JOB SAFETY ANALYSIS

Project. DGKCCL
ICPL CONSTRUCTION OF DG KHAN CEMENT PLANT, HUB Rev: 00
Date: 07-11-2016

PPE’s Required: Safety helmet, Safety Shoes, gloves, Coverall, Goggles, Dust Mask, Hi-V Jackets, Ear Plug, and
Full Body Safety Harness.
Date: 07-11-2016 Prepared by: Tauqeer Ahmad
Job: Cone Erection JSA:
Ite Detail of Equipment & Risk Involved Preventive Measure Responsi Sever
m Activities Tools Used ble ity
Person Ratin
g
 Ensure the competency of
 Cranes  Un trained personal.
 Chain Blocks Driver  Before start job training /
 Hooks  Over Speed induction.
1 Mobilization of  Webbing Lifting  Over Load  Communicate speed limit of 20 Constructio 2
Equipment, Slings  Use of mobile kmph within the site premises to n
Tools &  Wire Rope Phone all driver. Manager
personal Slings  Improper  Cell phone use is the strictly
 Shackles Stacking of prohibited in during
 Outriggers Pads Material operating/driving.
 Hand Tools  Personal  Mobilized equipment / tools must
Injury be parked or stacked properly.
 Property Loss  All workers must be trained for
 Electric their specific job.
Shock  Use of PPE should be strictly
 Wind observed.
 Dust  All Electrical equipment should be
inspected before starting job

Page 1 of 7
JOB SAFETY ANALYSIS

 Weather/ Wind conditions should


be checked
 Sprinkling of water should be
done for dust control
Lifting/ Erection  Cranes  Collapse of  Barricade the area of crane
 Chain Blocks Crane and operation and place warning
2 Load signs.
 Fire  Competent Operator and Crew Constructio 2
 Injury to  Verify the suitability of lifting n
Workers tackles & crane for the loads to be Manager
 Damage to handled
Load  Check the Lifting Tools; Tackles &
 Hit Crane have fitness validity and
 Fall certificate
 Over Loading  Ensure the area is free from
 Over obstacles for crane operations and
Speeding ground is properly compacted
 Un-Trained  Confirm the stability of the crane
operator and at work site
Crew  Conduct safety check of the crane
prior to start lifting
 Carry out the load test in case the
crane is assembled at site
 Ensure that the load is secured for
safe lifting
 Check the availability of suitable
& approved Fire Extinguishers at
site
 Check the slings, chain, ropes, eye
bolt, pallet, container are not
damaged and safe for lifting the
load
 Verify the workers are trained for

Page 2 of 7
JOB SAFETY ANALYSIS

heavy lifting operations and non-


essential person leave the area
before lifting operations starts
 Confirm the signals between crane
Operator & Banksman. Only
trained Banksman to give signal
 Ensure no one rides on the load
and nobody goes below the load
 Ensure the load safety before
lifting and never overload more
than the capacity of crane, pallet,
container, slings /chain / ropes or
tackles etc.
 Lift the load slowly & check the
slings / ropes / chains are not
twisted keeping the load in central
position
 Use the rope for guiding the load
if required
 During transportation of pre-cast
elements, should be supported
and tied on the trailer.
 Use rubber pads to protect
abrasion from slings
 Avoid standing at edges.
5 Vehicular  Cranes  Slip, Trip &  Make sure that workers are Constructio 2
properly wearing all PPE’s.
Movement  LTV’s Fall  A banks man should always be n
And Equipment  Back Injury available whenever heavy vehicle Manager
failure  Hand Pinch movement is involved.
 All equipment should have valid
 Face, Eye inspection checklists.
Injury  For LTV’s separate route should
 Reversing of be selected and all vehicles shall
vehicle not enter in the vicinity of

Page 3 of 7
JOB SAFETY ANALYSIS

foundations.
 In case of mechanical failure
mechanical team will there to sort
out issue and rectify the problem.
 Scaffolds must be designed by a
6 Scaffolds  Wrenches  Falls qualified person. Qualified means Constructio 3
 Scaffolding  Damaged/ one who, by possession of a n
Pipes Broken recognized degree, certificate, or Manager
 Joints Equipment professional standing, or who by
 Wooden Planks  Improper extensive knowledge, training,
 Base Plates Assembly and experience, has successfully
 Ropes  Improper Use demonstrated his/her ability to
 Toe Boards solve or resolve problems related
to the subject matter, the work,
or the project.
 Scaffolds must be used and
inspected in accordance with the
manufacturer’s instruction for
each specific model and type of
scaffold being used.
 All wheels equipped with locking
devices must be locked prior to
climbing, all bolts and nuts must
be tight, and all cotter pins must
be in place and secured before
use (if required).
 All erected scaffolds must be
erected under the supervision of a
scaffold competent person.
 When working off scaffolds that
are four ft. or more above a
walking/working surface, fall
protection or OSHA compliant
handrails are required.
 The scaffold competent person
and the qualified person may be

Page 4 of 7
JOB SAFETY ANALYSIS

the same individual.


 Newly erected or modified
scaffolds must be inspected by
the scaffold competent person
and by a qualified person prior to
use.
 Daily pre-use inspections must be
conducted by competent person
and the scaffold tag must be
signed by the scaffold competent
person.
 Make sure that safety net and
railing are properly installed &
 Bracket  Falling used.
 Scaffolding Objects  Passenger hoist will be third party
7 Work at Height  Passenger Hoist  Failure of certified. Constructio 3
Activities  Hydraulic Jacks Hoisting  Ensure the capacity of passenger n
 Electric Lights System hoist. Manager
 Man Basket  Personnel  All equipment used at height i.e.
Fall above ground level is to have a
 Fire lanyard fitted which is to be
 Electrocution handled by the person using that
 Personnel item.
Injury  When not is used the lanyard is to
 Property Loss be fixed to an anchor points.
 Where possible pedestrian access
is to be retried.
 Fall arrest harness should be
correctly fitted harness must be
100% tie off. Loose harness area
significant risk therefore harness
should be checked by a competent
person.

Page 5 of 7
JOB SAFETY ANALYSIS

 Working in the vicinity of an


opening through which a worker
could fall.
 All the electric wire should be
properly inspected and strictly
ensured that all extension leads
are connected with ELCB installed
DB.
 Water Cooler  Water  Available of drinking water. 2
 Rest Shed Deficiency  Provide periodic rest to workers.
 Smoking Area  Hot Weather  Rest area / shed shall be provided.
8 Health &  First Aid Box  Fatigue/Over  Strict compliance of no smoking Constructio
Welfare  Standby Vehicle Work policy at site. n
 Ambulance  Minor/Major  Smoking area shall be identified Manager
Injury highlighted (away from no
smokers).
 Ambulance with trained First
Aider will be available during
work activity.
 Hand Injury /  Ensure workers are complying 3
Eye Injury PPE’s required.
 Electric  Fire extinguisher must be
9 Night Working  Lights Shocks / presented at site all the time. Constructio
Activities  Stands Electrocution  Light should be proper prior to n
 Improper start the work. Manager
Illumination  All power cables should be
 Personal inspected and insulated.
Injury  Lights should be installed over
 Property Loss head height to avoid glaring to
personal.
 If generator use for electricity
should be properly grounded.

Page 6 of 7
JOB SAFETY ANALYSIS

Severity Rating: (1) First Aid / Minor Property Damage. (2) Recordable Accident / Property
Damage.
(3) Lost Time Accident / Major Property Loss. (4) Catastrophic Accident

What I Am Going to Do? How I Am Going to Do? What are the Risks? How do I Control Risks? Is
Risks too High?

______________________ ___________________
____________________
HSE Representative Verified By
Approved By

Page 7 of 7