Topics to Cover
Prequalification
Standard procedures for prequalification of Contractors
Standard procedures for prequalification of Consultants
What is prequalification?
Prequalification
Qualification in advance to take part in something. – Oxford Dictionary
Aim of prequalification
Aim of prequalification
The basic aim of the prequalification is intended to eliminate, early in
procurement proceedings, Constructors that are not suitably qualified to
perform the Contract.
Sub-total: 15
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 04.10.2019
NIT (SCEE), NUST H-12, Islamabad 17
CE-898
Contract Management
Prequalification of Consultants
Prequalification of Consultants
Importance & Philosophy
Prequalification of Consultants is an important step in the selection process to
ensure high quality proposals for a meaningful proposal evaluation in shorter
time for grading of firms in order to have an ultimate selection of suitable
consultants.
It may be remembered that registration of firms in general terms is not a
substitute for Prequalification before inclusion in the shortlist.
The qualifications and experience of the qualifying consultant should be such
as to reflect its previous association with such kind of project(s) and capability
to handle the project with dexterity.
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 04.10.2019
NIT (SCEE), NUST H-12, Islamabad 27
CE-898
Contract Management
Cost of business development: the costs a business incurs from researching, growing and introducing a new
product or service
The Notice must be publicly notified along with scope of work of the project
for which the services of a consultant are required.
Evaluation criteria
There are two essential elements for judging the capability of any firm to
perform credibly on a given project.
These are its previous experience on similar projects and its professional staff
having the specific expertise to meet its obligations during the assignment.
It is essential that appropriate importance / weightage is assigned to each
item.
It is recommended that it should be assigned in the following ratio:-
− Experience of the firm .. .. .. .. .. .. 30 percent points
− Quality of its Personnel’s expertise .. .. .. .. 70 percent points
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 04.10.2019
NIT (SCEE), NUST H-12, Islamabad 32
CE-898
Contract Management
Evaluation criteria
The committee constituted to compile the shortlist should also decide about
the threshold minimum score for the firms below which limit they would not
be considered for prequalification and inclusion in the shortlist.