Material

Material
Approved
Material ELECTRICAL ACTIVITY
FLOW DIAGRAM
Submittal Procurement

Material Delivery

Drawing
approved from
consultant
Drawing Electrical 1st Fix
Submittal Installation

Drawing approved Fix conduit &


from consultant G.I boxes

Drawing
approved from
Drawing authority
Electrical 2nd
Approval from
Fix Installation Testing
Local Authority

Completion of Mechanical
DBs, SMDBs, MDB
equipment installation
installation MCC, LV panel
Submission of application to installationDB, SMDB,
authority (free estimation) MDB Dressing
Fee payment to authority
civil clearance of elec trical room
LV panel installation

Insulation resistance test


Transformer Final Testing Continuity of cable conductors
Installation (by temporary
(by authority) power)

Circuit continuity test


Pre-commissioning ELV

Electrical work as per


authority ATS panel
installation
LV Cabling from
Authority Generator
transformer to LV panel (by Inspection Installation
authority)

Permanent
Power On
Electrical Final
Fix Installation
Commission bus riser
Commission variable frequency drive
Light protection earth/resitance test
Commission light fixture
Commission ELV final fixtures
Light fittings, fire alarms,
switch sockets & accessories
Final Handover
Commissioning