MPCC, which had the main construction contract to demolish Nassau County's former county social services building and erect a facade for the new family and matrimonial courthouse in Mineola, wrote this letter to the county.
Titlu original
The main construction contractor MPCC Corp.'s letter to Nassau County
MPCC, which had the main construction contract to demolish Nassau County's former county social services building and erect a facade for the new family and matrimonial courthouse in Mineola, wrote this letter to the county.
MPCC, which had the main construction contract to demolish Nassau County's former county social services building and erect a facade for the new family and matrimonial courthouse in Mineola, wrote this letter to the county.
MPOC cone. GENERAL CONTRACTORS
aaot
December 19, 2017
Shila Sba-Gavnoudlas, ME.
Commissioner of Publie Works
‘Nassau County Department of Public Works
1194 Prospect Avenue
Westbuiy, NY 11590.
Rez Nassau County Family and Matrimonial Cour! Complex,
Phase i Core & Shell
CNDPW Contract 4390652016
‘Dear Commissioner Gavnoudias:
‘am siting this letter in response to youts of December 15, 2017 in reference to the above referenced project,
‘Additionally, [find it
troublesome tha the County in someway, ring t ay blaine on MPCC fr this delay. IF this your
Peteeption and position on the matter vou are being completely misguided. Nothing eould be furor frown the
{ruth 'in fact, the deck repair and fil removal should have been concurrently performed over the hae
few months,
was setup partly for deck repair and roof il removal tobe concur performed, ‘Why the
County chose to ignore some i lm of thinking. We could have been doing
the dk repairs mouths ago and siete the manposer a production systematically. Ino way itis
‘emelition of the roof deck conerete andthe prodution therein impact the abil to remove and teplace the
tneal deck. Obviously, the isuanes ofthe approved change order Was the facto. As Hated, the mock os
Scheduled tobe sequenced as production was actalized. This specific area was ready forthe remetieuon
sociated with change order $6 since June 7, 2017. To be more specific the supplemental bulletin contd not
be generaued uni he rot eonerete was removed to accurately convey the work ooded to be done, cot
Sues the work was dane in order fre bull abe wtinlzed and distributed to MPC for pcg and
{thulssion. This change order was, and curently sl is driving the competion of not ony the reo det toe
the entire favade completion. And please be reminded, wien the County requested MPCC to neres
‘maupower, MPCC doubled is srew. As you knot this inerease proved io be meaningless based onthe
Countys delay in approving the change order #86 (SB 98) and reslted in numerous attempts tore
sequence the work,
Fo further elaborate iit is the County's position tha there is
ely in processing change order 46 (SB 95) and thereof demolition completion thsi a completly
Seco statement. Moreover, this position would also sanction thatthe County intends 0 use MPCC a ¢
seapezror te Place lame for its delays. This assessments ceranly not othe bes! interes. ofthe project ond
ie merely eltserving, MPCC hes consis peforned on the roost i the best interes of he Cos
espe tne bimany distegard and abandonment ofthe original wont design. As ares these action Pave
caused milion of dolls’ worth of delays io our company and suboottraciors. MPOC has tlss wade
frumerous requests 19 mest wih soto discus these and many ater items. al to which have beer deedJe cdinad in my previous leer and mehiple correspondence inert, the concrete removals hee nothing
do withthe issuance, aveeptance ot work of change onder #46 (SB 95) roof deck repait. Furthermore te uid
Wwe have exhausted the funds for time and matatial change order #23 (SB 37-1), demolition of roof conser
‘We now have been requested to provide a lump sum price to complete the work. Hf this change orders nor
Brocessed expeditiously, his wil also impact the projec signifiesnly. The rofcompletion aerial path
tem and fs currently driving the entre project at this juncture.
RE
GUE
t
Louis Caffechia
Senior Project Manager
ce: Joseph Amerigo CNDPI
Brent Chow, Cario Asiroiogo - Jacobs Engineering
‘Michael Bendoni, Arie Johansen, Garcick Yourg~Lifto