S. No Item Description
1. System Engineering Checking of specification & verification of proposed design
calculation for Generator turbine and allied equipment’s
2.
Designing of Layout of all the components of Powerhouse as well as Switch yard i/c cable
trenches etc.
3.
Complete system engineering drawings of E&M equipment i/e switchyard
4.
Checking of Technical Specification and selection of Turbine
5.
Checking of Technical Specification and selection of Generator.
6.
Checking of technical specification of all electrical items i.e. CT’s, PT’s, Breakers, Isolators,
Transformers, LA, Generators & Panels, Breaker switchyard etc.
7.
Checking of Technical Specification of all cables i.e. power cables, LT cables &
Instrumentation cables including its accessories
8. Checking of Technical specifications and Panel Layout for LT Panel, Unit Control Panel,
AVR Panel, Sync Panel,6.6KV HT Panel, NGT, LAVT, etc.
9. Checking of Technical specifications, Design and engineering of OPU system
10. Checking of Technical specifications, Design and engineering of Turbine and Generator
instrumentation.
11. Checking of Technical specifications, Design and engineering of GLOP system
12. Checking of Illumination Layout of Indoor & Outdoor switchyard and technical
specifications there off.
13. Checking of Technical specifications, Load calculation and design of DC system
14. Checking of Technical specifications, Selection and load calculation of Plant auxiliary
system including DG set.
15. Wiring drawings of all the panels including Plant and machinery.
16. Piping drawings: Design and specification for hydraulic system, cooling system and
BOM.
17. Checking of cable lengths for all sizes including BOM.
18. Checking of Technical specification design and engineering of Switch yard as per IS &
IEC standard and BOM
19. Checking of Technical specifications, Design and engineering of required control and
protection panels, LAVT and NGT panel etc.
20. Checking of Technical specifications, Design, engineering and selection of Governors.
21. Checking of Technical specifications, Design, engineering & selection of AVR system.
22. Monitoring of all items from drawing approval stage to till dispatch.
Note:
a) Advised venders should supply two sets of hard copy of the Drawings and
specifications for all the equipment to be installed in the powerhouse.
b) For all sort of equipment’s minimum Five suppliers shall be suggested with
complete address, along with email and their phone Nos.
A. Review of design & General Arrangement drawings for Civil and electro-mechanical plant &
Equipments. Following works will be carried under review of design & GA drawings of electro-
mechanical plant & equipments:
Review & approval of designs & GA drawings of main plant & equipment
Review & approval of main plant & equipment design parameters
Suggest inputs to improve overall design
Review & approval of supplier’s drawings and documentation
Review & approval of test & commissioning procedures
Design & drawings furnished by electro-mechanical supplier and civil designer
shall be reviewed to ensure adherence with specification and technical
parameters given in contract.
Review & approval of O&M manuals for electro-mechanical plant & equipments
received from Vendors / Equipment Suppliers and updated.
B. Review of design & GA drawings for hydro-mechanical works & equipments
Following works will be carried under review of design & GA drawings of hydro-
mechanical works, Gates, Steel Liner for Penstock / Pressure Shaft etc.:
Review & approval of designs & GA drawings of main plant & equipment
Review & approval of main plant & equipment parameters
Suggest inputs to improve overall design
Review & approval of supplier’s drawings and documentation
Review & approval of test & commissioning procedures
Design & drawings furnished by hydro-mechanical supplier shall be reviewed
to ensure adherence with specification and technical parameters given in
contract.
Review & approval of O&M manuals for hydro-mechanical plant & equipments
received from Vendors / Equipment Suppliers and updated.
Review of Welding Procedures for Steel Liner and Quality Assurance
Procedures for the same.
C. Review of design & GA drawings for power transmission (power evacuation system)
D. Preparation of Instrumentation Plan for Power House and weir if required
E. Attend Periodic Review Meetings either at site or at Client Office.