Sunteți pe pagina 1din 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

MEPL Reference dwg no: NOTE


MEPL/19-20/DWG/034 for Total earthing layout.
A MEPL/19-20/DWG/035 for Switch yard earthing. 1. All dimensions are in mm. A

MEPL/19-20/DWG/036 for Transformer hall earthing. 2. 50x12mm MS flat used for earth
MEPL/19-20/DWG/037 for Power house earthing. grid(equivalent size of conductor to be
MEPL/19-20/DWG/038 for Butterfly valve chamber earthing. used).
MEPL/19-20/DWG/039 for BOQ. 3. Four risers to be connected to the PPV
from earth grid.
B
4. All joints shall be painted using B

Bituminous paint to avoid corrosion.

SJVNL Refer dwg no:


PH-C2-AR3-C01/R1
TB-3-405-316-001(01of02)
TB-3-405-316-001(02of02)
C
PH-AR3-BID-003 C

PH-AR3-BID-017
PH-AR3-BID-014 REFERENCE DRAWING NUMBER :
PH-AR3-BID-015 DRG.NO. 1 200 00 20551
PH-AR3-BID-016
PH-AR3-BID-012
PH-AR3-BID-019
D PH-C2-AR3-C23/R1 D

PH-C2-AR3-C21
PH-C2-AR3-C17/R1
PH-C2-AR3-C34 LEGEND
PH-C2-AR3-C35
PH-C2-AR3-C36
PH-C2-AR3-C37
E
PH-C2-AR3-C38 E

y y y y y y y y y y y y
PH-C2-AR3-C39
y
y
y
y
y

50x12mm MS flat
y

F F
y
y

y y y y y y

PROJECT:
GROUNDING SYSTEM DESIGN OF ARUN-3, HEP
CLIENT:
G SJVN Arun-3 Power Development Company(SAPDC) G

SAPDC'S CONSULTANT:
Earth Grid SJVN LIMITED
EARTHING CONSULTANT:
MANAV ENERGY PVT LTD®
Sheet.Size
NAME SIGN DATE TITLE
A3
DESIGN MANI 12/02 /'20 PEN STOCK PROTECTION VALVE
CHKD. VIJAY 12/02 /'20
APPD. NAVEEN 12/02 /'20
MANAV DWG NO: CID:400 SCALE PROJECTION

H MEPL/19-20/DWG/033 NTS H

12/02 /'20 00 INITIAL RELEASE VIJAY NAVEEN


MANAV ENERGY PVT. LTD
DATE REV.NO. DESCRIPTION CHECKED APPROVED SUBMITTED FOR APPROVAL INFORMATION REFERENCE RECORDS CONSTRUCTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 P.No:47 of 47 16 17

S-ar putea să vă placă și