Sunteți pe pagina 1din 4

Curriculum Vitae

Name : Babar Latif Religion : Islam

Date of Birth: 11-08-1984 Aqama Status : Transferable

Nationality : Pakistan Marital Status : Married

Mobile : 00966-550580145 Email Address: babar_ch1@yahoo.com

Languages:
 English (Very Good)
 Urdu (Excellent)
 Arabic (Good)
 Punjabi (Excellent)

Qualities:
 Self motivate and, hard working and have capability to easily understand the new technologies.
 Work with honesty.

Objectives:
 Seeking a career oriented position with multinational and professional management organization, where
my education and work experience is be utilize for dedicate corporate development.
 A position of talent, sense of responsibilities, commitment and output of work is required along with the
personnel and professional growth.

Academic Qualification:
1999-2000 Matriculation from Canal Secondary School, Punjab, Pakistan.

2001-2002 Intermediate (Computer Science) from Islamia University Bahawalpur Punjab, Pakistan.
Professional Education:
 Diploma of Optical Fiber transmission system and cable splicing from Telecom Foundation Islamabad
Pakistan.
 Certificate of Optical Fiber Cable Splicing & Transmission System from Edutech College & Computer
Training Institute Islamabad Pakistan.
 Diploma of business management from Pak British Culture Center Bahawalpur Punjab Pakistan.
 Certificate of proficiency in English (CPE) Pak British Culture Center Bahawalpur Punjab Pakistan.

Highlight Skills:
 Worked as a Technician in Telecom Company (PTCL) Optical fiber transmission system & Optical
connectors, prepared different types of optical Fiber Cable for splicing, splicing with fusion splicer and
mechanical splicing for two years.
 Worked as a secretary in Globe Construction Company Pakistan.
 One year experience as a data entry operator (Askary Cement Ltd, Pakistan

Test Equipment Able to Operate:


 Fusion Machine / FUJIKURA 40’S,50’S, 60’S, and Ericson FSU 925
 Fiber Optic Cable on real testing using OTDR Anritsu (MT9083) Series and JDSU4000.
 Perform end to end testing, getting the Splice Loss with mean average value using OTDR & Power Meter.
 Preparation of cables on Closure using Raychem, 3M, KB Pressurized and non Pressurized.

Experience in Saudi Arabia:


 Worked as an Administrator in Saudi Pan Gulf Manufacturing Company in Jubail Dammam (KSA) for Ten
Months.2007-2008.
 Worked as H.R assistant in Dr.Cafe for in Riyadh (KSA) for one month
 Worked as an Optical Fiber Cable Splicer in Advacon (Advance Concepts for Contracting) Telecom
Company in Riyadh (KSA) for two years.
 Worked as a Saudi Aramco work Permit Receiver and Optical fiber technician in Thales Security Solution
& Services Co Jubail KSA for 19 months (AFK CCTV Project Khursaniyah).
 Worked as a Saudi Aramco work Permit Receiver in CAT (Contracting and Trading Company) Dammam
KSA for 16 months (Hawiyah Khuff Gas Project).
 Worked as a Saudi Aramco work Permit Receiver in JATCO (Al-Jehat Company) Dammam KSA for 2
months (East and West pipe line Survey Project).
 Worked as a Saudi Aramco work Permit Receiver in Samsung (Ever Green Company) Riyadh KSA for 5
months (CO2 Capture & Injection Facilities Project Uthmaniyah).
 Worked as a Saudi Aramco work Permit Receiver in Schlumberger Company Tanajeeb KSA for 2 months
(Installation of Tanajeeb Mud Plant Project).
 Worked as a Saudi Aramco work Permit Receiver in Ather Telecom Company Riyadh KSA for 9 months
(Installation of Emergency Public Phones Kingdome Wide)
 Working as a Saudi Aramco work Permit Receiver in CAT (Contracting and Trading Company) Dammam
KSA from 4 years (Haradh Khuff Gas Project).

Projects Involved:
 Abha SWCC Project

 Responsibilities’ OSP FOC Splicing and Testing Using Fujikura 50’S, SUMITOMO TYPE 39 for splicing End
to End testing with power meter 2007.

 South North Railway Project Hail

 Responsibilities’ OSP FOC Splicing and Testing Using Fujikura 60’S, for splicing End to End testing with
power meter and Installation of Patch Panel, pig tails..

 Al Kharaj Hard Project.

 Responsibilities’ OSP FOC Splicing and Testing Using Fujikura 60’S, for splicing and cut old FOC cable MDT
with new cable termination of FOC on ODF..2009.

 Aramco Oil Field Khuraniya (AFK) Project.

 Responsibilities’ Installation of CCTV Cameras Pulling FOC (12F SM), Belden (Control), Coaxial (RG-
59,6,11), Power Cables form Camera to Inside RTU Shelters and termination of cables Installation of
Grounding Roads using Earth Tester/Megger Installation of FOC Box on the poles and Installation of
OPtiped..2010.

 Hawiyah Khuff Gas Project.

 Responsibilities’ Receiving the work permit and handle safety issues on job site.

 East and West pipe line Survey Project.

 Responsibilities’ Receiving the work permit and handle safety issues on job site.

 CO2 Capture & Injection Facilities Project Uthmaniyah.

 Responsibilities’ Receiving the work permit and handle safety issues on job site.

 Installation of Tanajeeb Mud Plant Project.

 Responsibilities’ Receiving the work permit and handle safety issues on job site.
 Installation of Emergency Public Phones Kingdome Wide.

 Responsibilities 'Site supervisor ,Making Reports, Receiving the work permit and handle safety issues on
job site.

 Haradh Khuff Gas Project.

 Responsibilities’ Receiving the work permit and handle safety issues on job site.

DRIVING LICENSE:
 Having Valid Saudi Driving License.

Computer Applications:
 Word
 Excel
 PowerPoint
 Internet

Typing Speed:
 Typing speed is 20 words per minute.

(Note): Copies of Diplomas and Certificates provides on demand.

S-ar putea să vă placă și