DATOS: t1 Ws/c
γs = 1.80 t/m3
Ø= 20.00 º
u (talud)= 0.00 º
f'c= 210.00 kg/cm2
fy= 4200.00 kg/cm2 Hp
αt= 1.59 kg/cm2
s/c= 0.10 t/m2
γconcreto= 2.40 t/m3
r= 4.00 cm
Øflexion= 0.90 Hz
Øcorte= 0.75 t2
FSD= 1.50 B2 B1
FSV= 1.75
h= 3.50 m
CALCULOS:
f= 0.70 0.4
Ka= 0.490
DIMENSIONAMIENTO DE LA PANTALLA
considerando: Mu=Øbd2f'cw(1-0.59w)
Ø= 0.9 p= 0.004
b= 100 cm w= 0.08
f´c= 210.00 kg/cm2 n= 9.201
r= 4 cm k= 0.315
Øbarra= 5/8 " j= 0.895
fs/fc= 20
Dimensionamiento de t2:
d= 21.89 cm usar: t2= 50.0 cm
t2= 27.48 cm d= 45.21 cm
VERIFICACION POR CORTE:
Vdu= 6.56 t
Vdu/Ø= 8.75 t
DIMENSIONAMIENTO DE LA ZAPATA:
hz= 50.00 cm
H= 4.00 m
B= 2.30 m
B2= 0.40 m
B1= 1.90 m
VERIFICACION DE ESTABILIDAD:
DISEÑO DE LA PANTALLA:
REFUERZO SECUNDARIO:
Arriba:
1/2 Ast= 2.00 cm2/m
usar: Ø 3/8 @ 0.300 m
intermedio:
1/2 Ast= 3.50 cm2/m
usar: Ø 3/8 @ 0.200 m
Abajo:
1/2 Ast= 5.00 cm2/m
usar: Ø 3/8 @ 0.150 m
As montaje:
usar: Ø 3/8 @ 0.30 m
W= 1.2 ton/m
Wu= 21.345458 ton/m
Mu= 1.7076366 ton-m
d= 41.7 cm. (recubrimento 7.5 cm. y 1/2 acero 5/8")
b= 100 cm.
F'c= 210 kg/cm2
Fy= 4200 kg/cm2
W= 0.0052119
A) Astmp.= 9 cm2
Ø 1/2 @ 0.150 m
B) As montaje=
Ø 1/2 @ 0.300 m
DISEÑO DE MURO DE CONTENCION
PROYECTO: : "CREACION, SERVICIO DE LA CREACION PASIVA, LOCALIDAD LA OROYA ANTIGUA, DEL DISTRITO
DE LA OROYA, PROVINCIA DE YAULI-DEPARTAMENTO DE JUNIN"
###
DATOS: 1RA CAPA
γs = 1.80 t/m3 t1=0.2 m 2da CAPA
Ø= 20.00 º 3ra CAPA
u (talud)= 0.00 º N1
f'c= 210.00 kg/cm2 N2
fy= 4200.00 kg/cm2 N3
αt= 1.59 kg/cm2 h=3.5m ###
s/c= 0.10 t/m2 1RA CAPA
γconcreto= 2.40 t/m3 B2=0.4m B1-t2=1.4m 2da CAPA
r= 4.00 cm 3ra CAPA
Øflexion= 0.90 t2=0.5m hz=0.5m N1
Øcorte= 0.75 N2
h= 3.50 m B=2.3m N3
FSD= 1.50
FSV= 1.75
RESULTADOS
f= 0.70 t1= 0.20 m t2= 0.50 m
Ka= 0.49 d= 0.45 m B= 2.3 m
hz= 0.5 m B1= 1.9 m
H= 0.04 m B2= 0.4 m
DISEÑO
PANTALLA: *Cara interior usar: 3.00 Ø 5/8 " @ 0.305 m
*Cara exterior usar: 0.00 Ø 1/2 " @ 0.155 m
CIMENTACION:
ZAPATA ANTERIOR (IZQ.-PUNTA-CARA INFERIORusar: Ø 1/2 @ 0.175 m
Ø
USAR:
s=0.305m
3/8 @0.3m
1 @0.05,8@0.15,6@0.2,4@0.3m
3/8 1 @0.05,8@0.15,6@0.2,4@0.3m
usar: Ø
3/8
Usar: Φ
DATOS: t1 Ws/c
γs = 1.80 t/m3
Ø= 20.00 º
u (talud)= 0.00 º
f'c= 210.00 kg/cm2
fy= 4200.00 kg/cm2 Hp
αt= 1.36 kg/cm2
s/c= 0.00 t/m2
γconcreto= 2.40 t/m3
r= 4.00 cm
Øflexion= 0.90 Hz
Øcorte= 0.75 t2
FSD= 1.50 B2 B1
FSV= 1.75
h= 2.60 m
CALCULOS:
f= 0.70 0.4
Ka= 0.490
DIMENSIONAMIENTO DE LA PANTALLA
considerando: Mu=Øbd2f'cw(1-0.59w)
Ø= 0.9 p= 0.004
b= 100 cm w= 0.08
f´c= 210.00 kg/cm2 n= 9.201
r= 4 cm k= 0.315
Øbarra= 5/8 " j= 0.895
fs/fc= 20
Dimensionamiento de t2:
d= 14.77 cm usar: t2= 45.00 cm
t2= 19.57 cm d= 40.21 cm
Vdu= 3.41 t
Vdu/Ø= 4.55 t
DIMENSIONAMIENTO DE LA ZAPATA:
hz= 45.00 cm
H= 3.05 m
B= 1.50 m
B2= 0.20 m
B1= 1.30 m
VERIFICACION DE ESTABILIDAD:
DISEÑO DE LA PANTALLA:
REFUERZO SECUNDARIO:
Arriba:
1/2 Ast= 2.00 cm2/m
usar: Ø 3/8 @ 0.300 m
intermedio:
1/2 Ast= 3.25 cm2/m
usar: Ø 3/8 @ 0.225 m
Abajo:
1/2 Ast= 4.50 cm2/m
usar: Ø 3/8 @ 0.150 m
As montaje:
usar: Ø 3/8 @ 0.30 m
W= 1.08 ton/m
Wu= 14.813645 ton/m
Mu= 0.666614 ton-m
d= 36.7 cm. (recubrimento 7.5 cm. y 1/2 acero 5/8")
b= 100 cm.
F'c= 210 kg/cm2
Fy= 4200 kg/cm2
W= 0.0026227
REFUERZO TRANSVERSAL:
DATOS:
γs = 1.80 t/m3 t1=0.2 m
Ø= 20.00 º
u (talud)= 0.00 º
f'c= 210.00 kg/cm2
fy= 4200.00 kg/cm2
αt= 1.36 kg/cm2 h=2.6m
s/c= 0.00 t/m2
γconcreto= 2.40 t/m3 B2=0.3m B1-t2=1.15m
r= 4.00 cm
Øflexion= 0.90 t2=0.45m hz=0.45m
Øcorte= 0.75
h= 2.60 m B=1.9m
FSD= 1.50
FSV= 1.75
RESULTADOS
f= 0.70 t1= 0.20 m t2= 0.45 m
Ka= 0.49 d= 0.40 m B= 1.9 m
hz= 0.45 m B1= 1.6 m
H= 0.03 m B2= 0.3 m
DISEÑO
PANTALLA: *Cara interior usar: 2.00 Ø 1/2 " @ 0.43 m
*Cara exterior usar: 0.00 Ø 1/2 " @ 0.175 m
CIMENTACION:
@0.43m
1/2 "
Lc=0.95m
s=0.43m Ø
USAR:
3/8 @0.3m
1 @0.05,6@0.15,4@0.225,3@0.3m
1 @0.05,6@0.15,4@0.225,3@0.3m
usar: Ø
3/8
3/8
usar: Ø 1/2 @0.2m
Usar: Φ
Usar: Φ
usar: Ø 1/2 @0.2m usar: Ø 1/2 @0.15m
CALCULO ESTRUCTURAL DE MURO DE CONTENCION
: "CREACION, SERVICIO DE LA CREACION PASIVA, LOCALIDAD LA OROYA
PROYE
ANTIGUA, DEL DISTRITO DE LA OROYA, PROVINCIA DE YAULI-DEPARTAMENTO DE
CTO
JUNIN"
SUB-PRO: RECREACION PASIVA-LA OROYA
RESPONS: SUB GERENCIA DE ESTUDIOS - EQUIPO PROVINCI: YAULI
FECHA Oct-18 DISTRITO : LA OROYA
FORMULA
: INFRAESTRUCTURA PASIVA-MIRADOR LUGAR : LA OROYA ANTIGUA
DATOS: t1 Ws/c
γs = 1.80 t/m3
Ø= 20.00 º
u (talud)= 0.00 º
f'c= 210.00 kg/cm2
fy= 4200.00 kg/cm2 Hp
αt= 1.36 kg/cm2
s/c= 0.00 t/m2
γconcreto= 2.40 t/m3
r= 4.00 cm
Øflexion= 0.90 Hz
Øcorte= 0.75 t2
FSD= 1.50 B2 B1
FSV= 1.75
h= 2.20 m
CALCULOS:
f= 0.70 0.4
Ka= 0.490
DIMENSIONAMIENTO DE LA PANTALLA
considerando: Mu=Øbd2f'cw(1-0.59w)
Ø= 0.9 p= 0.004
b= 100 cm w= 0.08
f´c= 210.00 kg/cm2 n= 9.201
r= 4 cm k= 0.315
Øbarra= 5/8 " j= 0.895
fs/fc= 20
Dimensionamiento de t2:
d= 11.50 cm usar: t2= 40.00 cm
t2= 16.29 cm d= 35.21 cm
Vdu= 2.41 t
Vdu/Ø= 3.21 t
DIMENSIONAMIENTO DE LA ZAPATA:
hz= 40.00 cm
H= 2.60 m
B= 1.30 m
B2= 0.10 m
B1= 1.20 m
VERIFICACION DE ESTABILIDAD:
DISEÑO DE LA PANTALLA:
REFUERZO SECUNDARIO:
Arriba:
1/2 Ast= 2.00 cm2/m
usar: Ø 3/8 @ 0.300 m
intermedio:
1/2 Ast= 3.00 cm2/m
usar: Ø 3/8 @ 0.225 m
Abajo:
1/2 Ast= 4.00 cm2/m
usar: Ø 3/8 @ 0.175 m
As montaje:
usar: Ø 3/8 @ 0.30 m
W= 0.96 ton/m
Wu= 16.071863 ton/m
Mu= 0.3214373 ton-m
d= 31.7 cm. (recubrimento 7.5 cm. y 1/2 acero 5/8")
b= 100 cm.
F'c= 210 kg/cm2
Fy= 4200 kg/cm2
W= 0.0016941
REFUERZO TRANSVERSAL:
DATOS:
γs = 1.80 t/m3 t1=0.2 m
Ø= 20.00 º
u (talud)= 0.00 º
f'c= 210.00 kg/cm2
fy= 4200.00 kg/cm2
αt= 1.36 kg/cm2 h=2.2m
s/c= 0.00 t/m2
γconcreto= 2.40 t/m3 B2=0.2m B1-t2=0.8m
r= 4.00 cm
Øflexion= 0.90 t2=0.4m hz=0.4m
Øcorte= 0.75
h= 2.20 m B=1.4m
FSD= 1.50
FSV= 1.75
RESULTADOS
f= 0.70 t1= 0.20 m t2= 0.40 m
Ka= 0.49 d= 0.35 m B= 1.4 m
hz= 0.4 m B1= 1.2 m
H= 0.03 m B2= 0.2 m
DISEÑO
PANTALLA: *Cara interior usar: 2.00 Ø 1/2 " @ 0.625 m
*Cara exterior usar: 0.00 Ø 1/2 " @ 0.195 m
CIMENTACION:
@0.625m
1/2 "
Lc=0.85m
s=0.625m Ø
USAR:
3/8 @0.3m
1 @0.05,5@0.175,3@0.225,3@0.3m
1 @0.05,5@0.175,3@0.225,3@0.3m
usar: Ø
3/8
3/8
usar: Ø 1/2 @0.225m
Usar: Φ
Usar: Φ
usar: Ø 1/2 @0.225m usar: Ø 1/2 @0.175m