Documente Academic
Documente Profesional
Documente Cultură
PROJECT:R1048/3
ARAR ARAR Al Mosjajed Al Mosjajed Prime Electrical
IMPROVEMENTS OF Centaur Trading
(Tender Quote, dtd. 24.08.17) (SATWA PO) (Option-1 Ducab) (Option-2 Brugg) (Quote given by ANCG)
EXPO 2020 ROADS NETWORK
ITEM ITEM DESCRIPTION UNIT Qty RATE AMOUNT Remarks RATE AMOUNT Remarks RATE AMOUNT Remarks RATE AMOUNT Remarks RATE AMOUNT Remarks RATE AMOUNT Remarks
UAE. Dhs. UAE. Dhs. UAE. Dhs. UAE. Dhs. UAE. Dhs. UAE. Dhs.
DEWA approved Main contractor DEWA approved Main contractor DEWA approved Main contractor DEWA approved Main contractor DEWA approved Main contractor Not DEWA approved Main contractor for
0 132 kV CABLE DIVERSION WORKS
for 132kV Works for 132kV Works for 132kV Works for 132kV Works for 132kV Works 132kV Works
0
0 Preliminairies
0
A NOC Co-ordination 1 Included 10,855 10,855 Included Included Included
0
Preparation and submission of Trial pit drawing /
B 1 Included 21,710 21,710 Included Included Included
shop drawing / as built drawing
0
C DEWA Co-ordination & Supervision 1 Included 27,138 27,138 Included Included Included
0
0 Removal of Existing Cable
0
Carefully disconnect and remove existing 2x3 way
A 132 kV power cable + 2x pilot/FO cable including m 578 400 231,200 251 145,078 332 191,775 819 473,382 819 473,382 264 152,563
trough and deliver to RTA stores.
0
0 Power Cables
0
3,143
3,543
Riyadh
1 2 x 3way 132 kV power cables 500 2,617 1,308,271
2 Ducab Supervision charge for cable laying 60 3,675 220,500
3,058
3,458
Unit Rate Total amount Remarks
Total Amount
Installation of Material
400
400
PROJECT:R1048/3
ARAR ARAR Prime Electrical
IMPROVEMENTS OF
(Tender Quote, dtd. 24.08.17) (SATWA PO) (Quote given by ANCG)
EXPO 2020 ROADS NETWORK
ITEM ITEM DESCRIPTION UNIT Qty RATE AMOUNT Remarks RATE AMOUNT Remarks RATE AMOUNT Remarks
UAE. Dhs. UAE. Dhs. UAE. Dhs.
0 132 kV CABLE DIVERSION WORKS
0
0 Preliminairies
0
A NOC Co-ordination 1 - Included 10,855 10,855 185,427 185,427
0
Preparation and submission of Trial pit drawing /
B 1 - Included 21,710 21,710 - Included above
shop drawing / as built drawing
0
C DEWA Co-ordination & Supervision 1 - Included 27,138 27,138 - Included above
0
0 Removal of Existing Cable
0
Carefully disconnect and remove existing 2x3 way
A 132 kV power cable + 2x pilot/FO cable including m 578 400 231,200 251 145,078 1,126 650,828
trough and deliver to RTA stores.
0
0 Power Cables
0
11KV Cable
1 1Cx630mm2 443,000 29.188 33.665 250.00 - 443.00 450.30 450.30 460.04 460.04
Total (m)
11KV Cable
1 1Cx630mm2 434,142 7.793 8.050 250.00 - 434.14 436.09 436.09 450.84 450.84