Sunteți pe pagina 1din 3

Sheet1

Stair case – lighting 125 wire


200 fishing wire
200 4 fixtures @50 each
Bedrooms – lighting 225 wire
400 fishing wire
360 3 ceiling fans @120 each
Bedrooms – carpet (2) 800 Installed – with padding
Stove 800
Fridge 800
Basement dry lock 1050 7, 5 gallon buckets
basement glass block 875 7, sets of glass block windows
Basement door 750 Installed & framing
Basement drain 175 clear it with snake
Rent sander 275 1 weekend rental & includes sandpaper
Polyurethane & stain 200
Front door & new screen 1000 door, screen, lock, hardware
Back door & new screen 1000 same as front door
Ceiling paint 60 3 gallons
Wall paint 320 8 different colors & 1 gallon each
Brushes, tools 200
New windows 6000 20 windows, average price of window + install = $300
Siding 4000
Front porch 1500 pay someone to repair
Repair shed 200 new lock, bondo for rust & paint
lawn mower 250
shower curtain holder 50 Item + install
Bathroom – sink & vanity 300 sink, vanity & faucet package deal
Kitchen faucet 125
plumbing? 2500
Sister & brother 10000
Misc. 500 switch plates, nails, screws, joint compound, caulking, sandpaper – things that
35240

*for some items, buy gift card (Lowes/Home Depot) at Giant Eagle & then purchase items
When I did this for my garage door, got free gas for 1.5 months

*see if lawyer suggests waiting out the liens. I’d suggest doing that. If you pay them off now
with your mortgage, you’ll be paying interest on the money for as long as you have the mortgage.

Including the liens in the mortgage would also increase your mortgage payment – about $4-5 per
every thousand. So if they are $6,000 – you will be adding $30 to your mortgage payment each month.

30 year loan = 360 payments


360 payments * $30 a month = $10,800 It will cost you almost $11,000 to pay off the $6,000

4.5% interest, 30 year loan & $36,000 4.5% interest, 30 year & $42,000 (i.e. including the liens)
182 monthly mortgage 213 monthly mortgage
150 property tax 150 property tax
70 insurance 70 insurance
402 433

Page 1
Sheet1
65 water/sewer/trash 65 water/sewer/trash
85 budget electric 85 budget electric
90 budget heat 90 budget heat
642 673

Page 2
Sheet1

caulking, sandpaper – things that add up after awhile

ent each month.

000 (i.e. including the liens)

Page 3

S-ar putea să vă placă și