SOAL NOMOR 7
The Equipment will be housed indoors and will require a minimum of additional utility services.
Little instrumentation will be employed
a. Purchased-Equipment Cost
Steel mechanical
1 300
crystallizer
Steel atmopheric tray
1 200
dryer
2 Pine storage tanks 2000
Steel batch top-
1 42
suspended centrifugal
Total Purchased-Equipment Cost
b. Physical-Plant Cost
Percentage
Purchased-equipment cost
Equipment installation 43%
Piping 36%
Instrumentation 5%
Insulation 8%
Electrical 15%
Building 80%
Land and yard improvements 12%
Utilities 25%
Total Physical-Plant Cost
c. Direct-Plant Cost
Percentage
Physical-plant cost
Engineering and construction 30%
Contractor's fee 7%
Total Direct-Plant Cost
d. Fixed-Capital Investment
Percentage
Direct-Plant Cost
Contingency 10%
Total Fixed-Capital Investment
NO 8
a. Menentukan ukuran diameter Pipa yang digunakan
Use 1 In diameter pipe (SOURCE : FIG 53)
Cost per
Unit Total Cost ($) Source
Capacity ($)
gal 3100 9300 Fig. 44 (1)
in 5600 5600
Fig. 3 (1)
st 67760
Cost Source
67760
29136.8 Page 77
24393.6 Table 17
3388 Table 19
5420.8 Table 21
10164 Page 102
54208 Table 27
8131.2 Page 109
16940 Table 31
219542.4
Cost Source
219542.4
65862.72 Table 4
15367.968 Page 4
300773.088
Cost Source
300773.088
30077.3088 Table 5
330850.3968