Sunteți pe pagina 1din 24

Page 1

TANAJIB GAS PLANT


BI-10-09003
Ref Unit Plot plan: T80-A-PP-013001 & 023001
C&S Scope: From drawing no. T70-A-PP-013002 To 013016 and T76-A-PP-013048 To 013050

Piperack Steel MTO


Group Piperack C/S Remarks Need list
numbering kg/m3

EL. +127.000

EL. +122.000

EL. +118.500

1. No of tiers of cable trays ( including access way


EL. +112.500 between cable trays if any)
This group includes 2. Location and dia of pipes larger than 12"
GROUP-1 pipebridge in PR-
002. 3. Access platform requirements
4. Stair case location & Numbers
EL. +106.500

EL. +100.000

6.0 m

EL. +118.500

EL. +112.500
1. No of tiers of cable trays ( including access way
between cable trays if any)
GROUP-2 2. Location and dia of pipes larger than 12"
3. Access platform requirements
EL. +106.500 4. Stair case location & Numbers

6.0 m
EL. +100.000

EL. +123.500

EL. +118.500

EL. +115.500
1. No of tiers of cable trays ( including access way
between cable trays if any)
2. Location and dia of pipes larger than 12"
GROUP-3 EL. +109.500 3. Access platform requirements
4. Stair case location & Numbers
EL. +105.500

6.0 m 6.0 m
EL. +100.000
Page 2

EL. +132.000

EL. +127.000

EL. +123.000

EL. +118.500 1. No of tiers of cable trays ( including access way


between cable trays if any)
GROUP-4 2. Location and dia of pipes larger than 12" 22.5
3. Access platform requirements
EL. +112.500 4. Stair case location & Numbers

EL. +106.500

6.0 m 6.0 m
EL. +100.000

EL. +115.500

EL. +112.500

EL. +108.500 1. No of tiers of cable trays ( including access way


between cable trays if any)
2. Location and dia of pipes larger than 12" PR - 15.6
GROUP-5 PB - 31.4
3. Access platform requirements
4. Stair case location & Numbers

EL. +100.000

7.5 m 7.5 m

1. No of tiers of cable trays ( including access way


between cable trays if any)
GROUP-6 2. Location and dia of pipes larger than 12" 17.24
3. Access platform requirements
4. Stair case location & Numbers

1. No of tiers of cable trays ( including access way


between cable trays if any)
GROUP-7 2. Location and dia of pipes larger than 12" 21.88
3. Access platform requirements
4. Stair case location & Numbers
Page 3

TANAJIB GAS PLANT


BI-10-09003
Ref Unit Plot plan: T80-A-PP-013001 & 023001
C&S Scope: From drawing no. T70-A-PP-013002 To 013016 and T76-A-PP-013048 To 013050

Cross section As per Bent


Piperack Piperack spacing
Dwg. No. Group Piperack spanning measur Remarks Design Need list
numbering numbering direction ed in Grouping
Plot Plan SPR SPR (m)

Assumed these
modules are
GROUP-3 PR-001 E/W rack C/S not available Piperack not modelled 6.0
similar to N/S
rack PR-002

10 nos - 36m &


42 m long
modules.
Plan to design 1
typical module
Pipe racks are 42m long & 6m 1. No of tiers of cable trays ( including access
GROUP-3 PR-002 N/S rack Piperack not modelled 6.0 not available in each bay span way between cable trays if any)
the model 2. Location and dia of pipes larger than 12"
T70-A-PP-013002_Rev A
3. Access platform requirements
4. Stair case location & Numbers

These modules
Piperack yet to are minor spur
- PR-017 N/S rack C/S not available Piperack not modelled 6.0
model in SPR racks. Hence no
design envisaged

shown as single Seems 8 typical


module and we
rack. Plan to 1. C/S of rack is required
GROUP-2 PR-003 E/W rack C/S not available Piperack not modelled 6.0 consider as
expansion joint design One 2. Other need list is same as in PR-001 & 002
module
after 42 m

T70-A-PP-013003_Rev A

Few Module 1. No of tiers of cable trays ( including access


lengths are more way between cable trays if any)
than 42m Plan to design 1 2. Location and dia of pipes larger than 12"
GROUP-6 PR-004 N/S rack Piperack not modelled 6.0
Assumed all are no. of Module 3. Access platform requirements
42 m long 4. Stair case location & Numbers
modules

1. No of tiers of cable trays ( including access


Road way between cable trays if any)
2. Location and dia of pipes larger than 12"
T70-A-PP-013004_Rev A - PR-005 crossing Piperack not modelled 6.0 Not in IO scope 3. Access platform requirements
E/W rack
4. Stair case location & Numbers

EL. +122.000

EL. +118.500

1. No of tiers of cable trays ( including access


EL. +112.500 Plot plan showing Plan to design1 way between cable trays if any)
the piperack No of Module of 2. Location and dia of pipes larger than 12"
T70-A-PP- Road
crossing road. all 3 road 3. Access platform requirements
013004,013005 & GROUP-1 PR-006 crossing C/S not available 6.0
013006_Rev A E/W rack But there is no crossing shown in 4. Stair case location & Numbers 5.
road crossing in plot plan dwg no Need Longitudinal section showing road
EL. +106.500 model 013004 to 6. crossing of piperack

6.0 m
EL. +100.000

EL. +122.000

EL. +118.500

1. No of tiers of cable trays ( including access


EL. +112.500 Plan to design 1
T70-A-PP- C/S of pipe rack module out of 6 way between cable trays if any)
in model not 2. Location and dia of pipes larger than 12"
013004,013005 & GROUP-7 PR-007 E/W rack 6.0 modules shown
013006_Rev A matching with in plot plan dwg 3. Access platform requirements
plot plan section. 4. Stair case location & Numbers
nos 013004 to 6
EL. +106.500

6.0 m
EL. +100.000

Considering the 2nos.- Plan to


racks shown in
T70-A-PP-013006_Rev A - PR-008 E/W rack C/S not available Piperack not modelled 013004 & 06 are design one
typical module
similar

1.0 Plot plan


EL. +132.000 013008 & 09 are
not available.
EL. +127.000 However model
shows these
racks are same as
EL. +123.000 013007.
2.0 Cross section 3 modules 32m
Not available in
EL. +118.500 height and 3
Plot plan modules 23m 1. No of tiers of cable trays ( including access
3.0 module
length is shown height. way between cable trays if any)
Plan to design 1 2. Location and dia of pipes larger than 12"
T70-A-PP-013007_Rev A GROUP-4 PR-021 E/W rack C/S not available 6.0 as more than 42 module of height 3. Access platform requirements
EL. +112.500 m long 32m and adopt 4. Stair case location & Numbers
the same sizes
for 123m height
modules
EL. +106.500

6.0 m 6.0 m
EL. +100.000
Page 4

EL. +123.000

EL. +118.500

1. No of tiers of cable trays ( including access


way between cable trays if any)
EL. +112.500 Cross section Not Plan to follow 2. Location and dia of pipes larger than 12"
T70-A-PP-013007_Rev A GROUP-3 PR-022 E/W rack C/S not available 6.0 available in Plot
above type 3. Access platform requirements
plan 4. Stair case location & Numbers

EL. +106.500

6.0 m 6.0 m
EL. +100.000

T70-A-PP-013008_Rev A - Plot plan not available. But identical as per Plot plan T70-A-PP-013007

T70-A-PP-013009_Rev A - Plot plan not available. But identical as per Plot plan T70-A-PP-013007

T70-A-PP-013010_Rev A - No Piperack shown, pipe sleeper is shown

1. No of tiers of cable trays ( including access


way between cable trays if any)
Model not Plan to design 1 2. Location and dia of pipes larger than 12"
GROUP-2 PR-009 N/S rack Model not available 6.0
available module 3. Access platform requirements
4. Stair case location & Numbers

T70-A-PP-013011 &
12_Rev A
EL. +124.500
EL. +124.500
EL. +118.500 EL. +118.500
Total 2 nos loop
This group modules and 2
EL. +112.500 includes road nos of non loop 1. No of tiers of cable trays ( including access
EL. +112.500 crossing. modules.
Model shows one Loop module way between cable trays if any)
2. Location and dia of pipes larger than 12"
GROUP-3 PR-010 E/W rack 6.0 bay and plot plan have road 3. Access platform requirements
EL. +106.500 shows two bays crossing also.
EL. +106.500 4. Stair case location & Numbers
rack. Plan to design 5. Equipment loading
6.0 m 2 different c/s this module and
6.0 m 6.0 m modelled in SPR. adopt the same
EL. +100.000
EL. +100.000 size for non loop
module

EL. +123.500

EL. +118.500
EL. +115.500 Total 7 modules
are available.
1. Location and dia of pipes larger than 12"
Cross section Not This module is 2. Access platform requirements
GROUP-3 PR-011 N/S rack C/S not available 6.0 available in Plot similar to Module
22. Hence plan to 3. Stair case location & Numbers
EL. +109.500
plan
use the same
EL. +105.500 member sizes
6.0 m 6.0 m
EL. +100.000

EL. +127.000

EL. +122.000
This is similar to
EL. +118.500 1. No of tiers of cable trays ( including access
Not matching module 10. way between cable trays if any)
with plot plan Hence plan to
T70-A-PP-013013_Rev A section. use the same 2. Location and dia of pipes larger than 12"
GROUP-1 PR-012 E/W rack C/S not available EL. +112.500 6.0 3. Access platform requirements
Plot plan shows 2 member sizes in 4. Stair case location & Numbers
bays and model case no
shows single bay equipment is 5. Equipment loading
EL. +106.500
supported
6.0 m
EL. +100.000

EL. +118.500

EL. +112.500 SPR modelled


Plan to use same
with 2 diff. member size of 1. Location and dia of pipes larger than 12"
heights of pipe 2. Access platform requirements
GROUP-2 PR-023 E/W rack 6.0 rack, whereas module 12 in 3. Stair case location & Numbers
case no
EL. +106.500 plot plan shows 1 equipment is 4. Equipment loading
typical cross
section. supported

6.0 m
EL. +100.000

EL. +123.500

EL. +118.500
EL. +115.500 Total 7 modules
Includes Pipe are available.
bridge road
crossing. This module is
GROUP-3 PR-011 N/S rack C/S not available 6.0 similar to Module
EL. +109.500 Cross section Not 22. Hence plan to
available in Plot
plan use the same
EL. +105.500 member sizes
6.0 m 6.0 m
EL. +100.000

1. No of tiers of cable trays ( including access


T70-A-PP-013014_Rev A Similar to module way between cable trays if any)
SPR section
GROUP-1 PR-013 E/W rack Piperack not modelled 6.0 shows same as 10. Plan to use 2. Location and dia of pipes larger than 12"
same member 3. Access platform requirements
Group 12 sizes 4. Stair case location & Numbers
Page 5

1. No of tiers of cable trays ( including access


way between cable trays if any)
Similar to module
2. Location and dia of pipes larger than 12"
GROUP-2 PR-024 N/S rack Piperack not modelled 6.0 Piperack yet to 9. Plan to use 3. Access platform requirements
model in SPR same member
sizes 4. Stair case location & Numbers
5. Equipment loading

1. No of tiers of cable trays ( including access


Similar to module way between cable trays if any)
10. Plan to use 2. Location and dia of pipes larger than 12"
T70-A-PP-013015_Rev A GROUP-2 PR-014 N/S rack Piperack not modelled 6.0 same member 3. Access platform requirements
sizes 4. Stair case location & Numbers

Piperack yet to
- PR-015 E/W rack C/S not available Piperack not modelled 6.0 model in SPR

This module is
similar to Module
22. Hence plan to
use same design 1. No of tiers of cable trays ( including access
T70-A-PP-013016_Rev A For N/S rack, this
way between cable trays if any)
GROUP-3 PR-016 E/W rack Piperack not modelled 6.0 Piperack yet to is similar to 2. Location and dia of pipes larger than 12"
model in SPR storage unit main
rack which is in 3. Access platform requirements
4. Stair case location & Numbers
Reading scope
and plan to use
the same
member size

These modules
- PR-017 N/S rack C/S not available Piperack not modelled 6.0 Piperack yet to are minor spur
model in SPR racks. Hence no
design envisaged

EL. +115.500
16" line - 2 lines EL. +112.500

1. No of tiers of cable trays ( including access


EL. +108.500 This group Total 11 modules way between cable trays if any)
includes Pipe +4 nos of road 2. C/S showing location and dia of pipes
48" line bridge road crossing. Plan to larger than 12".
T70-A-PP-013048_Rev A GROUP-5 PR-018 N/S rack 6.0
crossing. design each one 3. Access platform requirements
56" line Pipe line > 12" module for each 4. Stair case location & Numbers
EL. +100.000 are indicated type 5. Preliminary pipe stress report.

7.5 m 7.5 m

EL. +115.500
16" line - 2 lines EL. +112.500

This group
EL. +108.500 includes Pipe
bridge road
GROUP-5 PR-018 N/S rack 6.0 same as above
48" line crossing.
Pipe line > 12"
56" line are indicated
EL. +100.000

7.5 m 7.5 m

EL. +105.000

10.0 m
.This is single tier
EL. +100.000 cable rack. Hence
- PR-019 E/W rack 6.0
T70-A-PP-013049_Rev A no design
planned

EL. +113.500

EL. +110.500
1. No of tiers of cable trays ( including access
way between cable trays if any)
14" line Similar to module 2. C/S showing location and dia of pipes
9 and plan to use larger than 12".
GROUP-2 PR-020 E/W rack EL. +106.500 6.0
the same 3. Access platform requirements
member sizes 4. Stair case location & Numbers
5. Preliminary pipe stress report.

6.0 m
EL. +100.000

EL. +115.500
16" line - 2 lines EL. +112.500

This group
EL. +108.500 includes Pipe
bridge road
GROUP-5 PR-018 N/S rack 48" line 24" line 6.0 crossing. same as above
16" line Pipe line > 12"
56" line are indicated as
EL. +100.000 per SPR.

7.5 m 7.5 m

T70-A-PP-013050_Rev A
Page 6

T70-A-PP-013050_Rev A
EL. +113.500

EL. +110.500

As per section-C
14" line in this drawing Similar to module
GROUP-2 PR-020 E/W rack 6.0 only cable tray 9 and plan to use
EL. +106.500 shown but as per the same
SPR piperack is member sizes
modelled.

6.0 m
EL. +100.000

LEGEND:

PIPERACK CROSS SECTION NOT AVAILABLE


Page 7

TANAJIB GAS PLANT INCL. NGL


BASED ON WORKING COPY RECEIVED ON 02.05.2018
Ref Unit Plot plan: T80-A-PP-013001 & 023001
IEC Scope: From drawing no. T70-A-PP-013002 To 013016, T76-A-PP-013048 To 013050, T79-A-PP-013069
and T83-A-PP-013076 To T83-A-PP-013077

Piperack
Group Piperack C/S Remarks Need list
numbering

GROUP-1

Already
completed
GROUP-2 with 8m width
and 9.5m
height

EL. +114.500

Already
EL. +110.500 completed
with 3
transverse
GROUP-3 EL. +106.500 bays with 6m
each incl. pipe
stress report,
now geometry
9.0 m 9.0 m got changed.

EL. +113.000

EL. +108.500
GROUP-4

EL. +111.700

EL. +108.500

GROUP-5 Loop bay


EL. +104.500

4.0m 6.0m 4.0m


Page 8

Piperack
Group Piperack C/S Remarks Need list
numbering

GROUP-6

GROUP-7

Already
completed 1. Pipe stress input
with assumed required.
GROUP-8 air cooler
weight and 2. Air fin cooler vendor data
required.
without
pipestress.

EL. +114.500

EL. +109.500

EL. +106.500 Completed


GROUP-9 already but
without
7.5m pipestress
7.5m

EL. +117.000

EL. +113.500

EL. +108.500
GROUP-10
6.0m 6.0m 26.0 6.0m
m
Page 9

Piperack
Group Piperack C/S Remarks Need list
numbering

GROUP-11

EL. +115.500

EL. +112.500

EL. +108.500

GROUP-12 4.5m 6.0m 26.0m 6.0m

GROUP-13

30" EL. + 121.500


24"
42"
EL. + 117.500

36"
EL. + 113.500

EL. + 109.500
16" - 2 Lines

GROUP-14 EL. + 105.500

7.0 7.0

EL. + 117.000
EL. + 113.100
EL. + 109.100

6.0 28.0 6.0 6.0


GROUP-15
Page 10

Piperack
Group Piperack C/S Remarks Need list
numbering

GROUP-16
Page 11

TANAJIB GAS PLANT INCL. NGL


BASED ON WORKING COPY RECEIVED ON 02.05.2018
Ref Unit Plot plan: T80-A-PP-013001 & 023001
IEC Scope: From drawing no. T70-A-PP-013002 To 013016, T76-A-PP-013048 To 013050, T79-A-PP-013069 and T83-A-PP-013076 To T83-A-PP-013077

Cross section As per


Piperack Piperack Piperack Piperack
Dwg. No. Group numbering numbering spanning Remarks Design Need list
Grouping
numbering OLD NEW direction
Plot Plan SPR

36" line - 2 lines EL. +114.500


18" line

24" line EL. +110.500


PR-156E, PR-
157A, PR-
GROUP-1 PR-001 157B, PR- E/W rack EL. +106.500
157C, PR-
157D

6.0 m 6.0 m EL. +100.000

EL. +114.500

EL. +110.500
PR-156A, PR-
GROUP-1 PR-002 156B, PR- N/S rack C/S not available
156C, PR-
T70-A-PP-013002 156D EL. +106.500

6.0 m 6.0 m

EL. +100.000

GROUP-10 PB-002 PB-156A N/S rack C/S not available

EL. +110.500
PR-152A, PR- EL. +108.500
152B, PR-
152C, PR-
152D, PR-
GROUP-2 PR-003 152E, PR- E/W rack EL. +104.500
152F, PR-
152G, PR-
152H, PR- 6.0 m
152J, PR-152K

EL. +114.500

PR-151A, PR-
151B, PR- EL. +110.500
151C, PR- Plot plan section not
151D, PR-
GROUP-3 PR-004 151E, PR- N/S rack matching with the plan.
EL. +106.500 Plan shows only 2
151F, PR- transverse bays.
151G, PR-
151H, PR- 9.0 m 9.0 m
151J

EL. +113.000

EL. +108.500
GROUP-4 PB-004 PB-151A N/S rack C/S not available
T70-A-PP-013003

EL. +111.700

EL. +108.500

GROUP-5 PR-003A PR-154A E/W rack C/S not available


EL. +104.500

4.0m 6.0m 4.0m

EL. +110.500

EL. +108.500

PR-153A, PR-
153B, PR- EL. +104.500
GROUP-2 PR-003B 155A, PR- E/W rack C/S not available
145E, PR-
145F
6.0m

EL. +108.500

PR-145A, PR- EL. +104.500


GROUP-2 PR-005 145B, PR- E/W rack
145C, PR-
145D
6.0m

T70-A-PP-013004

Road
GROUP-16 PB-005 PB-145A crossing Pipebridge not modelled
E/W rack

EL. +119.500

EL. +115.500
PR-143C, PR-
144E, PR- EL. +112.500
144F, PR-
143B, PR-
T70-A-PP-013004, GROUP-6 PR-007 144C, PR- E/W rack EL. +108.500
013005 & 013006
144D, PR-
143A, PR- EL. +105.500
144A, PR-
144B 6.0m

PR-146G, PR-
GROUP-2 PR-021 146D, PR- E/W rack C/S not available Piperack not modelled Required Pipe stress input
146A
Page 12

PR-147G, PR-
147H, PR-
147J, PR-
147D, PR-
GROUP-2 PR-021A 147E, PR- N/S rack C/S not available Piperack not modelled Required Pipe stress input
147F, PR-
147A, PR-
147B, PR-
147C
T70-A-PP-013007,
013008 & 013009

PR-146H, PR-
146J, PR-
GROUP-8 PR-022 146E, PR- E/W rack Piperack not modelled Required Pipe stress input
146F, PR-
146B, PR-
146C

T70-A-PP-013010 - No Piperacks only pipe sleepers in this unit. Required Pipe stress input

EL. +115.000

EL. +110.000

GROUP-11 PR-009 PR-162B, PR- N/S rack SPR shows 2 no. of


162A transverse bays
EL. +105.000

8.0m

T70-A-PP-013011 &
013012 EL. +115.500

EL. +112.500

PR-159B, PR- EL. +108.500


160B, PR-
GROUP-1 PR-010 161B, PR- E/W rack
159A, PR-
160A, PR- EL. +105.500
161A
5.0m 5.0m

T70-A-PP-013011 GROUP-2 PR-009A PR-163A, PR- E/W rack Piperack not modelled
163B

EL. +114.500

PR-158F, PR- EL. +109.500


158G, PR-
158H, PR-
158A, PR- EL. +106.500
GROUP-9 PR-011 N/S rack C/S not available
158B, PR-
158C, PR-
158D, PR-
158E 7.5m 7.5m

T70-A-PP-013013 &
013014 EL. +117.000

EL. +113.500

EL. +108.500
GROUP-10 PB-011 PB-158A N/S rack C/S not available
6.0m 6.0m 26.0 6.0m
m

PR-165A, PR-
GROUP-5 PR-023 165B, PR- E/W rack C/S not available Piperack not modelled
164A, PR-
164B

EL. +114.500

EL. +111.500

PR-172Q, PR-
180A, PR-
180B, PR- E/W rack & EL. +106.500
T70-A-PP-013016 GROUP-7 PR-016 180C, PR- Required Pipe stress input
180D, PR- N/S rack
180E, PR-
180F
6.0m 6.0m

EL. +115.500

EL. +112.500
PR-137J, PR-
137D, PR-
137E, PR- EL. +108.500
137F, PR-
T76-A-PP-013048, GROUP-11 PR-018 137G, PR- N/S rack
013049 & 013050
137H, PR-
137A, PR- 9.0m
137B, PR-
137C

EL. +115.500

EL. +112.500

PB-137D, PB- EL. +108.500


T76-A-PP-013048, 137C, PB- Road
013049 & 013050 GROUP-12 PB-018 137A, PB- crossing C/S not available
N/S rack
137B
4.5m 6.0m 26.0m 6.0m

PR-141A, PR-
141B, PR- EL. +105.000 SPR shows with 1 level
T76-A-PP-013049 PR-019 141C, PR- E/W rack C/S not available 10.0m at EL +105.000. Not
141D, PR- required to design. No
pipes routed.
141E

EL. +111.500
PR-140A, PR- EL. +108.500
140B, PR-
140C, PR-
T76-A-PP-013049 & 140D, PR-
013050 GROUP-2 PR-020 140E, PR- E/W rack C/S not available EL. +104.500 No pipes routed.
138A, PR-
138B, PR-
138C, PR- 6.0m
138D

PR-139A, PR-
139B, PR-
T76-A-PP-013050 GROUP-2 PR-020A 139C, PR- N/S rack C/S not available Piperack not modelled
139D, PR-
139E, PR-
139F
Page 13

EL. + 130.500

EL. + 128.000
3.0
EL. + 125.500
PR-107B, PR-
107C, PR- 42"
30" EL. + 121.500
107D, PR- 2.3
107E, PR- EL. + 119.500 24"
107F, PR-
107G, PR- 3.7 EL. + 117.500

GROUP-13 PR-026 107H, PR- N/S rack


107K, PR- 36"
107L, PR- EL. + 113.500
107M, PR-
107N, PR- EL. + 109.500
107P, PR- 16" - 2 Lines
107Q, PR-
107R EL. + 105.500

7.0 7.0

30" EL. + 121.500


24"
42"
EL. + 117.500

36"
EL. + 113.500
GROUP-14 PR-027 PR-107A, PR- N/S rack C/S not available
107J EL. + 109.500
16" - 2
Lines
EL. + 105.500

7.0 7.0

EL. + 117.000
EL. + 113.100

EL. + 109.100
GROUP-15 PB-027 PB-107A, PB- N/S rack C/S not available
107B
6.0 28.0 6.0 6.0

T83-A-PP-013076 &
013077

EL. + 121.500

EL. + 117.500

EL. + 113.500

GROUP-11 PR-028 PR-108A, PR- N/S rack


108B EL. + 109.500

EL. + 105.500

7.0

GROUP-12 PB-028 PB-108A, PB-


108B

PR-109A, PR-
109B, PR-
109C, PR-
109D, PR-
109E, PR-
GROUP-2 PR-029 109F, PR-
109G, PR- E/W rack Piperack not modelled
109H, PR-
109J, PR-
109K, PR-
109L, PR-
109M

LEGEND:

PIPERACK CROSS SECTION NOT AVAILABLE


Page 14

TANAJIB GAS PLANT INCL. NGL

Piperack Piperack Design Foundation Design Need list Responsible


PR Group No. identification Engineer Status
Start End Start End Steel
PR-156E, PR-157A, PR-157B, PR-157C, PR-157D, PR-156A, PR-
GROUP-1 156B, PR-156C, PR-156D, PR-159B, PR-160B, PR-161B, PR-159A, 8-May-18 10-May-18 SS Completed
PR-160A, PR-161A

PR-152A, PR-152B, PR-152C, PR-152D, PR-152E, PR-152F, PR-


152G, PR-152H, PR-152J, PR-152K, PR-153A, PR-153B, PR-155A,
PR-145E, PR-145F, PR-145A, PR-145B, PR-145C, PR-145D, PR-
147G, PR-147H, PR-147J, PR-147D, PR-147E, PR-147F, PR-147A,
PR-147B, PR-147C, PR-163A, PR-163B, PR-140A, PR-140B, PR-
GROUP-2 140C, PR-140D, PR-140E, PR-141A, PR-141B, PR-141C, PR-141D, 10-May-18 11-May-18 RSD Completed
PR-141E, PR-138A, PR-138B, PR-138C, PR-138D, PR-139A, PR-
139B, PR-139C, PR-139D, PR-139E, PR-139F, PR-109A, PR-109B,
PR-109C, PR-109D, PR-109E, PR-109F, PR-109G, PR-109H, PR-
109J, PR-109K, PR-109L, PR-109M

GROUP-3 PR-151A, PR-151B, PR-151C, PR-151D, PR-151E, PR-151F, PR- 10-May-18 24-May-18 NRK Completed
151G, PR-151H, PR-151J

GROUP-4 PB-151A 25-May-18 30-May-18 NRK Completed

GROUP-5 PR-154A, PR-165A, PR-165B, PR-164A, PR-164B 30-May-18 31-May-18 NRK Completed

GROUP-6 PR-143C, PR-144E, PR-144F, PR-143B, PR-144C, PR-144D, PR- 15-May-18 16-May-18 SS Completed
143A, PR-144A, PR-144B

GROUP-7 PR-172Q, PR-180A, PR-180B, PR-180C, PR-180D, PR-180E, PR- 15-May-18 16-May-18 1. Pipe stress RSD Completed
180F input required.
Page 15

Piperack Piperack Design Foundation Design Need list Responsible


PR Group No. identification Engineer Status
Start End Start End Steel
1. Pipe stress
input required.
GROUP-8 PR-146H, PR-146J, PR-146E, PR-146F, PR-146B, PR-146C 2. Air fin cooler
vendor data
required.

PR-158F, PR-158G, PR-158H, PR-158A, PR-158B, PR-158C, PR-


GROUP-9 158D, PR-158E 10-May-18 11-May-18 SS Completed

GROUP-10 PB-158A, PB-156A 14-May-18 15-May-18 SS Completed

GROUP-11 PR-162B, PR-162A, PR-137J, PR-137D, PR-137E, PR-137F, PR-


137G, PR-137H, PR-137A, PR-137B, PR-137C, PR-108A, PR-108B 8-May-18 9-May-18 15-May-18 16-May-18 RSD Completed

GROUP-12 PB-137D, PB-137C, PB-137A, PB-137B, PB-108A, PB-108B 9-May-18 10-May-18 15-May-18 16-May-18 RSD Completed

PR-107B, PR-107C, PR-107D, PR-107E, PR-107F, PR-107G, PR-


GROUP-13 107H, PR-107K, PR-107L, PR-107M, PR-107N, PR-107P, PR-
107Q, PR-107R, PR-146B, PR-146E, PR-146H,PR-146A, PR-146C, 26-Apr-18 7-May-18 7-May-18 8-May-18 SS Completed
PR-146D, PR-146F, PR-146G, PR-146J

GROUP-14 PR-107A, PR-107J 26-Apr-18 27-Apr-18 27-Apr-18 30-Apr-18 RSD Completed


GROUP-15 PB-107A, PB-107B 14-May-18 15-May-18 15-May-18 16-May-18 RSD Completed

GROUP-16 PB-145A, PB-152A 30-May-18 30-May-18 RSD Completed


Page 16

Remarks

Spur rack with assumed


pipe anchor bent.

I/C rack. Preliminary info


only available. Mismatch
between plot plan &
SPR. Pipe loads applied
with blanket loads and
for available pipes, pipe
stress applied.

I/C rack

Spur rack with blanket


load. Elevation not
available in plot plan,
assumed from SPR.

Pipe stress not available


in spur racks
Completed w/o Pipe
stress
Page 17

Remarks

Grouped in 2 & 13

I/C rack

I/C rack

I/C rack

I/C rack

NGL - I/C rack

NGL - I/C rack


NGL

No pipes routed in SPR.


No pipe stress report.
Page 18

TANAJIB GAS PLANT INCL. NGL - Calculation revision for 60% Plot plan_Rev.B

Piperack Engineer for Steel Design Foundation Design Engineer for


PR Group No. identification STR design Checked by FDN design Checked by
Start End Start End
PR-156A, PR-156B, PR-156C, PR-156D ,PR-156E, PR-157A, PR-157B, PR-157C, PR-
GROUP-1 BPK 05.07.18 10.07.18 SS 24.07.18 24.07.18 BPK SS
157D

PR-152A, PR-152B, PR-152C, PR-152D, PR-152E, PR-152F, PR-152G, PR-152H, PR-


152J, PR-152K, PR-155A, PR-155B, PR-154A, PR-154B, PR-145E, PR-145A, PR-145B,
GROUP-2 PR-145C, PR-145D, PR-163A, PR-163B, PR-140A, PR-140B, PR-140C, PR-140D, PR- SS 09.07.18 11.07.18 NRK 24.07.18 24.07.18 SS NRK
140E, PR-141A, PR-141B, PR-141C, PR-141D, PR-141E, PR-138A, PR-138B, PR-138C,
PR-138D, PR-139A, PR-139B, PR-139C, PR-139D, PR-139E, PR-139F

PR-151A, PR-151B, PR-151C, PR-151D, PR-151E, PR-151F, PR-151G, PR-151H, PR-


GROUP-3 151J NRK 09.07.18 11.07.18 RSD 24.07.18 24.07.18 NRK RSD

GROUP-4 PB-151A NRK 11.07.18 13.07.18 RSD 25.07.18 25.07.18 NRK RSD
GROUP-5 PR-153B, PR-153A, PR-165A, PR-165B, PR-164A, PR-164B NRK/BPK 16.07.18 18.07.18 BPK 26.07.18 26.07.18 BPK NRK
GROUP-6
GROUP-7 PR-172R, PR-180A, PR-180B, PR-180C, PR-180D, PR-180E, PR-180F RSD 10.07.18 12.07.18 SS 24.07.18 24.07.18 RSD SS

GROUP-8 PR-159B, PR-160B, PR-161B, PR-159A, PR-160A, PR-161A BPK 18.07.18 20.07.18 BPK 27.07.18 27.07.18 BPK NRK

GROUP-9 PR-158A, PR-158B, PR-158C, PR-158D SS 11.07.18 13.07.18 NRK 25.07.18 25.07.18 SS NRK
GROUP-10 PB-158A, PB-158B, PB-158C, PB-158D, PB-156A SS 16.07.18 18.07.18 NRK 26.07.18 26.07.18 SS NRK
PR-162B, PR-162A, PR-137J, PR-137D, PR-137E, PR-137F, PR-137G, PR-137H, PR-
GROUP-11 137A, PR-137B, PR-137C, PR-108A, PR-108B, PR-108C, PR-108D BPK 13.07.18 16.07.18 RSD 26.07.18 26.07.18 BPK RSD

GROUP-12 PB-137D, PB-137C, PB-137A, PB-137B, PB-108A, PB-108B BPK 16.07.18 17.07.18 RSD 27.07.18 27.07.18 BPK RSD

PR-107B, PR-107C, PR-107D, PR-107E, PR-107F, PR-107G, PR-107H, PR-107K, PR-


GROUP-13 SS 18.07.18 20.07.18 NRK 27.07.18 27.07.18 NRK SS
107L, PR-107M, PR-107N, PR-107P, PR-107R, PR-107S

GROUP-14 PR-107A, PR-107J RSD 12.07.18 13.07.18 SS 25.07.18 25.07.18 RSD SS


GROUP-15 PB-107A, PB-107B RSD 16.07.18 18.07.18 BPK 26.07.18 26.07.18 RSD BPK
GROUP-16 PB-145B, PB-145A, PB-152A RSD 18.07.18 20.07.18 BPK 27.07.18 27.07.18 RSD BPK
Page 19

Remarks

Loop & one more tier added.

Added in Group-18

Newly added (separated


from Group-1).
Page 20

TANAJIB GAS PLANT INCL. NGL - Calculation revision for 90% Rev C0 plot plan

Engineer for Checked


Piperack Engineer for
Steel Design Foundation Design FDN design by Governing Parameter for
PRIORITY
PR Group No. identification STR design Checked by Date Remarks Optimization Unit no.
KS Review comments
Start End Start End

PR-156C-SECTON MODIFIED APART FROM THE PLOT


PR-156A, PR-156B, PR-156C, PR-156D ,PR-156E, PR- PLAN -C (CABLE TRAY LOAD CONSIDERED @
GROUP-1 157A, PR-157B, PR-157C, PR-157D BPK 27-8-18 28-8-18 NRK 29-8-18 29-8-18 BPK BPK 12/9/2018 EL.123m & @ EL.117.5m. SIMILARLY @ 117.5m 2.Deflection 2 A
PENULTIMATE BAY 36" DIA. PIPE LOADS
CONSIDERED FOR MAX. LOAD EFFECTS)

This PR-154A is
very tall and using
this metrics to
PR-145A, PR-145B, PR-145C, PR-145D, PR-145E, PR- other shorter
modules will result
163A, PR-163B, PR-140A, PR-140B, PR-140C, PR-140D, Updated as per KS comments. PR-154A higher MTO.
GROUP-2 PR-140E, PR-138A, PR-138B, PR-138C, PR-138D, PR- SS 24-8-18 27-8-18 NRK 3/9/2018 4/9/2018 SS BPK 14-9-18 & PR-155A moved to group-5. PR- 5. Section availability 3 4 11 48 49 50 E Hence compare
139A, PR-139B, PR-139C, PR-139D, PR-139E, PR-139F, 187A/B/C/D/E newly added. this with PR-03F of
PR-202A, PR-202B, PR-202C, PR-202D, PR-202E OIL unit and apply
to all the other
modules. Use PR-
154A metrics for
PR-154B, PR-155A
& B only as these
four are similar
For PR-154B - Try
to optimise. The
column stress
ratios are very
less.0.57. In case
deflection is
governing then
ok...
PR-151A, PR-151B, PR-151C, PR-151D, PR-151E, PR-
GROUP-3 151F, PR-151G, PR-151H, PR-151J SS 3-Sep-18 4-Sep-18 NRK 10/9/2018 11/9/2018 RSD BPK Geometry change required. 5. Section availability 3 K

GROUP-4 PB-151A BPK 7-Sep-18 8-Sep-18 NRK 11/9/2018 12/9/2018 NRK BPK RSD - 1. Strength 3 K

PR-153A, PR-153B, PR-155A, PR-154A, PR-165A, PR- Deflection controlled at level where pipes coming
GROUP-5 165B, PR-164A, PR-164B RSD 27-8-18 28-8-18 NRK 5/9/2018 6/9/2018 RSD BPK 11/9/2018 from equipment 3. Drift 3 13 14 G

PR-152A, PR-152B, PR-152C, PR-152D, PR-152E, PR- Single transverse bay changed to double transverse
GROUP-6 152F, PR-152G, PR-152H, PR-152J, PR-152K RSD 5-Sep-18 6-Sep-18 SS 11-Sep-18 12-Sep-18 SS BPK RSD bay. Rack added with sour gas heater at mid tier. 3. Drift 3 K

PR-172R, PR-180A, PR-180B, PR-180C, PR-180D, PR- As per new PP, PR-180D length reduced hence
GROUP-7 180E, PR-180F RSD 22-8-18 23-8-18 NRK 29-8-18 30-8-18 NRK BPK 7/9/2018 analyzed PR-180B. Geometry change required. 1. Strength 16 B
Completed with introducing columns.

PR-159B, PR-160B, PR-161B, PR-159A, PR-160A, PR- In PR-161A cooler removed and length reduced.
GROUP-8 161A BPK 5-Sep-18 6-Sep-18 SS 4-Sep-18 5-Sep-18 BPK BPK 7/9/2018 Hence analyzed PR-160AGeometry change required.
1. Strength 11 12 E

GROUP-9 PR-158A, PR-158B, PR-158C, PR-158D SS 28-8-18 29-8-18 NRK 6/9/2018 7/9/2018 NRK BPK 14-9-18 Geometry change required. 1. Strength 13 14 G
GROUP-10 PB-158A, PB-158B, PB-158C, PB-158D, PB-156A SS 22-8-18 23-8-18 NRK 27-8-18 28-8-18 NRK BPK 14-9-18 Geometry change required. 4. Connection requirements 13 14 2 A

PR-162A, PR-162B, PR-137A, PR-137B, PR-137C, PR-


137D, PR-137E, PR-137F, PR-137G, PR-137H, PR-137J, 11 12 48 49 50 Members are
GROUP-11 PR-108A, PR-108B, PR-108C, PR-108D, PR-108E, PR- RSD 23-8-18 24-8-18 NRK 5-Sep-18 6-Sep-18 NRK SS 7/9/2018 PR-108E & F newly added. 1. Strength 76 77 E failing. Check the
output file
108F
Also can we check
for Lz 8.3m ??

1. Strength F
PB-137A, PB-137B, PB-137C, PB-137D, PB-108A, PB-
GROUP-12 BPK 20-9-18 21-9-18 NRK 22-9-18 24-9-18 BPK SS RSD 49 50 76 77
108B
6. Loacal Beams design
requirements

PR-107B, PR-107C, PR-107D, PR-107E, PR-107F, PR-


GROUP-13 107G, PR-107H, PR-107K, PR-107L, PR-107M, PR-107N, SS 21-9-18 22-9-18 NRK 24-9-18 25-9-18 SS SS SS Level change required. 5. Section availability 76 77 L
PR-107P, PR-107R, PR-107S
GROUP-14 PR-107A, PR-107J RSD 17-9-18 18-9-18 SS 20-9-18 21-9-18 RSD SS SS Level change required. 1. Strength 76 77 L
GROUP-15 PB-107A, PB-107B RSD 24-9-18 25-9-18 SS 25-9-18 26-9-18 RSD SS BPK Level change required. 1. Strength 76 77 L
GROUP-16 PB-145B, PB-145A, PB-152A RSD 29-8-18 30-8-18 NRK 7-Sep-18 8-Sep-18 RSD SS 12/9/2018 Only Cable tray supporting pipebridge 1. Strength 3 4 15 H

PR-147B, PR-147C, PR-147E, PR-147F, PR-147H, PR- This group to be reviewed all these racks merged to
GROUP-17
147J
BPK 31-8-18 NRK 31-8-18 1-Sep-18 BPK SS 12/9/2018 structure. Hence no more racks 1. Strength 789 D

PR-109A, PR-109B, PR-109C, PR-109D, PR-109E, PR-


109F, PR-198A, PR-198B, PR-143A, PR-143B, PR-143C, Geometry change required for PR-143 & 144.
GROUP-18 PR-144A, PR-144B, PR-144C, PR-144D, PR-144E, PR- SS 30-8-18 31-8-18 NRK 8-Sep-18 10-Sep-18 BPK BPK 11/9/2018 76 77 PP not issued till 20.08.18 3. Drift 76 77 4 5 6 3 J
144F,PR-155B, PR-154B
PR154A/B are only 3 bays where as other modules are having more number of bays which means that the bracing may be under sized. Hence compare this bracin

PR-146A, PR-146B, PR-146C, PR-146D, PR-146E, PR-


GROUP-19 146F, PR-146G, PR-146H, PR-146J, PR-146K, PR-146L, BPK 3-Sep-18 4-Sep-18 NRK 1-Sep-18 3-Sep-18 BPK BPK 7-Sep-18 1. Strength 789 D
PR-146M

GROUP-20 STR-162, PR-201A, PR-201B, PR-201C, PR-201D BPK 29-8-18 30-8-18 NRK 30-8-18 31-8-18 BPK SS 12/9/2018 Changed from flare stack to box piperack. 1. Strength 10 C
Rack added with exchanger at top tier
GROUP-21 PR-141A, PR-141B, PR-141C, PR-141D, PR-141E RSD 19-9-18 20-9-18 NRK 21-9-18 22-9-18 RSD SS SS and level increased 1. Strength 49 F

Design/ Checking in Progress


Design/ Checking Completed
Design Completed after Checking
Page 21

TANAJIB GAS PLANT INCL. NGL


BASED ON WORKING COPY RECEIVED ON 02.05.2018
Ref Unit Plot plan: T80-A-PP-013001 & 023001
IEC Scope: From drawing no. T70-A-PP-013002 To 013016, T76-A-PP-013048 To 013050, T79-A-PP-013069
and T83-A-PP-013076 To T83-A-PP-013077

Piperack
Group Piperack C/S Remarks Need list
numbering

Updated as per
revised plot
GROUP-1 plan.Loop bay
added & height
increased.

GROUP-2

Already
completed
with 3
transverse
GROUP-3 bays with 6m
each incl. pipe
stress report,
now geometry
got changed.

EL. +113.000

EL. +108.500
GROUP-4

EL. +111.700

EL. +108.500

GROUP-5 EL. +104.500 Loop bay

4.0m 6.0m 4.0m


Page 22

Piperack
Group Piperack C/S Remarks Need list
numbering

GROUP-6

GROUP-7

Already
completed 1. Pipe stress input
with assumed required.
GROUP-8 air cooler
weight and 2. Air fin cooler vendor data
required.
without
pipestress.

EL. +114.500

EL. +109.500

Completed
EL. +106.500 already but
GROUP-9
without
pipestress
7.5m 7.5m

EL. +117.000

EL. +113.500

EL. +108.500
GROUP-10

6.0m 6.0m 26.0 6.0m


m
Page 23

Piperack
Group Piperack C/S Remarks Need list
numbering

GROUP-11

EL. +115.500

EL. +112.500

EL. +108.500
GROUP-12

4.5m 6.0m 26.0m 6.0m

GROUP-13

30" EL. + 121.500

24"
42"
EL. + 117.500

36"
EL. + 113.500

GROUP-14
EL. + 109.500
16" - 2 Lines

EL. + 105.500

7.0 7.0

EL. + 117.000
EL. + 113.100

EL. + 109.100
GROUP-15

6.0 28.0 6.0 6.0


Page 24

Piperack
Group Piperack C/S Remarks Need list
numbering

GROUP-16

S-ar putea să vă placă și