 23,275,000.00

DEAN MARK T. GALANG GINO G. GARCIA RONALD J. MANUEL


Accountant III General Manager (Witness)

REYNALDO H. PARAS JR. JONAS F. BARREDA


Client Administrative Officer V
(Witness)
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:
1. In this Agreement, words and expressions shall have the same meanings as
are respectively assigned to them in the Conditions of Contract
hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed
as part of this Agreement, to wit:
a) General Conditions of Contract;
b) Special Conditions of Contract;
c) Drawings/Plans/Specifications;
d) Plans/Drawings (Volume IV of Bid Documents);
e) Invitation to Bid;
f) Instruction to Bidders;
g) Bid Data Sheet;
h) Bid form, including all the documents/statements contained in the Bidders
bidding envelopes, as annexes;
i) Performance Security
j) Net Financial Contracting Capacity (NFCC)
k) Notice of Award of Contract and the Bidder’s conforme thereto;
l) Other contract documents that may be required by existing laws and/or the
Owner.
3. In consideration of the payment to be made by the OWNER to the
CONTRACTOR herein before mentioned, the CONTRACTOR hereby
covenants with the OWNER to execute and complete the Works
and remedy any defects therein in conformity with provisions of this Contract
in all respects.
4. The OWNER hereby covenants to pay the CONTRACTOR in consideration of
the execution and completion of the Works and the remedying of
defects wherein, the Contract Price or such other sum as may become
payable under the provisions of this Contract at the time and in the
manner prescribed by this Contract.
5. The Contractor shall pay taxes in full and on time and that failure to do so will
entitle the government to suspend payment for any services delivered
by the Contractor.
6. The Contractor shall likewise regularly present within the duration of the
Contract, a tax clearance from the BIR as well as a copy of its income
and business tax returns duly stamped and received by the BIR and duly
validated with Tax payments made thereon.
CONTRIBUTIONS RATING
Leader: Garcia, Gino Compiles and write the Contract Very Satisfactory
Agreement.
Asst. Leader: Manuel, Ronald Write the half of Scope of Work. Very Satisfactory

Aquino, John Lexus Check the grammars of the Satisfactory


Contract.
Barreda, Jonas Finds the plan about the bridge. Very Satisfactory

Cabrera, Paolo Helps and paid all the expenses. Satisfactory

Galang, Dean-Mark Prints all the papers. Satisfactory

Gamboa, Mikee Search how to do the Scope of Satisfactory


Work.
Layson, Jhefferson Carl Write the other half of Scope of Very Satisfactory
Work.
Miranda, Elliniel Search templates and how to do Satisfactory
the Contract writing.
Pineda, Leanmarie Helps and paid all the expenses. Satisfactory

Very Satisfactory 5
Satisfactory 4
Fair 3
Poor 2
Very Poor 1

S-ar putea să vă placă și