EL. +127.000
EL. +122.000
EL. +118.500
EL. +100.000
6.0 m
EL. +118.500
EL. +112.500
1. No of tiers of cable trays ( including access way
between cable trays if any)
GROUP-2 2. Location and dia of pipes larger than 12"
3. Access platform requirements
EL. +106.500 4. Stair case location & Numbers
6.0 m
EL. +100.000
EL. +123.500
EL. +118.500
EL. +115.500
1. No of tiers of cable trays ( including access way
between cable trays if any)
2. Location and dia of pipes larger than 12"
GROUP-3 EL. +109.500 3. Access platform requirements
4. Stair case location & Numbers
EL. +105.500
6.0 m 6.0 m
EL. +100.000
Page 2
EL. +132.000
EL. +127.000
EL. +123.000
EL. +106.500
6.0 m 6.0 m
EL. +100.000
EL. +115.500
EL. +112.500
EL. +100.000
7.5 m 7.5 m
Assumed these
modules are
GROUP-3 PR-001 E/W rack C/S not available Piperack not modelled 6.0
similar to N/S
rack PR-002
These modules
Piperack yet to are minor spur
- PR-017 N/S rack C/S not available Piperack not modelled 6.0
model in SPR racks. Hence no
design envisaged
T70-A-PP-013003_Rev A
EL. +122.000
EL. +118.500
6.0 m
EL. +100.000
EL. +122.000
EL. +118.500
6.0 m
EL. +100.000
6.0 m 6.0 m
EL. +100.000
Page 4
EL. +123.000
EL. +118.500
EL. +106.500
6.0 m 6.0 m
EL. +100.000
T70-A-PP-013008_Rev A - Plot plan not available. But identical as per Plot plan T70-A-PP-013007
T70-A-PP-013009_Rev A - Plot plan not available. But identical as per Plot plan T70-A-PP-013007
T70-A-PP-013011 &
12_Rev A
EL. +124.500
EL. +124.500
EL. +118.500 EL. +118.500
Total 2 nos loop
This group modules and 2
EL. +112.500 includes road nos of non loop 1. No of tiers of cable trays ( including access
EL. +112.500 crossing. modules.
Model shows one Loop module way between cable trays if any)
2. Location and dia of pipes larger than 12"
GROUP-3 PR-010 E/W rack 6.0 bay and plot plan have road 3. Access platform requirements
EL. +106.500 shows two bays crossing also.
EL. +106.500 4. Stair case location & Numbers
rack. Plan to design 5. Equipment loading
6.0 m 2 different c/s this module and
6.0 m 6.0 m modelled in SPR. adopt the same
EL. +100.000
EL. +100.000 size for non loop
module
EL. +123.500
EL. +118.500
EL. +115.500 Total 7 modules
are available.
1. Location and dia of pipes larger than 12"
Cross section Not This module is 2. Access platform requirements
GROUP-3 PR-011 N/S rack C/S not available 6.0 available in Plot similar to Module
22. Hence plan to 3. Stair case location & Numbers
EL. +109.500
plan
use the same
EL. +105.500 member sizes
6.0 m 6.0 m
EL. +100.000
EL. +127.000
EL. +122.000
This is similar to
EL. +118.500 1. No of tiers of cable trays ( including access
Not matching module 10. way between cable trays if any)
with plot plan Hence plan to
T70-A-PP-013013_Rev A section. use the same 2. Location and dia of pipes larger than 12"
GROUP-1 PR-012 E/W rack C/S not available EL. +112.500 6.0 3. Access platform requirements
Plot plan shows 2 member sizes in 4. Stair case location & Numbers
bays and model case no
shows single bay equipment is 5. Equipment loading
EL. +106.500
supported
6.0 m
EL. +100.000
EL. +118.500
6.0 m
EL. +100.000
EL. +123.500
EL. +118.500
EL. +115.500 Total 7 modules
Includes Pipe are available.
bridge road
crossing. This module is
GROUP-3 PR-011 N/S rack C/S not available 6.0 similar to Module
EL. +109.500 Cross section Not 22. Hence plan to
available in Plot
plan use the same
EL. +105.500 member sizes
6.0 m 6.0 m
EL. +100.000
Piperack yet to
- PR-015 E/W rack C/S not available Piperack not modelled 6.0 model in SPR
This module is
similar to Module
22. Hence plan to
use same design 1. No of tiers of cable trays ( including access
T70-A-PP-013016_Rev A For N/S rack, this
way between cable trays if any)
GROUP-3 PR-016 E/W rack Piperack not modelled 6.0 Piperack yet to is similar to 2. Location and dia of pipes larger than 12"
model in SPR storage unit main
rack which is in 3. Access platform requirements
4. Stair case location & Numbers
Reading scope
and plan to use
the same
member size
These modules
- PR-017 N/S rack C/S not available Piperack not modelled 6.0 Piperack yet to are minor spur
model in SPR racks. Hence no
design envisaged
EL. +115.500
16" line - 2 lines EL. +112.500
7.5 m 7.5 m
EL. +115.500
16" line - 2 lines EL. +112.500
This group
EL. +108.500 includes Pipe
bridge road
GROUP-5 PR-018 N/S rack 6.0 same as above
48" line crossing.
Pipe line > 12"
56" line are indicated
EL. +100.000
7.5 m 7.5 m
EL. +105.000
10.0 m
.This is single tier
EL. +100.000 cable rack. Hence
- PR-019 E/W rack 6.0
T70-A-PP-013049_Rev A no design
planned
EL. +113.500
EL. +110.500
1. No of tiers of cable trays ( including access
way between cable trays if any)
14" line Similar to module 2. C/S showing location and dia of pipes
9 and plan to use larger than 12".
GROUP-2 PR-020 E/W rack EL. +106.500 6.0
the same 3. Access platform requirements
member sizes 4. Stair case location & Numbers
5. Preliminary pipe stress report.
6.0 m
EL. +100.000
EL. +115.500
16" line - 2 lines EL. +112.500
This group
EL. +108.500 includes Pipe
bridge road
GROUP-5 PR-018 N/S rack 48" line 24" line 6.0 crossing. same as above
16" line Pipe line > 12"
56" line are indicated as
EL. +100.000 per SPR.
7.5 m 7.5 m
T70-A-PP-013050_Rev A
Page 6
T70-A-PP-013050_Rev A
EL. +113.500
EL. +110.500
As per section-C
14" line in this drawing Similar to module
GROUP-2 PR-020 E/W rack 6.0 only cable tray 9 and plan to use
EL. +106.500 shown but as per the same
SPR piperack is member sizes
modelled.
6.0 m
EL. +100.000
LEGEND:
Piperack
Group Piperack C/S Remarks Need list
numbering
GROUP-1
Already
completed
GROUP-2 with 8m width
and 9.5m
height
EL. +114.500
Already
EL. +110.500 completed
with 3
transverse
GROUP-3 EL. +106.500 bays with 6m
each incl. pipe
stress report,
now geometry
9.0 m 9.0 m got changed.
EL. +113.000
EL. +108.500
GROUP-4
EL. +111.700
EL. +108.500
Piperack
Group Piperack C/S Remarks Need list
numbering
GROUP-6
GROUP-7
Already
completed 1. Pipe stress input
with assumed required.
GROUP-8 air cooler
weight and 2. Air fin cooler vendor data
required.
without
pipestress.
EL. +114.500
EL. +109.500
EL. +117.000
EL. +113.500
EL. +108.500
GROUP-10
6.0m 6.0m 26.0 6.0m
m
Page 9
Piperack
Group Piperack C/S Remarks Need list
numbering
GROUP-11
EL. +115.500
EL. +112.500
EL. +108.500
GROUP-13
36"
EL. + 113.500
EL. + 109.500
16" - 2 Lines
7.0 7.0
EL. + 117.000
EL. + 113.100
EL. + 109.100
Piperack
Group Piperack C/S Remarks Need list
numbering
GROUP-16
Page 11
EL. +114.500
EL. +110.500
PR-156A, PR-
GROUP-1 PR-002 156B, PR- N/S rack C/S not available
156C, PR-
T70-A-PP-013002 156D EL. +106.500
6.0 m 6.0 m
EL. +100.000
EL. +110.500
PR-152A, PR- EL. +108.500
152B, PR-
152C, PR-
152D, PR-
GROUP-2 PR-003 152E, PR- E/W rack EL. +104.500
152F, PR-
152G, PR-
152H, PR- 6.0 m
152J, PR-152K
EL. +114.500
PR-151A, PR-
151B, PR- EL. +110.500
151C, PR- Plot plan section not
151D, PR-
GROUP-3 PR-004 151E, PR- N/S rack matching with the plan.
EL. +106.500 Plan shows only 2
151F, PR- transverse bays.
151G, PR-
151H, PR- 9.0 m 9.0 m
151J
EL. +113.000
EL. +108.500
GROUP-4 PB-004 PB-151A N/S rack C/S not available
T70-A-PP-013003
EL. +111.700
EL. +108.500
EL. +110.500
EL. +108.500
PR-153A, PR-
153B, PR- EL. +104.500
GROUP-2 PR-003B 155A, PR- E/W rack C/S not available
145E, PR-
145F
6.0m
EL. +108.500
T70-A-PP-013004
Road
GROUP-16 PB-005 PB-145A crossing Pipebridge not modelled
E/W rack
EL. +119.500
EL. +115.500
PR-143C, PR-
144E, PR- EL. +112.500
144F, PR-
143B, PR-
T70-A-PP-013004, GROUP-6 PR-007 144C, PR- E/W rack EL. +108.500
013005 & 013006
144D, PR-
143A, PR- EL. +105.500
144A, PR-
144B 6.0m
PR-146G, PR-
GROUP-2 PR-021 146D, PR- E/W rack C/S not available Piperack not modelled Required Pipe stress input
146A
Page 12
PR-147G, PR-
147H, PR-
147J, PR-
147D, PR-
GROUP-2 PR-021A 147E, PR- N/S rack C/S not available Piperack not modelled Required Pipe stress input
147F, PR-
147A, PR-
147B, PR-
147C
T70-A-PP-013007,
013008 & 013009
PR-146H, PR-
146J, PR-
GROUP-8 PR-022 146E, PR- E/W rack Piperack not modelled Required Pipe stress input
146F, PR-
146B, PR-
146C
T70-A-PP-013010 - No Piperacks only pipe sleepers in this unit. Required Pipe stress input
EL. +115.000
EL. +110.000
8.0m
T70-A-PP-013011 &
013012 EL. +115.500
EL. +112.500
T70-A-PP-013011 GROUP-2 PR-009A PR-163A, PR- E/W rack Piperack not modelled
163B
EL. +114.500
T70-A-PP-013013 &
013014 EL. +117.000
EL. +113.500
EL. +108.500
GROUP-10 PB-011 PB-158A N/S rack C/S not available
6.0m 6.0m 26.0 6.0m
m
PR-165A, PR-
GROUP-5 PR-023 165B, PR- E/W rack C/S not available Piperack not modelled
164A, PR-
164B
EL. +114.500
EL. +111.500
PR-172Q, PR-
180A, PR-
180B, PR- E/W rack & EL. +106.500
T70-A-PP-013016 GROUP-7 PR-016 180C, PR- Required Pipe stress input
180D, PR- N/S rack
180E, PR-
180F
6.0m 6.0m
EL. +115.500
EL. +112.500
PR-137J, PR-
137D, PR-
137E, PR- EL. +108.500
137F, PR-
T76-A-PP-013048, GROUP-11 PR-018 137G, PR- N/S rack
013049 & 013050
137H, PR-
137A, PR- 9.0m
137B, PR-
137C
EL. +115.500
EL. +112.500
PR-141A, PR-
141B, PR- EL. +105.000 SPR shows with 1 level
T76-A-PP-013049 PR-019 141C, PR- E/W rack C/S not available 10.0m at EL +105.000. Not
141D, PR- required to design. No
pipes routed.
141E
EL. +111.500
PR-140A, PR- EL. +108.500
140B, PR-
140C, PR-
T76-A-PP-013049 & 140D, PR-
013050 GROUP-2 PR-020 140E, PR- E/W rack C/S not available EL. +104.500 No pipes routed.
138A, PR-
138B, PR-
138C, PR- 6.0m
138D
PR-139A, PR-
139B, PR-
T76-A-PP-013050 GROUP-2 PR-020A 139C, PR- N/S rack C/S not available Piperack not modelled
139D, PR-
139E, PR-
139F
Page 13
EL. + 130.500
EL. + 128.000
3.0
EL. + 125.500
PR-107B, PR-
107C, PR- 42"
30" EL. + 121.500
107D, PR- 2.3
107E, PR- EL. + 119.500 24"
107F, PR-
107G, PR- 3.7 EL. + 117.500
7.0 7.0
36"
EL. + 113.500
GROUP-14 PR-027 PR-107A, PR- N/S rack C/S not available
107J EL. + 109.500
16" - 2
Lines
EL. + 105.500
7.0 7.0
EL. + 117.000
EL. + 113.100
EL. + 109.100
GROUP-15 PB-027 PB-107A, PB- N/S rack C/S not available
107B
6.0 28.0 6.0 6.0
T83-A-PP-013076 &
013077
EL. + 121.500
EL. + 117.500
EL. + 113.500
EL. + 105.500
7.0
PR-109A, PR-
109B, PR-
109C, PR-
109D, PR-
109E, PR-
GROUP-2 PR-029 109F, PR-
109G, PR- E/W rack Piperack not modelled
109H, PR-
109J, PR-
109K, PR-
109L, PR-
109M
LEGEND:
GROUP-3 PR-151A, PR-151B, PR-151C, PR-151D, PR-151E, PR-151F, PR- 10-May-18 24-May-18 NRK Completed
151G, PR-151H, PR-151J
GROUP-5 PR-154A, PR-165A, PR-165B, PR-164A, PR-164B 30-May-18 31-May-18 NRK Completed
GROUP-6 PR-143C, PR-144E, PR-144F, PR-143B, PR-144C, PR-144D, PR- 15-May-18 16-May-18 SS Completed
143A, PR-144A, PR-144B
GROUP-7 PR-172Q, PR-180A, PR-180B, PR-180C, PR-180D, PR-180E, PR- 15-May-18 16-May-18 1. Pipe stress RSD Completed
180F input required.
Page 15
GROUP-12 PB-137D, PB-137C, PB-137A, PB-137B, PB-108A, PB-108B 9-May-18 10-May-18 15-May-18 16-May-18 RSD Completed
Remarks
I/C rack
Remarks
Grouped in 2 & 13
I/C rack
I/C rack
I/C rack
I/C rack
TANAJIB GAS PLANT INCL. NGL - Calculation revision for 60% Plot plan_Rev.B
GROUP-4 PB-151A NRK 11.07.18 13.07.18 RSD 25.07.18 25.07.18 NRK RSD
GROUP-5 PR-153B, PR-153A, PR-165A, PR-165B, PR-164A, PR-164B NRK/BPK 16.07.18 18.07.18 BPK 26.07.18 26.07.18 BPK NRK
GROUP-6
GROUP-7 PR-172R, PR-180A, PR-180B, PR-180C, PR-180D, PR-180E, PR-180F RSD 10.07.18 12.07.18 SS 24.07.18 24.07.18 RSD SS
GROUP-8 PR-159B, PR-160B, PR-161B, PR-159A, PR-160A, PR-161A BPK 18.07.18 20.07.18 BPK 27.07.18 27.07.18 BPK NRK
GROUP-9 PR-158A, PR-158B, PR-158C, PR-158D SS 11.07.18 13.07.18 NRK 25.07.18 25.07.18 SS NRK
GROUP-10 PB-158A, PB-158B, PB-158C, PB-158D, PB-156A SS 16.07.18 18.07.18 NRK 26.07.18 26.07.18 SS NRK
PR-162B, PR-162A, PR-137J, PR-137D, PR-137E, PR-137F, PR-137G, PR-137H, PR-
GROUP-11 137A, PR-137B, PR-137C, PR-108A, PR-108B, PR-108C, PR-108D BPK 13.07.18 16.07.18 RSD 26.07.18 26.07.18 BPK RSD
GROUP-12 PB-137D, PB-137C, PB-137A, PB-137B, PB-108A, PB-108B BPK 16.07.18 17.07.18 RSD 27.07.18 27.07.18 BPK RSD
Remarks
Added in Group-18
TANAJIB GAS PLANT INCL. NGL - Calculation revision for 90% Rev C0 plot plan
This PR-154A is
very tall and using
this metrics to
PR-145A, PR-145B, PR-145C, PR-145D, PR-145E, PR- other shorter
modules will result
163A, PR-163B, PR-140A, PR-140B, PR-140C, PR-140D, Updated as per KS comments. PR-154A higher MTO.
GROUP-2 PR-140E, PR-138A, PR-138B, PR-138C, PR-138D, PR- SS 24-8-18 27-8-18 NRK 3/9/2018 4/9/2018 SS BPK 14-9-18 & PR-155A moved to group-5. PR- 5. Section availability 3 4 11 48 49 50 E Hence compare
139A, PR-139B, PR-139C, PR-139D, PR-139E, PR-139F, 187A/B/C/D/E newly added. this with PR-03F of
PR-202A, PR-202B, PR-202C, PR-202D, PR-202E OIL unit and apply
to all the other
modules. Use PR-
154A metrics for
PR-154B, PR-155A
& B only as these
four are similar
For PR-154B - Try
to optimise. The
column stress
ratios are very
less.0.57. In case
deflection is
governing then
ok...
PR-151A, PR-151B, PR-151C, PR-151D, PR-151E, PR-
GROUP-3 151F, PR-151G, PR-151H, PR-151J SS 3-Sep-18 4-Sep-18 NRK 10/9/2018 11/9/2018 RSD BPK Geometry change required. 5. Section availability 3 K
GROUP-4 PB-151A BPK 7-Sep-18 8-Sep-18 NRK 11/9/2018 12/9/2018 NRK BPK RSD - 1. Strength 3 K
PR-153A, PR-153B, PR-155A, PR-154A, PR-165A, PR- Deflection controlled at level where pipes coming
GROUP-5 165B, PR-164A, PR-164B RSD 27-8-18 28-8-18 NRK 5/9/2018 6/9/2018 RSD BPK 11/9/2018 from equipment 3. Drift 3 13 14 G
PR-152A, PR-152B, PR-152C, PR-152D, PR-152E, PR- Single transverse bay changed to double transverse
GROUP-6 152F, PR-152G, PR-152H, PR-152J, PR-152K RSD 5-Sep-18 6-Sep-18 SS 11-Sep-18 12-Sep-18 SS BPK RSD bay. Rack added with sour gas heater at mid tier. 3. Drift 3 K
PR-172R, PR-180A, PR-180B, PR-180C, PR-180D, PR- As per new PP, PR-180D length reduced hence
GROUP-7 180E, PR-180F RSD 22-8-18 23-8-18 NRK 29-8-18 30-8-18 NRK BPK 7/9/2018 analyzed PR-180B. Geometry change required. 1. Strength 16 B
Completed with introducing columns.
PR-159B, PR-160B, PR-161B, PR-159A, PR-160A, PR- In PR-161A cooler removed and length reduced.
GROUP-8 161A BPK 5-Sep-18 6-Sep-18 SS 4-Sep-18 5-Sep-18 BPK BPK 7/9/2018 Hence analyzed PR-160AGeometry change required.
1. Strength 11 12 E
GROUP-9 PR-158A, PR-158B, PR-158C, PR-158D SS 28-8-18 29-8-18 NRK 6/9/2018 7/9/2018 NRK BPK 14-9-18 Geometry change required. 1. Strength 13 14 G
GROUP-10 PB-158A, PB-158B, PB-158C, PB-158D, PB-156A SS 22-8-18 23-8-18 NRK 27-8-18 28-8-18 NRK BPK 14-9-18 Geometry change required. 4. Connection requirements 13 14 2 A
1. Strength F
PB-137A, PB-137B, PB-137C, PB-137D, PB-108A, PB-
GROUP-12 BPK 20-9-18 21-9-18 NRK 22-9-18 24-9-18 BPK SS RSD 49 50 76 77
108B
6. Loacal Beams design
requirements
PR-147B, PR-147C, PR-147E, PR-147F, PR-147H, PR- This group to be reviewed all these racks merged to
GROUP-17
147J
BPK 31-8-18 NRK 31-8-18 1-Sep-18 BPK SS 12/9/2018 structure. Hence no more racks 1. Strength 789 D
GROUP-20 STR-162, PR-201A, PR-201B, PR-201C, PR-201D BPK 29-8-18 30-8-18 NRK 30-8-18 31-8-18 BPK SS 12/9/2018 Changed from flare stack to box piperack. 1. Strength 10 C
Rack added with exchanger at top tier
GROUP-21 PR-141A, PR-141B, PR-141C, PR-141D, PR-141E RSD 19-9-18 20-9-18 NRK 21-9-18 22-9-18 RSD SS SS and level increased 1. Strength 49 F
Piperack
Group Piperack C/S Remarks Need list
numbering
Updated as per
revised plot
GROUP-1 plan.Loop bay
added & height
increased.
GROUP-2
Already
completed
with 3
transverse
GROUP-3 bays with 6m
each incl. pipe
stress report,
now geometry
got changed.
EL. +113.000
EL. +108.500
GROUP-4
EL. +111.700
EL. +108.500
Piperack
Group Piperack C/S Remarks Need list
numbering
GROUP-6
GROUP-7
Already
completed 1. Pipe stress input
with assumed required.
GROUP-8 air cooler
weight and 2. Air fin cooler vendor data
required.
without
pipestress.
EL. +114.500
EL. +109.500
Completed
EL. +106.500 already but
GROUP-9
without
pipestress
7.5m 7.5m
EL. +117.000
EL. +113.500
EL. +108.500
GROUP-10
Piperack
Group Piperack C/S Remarks Need list
numbering
GROUP-11
EL. +115.500
EL. +112.500
EL. +108.500
GROUP-12
GROUP-13
24"
42"
EL. + 117.500
36"
EL. + 113.500
GROUP-14
EL. + 109.500
16" - 2 Lines
EL. + 105.500
7.0 7.0
EL. + 117.000
EL. + 113.100
EL. + 109.100
GROUP-15
Piperack
Group Piperack C/S Remarks Need list
numbering
GROUP-16