Sunteți pe pagina 1din 8

2007 iREP Symposium- Bulk Power System Dynamics and Control - VII, Revitalizing Operational Reliability

August 19-24, 2007, Charleston, SC, USA

Multiple Purpose Micro Hydro Electric Power Station

Dan Basarab Guzun, Mircea Dimitrie Cazacu Nicolae Nistor Razvan Guzun
Faculty of Power Engineering, Politehnica High School Student, Faculty of (Hydro)
University from Bucharest - PUB, ROMANIA-RO Sebes- Alba, RO Power Engineering, PUB, RO.

Abstract
One presents the calculus of a micro hydro-electric power we have to say, this second aim have nothing to do with
station, long ago dreamed by our former famous professor some loss regarding any real practical aspects.
Dorin Pavel, from the Politehnica University in
Bucharest, PUB; we decided as a proper location for this By contrary, we do have to state the fact that is a very
micro hydro power plant MHPP in discussion to be complex and ambitious task to insert into the students’
arranged nearby the PUB, on the Ciurel Dam at the Lake mind the right amount of specific knowledge about their
Morii site, located on the River Dambovita, crossing our future job into the branch of power engineering; we do
capital, the city of Bucharest. It results one and very expect, after this short but dense dedicated training
demonstrative application for practicing our students, around the above MHPP, the students will be easier able
just in order to be well specialised on their hydro-electric to cope with their future job of enrollment into the real
power engineering, future field of their activity. This power industry. In so doing, it results in cutting the
small river which cross the City of Bucharest, assures an undesired period of well known transients regarding
agreeable aquatic and atmospheric biodiversity, being at accommodation when they will be involved at work into
the same time a proper place not only for our students’ one real power station, substation, network etc.
practice, but also for power generation aim. For the
beginning, the ideas of general design are crucial. The Going further on the same discussion, some research
problem is the actual careful extension of the above problems coming from the Power Industry PI side – also
project just in order to cover its double ambitious aim: could be solved by the advanced students preparing their
continue power generation with local distribution and master or Ph D stages etc. as reverse tidal wave of brain
proper place for skilful devoted students, students storming coming now from the University’s side toward
preparing masters or their Ph D - to cope with full the PI ! We do think this could be one world wide
management program onto a real scale power lab. problem of interest into the scientific, Universitary chain.

Keywords: Hydraulic turbine, Electric power All these above, with only one condition: the initial
generator/motor, synchronous, asynchronous, power careful design of this small HPP to allow this large frame
stations, micro hydro-electric power plants - MHPP. of student’s education, becoming skillful in the end,
within the bounty phenomena commonly encountered
1. The Importance to Erect One Special into the power industry; all this is to be seen as being
strongly reinforced by the educational actions conducted
Designed Micro-Hydro Power Plant MHPP by devoted teachers, well prepared at their turn and
recognized by the Power Industry PI, in order to control
It’s the real truth, that the plant is still in the advanced at the best the entire educational process.
design process, at this stage, now. But, how to conduct
this designing process and the initial concept - is of high In the followings, we do discuss only the pertinent
importance, having in mind this double aim: (1) - technical aspects covering the above aim. So,
delivering its amount of kWh as clean energy output, and
much more, intelligent locally distributed generation; (2) -
the overall management for this energy is versatile 2. The Main Content for Overall Concept
conducted in the end, in order to maximize its scientific
aim: it will respond at the best within the delicate process It is really one very delicate and difficult task to make
for teaching – learning for our students involved in the clear from the beginning what is the content of the overall
branch of power engineering education. By the far concept before to build such a special MHPP, responding
frankly at this double aimed as above described. If will succeed,

1-4244-1519-5/07/$25.00 ©2007 IEEE.


the merit of such a presentation, at this point and for this convince the power engineering specialists with this very
IREP-Conference, is very high in our mind, both from aspects and giving the solution with one intelligent
theoretical and practical point of view! design, even poured into one small MHPP - but with very
large consequences for changing the students’ attitude,
Training at the best isn’t an easy task, everywhere into the especially into this crucial important power engineering
Universities - around the world, without a practical, well branch - for all our society, considered as a forward line !
conceived tech base - even at small installed power, let
say - hundreds of kW, as we do point here. Such an It will be one lucky opportunity to discuss at the present
intelligent base created with a special architecture in IREP Conference all these delicate and pertinent aspects
machinery, primary / secondary circuitry and revealing a for our future students’ education in the power-
bounty of phenomena, have to be seen as real opportunity engineering field of activity.
to harden the preparation of our students. This is stated
here as the very subject we are dealing right now and try 3. Some Hydro-mechanical Useful Details
to show you all these aspects at the IREP - Conference. 3.1. Positioning the Power Station

Confining the paper’s ideas, it obviously does respond to Because there is no free space on the river bed to place
the main following main aspects, so: the new power station and also to eliminate the adiacent
power losses, we did decide to erect the whole building-
(1) - how large could be the extension of the power house as a MHPP - let say one HPP of dam-type,
primary scheme, so that the secondary attached [3][4]; in other words, we have decided to locate the
schemes is to color enough the real situations power house closed to the existing dam’s ending part and
currently encountered into one common power so to continue the in-feed water pipe of 1.4 m diameter,
house; additionally also designed to facilitate now prolonged into this newly added power house.
special further testing: different more efficient
prime movers, power generators/motors of The new building, made of steel reinforced concrete, is
asynchronous, standard synchronous or PMG sustained on adequate pillars, a little above the surface of
type, controlled by different classic or PLC discharging water reservoir; this original design was
based protective relays, standard and advanced thought mainly in order to eliminate possible
digital adaptive regulators for speed and interferences with the damping down river water blanket,
voltage, based on PSS etc.; especially during the over-flooding periods with high
excedentary water flow discharged over the up-stream
(2) – how to draw maximum from these dam (nearly up to ten times greater than the normal, rated
educational efforts devoted to our students in flow).
standard preparation at the power engineering
faculty, in order to better fit with their future 3.2. Some Original Theoretical Investigations
jobs at the power industry PI; for the advanced
student category involved in their master or Ph In the Table 1, we did calculate for different heads H, the
D program, the problem is how to short their speed values V, of the water flow Q, into the pipe
program, but at highest possible quality level; assumed to be of 0.6 m in its cross section diameter D;
furthermore, following some original calculations for
(3) – the last but not least, stands the aim for axial hydro power turbines – as it was stated by the first
distributed generation in order to locally author in the references [5-7] - for maximum rotational
generate/absorb some significant kWh, speeds n, avoiding the cavitation effect, it was pushed
modeling from standard up to complex further the MHPP’s overall efficiency by maximization
operational regimes encountered for one the extracted power P.
MHPP, e.g. with storage energy facilities. Special careful new design for the turbine’s blades, have
conducted in this way to far improved rapidity ns , as it
Today, not only in our vision, but from many other can be clearly seen below.
recognized specialists, the signals coming from the
today’s academic side are not encouraging, regarding the The new design consists in improving the overall
students’ poor interest for theory; that’s because often is efficiency for one MHPP by adopting the maximal speeds
missing one practical well designed support. “This and eliminating damaging cavitation process,
cultural lack of interest in engineering extends to the simultaneously using one original method of blades’
young people…” is however, bitterly recognizing by one design by maximizing the extracted power; the formulas
experienced author, [9]. Our paper try to manage and to used, were as follow:
- for the definite, net head in turbine Hnet, by applying the
well known Bernoulli relation, we have
2
⎛ L ⎞V (1)
Hnet = Hbrut − ∑hr = Hbrut − ∑⎜ λ +ζ⎟ Turbine’s
stator
⎝ D ⎠ 2g ,
- from which, results the speed V and the flow Q of the
water through every diameter D of the pipe having the
cross section S, so
2g ( Hbrut − Hnet ) πD2
V= → Q= V = SV , (2) Turbine’s rotor
⎛ L ⎞ 4
∑⎜⎝ D ⎟⎠
λ +ζ

- the available power at turbine’s shaft and at the electric


generator’s terminals, of efficiencies ηturb, ηgen is

, (3) Fig. 1. Stator and rotor blades, the current lines in the absolute
movement and the speed triangles, inlet/outlet of the rotor.
- the turbine’s rapidity for the admited speeds ratio for
which, U / V ≅ 3,3 → n = 3,3×60 V/πD
Dorin Pavel, which offers at the small speeds of the
stream liquid, one very good, uncommon performance of
n Pturb n Q the maximum power coefficient Cp = 0,56 – as it is
ns = = 3,65 , (4) already presented into the figure 3.
H net H net H net H net
Table 1
with which occasion we do realise the high value of the H V Q P n ns
turbine’s rapidity ns, and also the fact of being (m (m/s) (m3/s) (kW) (r.p.m.)
independent as regard the available head H. )
According with the figure 1 the rotational speed 2 5,49 1,55 16,7 577 1591
component obtained by the directory blades system, is 4 7,77 2,20 47,3 817 1591
gH net 6 9,52 2,69 86,9 1000 1591
Cu1 = , (5)
U j ( Rj ) 8 10,99 3,11 133,8 1155 1591
10 12,29 3,47 186,9 1291 1591
with the rotational speed for the tronson of the blade 12 13,46 3,80 245,7 1414 1591
π D jn
U j = , (6) The generous diameter at the cross-dam pipe D = 1,4 m
60
is suitable for the triple derivation 3d = 3× 0,4 m diameter
and the meridian component for the absolute fluid speed for each power turbine unit (e.g. of special rapid turbine
will be type, vertical position – until other pertinent researching
4Q / π efforts are done).
Cm1 = , (7)
D − d butuc
2 2
cond In fact, the MHPP in question is thought mainly as a real
training lab and related testing place for the best solutions
where C denotes the number of channels for the whole in the field.
water flow considered here into the calculation.
These new solutions are regarding as the best electro-
Figure 1 shows the profiles of the stator and rotor blades hydro-mechanic energy conversion techniques, with
with their speed triangles. Figure 2 shows the rotor machineries of advanced, may be world wide of complete
prototype of an axial turbine which was tested onto the new designed type, as we can show below, for power
glass channel model from the Hydropower lab Professor turbines / pumps, following these above relations (1-7),
as mathematical support.
Fig. 2. The aspect of the hydraulic turbine rotor
Power coefficient Cp

0,6
0,4
Cp (V)
(V)

0,2
0
0 0,5 1
Fig. 4. The photo taken on the actual Ciurel-dam near-by the Polytech
Liquid current velocity V (m/s) University of Bucharest PUB, ready to admit on the left side, the closed
coupled micro hydro-electric power plant MHPP in question, rated
Fig. 3. Power coefficient variation versus the liquid current velocity, 3•100 kW, as installed power.
for the turbine rotor type shown in the figure 1

In the case of reversible turbine-pump, we did adopt for 4. Some Electric Useful Details
the blades’ construction, some original simetric profiles,
having the maximum thickness at the middle of the blade On the primary side, the management for the complex
and using the well known Coanda’s effect against the take power machinery part is quite the same as in reality; even
off phenomena for the fluid, as leaving the profile’ the output ranges around 100 kW, the care and the
surface. operational complex regimes is the same as for the HPP
with MW output; besides, changing the regimes from
3.3. The Water Deaeration Problem – One Necessary generator / motor – turbine / pump, synchronous /
Condition For Conservation The Aquatic Biodiversity asynchronous type at fixed or variable frequency;

One special care has to be taken for the permanent water So, we do cover all significant and so maximized
deaeration all along the River Dambovita crossing the possibilities to teach at the best our students not only here
Romanian Capital, City of Bucharest, and prevented with but standing as an example, everywhere in the world of
some steps; In these places, we did prevent one series of tech universities, where really does exist the desire for
small electric submersible generators with permanent one quality teaching process.
magnets, direct coupled with rotors prevented with radial
blades in order to split the deversant water stream into Advanced rapid turbine/pumps are also in our mind as a
sufficient small drops, just in order to deaerate the patented-newness in progress, in order to minimize the
deversant water-jets. overall dimension at sensible raised efficiency; on the
In this way, we do think to improve the deaeration same line of discussion, we do exercise here the new
capacity in paralel with some electric power generation – concepts of distributed generated energy, having nearby
useful for some auxilliaries, as: illuminating system of the the consumers as the internal services of the MHPP, the
dam and the related street, commercial advertising illuminating system on the dam / street, or the nearby
pannels, heating cabines to shelter the workers during the students’ hostels, even partially.
winter time, some part from the near-by students’ hostels
etc. as incorporated into the newly modern concept of DG The general power electric scheme for the main types of
or direct generation generators is presented into the next figure 5.
Fig. 5.The general electric lay-out diagram for distributed generation proposed scheme for the present MHC

On the secondary side, also lies the most complex part of In so doing the complex design for this new MHPP leads
this application, being in line with IREP theme and we do to the combined idea to prepare at the best our regular
intend to sustain there: all the necessary measuring hydro- students or some students preparing their master-doctoral
electric instrumentation, as flow, pressure, levels, stages; to consider also the MHPP as a training useful
temperatures etc. and the related electric measurements field to deeply experiment for the power industry PI new
departing from the measuring transformers CTs & PTs as protective relays architecture and new automatic
currents, voltages, powers, energies flowing between the regulating loops, especially devoted for speed and voltage
network and this small hydro power station. In this at fixed or variable frequency. In the same time, we do
respect, we can see that the MHPP operates on bounty of continue to release the kWh output into the neighbouring
regimes and transient phenomena as coupled to the network ! The pertinent advantage is the fact that we
external rigid grid or at an isolated island; different could select the indicated regime and to experiment new
complex system of protective relays SPR are prevented devices, without the current risk of loosing MWs as could
on the generator/motor part, outgoing power cables, bus be happened into a real HPP; So, the MHPP stands as a
bars etc. in order to find out which could be the real training and researching polygon – which have to be
intelligent combination to respond at the best within the seen as its high value - in the benefit of the PI; also, for
careful selected operational power regimes. In the same quality training place for students, finally needed to be
line, the advanced digital automatic control means delivered in a “warm state” to this power industry PI,
different types of AVRs and different speed governors, well already prepared to fit with their future field of
ready for testing on site and drawing the right, pertinent activity.
observations. Following this multiple purposes aspect we have had
foreseen not only a completely new hydraulic turbine type
and a turbine-pump type to build any energy-storage by
pumping manoeuvres, but also one synchronous electric into the medium voltage m.v power grid 6/20/110 kV; as
generator/motor; so, the first unit more simple is thought far as the water flow is relatively constant, average 2-3
to be a reversible asynchronous electric machine motor- m3/s, one single simpler unit of asynchronous type HG-
generator. On the same line we did study the wide As1 – capacitive compensated, will running the majority
possibilities for automatic control on the working of time, at the basement of the load curve; during its
mechanical and electrical parameters. failure periods, the synchronous HG-S2 unit of PMG type
We intend to install at least two hydro-electric units of will be coupled to the grid, producing its kW and also its
good efficiency: one as an axial turbine and other one as a implicitly kvars, as the reactive task is usually of local
turbine-pump reversible machine, to make more familiar interest and necessary.
the mass of students with the common manoeuvres for
one pumping, energy - storage power station. We have to d. Educational aspects. One quality teaching process,
state also that the micro-hydro power plant consists of tech. University level could be sustained for common
two types of electric machines, synchronous / students, masters and graduated students preparing their
asynchronous generator; besides, at least one power unit Ph D works. So, in order not to complicate the first
is of reversible type, electric generator-motor, coupled priority which remains the commercial task, we do
with the related turbine - pump. Besides, only one power recommend here the 3rd unit, HG-S3 especially devoted
synchronous unit is of simplified PMG type, the other one for training purposes, high level equipped power unit
has excitation system and therefore will be subjected to with different system excitations, automatic regulators
actions directed by the automatic voltage regulator AVR. and digital protective relay, variable inertia constant (2H)
etc.
a. In the same time we think to be in line with the So, the final complete formula for the above discussed
European Program of Distributed Generation in MHPP is 3•100 kW as rated installed power.
Associated States – DIGENAS, initiated one year before,
by Italy, which means to experiment the direct distributed e. Operational regimes. 1-(HG/M)As, operates continue
clean energy, on isolate consumers, let say here onto the at the base, like induction generator or asynchronous
dam’s auxiliaries or onto the student hostels near-by motor for storage energy purposes; 2-(HG/M)S prevented
located (the associated states are gathered from the also as one PMG rotor, stands to model the pumping
regional European Community, as Rmania, Bulgaria, stations’ operational regimes at fix or variable speed,
Greece, being coordinated in this project by Italy, interconnected to the grid or at islanding conditions on its
Politecnico di Torino - PoliTO, Dept. of Electrical ancillary consumers or supplying some part for the
Engineering, professor Gianfranco CHICCO, [8]). The student hostels; 3-(HG/M)S is well equipped with
following main considerations are below listed. So, standard and modern regulators, digital protections, it is
at the professor’s disposal to conduct lab’s works at
b. Considerations on the power electric side. The final different complexity level, from standard to scientific
general requirements, as we do hope, are to be gathered research together with the regular students, or involved in
the main investment into: the electro-hydraulic master program, graduated students preparing their Ph D
machinery, the envelope building for the machines’ room, etc.
is also the class room prevented at the power house (or The list of works can be carefully conceived, suitable for
better at the first floor), also some demo facilities for common students and for graduated students, following
wind - combined with solar - power generation, our acquired experience with generations of students.
accommodated onto the roof, as superior level, if finally
will be approved. f. However, this bounty or operational regimes will serve
The machines’ room will be suspended over the waters, as real base for the Power Industry PI to test its most
located into the space now left free, between the dam and recent products as regards the digital system protective
the bridge, of maximum span, 7•25 m. The scope is a relay SPR and standard automations, especially advanced
double one: distributed electric power generation, for types of regulators – as for speed governors and for
isolate consumers, so implicitly sustaining the students’ terminal voltage – AVRs.
quality formation directly at work, as far as the
University’s Hydro-Electric Power Lab’s frame within This may be an answer to reach the correct way just in
this genuine MHPP in its ambitious aim. order to diminish the amount of future mistakes however
done by our power engineers in their early stages of the
c. Commercial aspect. The main power units, rated 2¤100 pragmatic activity, involved in the power plants and
kW, connected to the local grid 0.4 kV, 50 Hz, via the network dispatching centers. If it so, the efforts presented
compact distribloc cubicles, will cover firstly the dam’s here with our real scale modeling, even over one MHPP,
ancillary consumers, then excedentary power, injected but carefully designed - are surely worthy.
parallel with one high quality teaching – learning process,
This stands as the main idea underlined by the second mainly devoted to the students involved into the power
author of the present paper: the educational high leveled engineering field.
university purposes, entirely sustained by the commercial
one, [7-9].
References
5. Instead of Conclusions
[1]. Pavel, D. – Hydraulic works around the Bucharest Capital. Tech.
We spoke about one small hydro-power plant MHPP Monography. Uzinele Comunale Bucureşti, 1936 (in Romanian).
[2]. Pavel, D. – The sanitation efforts for the lakes around the Capital.
prevented from ther initial design with its maximum
Institutul Român de Energetică, Vol. 121, 1937,(in Romanian).
versatile features: to generate electric energy and to [3]. Pavel, D. – Waterfalls and hydraulic machinery. 2nd edition,
educate at the best the young generation of students. Tipografia Geniului Publ. House, Bucharest, 1944. (in Romanian)
[4]. Pavel, D. - Hydraulic machinery. vol. 1, Editura Energ. de Stat –
So, the final aim is double - firstly, to inject some modest Publ. House, Bucharest , 1954. (In RO)
[5]. Cazacu, M.D. - Small hydro power units with improved efficiency.
power, even demonstrative – in/out from the network; The 5th National Conference N “Prof. D. Pavel”, 3-4 June 2005, Sebeş,
secondly, in parallel to reduce the probable rate for next Editua AGIR, Bucharest 2005, Vol. 7, p. 195-200. (In Romanian)
mistakes, however done by our future power engineers [6]. Cazacu, M.D. – The efficient extraction for the micro-hydro
working into the real scaled, bulky power systems. potential. The 4th Conf. Dorin Pavel . 26-27 May 2006, Univ.
Politehnica, Bucharest, Vol. II, p. 863- 872. (In Romanian).
[7]. Cazacu, M.D. - Maximization methods of turbomachines
Besides, into (or over !) the machines’ room we hope to performances. International Conference on Applied and Industrial
manage one classroom for students; over this, onto the Mathematics, 17-19 august 2006, Chişinău, Rep.Moldova, Rev.
roof, we do hope to accommodate one demo-park for University from -Tiraspol.
[8]. Chicco, G. - European Program of Distributed Generation in
wind and solar reliable energy converters. Associated States – DIGENAS. Politehnica University from Bucharest,
RO, October, 2006.
We could add the third aim, which stands for quality [9]. Truchard, J. – Where have all the heroes gone ? Control
scientific research devoted to our students etc., and also Engineering. EU, June - July 2005, p.16.
[10]. Guzun, B.D., Mucichescu, C.– Automations in Hidropower
for the power industry PI itself, in order to test the new Engineering. Editura Tehnica Publ. House, 1995, 272 p.
regulators prevented with adaptive PSS, digital protective [8]. Guzun, B.D., Gal, S.A., Darie, G., Olovinaru, D. – Power Stations,
relays, working into specific dynamic regimes for Substations and Electric Networks CSRE. Basic Elements. Editura
different external reactance and power units’ mechanical Academiei Române Publishing House, 2005, 450 p.
[11]. Guzun, B.D., Mucichescu, C., Barglazan, M., Gaiceanu, M.. –
inertia constant etc. Optimal High Power Pumped-Storage System. Rev. Energetica, nr.11,
November 2006, p. 487 – 91.
One turbo unit is asynchronous type, the other one could
be of synchronous type with permanent magnets as About the Authors
generator/motor – PMG, very reliable and devoted to
kW+kvar production; however, the third one have to be Dr. Eng. Basarab Dan GUZUN, - is professor at the Dept.
one pure synchronous classic generator/motor, but up-to- of Power Generation and Use, Faculty of Power Engg.,
date prevented with different system excitation and Politehnica University from Bucharest, Splaiul Indep.
automatic voltage and speed regulators, at different 313, 060042 Bucharest,sector 6, P.O. 16, Romania ,
complexity and devoted to experiments, researching guzunbasarab@yahoo.com;
studies.
Ph D Eng. Mircea Dimitrie CAZACU, is a senior
All the scientific worthy efforts done at the level of this consultant Professor, onorific researcher at the Romanian
small but intelligent designed MHPP are to be further Academy of Science, member of the AGIR, SPERIN
disseminated into one responsible bulky power systems, Associations, Romanian Society-Mathematical Sciences,
ready to proceed it, just in order to obtain one desired Dept. of Power Hydraulics, Faculty of Power Engg.,
revitalized at higher reliability for the main operational Politehnica University from Bucharest - PUB,
regimes, both generation or motoring – the last one for Splaiul Independ. Str. 313, 060042 Bucharest, RO,
storing energy purposes. cazacumircea@yahoo.com, cazacu@hydrop.pub.ro;

The fully completed MHPP will include practical Nicolae NISTOR is with the High School College
schemes and operational regimes describing both the „Lucian Blaga” Sebes-Alba County, professor of applied
turbines of new design and electric machines at work, physics.
regarding the new design concepts – so, double aim
responding: electric energy locally generated/absorbed in
Razvan Guzun, student, in his final stage - finishing the
Faculty of Power Engineering, Power Hydraulics Dept.,
Politehnica University from Bucharest PUB, RO,
guzunr@yahoo.com.

S-ar putea să vă placă și