Sunteți pe pagina 1din 16

Periodic Maintenance Work of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.

17+756 to
62+295 of NH-11 under NHDP Phase IIIA in the State of Uttar Pradesh & Rajasthan."

INVOICE NO. OPAPL/Bharatpur/SC-WO/Maint/2019-20/RA NO.7/RAJ07 Date :- 04.10..2019

NAME OF THE CONCESSIONER:-M/s. ORIENTAL PATHWAYS (AGRA) PVT LTD. GSTN NO :-08AAACO7826R1ZP

Address of the Company :- PLOT NO 871, NAGLA BHAMRA, POST - CHICHANA,


POST- CHICHANA, Bharatpur, Rajasthan, 321203.

NAME OF THE EPC CONTRACTOR :- M/S. PRAKASH ASHAPLATINGS AND


GSTN NO :-08AABCP0398N1ZY.
TOLL HIGHWAYS (I) LTD.

Address of the Company :- 242, Subbash Nagar, Udaipur,Rajasthan,313001

Invoice Period UP to 01.09.2019 TO 30.09.2019

Upto Date Work Done


Previous Paid Amount This IPC Amount
S.No Description Amount
(Rs)* (Rs)
(Rs)

A Total Amount Based on Works Executed

a) Work done INR 239,112,251.15 INR 232,216,446.15 INR 6,895,805.00

A INR 239,112,251.15 INR 232,216,446.15 INR 6,895,805.00

c) SGST 6 %. INR 14,346,736.00 INR 13,932,987.00 INR 413,749.00

d) CGST 6 %. INR 14,346,736.00 INR 13,932,987.00 INR 413,749.00

B Sub Total A {1A+1B+2} INR 267,805,723.15 INR 260,082,420.15 INR 7,723,303.00

INR 267,805,723.15 INR 260,082,420.15 INR 7,723,303.00

D Recoveries

a) Retention Money.

b) Mobilization Advance.

Sub Total D

Net Payable(C+D) INR 267,805,723.15 INR 260,082,420.15 INR 7,723,303.00

This Bill Amount In Words: (Rupees One Crore Twelve Lakhs Forty Three Thousand Seven Hundred Six only)

M/s. Oriental Pathways (Agra) Pvt Ltd. For Prakash Asphaltings & Toll Highways (I) Limited.
NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state of Rajasthan."(Bharatpur Section)"
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of NH-
11 under NHDP Phase IIIA in the State of Uttar Pradesh & Rajasthan."
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) Ltd.
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.09.2019 To 30.09.2019
9 BILL No 8
SUMMARY BILL OF QUANTITIES UPTO LAST BILL FOR THIS BILL UPTO DATE

Sl Item Description Unit Quantity Rate Amount (RS) Quantity Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.25 kg per sqm on the existing
1 bituminous/granular surface cleaned with mechanical broom as directed SQM 3 57 006 16 57 12 092 379,364.78 6,069,836.48 5,180.00 82,880.00 384,544.78 6,152,716.48
by authorized representative of OPAPL.

Carrying out repair to POT Holes and necessary patch repair work to
2 existing Bituminous carriageway as per MORTH (Revision 5th) specification SQM 30 000 800 2 40 00 000 32,075.08 25,660,064.00 - - 32,075.08 25,660,064.00
Clause 3004.

Milling of existing flexible pavement up to 50 mm depth and finished to


3 uniform level by Milling machine (Wirtgen Sensor Milling Machine) as SQM 30 000 48 14 40 000 32,914.85 1,579,912.80 5,180.00 248,640.00 38,094.85 1,828,552.80
directed by authorized representative of OPAPL.

Providing & laying Bituminous Concrete wearing course using refinery


produced crumb rubber modified bitumen (CRMB-60) complete as per
approved overlay plan / drawing and MORT&H (Fifth Revision)
4 Specifications Clause 507. The BC shall be laid by Full Carriageway Cum 15 333 11 900 18 24 66 667 15,171.71 180,543,407.07 - - 15,171.71 180,543,407.07
width Sensor Paver with Big ski Multiplex levelling system consisting of 6
ultrasonic sensors / 2 Control box / connecting cables etc.

Providing and laying of Microsurfacing (Type-III, 6 to 8mm) composed of


modified bitumen emulsion, mineral aggregate, water and necessary
additives (if needed) proportioned, mixed and uniformly spread over a
5 SQM 50 667 140 70 93 333 37340.82 5,227,714.80 11,839.75 1,657,565.00 49,180.57 6,885,279.80
properly prepared surface for surface treatment of pavement as per
MORTH (Revision 5th) specification clause 514 and IRC SP 81-2008.

Providing & laying pavement marking with hot applied thermoplastic


6 paints conforming to ASTM D36/BS 3262 (Part - 1) as per drawing & SQM 15 556 550 85 55 556 4716.84 2,594,262.00 - - 4,716.84 2,594,262.00
MORT&H (Revision 5th) Specifications Clause 803.
Repair/ Filling of Earthen shoulder in main carriageway, service road,
major/ minor junctions & rest area, satisfying the requirements of
7 minimum soaked CBR value (10%) as indicated in the of modified proctor SQM 78 562 40 31 42 471 64700.00 2,588,000.00 - - 64,700.00 2,588,000.00
density with all leads & lIfts all complete as per drawings and MORT&H
specifications clause 3003.

Painting of Kerb / Crash barrier with two or more coats of Synthetic


8 enamel paint including a base coat of cement primer. Km 39.28 60 000 23 56 800 18.64 1,118,520.00 3.73 2 23 500 22.37 1,342,020.00

Painting of Structure Parapet/Retaining wall with two or more coats of


9 Synthetic enamel paint. SQM -- 3 100 799.83 2,479,473.00 - - 799.83 2,479,473.00

10 Median kerb Height Raising by concrete M-20 grade. RM -- 330 8,940.00 2,950,200.00 2,490.00 821,700 11,430.00 3,771,900.00

11 WMM Work Median Opening Cum - 1 261 30.00 37,830.00 - - 30.00 37,830.00

12 CRMBB Work For Median Opening Cum - 957 24.00 22,968.00 - - 24.00 22,968.00

13 PGR PAINTING RM - 250 - - 652.00 1 63 000 652.00 163,000.00


NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state of Rajasthan."(Bharatpur Section)"
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of NH-
11 under NHDP Phase IIIA in the State of Uttar Pradesh & Rajasthan."
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) Ltd.
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.09.2019 To 30.09.2019
9 BILL No 8
SUMMARY BILL OF QUANTITIES UPTO LAST BILL FOR THIS BILL UPTO DATE

Sl Item Description Unit Quantity Rate Amount (RS) Quantity Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

14 DBM LAYING CUM - 10 200 131.79 1,344,258.00 362.60 36 98 520 494.39 5,042,778.00

Total Amount of Work Order in Rs. 234,766,919 232,216,446.15 6,895,805.00 239,112,251.15

Submitted by For Verified and Approved By


M/s Prakash Asphalting & Toll Highways (India) Ltd. M/s. Oriental Pathways (Agra) Pvt Ltd (OPAPL)

Authorised Signatory Authorised Signatory


Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR KERB PAINTING

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR.
Date Side Depth+ Length Remark.
No. From To Length
Top (KM)
1 9/Sep/19 42770 43000 LHS 230 0.33 0.23
2 20/Sep/19 47930 47940 BS 10 0.35 0.01
3 20/Sep/19 48050 48300 BS 250 0.42 0.25
4 20/Sep/19 47745 47800 RHS 55 0.41 0.055
5 20/Sep/19 47800 47850 RHS 50 0.41 0.05
6 20/Sep/19 47850 47900 RHS 50 0.41 0.05
7 20/Sep/19 48400 48450 RHS 50 0.33 0.05
8 20/Sep/19 48450 48500 RHS 50 0.35 0.05
9 20/Sep/19 48500 48550 RHS 50 0.36 0.05
10 20/Sep/19 48550 48600 RHS 50 0.38 0.05
11 20/Sep/19 48600 48650 RHS 50 0.34 0.05
12 20/Sep/19 48650 48700 RHS 50 0.35 0.05
13 20/Sep/19 48700 48750 RHS 50 0.34 0.05
14 20/Sep/19 48750 48800 RHS 50 0.35 0.05
15 24/Sep/19 49050 49100 RHS 50 0.32 0.05
16 24/Sep/19 49100 49150 RHS 50 0.31 0.05
17 24/Sep/19 49150 49200 RHS 50 0.31 0.05
18 24/Sep/19 49200 49250 RHS 50 0.33 0.05
19 24/Sep/19 49250 49300 RHS 50 0.33 0.05
20 25/Sep/19 61500 61550 RHS 50 0.4 0.05
21 25/Sep/19 61550 61600 RHS 50 0.39 0.05
22 25/Sep/19 61600 61650 RHS 50 0.4 0.05
23 25/Sep/19 61650 61700 RHS 50 0.42 0.05
24 25/Sep/19 61700 61750 RHS 50 0.42 0.05
25 25/Sep/19 61750 61850 RHS 70 0.35 0.07
26 25/Sep/19 61850 61900 RHS 50 0.39 0.05
27 25/Sep/19 61900 61950 RHS 50 0.41 0.05
28 25/Sep/19 61950 61990 RHS 40 0.4 0.04
29 25/Sep/19 62030 62050 RHS 20 0.4 0.02
30 25/Sep/19 62050 62100 RHS 50 0.41 0.05
31 25/Sep/19 62100 62150 RHS 50 0.41 0.05
32 25/Sep/19 62150 62200 RHS 50 0.42 0.05
33 25/Sep/19 62200 62250 RHS 50 0.42 0.05
34 25/Sep/19 62250 62300 RHS 50 0.4 0.05
35 26/Sep/19 49300 49350 RHS 50 0.33 0.05
36 26/Sep/19 49350 49400 RHS 50 0.32 0.05
37 26/Sep/19 49400 49450 RHS 50 0.34 0.05
38 26/Sep/19 49450 49500 RHS 50 0.35 0.05
39 26/Sep/19 49500 49550 RHS 50 0.33 0.05
40 26/Sep/19 49550 49600 RHS 50 0.33 0.05
41 26/Sep/19 59950 60000 RHS 50 0.41 0.05
42 26/Sep/19 60000 60050 RHS 50 0.4 0.05
43 26/Sep/19 60050 60100 RHS 50 0.41 0.05
44 26/Sep/19 60100 60150 RHS 50 0.41 0.05
45 26/Sep/19 60150 60200 RHS 50 0.41 0.05
46 26/Sep/19 60200 60250 RHS 50 0.4 0.05
47 26/Sep/19 60250 60300 RHS 50 0.41 0.05
48 26/Sep/19 60300 60350 RHS 50 0.42 0.05
49 26/Sep/19 60350 60400 RHS 50 0.41 0.05
50 26/Sep/19 60400 60450 RHS 50 0.41 0.05
51 26/Sep/19 60450 60500 RHS 50 0.38 0.05
52 26/Sep/19 60940 61000 RHS 60 0.42 0.06
53 26/Sep/19 61000 61050 RHS 50 0.41 0.05
54 26/Sep/19 61050 61100 RHS 50 0.38 0.05
55 26/Sep/19 61100 61150 RHS 50 0.41 0.05
56 26/Sep/19 61150 61200 RHS 50 0.41 0.05
57 26/Sep/19 61200 61250 RHS 50 0.4 0.05
58 26/Sep/19 61250 61300 RHS 50 0.4 0.05
59 26/Sep/19 61300 61350 RHS 50 0.41 0.05
60 26/Sep/19 61350 61400 RHS 50 0.4 0.05
61 26/Sep/19 61400 61450 RHS 50 0.38 0.05
62 26/Sep/19 61450 61500 RHS 50 0.38 0.05
63 29/Sep/19 61850 61900 LHS 50 0.4 0.05
64 29/Sep/19 61900 61950 LHS 50 0.4 0.05
65 29/Sep/19 61950 61990 LHS 40 0.4 0.04
66 29/Sep/19 62150 62200 LHS 50 0.35 0.05
67 29/Sep/19 62200 62250 LHS 50 0.32 0.05
68 29/Sep/19 62250 62300 LHS 50 0.33 0.05
Grand Total Area. (KM) 3.73
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR PGR Painting

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR. No. Date Side Depth+ Length(
From To Length
Top RM)
1 20/Sep/19 54170 54210 median 40 1.2 40
2 20/Sep/19 54110 54130 median 20 1.2 20
3 20/Sep/19 54130 54160 LHS 30 1.2 30
4 20/Sep/19 54160 54170 LHS 10 1.2 10
5 21/Sep/19 54170 54240 LHS 70 1.2 70
6 22/Sep/19 54240 54282 LHS 42 1.2 42
7 22/Sep/19 54282 54364 LHS 82 1.2 82
8 23/Sep/19 54364 54420 median 56 1.2 56
9 23/Sep/19 54307 54364 median 57 1.2 57
10 24/Sep/19 57446 57510 median 64 1.2 64
11 24/Sep/19 57434 57446 median 12 1.2 12
12 25/Sep/19 57360 57394 median 34 1.2 34
13 25/Sep/19 61955 61985 median 30 1.2 30
14 25/Sep/19 62045 62115 median 70 1.2 70
15 26/Sep/19 61920 61955 median 35 1.2 35
Grand Total Area. (RM) 652
Pvt. Ltd.

ghways (I) Ltd.

Remark.
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR KERB HEIGHT RAISING

PERIOD FROM 01-09-2019 To 30-09-2019

Chainage Measurment

SR. No. Date Side Grade of


From To Length Qty.R/M
Concrete

1 2/Sep/19 45395 45550 RHS 155 M.20 155


2 2/Sep/19 44030 44150 RHS 120 M.20 120
3 2/Sep/19 43450 43520 RHS 70 M.20 70
4 3/Sep/19 51125 51300 RHS 175 M.20 175
5 3/Sep/19 47640 47900 RHS 260 M.20 260
6 4/Sep/19 56900 57500 RHS 600 M.20 600
7 5/Sep/19 56020 56080 RHS 60 M.20 60
8 5/Sep/19 56350 56900 RHS 550 M.20 550
9 6/Sep/19 54700 54900 RHS 200 M.20 200
10 6/Sep/19 54500 54650 RHS 150 M.20 150
11 6/Sep/19 53050 53200 RHS 150 M.20 150

Grand Total Area. (RM) 2490


Ltd.

ways (I) Ltd.

Remark.
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR DBM

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR.
Date Side
No. From To Length Width Sqm. Depth

1 5/Sep/19 60123 60283 RHS 160.00 3.8 608.00 0.07


2 5/Sep/19 60233 60365 RHS 132.00 3.70 488.40 0.07
3 14/Sep/19 59935 60105 RHS 170.00 3.80 646.00 0.07
4 17/Sep/19 59293 59361 RHS 68.00 3.85 261.80 0.07
5 17/Sep/19 59905 59935 RHS 30.00 3.80 114.00 0.07
6 17/Sep/19 59531 59550 RHS 19.00 3.70 70.30 0.07
7 20/Sep/19 59246 59293 RHS 47.00 3.80 178.60 0.07
8 20/Sep/19 59022 59063 RHS 41.00 3.60 147.60 0.07
9 20/Sep/19 58995 59023 RHS 28.00 3.70 103.60 0.07
10 20/Sep/19 58892 58950 RHS 58.00 3.70 214.60 0.07
11 20/Sep/19 58750 58869 RHS 119.00 4.00 476.00 0.07
12 20/Sep/19 58600 58650 RHS 50.00 3.70 185.00 0.07
13 20/Sep/19 58500 58550 RHS 50.00 3.70 185.00 0.07
14 20/Sep/19 57900 57905 RHS 5.00 3.80 19.00 0.07
15 21/Sep/19 57810 57900 RHS 90.00 3.80 342.00 0.07
16 21/Sep/19 58234 58250 RHS 16.00 3.80 60.80 0.07
17 21/Sep/19 57028 57130 RHS 102.00 3.60 367.20 0.07
18 21/Sep/19 56860 57028 RHS 168.00 3.60 604.80 0.07
19 21/Sep/19 57322 57335 RHS 13.00 3.70 48.10 0.07
20 21/Sep/19 56556 56572 RHS 16.00 3.70 59.20 0.07
Grand Total QTY. (CUM)
ays (Agra) Pvt. Ltd.

Toll Highways (I) Ltd.

0-09-2019
ent
Qty. Remark.
Cum
42.56
34.19
45.22
18.33
7.98
4.92
12.50
10.33
7.25
15.02
33.32
12.95
12.95
1.33
23.94
4.26
25.70
42.34
3.37
4.14
362.6
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR DBM TACK COAT

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR.
Date Side
No. From To Length Width Sqm.

1 5/Sep/19 60123 60283 RHS 160.00 3.8 608.00


2 5/Sep/19 60233 60365 RHS 132.00 3.70 488.40
3 14/Sep/19 59935 60105 RHS 170.00 3.80 646.00
4 17/Sep/19 59293 59361 RHS 68.00 3.85 261.80
5 17/Sep/19 59905 59935 RHS 30.00 3.80 114.00
6 17/Sep/19 59531 59550 RHS 19.00 3.70 70.30
7 20/Sep/19 59246 59293 RHS 47.00 3.80 178.60
8 20/Sep/19 59022 59063 RHS 41.00 3.60 147.60
9 20/Sep/19 58995 59023 RHS 28.00 3.70 103.60
10 20/Sep/19 58892 58950 RHS 58.00 3.70 214.60
11 20/Sep/19 58750 58869 RHS 119.00 4.00 476.00
12 20/Sep/19 58600 58650 RHS 50.00 3.70 185.00
13 20/Sep/19 58500 58550 RHS 50.00 3.70 185.00
14 20/Sep/19 57900 57905 RHS 5.00 3.80 19.00
15 21/Sep/19 57810 57900 RHS 90.00 3.80 342.00
16 21/Sep/19 58234 58250 RHS 16.00 3.80 60.80
17 21/Sep/19 57028 57130 RHS 102.00 3.60 367.20
18 21/Sep/19 56860 57028 RHS 168.00 3.60 604.80
19 21/Sep/19 57322 57335 RHS 13.00 3.70 48.10
20 21/Sep/19 56556 56572 RHS 16.00 3.70 59.20
Grand Total QTY. (SQM) 5180.0
ys (Agra) Pvt. Ltd.

oll Highways (I) Ltd.

COAT

-09-2019
Remark.
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR MICROSURFACING

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR. No. Date Side Lane
From To Length Width Sqm.

1 6/Sep/19 53385 53570 LHS I,II 185 4.85 897.25


2 6/Sep/19 53615 53850 LHS I 235 3 705
3 8/Sep/19 53850 54020 LHS I 170 3 510
4 8/Sep/19 53414 53488 LHS I 74 3 222
5 8/Sep/19 53488 53570 LHS II 82 3 246
6 8/Sep/19 53570 53850 LHS II 280 2.5 700
7 9/Sep/19 53450 53550 LHS II 100 3 300
8 9/Sep/19 54020 54650 LHS I 630 3 1890
9 9/Sep/19 53850 54070 RHS II 220 2.5 550
10 10/Sep/19 53850 54650 LHS II 800 2.7 2160
11 10/Sep/19 60750 A RHS I,II 120 5.5 660
12 12/Sep/19 60750 B RHS I,II 25 5.5 137.5
13 12/Sep/19 60750 C RHS I,II,III 42 7.5 315
14 12/Sep/19 60750 D RHS I,II,III 30 7.5 225
15 13/Sep/19 50300 50400 RHS I,II 100 5.5 550
16 13/Sep/19 45913 46030 RHS I,II 117 5.5 643.5
17 19/Sep/19 62000 A RHS I,II,III 12 8 96
18 19/Sep/19 62000 B RHS I,II,III,IV,V 23.5 15 352.5
19 19/Sep/19 53750 53850 RHS II 100 2.3 230
20 19/Sep/19 53450 53600 RHS I 150 3 450

Grand Total Area.(SQM) 11840


vt. Ltd.

ghways (I) Ltd.

Remarks

S.ROAD
S.ROAD
S.ROAD
S.ROAD
S.ROAD
S.ROAD
S.ROAD
S.ROAD
S.ROAD
S.ROAD
LINK ROAD
LINK ROAD
LINK ROAD
LINK ROAD
BUS BAY
BUS BAY
LINK ROAD
LINK ROAD
S.ROAD
S.ROAD

11840
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR DBM MILLING

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR.
Date Side Remark.
No. From To Length Width Sqm.

1 5/Sep/19 60123 60283 RHS 160.00 3.8 608.00


2 5/Sep/19 60233 60365 RHS 132.00 3.70 488.40
3 14/Sep/19 59935 60105 RHS 170.00 3.80 646.00
4 17/Sep/19 59293 59361 RHS 68.00 3.85 261.80
5 17/Sep/19 59905 59935 RHS 30.00 3.80 114.00
6 17/Sep/19 59531 59550 RHS 19.00 3.70 70.30
7 20/Sep/19 59246 59293 RHS 47.00 3.80 178.60
8 20/Sep/19 59022 59063 RHS 41.00 3.60 147.60
9 20/Sep/19 58995 59023 RHS 28.00 3.70 103.60
10 20/Sep/19 58892 58950 RHS 58.00 3.70 214.60
11 20/Sep/19 58750 58869 RHS 119.00 4.00 476.00
12 20/Sep/19 58600 58650 RHS 50.00 3.70 185.00
13 20/Sep/19 58500 58550 RHS 50.00 3.70 185.00
14 20/Sep/19 57900 57905 RHS 5.00 3.80 19.00
15 21/Sep/19 57810 57900 RHS 90.00 3.80 342.00
16 21/Sep/19 58234 58250 RHS 16.00 3.80 60.80
17 21/Sep/19 57028 57130 RHS 102.00 3.60 367.20
18 21/Sep/19 56860 57028 RHS 168.00 3.60 604.80
19 21/Sep/19 57322 57335 RHS 13.00 3.70 48.10
20 21/Sep/19 56556 56572 RHS 16.00 3.70 59.20
Grand Total QTY. (SQM) 5180.0