M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
PLOT NO. 43
Construction Stage
Finishes
PARKING LEVEL 3
Run Date 20NOV10 12:27 CP30 Danet Abu Dhabi Tower Sheet 1 of 22
Early Bar
Plot 43 Date Revision Checked Approved
Progress Bar
Under Progress Activities 16APR10 Target Rev.0 AN
Critical Activity
Sheet 2 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
04AR059 Marble Thersholders 1 28MAR10A 28MAR10A 0 100 Marble Thersholders
04AR161 Gypsum Board False Ceiling Installation 6 16MAR10A 22MAR10A 0 100 Gypsum Board False Ceiling Installation
04AR173 Moisture Resistance Gyp. Board False Ceiling 6 23MAR10A 29MAR10A 0 100 Moisture Resistance Gyp. Board False Ceiling
04AR111 Vanity Top 4 04APR10A 07APR10A 0 100 Vanity Top
04AR116 kitchen Cabinet 6 03APR10A 08APR10A 0 100 kitchen Cabinet
04AR141 Epoxy Floor For Services Room (Elec.,IT,Jaintor) 5 14MAR10A 18MAR10A 0 100 Epoxy Floor For Services Room (Elec.,IT,Jaintor)
04AR191 Painting (1st coat, 2nd coat) 4 20MAR10A 23MAR10A 0 100 Painting (1st coat, 2nd coat)
04AR113 Breakfast Counter 5 04APR10A 08APR10A 0 100 Breakfast Counter
04AR121 Toilet Mirrors 1 19APR10A 19APR10A 0 100 Toilet Mirrors
04AR211 Hollow Metal Door Installation 1 21APR10A 21APR10A 0 100 Hollow Metal Door Installation
04AR201 Painting Final Coat 4 22APR10A 26APR10 0 25 Painting Final Coat
TOWER LEVEL 5
Sheet 3 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
08AR121 Toilet Mirrors 1 24APR10 24APR10 0 0 Toilet Mirrors
08AR221 Wooden Door Installation &Ironmongery 4 07APR10A 11APR10A 0 100 Wooden Door Installation &Ironmongery
08AR211 Hollow Metal Door Installation 1 24APR10 24APR10 0 0 Hollow Metal Door Installation
08AR201 Painting Final Coat 4 27APR10 01MAY10 0 0 Painting Final Coat
TOWER LEVEL 9
Sheet 4 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
13AR021 Internal Plastering Wor 10 30DEC09A 20FEB10A 100 100 Internal Plastering Wor
13AR011 Install Of Doors Sub Frame 4 23JAN10A 01FEB10A 100 100 Install Of Doors Sub Frame
13AR053 Ceramic Floor Tiles for Bed Rooms 12 16FEB10A 22FEB10A 100 100 Ceramic Floor Tiles for Bed Rooms
13AR055 Ceramic FLR Tiles for Living,Dinning,Foyer,WD 6 16FEB10A 22FEB10A 100 100 Ceramic FLR Tiles for Living,Dinning,Foyer,WD
13AR057 Ceramic Skirting For Rooms 2 20FEB10A 22FEB10A 100 100 Ceramic Skirting For Rooms
13AR041 Finishing For corridor wall 6 17APR10A 22APR10A 83 100 Finishing For corridor wall
13AR051 Porcelain Floor Tiles for lift lobby+corridor 4 11APR10A 14APR10A 100 100 Porcelain Floor Tiles for lift lobby+corridor
13AR061 Porcelain Skirting for lift lobby 4 15APR10A 19APR10A 50 100 Porcelain Skirting for lift lobby
13AR181 Painting ( primer ,Putty ) 8 16MAR10A 24MAR10A 100 100 Painting ( primer ,Putty )
13AR131 Epoxy Paint For Services Room (Elec.,IT,Jaintor) 2 28MAR10A 29MAR10A 66 100 Epoxy Paint For Services Room (Elec.,IT,Jaintor)
13AR071 Ceramic Tiles For Toilet Wall 6 25MAR10A 31MAR10A 15 100 Ceramic Tiles For Toilet Wall
13AR221 Wooden Door Installation &Ironmongery 4 17APR10A 20APR10A 13 100 Wooden Door Installation &Ironmongery
13AR151 Suspension System False Ceiling 6 06APR10A 12APR10A 10 100 Suspension System False Ceiling
13AR081 Water Proofing For Wet Area 4 29MAR10A 01APR10A 0 100 Water Proofing For Wet Area
13AR031 30x60 Granite for wall (lift lobby ) 2 28MAR10A 29MAR10A 0 100 30x60 Granite for wall (lift lobby )
13AR091 Ceramic Tiles for Toilet& Kitchens Floor 7 05APR10A 12APR10A 0 100 Ceramic Tiles for Toilet& Kitchens Floor
13AR059 Marble Thersholders 1 11APR10A 11APR10A 0 100 Marble Thersholders
13AR111 Vanity Top 4 18APR10A 21APR10A 0 100 Vanity Top
13AR161 Gypsum Board False Ceiling Installation 6 08APR10A 14APR10A 0 100 Gypsum Board False Ceiling Installation
13AR173 Moisture Resistance Gyp. Board False Ceiling 6 13APR10A 19APR10A 0 100 Moisture Resistance Gyp. Board False Ceiling
13AR121 Toilet Mirrors 1 29APR10 29APR10 0 0 Toilet Mirrors
13AR116 kitchen Cabinet 6 24APR10 29APR10 0 0 kitchen Cabinet
13AR191 Painting (1st coat, 2nd coat) 4 15APR10A 19APR10A 0 100 Painting (1st coat, 2nd coat)
13AR113 Breakfast Counter 5 25APR10 29APR10 0 0 Breakfast Counter
13AR211 Hollow Metal Door Installation 1 27APR10 27APR10 0 0 Hollow Metal Door Installation
13AR141 Epoxy Floor For Services Room (Elec.,IT,Jaintor) 5 12APR10A 17APR10A 0 100 Epoxy Floor For Services Room (Elec.,IT,Jaintor)
13AR201 Painting Final Coat 4 02MAY10 05MAY10 0 0 Painting Final Coat
TOWER LEVEL 14
Sheet 5 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
17AR061 Porcelain Skirting for lift lobby 4 20APR10A 24APR10 50 75 Porcelain Skirting for lift lobby
17AR051 Porcelain Floor Tiles for lift lobby+corridor 4 15APR10A 19APR10A 100 100 Porcelain Floor Tiles for lift lobby+corridor
17AR181 Painting ( primer ,Putty ) 8 24MAR10A 01APR10A 100 100 Painting ( primer ,Putty )
17AR221 Wooden Door Installation &Ironmongery 4 25APR10 28APR10 13 0 Wooden Door Installation &Ironmongery
17AR071 Ceramic Tiles For Toilet Wall 6 01APR10A 07APR10A 0 100 Ceramic Tiles For Toilet Wall
17AR031 30x60 Granite for wall (lift lobby ) 2 30MAR10A 31MAR10A 0 100 30x60 Granite for wall (lift lobby )
17AR081 Water Proofing For Wet Area 4 10APR10A 13APR10A 0 100 Water Proofing For Wet Area
17AR059 Marble Thersholders 1 12APR10A 12APR10A 0 100 Marble Thersholders
17AR091 Ceramic Tiles for Toilet& Kitchens Floor 7 13APR10A 20APR10A 0 100 Ceramic Tiles for Toilet& Kitchens Floor
17AR151 Suspension System False Ceiling 6 13APR10A 19APR10A 0 100 Suspension System False Ceiling
17AR111 Vanity Top 4 22APR10A 26APR10 0 25 Vanity Top
17AR121 Toilet Mirrors 1 04MAY10 04MAY10 0 0 Toilet Mirrors
17AR161 Gypsum Board False Ceiling Installation 6 20APR10A 26APR10 0 50 Gypsum Board False Ceiling Installation
17AR173 Moisture Resistance Gyp. Board False Ceiling 6 20APR10A 26APR10 0 50 Moisture Resistance Gyp. Board False Ceiling
17AR211 Hollow Metal Door Installation 1 29APR10 29APR10 0 0 Hollow Metal Door Installation
17AR116 kitchen Cabinet 6 01MAY10 06MAY10 0 0 kitchen Cabinet
17AR191 Painting (1st coat, 2nd coat) 4 24APR10 27APR10 0 0 Painting (1st coat, 2nd coat)
17AR113 Breakfast Counter 5 02MAY10 06MAY10 0 0 Breakfast Counter
17AR201 Painting Final Coat 4 08MAY10 11MAY10 0 0 Painting Final Coat
17AR141 Epoxy Floor For Services Room (Elec.,IT,Jaintor) 5 24APR10 28APR10 0 0 Epoxy Floor For Services Room (Elec.,IT,Jaintor)
TOWER LEVEL 18
Sheet 6 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
21AR151 Suspension System False Ceiling 6 20APR10A 26APR10 0 50 Suspension System False Ceiling
21AR111 Vanity Top 4 27APR10 01MAY10 0 0 Vanity Top
21AR161 Gypsum Board False Ceiling Installation 6 27APR10 03MAY10 0 0 Gypsum Board False Ceiling Installation
21AR121 Toilet Mirrors 1 09MAY10 09MAY10 0 0 Toilet Mirrors
21AR211 Hollow Metal Door Installation 1 02MAY10 02MAY10 0 0 Hollow Metal Door Installation
21AR041 Finishing For corridor wall 6 01MAY10 06MAY10 0 0 Finishing For corridor wall
21AR173 Moisture Resistance Gyp. Board False Ceiling 6 27APR10 03MAY10 0 0 Moisture Resistance Gyp. Board False Ceiling
21AR191 Painting (1st coat, 2nd coat) 4 01MAY10 04MAY10 0 0 Painting (1st coat, 2nd coat)
21AR221 Wooden Door Installation &Ironmongery 4 04MAY10 08MAY10 0 0 Wooden Door Installation &Ironmongery
21AR116 kitchen Cabinet 6 08MAY10 13MAY10 0 0 kitchen Cabinet
21AR113 Breakfast Counter 5 09MAY10 13MAY10 0 0 Breakfast Counter
21AR201 Painting Final Coat 4 12MAY10 16MAY10 0 0 Painting Final Coat
21AR141 Epoxy Floor For Services Room (Elec.,IT,Jaintor) 5 29APR10 04MAY10 0 0 Epoxy Floor For Services Room (Elec.,IT,Jaintor)
MECHANICAL LEVEL
P3K1AC031 Chilled Water Pipe suspension System 12 15AUG09A 17JAN10A 100 100
P3K1AC005 Pre-insulatted Duct Installation 14 28SEP09A 24MAR10A 60 100
P3K1AC001 Duct Suspension System Installation 14 30SEP09A 20MAR10A 80 100
P3K1AC035 Chilled Water Pipe Installation 5 13JAN10A 16JAN10A 100 100
P3K1AC021 FCU Installation 4 16JAN10A 17JAN10A 100 100
P3K1AC051 Valves Installation 5 23MAR10A 28MAR10A 0 100
P3K1AC011 Dampers Installation 3 25MAR10A 28MAR10A 0 100
P3K1AC063 Extract Fans Installation 14 08APR10A 24APR10 0 93
P3K1AC041 Chilled Water Pipe Insulation 6 27MAR10A 01APR10A 0 100
P3K1AC081 Air Outlets Installation 4 03APR10A 06APR10A 0 100
PARKING LEVEL 2
PK1AC031 Chilled Water Pipe suspension System 12 26AUG09A 23JAN10A 100 100
PK1AC001 Duct Suspension System Installation 12 25OCT09A 22MAR10A 40 100
PK1AC021 FCU Installation 4 17JAN10A 17JAN10A 100 100
PK1AC035 Chilled Water Pipe Installation 4 17JAN10A 21JAN10A 100 100
PK1AC051 Valves Installation 5 17JAN10A 06APR10A 90 100
PK1AC005 Pre-insulatted Duct Installation 12 23MAR10A 05APR10A 0 100
PK1AC011 Dampers Installation 3 03APR10A 05APR10A 0 100
PK1AC041 Chilled Water Pipe Insulation 4 11APR10A 14APR10A 0 100
PK1AC081 Air Outlets Installation 5 07APR10A 12APR10A 0 100
Sheet 7 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
PK1AC063 Extract Fans Installation 14 25APR10 10MAY10 0 0 Extract Fans Installation
PARKING LEVEL 1
P1AC031 Chilled Water Pipe suspension System 8 20MAR10A 28MAR10A 0 100 Chilled Water Pipe suspension System
P1AC001 Duct Suspension System Installation 10 24MAR10A 04APR10A 0 100 Duct Suspension System Installation
P1AC035 Chilled Water Pipe Installation 8 29MAR10A 06APR10A 0 100 Chilled Water Pipe Installation
P1AC005 Pre-insulatted Duct Installation 8 31MAR10A 08APR10A 0 100 Pre-insulatted Duct Installation
P1AC011 Dampers Installation 3 10APR10A 12APR10A 0 100 Dampers Installation
P1AC021 FCU Installation 5 13APR10A 18APR10A 0 100 FCU Installation
P1AC051 Valves Installation 5 13APR10A 18APR10A 0 100 Valves Installation
P1AC061 BTU Meter 1st fix 5 13APR10A 18APR10A 0 100 BTU Meter 1st fix
P1AC041 Chilled Water Pipe Insulation 10 15APR10A 26APR10 0 70 Chilled Water Pipe Insulation
P1AC081 Air Outlets Installation 8 22APR10A 01MAY10 0 13 Air Outlets Installation
PODIUM LEVEL 2
AC031 Chilled Water Pipe suspension System 8 13OCT09A 21NOV09A 100 100 Chilled Water Pipe suspension System
AC035 Chilled Water Pipe Installation 8 13OCT09A 07DEC09A 100 100 Chilled Water Pipe Installation
AC001 Duct Suspension System Installation 9 17OCT09A 04NOV09A 100 100 Duct Suspension System Installation
AC041 Chilled Water Pipe Insulation 8 02NOV09A 25JAN10A 100 100 Chilled Water Pipe Insulation
AC051 Valves Installation 5 03NOV09A 01APR10A 90 100 Valves Installation
AC005 Pre-insulatted Duct Installation 8 07NOV09A 06MAR10A 100 100 Pre-insulatted Duct Installation
AC021 FCU Installation 5 05DEC09A 09DEC09A 100 100 FCU Installation
AC011 Dampers Installation 3 07DEC09A 06MAR10A 95 100 Dampers Installation
AC061 BTU Meter 1st fix 5 03APR10A 07APR10A 0 100 BTU Meter 1st fix
AC081 Air Outlets Installation 5 08APR10A 13APR10A 0 100 Air Outlets Installation
TOWER LEVEL 2
02AC031 Chilled Water Pipe suspension System 8 31OCT09A 16NOV09A 100 100 Chilled Water Pipe suspension System
02AC035 Chilled Water Pipe Installation 8 31OCT09A 19NOV09A 100 100 Chilled Water Pipe Installation
02AC005 Pre-insulatted Duct Installation 8 22NOV09A 06MAR10A 100 100 Pre-insulatted Duct Installation
02AC001 Duct Suspension System Installation 9 29NOV09A 15DEC09A 100 100 Duct Suspension System Installation
02AC021 FCU Installation 5 07DEC09A 12DEC09A 100 100 FCU Installation
02AC011 Dampers Installation 3 20DEC09A 06MAR10A 95 100 Dampers Installation
02AC041 Chilled Water Pipe Insulation 8 05JAN10A 26JAN10A 100 100 Chilled Water Pipe Insulation
02AC051 Valves Installation 5 09JAN10A 01APR10A 90 100 Valves Installation
02AC061 BTU Meter 1st fix 5 03APR10A 07APR10A 0 100 BTU Meter 1st fix
02AC081 Air Outlets Installation 5 08APR10A 13APR10A 0 100 Air Outlets Installation
TOWER LEVEL 3
03AC031 Chilled Water Pipe suspension System 8 02NOV09A 14NOV09A 100 100 Chilled Water Pipe suspension System
03AC035 Chilled Water Pipe Installation 8 02NOV09A 23NOV09A 100 100 Chilled Water Pipe Installation
03AC001 Duct Suspension System Installation 9 30NOV09A 04JAN10A 100 100 Duct Suspension System Installation
03AC021 FCU Installation 5 09DEC09A 14DEC09A 100 100 FCU Installation
03AC005 Pre-insulatted Duct Installation 8 14DEC09A 06MAR10A 100 100 Pre-insulatted Duct Installation
03AC041 Chilled Water Pipe Insulation 8 09JAN10A 26JAN10A 100 100 Chilled Water Pipe Insulation
03AC011 Dampers Installation 3 10JAN10A 06MAR10A 95 100 Dampers Installation
03AC051 Valves Installation 5 10JAN10A 01APR10A 90 100 Valves Installation
03AC061 BTU Meter 1st fix 5 03APR10A 07APR10A 0 100 BTU Meter 1st fix
03AC081 Air Outlets Installation 5 08APR10A 13APR10A 0 100
TOWER LEVEL 4
04AC031 Chilled Water Pipe suspension System 8 30NOV09A 07DEC09A 100 100
04AC035 Chilled Water Pipe Installation 8 30NOV09A 11DEC09A 100 100
04AC001 Duct Suspension System Installation 9 10DEC09A 03JAN10A 100 100
04AC005 Pre-insulatted Duct Installation 8 10DEC09A 06MAR10A 100 100
04AC021 FCU Installation 5 13DEC09A 17DEC09A 100 100
04AC011 Dampers Installation 3 27DEC09A 06MAR10A 95 100
04AC041 Chilled Water Pipe Insulation 8 11JAN10A 16FEB10A 100 100
04AC051 Valves Installation 5 11JAN10A 01APR10A 90 100
04AC061 BTU Meter 1st fix 5 03APR10A 07APR10A 0 100
04AC081 Air Outlets Installation 5 08APR10A 13APR10A 0 100
TOWER LEVEL 5
07AC031 Chilled Water Pipe suspension System 8 03JAN10A 09JAN10A 100 100
07AC035 Chilled Water Pipe Installation 8 03JAN10A 09JAN10A 100 100
07AC001 Duct Suspension System Installation 9 10JAN10A 19JAN10A 100 100
07AC005 Pre-insulatted Duct Installation 8 10JAN10A 10MAR10A 90 100
07AC051 Valves Installation 5 12JAN10A 24MAR10A 90 100
07AC011 Dampers Installation 3 16JAN10A 10MAR10A 95 100
07AC041 Chilled Water Pipe Insulation 8 07FEB10A 10FEB10A 100 100
07AC021 FCU Installation 5 28FEB10A 22MAR10A 100 100
07AC061 BTU Meter 1st fix 5 03APR10A 07APR10A 0 100
07AC081 Air Outlets Installation 5 14APR10A 19APR10A 0 100
TOWER LEVEL 8
08AC031 Chilled Water Pipe suspension System 8 18MAR10A 27MAR10A 100 100
08AC035 Chilled Water Pipe Installation 8 24MAR10A 01APR10A 100 100
Sheet 8 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
08AC051 Valves Installation 5 03APR10A 07APR10A 90 100 Valves Installation
08AC001 Duct Suspension System Installation 9 18MAR10A 28MAR10A 60 100 Duct Suspension System Installation
08AC005 Pre-insulatted Duct Installation 8 24MAR10A 01APR10A 0 100 Pre-insulatted Duct Installation
08AC021 FCU Installation 5 03APR10A 07APR10A 0 100 FCU Installation
08AC061 BTU Meter 1st fix 5 03APR10A 07APR10A 0 100 BTU Meter 1st fix
08AC011 Dampers Installation 3 30MAR10A 01APR10A 0 100 Dampers Installation
08AC041 Chilled Water Pipe Insulation 8 07APR10A 15APR10A 0 100 Chilled Water Pipe Insulation
08AC081 Air Outlets Installation 5 14APR10A 19APR10A 0 100 Air Outlets Installation
TOWER LEVEL 9
09AC001 Duct Suspension System Installation 9 13JAN10A 01FEB10A 100 100 Duct Suspension System Installation
09AC005 Pre-insulatted Duct Installation 8 13JAN10A 11MAR10A 90 100 Pre-insulatted Duct Installation
09AC031 Chilled Water Pipe suspension System 8 13JAN10A 18JAN10A 100 100 Chilled Water Pipe suspension System
09AC035 Chilled Water Pipe Installation 8 13JAN10A 18JAN10A 100 100 Chilled Water Pipe Installation
09AC051 Valves Installation 5 14JAN10A 04APR10A 90 100 Valves Installation
09AC011 Dampers Installation 3 01FEB10A 11MAR10A 95 100 Dampers Installation
09AC041 Chilled Water Pipe Insulation 8 08FEB10A 16FEB10A 100 100 Chilled Water Pipe Insulation
09AC021 FCU Installation 5 22FEB10A 04APR10A 100 100 FCU Installation
09AC061 BTU Meter 1st fix 5 03APR10A 07APR10A 0 100 BTU Meter 1st fix
09AC081 Air Outlets Installation 5 20APR10A 25APR10 0 60 Air Outlets Installation
TOWER LEVEL 10
10AC001 Duct Suspension System Installation 9 10JAN10A 28MAR10A 100 100 Duct Suspension System Installation
10AC005 Pre-insulatted Duct Installation 8 11JAN10A 01APR10A 90 100 Pre-insulatted Duct Installation
10AC011 Dampers Installation 3 15FEB10A 01APR10A 95 100 Dampers Installation
10AC031 Chilled Water Pipe suspension System 8 18MAR10A 27MAR10A 100 100 Chilled Water Pipe suspension System
10AC035 Chilled Water Pipe Installation 8 24MAR10A 01APR10A 100 100 Chilled Water Pipe Installation
10AC021 FCU Installation 5 05APR10A 10APR10A 100 100 FCU Installation
10AC051 Valves Installation 5 05APR10A 10APR10A 0 100 Valves Installation
10AC061 BTU Meter 1st fix 5 05APR10A 10APR10A 0 100 BTU Meter 1st fix
10AC041 Chilled Water Pipe Insulation 8 10APR10A 18APR10A 0 100 Chilled Water Pipe Insulation
10AC081 Air Outlets Installation 5 20APR10A 25APR10 0 60 Air Outlets Installation
TOWER LEVEL 11
11AC031 Chilled Water Pipe suspension System 8 18JAN10A 25JAN10A 100 100 Chilled Water Pipe suspension System
11AC035 Chilled Water Pipe Installation 8 18JAN10A 30JAN10A 100 100 Chilled Water Pipe Installation
11AC051 Valves Installation 5 18JAN10A 10APR10A 90 100 Valves Installation
11AC001 Duct Suspension System Installation 9 21JAN10A 03FEB10A 100 100 Duct Suspension System Installation
11AC005 Pre-insulatted Duct Installation 8 02FEB10A 11MAR10A 90 100 Pre-insulatted Duct Installation
11AC011 Dampers Installation 3 03FEB10A 11MAR10A 95 100 Dampers Installation
11AC041 Chilled Water Pipe Insulation 8 22FEB10A 01MAR10A 100 100 Chilled Water Pipe Insulation
11AC021 FCU Installation 5 05APR10A 10APR10A 100 100 FCU Installation
11AC061 BTU Meter 1st fix 5 05APR10A 10APR10A 0 100 BTU Meter 1st fix
11AC081 Air Outlets Installation 5 20APR10A 25APR10 0 60 Air Outlets Installation
TOWER LEVEL 12
12AC001 Duct Suspension System Installation 9 23JAN10A 16FEB10A 100 100 Duct Suspension System Installation
12AC031 Chilled Water Pipe suspension System 8 26JAN10A 29JAN10A 100 100 Chilled Water Pipe suspension System
12AC035 Chilled Water Pipe Installation 8 26JAN10A 02FEB10A 100 100 Chilled Water Pipe Installation
12AC051 Valves Installation 5 26JAN10A 10APR10A 90 100 Valves Installation
12AC005 Pre-insulatted Duct Installation 8 07FEB10A 13MAR10A 90 100 Pre-insulatted Duct Installation
12AC011 Dampers Installation 3 07FEB10A 13MAR10A 95 100 Dampers Installation
12AC041 Chilled Water Pipe Insulation 8 10APR10A 18APR10A 100 100 Chilled Water Pipe Insulation
12AC021 FCU Installation 5 05APR10A 10APR10A 100 100 FCU Installation
12AC061 BTU Meter 1st fix 5 05APR10A 10APR10A 0 100 BTU Meter 1st fix
12AC081 Air Outlets Installation 5 20APR10A 25APR10 0 60 Air Outlets Installation
TOWER LEVEL 13
13AC031 Chilled Water Pipe suspension System 8 30JAN10A 03FEB10A 100 100 Chilled Water Pipe suspension System
13AC035 Chilled Water Pipe Installation 8 30JAN10A 04FEB10A 100 100 Chilled Water Pipe Installation
13AC051 Valves Installation 5 30JAN10A 15APR10A 90 100 Valves Installation
13AC001 Duct Suspension System Installation 9 20FEB10A 14MAR10A 100 100 Duct Suspension System Installation
13AC005 Pre-insulatted Duct Installation 8 20FEB10A 20MAR10A 90 100 Pre-insulatted Duct Installation
13AC011 Dampers Installation 3 20FEB10A 21MAR10A 95 100 Dampers Installation
13AC041 Chilled Water Pipe Insulation 8 15APR10A 24APR10 100 88 Chilled Water Pipe Insulation
13AC021 FCU Installation 5 11APR10A 15APR10A 100 100 FCU Installation
13AC061 BTU Meter 1st fix 5 11APR10A 15APR10A 0 100 BTU Meter 1st fix
13AC081 Air Outlets Installation 5 26APR10 01MAY10 0 0 Air Outlets Installation
TOWER LEVEL 14
14AC031 Chilled Water Pipe suspension System 8 30JAN10A 20FEB10A 100 100 Chilled Water Pipe suspension System
14AC035 Chilled Water Pipe Installation 8 03FEB10A 04APR10A 100 100 Chilled Water Pipe Installation
14AC051 Valves Installation 5 21FEB10A 15APR10A 90 100 Valves Installation
14AC001 Duct Suspension System Installation 9 23FEB10A 14MAR10A 100 100 Duct Suspension System Installation
14AC005 Pre-insulatted Duct Installation 8 23FEB10A 20MAR10A 90 100 Pre-insulatted Duct Installation
14AC011 Dampers Installation 3 23FEB10A 21MAR10A 95 100
14AC021 FCU Installation 5 11APR10A 15APR10A 100 100
14AC061 BTU Meter 1st fix 5 11APR10A 15APR10A 0 100
14AC041 Chilled Water Pipe Insulation 8 15APR10A 24APR10 0 88
14AC081 Air Outlets Installation 5 26APR10 01MAY10 0 0
TOWER LEVEL 15
16AC031 Chilled Water Pipe suspension System 8 02MAR10A 27MAR10A 100 100
16AC035 Chilled Water Pipe Installation 8 02MAR10A 01APR10A 100 100
16AC051 Valves Installation 5 17APR10A 21APR10A 90 100
16AC001 Duct Suspension System Installation 9 13MAR10A 22MAR10A 100 100
16AC011 Dampers Installation 3 24MAR10A 27MAR10A 90 100
16AC005 Pre-insulatted Duct Installation 8 18MAR10A 27MAR10A 90 100
16AC041 Chilled Water Pipe Insulation 8 21APR10A 29APR10 100 25
16AC021 FCU Installation 5 17APR10A 21APR10A 20 100
16AC061 BTU Meter 1st fix 5 17APR10A 21APR10A 0 100
16AC081 Air Outlets Installation 5 26APR10 01MAY10 0 0
TOWER LEVEL 17
17AC031 Chilled Water Pipe suspension System 8 21MAR10A 29MAR10A 100 100
17AC035 Chilled Water Pipe Installation 8 27MAR10A 04APR10A 100 100
17AC001 Duct Suspension System Installation 9 23MAR10A 01APR10A 100 100
17AC005 Pre-insulatted Duct Installation 8 29MAR10A 06APR10A 90 100
17AC051 Valves Installation 5 17APR10A 21APR10A 90 100
17AC011 Dampers Installation 3 04APR10A 06APR10A 90 100
17AC021 FCU Installation 5 17APR10A 21APR10A 20 100
17AC061 BTU Meter 1st fix 5 17APR10A 21APR10A 0 100
17AC041 Chilled Water Pipe Insulation 8 21APR10A 29APR10 0 25
17AC081 Air Outlets Installation 5 02MAY10 06MAY10 0 0
TOWER LEVEL 18
18AC031 Chilled Water Pipe suspension System 8 21MAR10A 29MAR10A 100 100
18AC035 Chilled Water Pipe Installation 8 05APR10A 13APR10A 100 100
18AC051 Valves Installation 5 17APR10A 21APR10A 90 100
18AC001 Duct Suspension System Installation 9 23MAR10A 01APR10A 100 100
18AC005 Pre-insulatted Duct Installation 8 29MAR10A 06APR10A 90 100
18AC011 Dampers Installation 3 04APR10A 06APR10A 95 100
18AC021 FCU Installation 5 17APR10A 21APR10A 20 100
18AC061 BTU Meter 1st fix 5 17APR10A 21APR10A 0 100
18AC041 Chilled Water Pipe Insulation 8 21APR10A 29APR10 0 25
Sheet 9 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
18AC081 Air Outlets Installation 5 02MAY10 06MAY10 0 0 Air Outlets Installation
TOWER LEVEL 19
19AC031 Chilled Water Pipe suspension System 8 30MAR10A 07APR10A 100 100 Chilled Water Pipe suspension System
19AC035 Chilled Water Pipe Installation 8 05APR10A 13APR10A 100 100 Chilled Water Pipe Installation
19AC051 Valves Installation 5 22APR10A 27APR10 90 20 Valves Installation
19AC001 Duct Suspension System Installation 9 23MAR10A 01APR10A 100 100 Duct Suspension System Installation
19AC005 Pre-insulatted Duct Installation 8 29MAR10A 06APR10A 70 100 Pre-insulatted Duct Installation
19AC011 Dampers Installation 3 04APR10A 06APR10A 50 100 Dampers Installation
19AC021 FCU Installation 5 22APR10A 27APR10 20 20 FCU Installation
19AC061 BTU Meter 1st fix 5 22APR10A 27APR10 0 20 BTU Meter 1st fix
19AC041 Chilled Water Pipe Insulation 8 26APR10 04MAY10 0 0 Chilled Water Pipe Insulation
19AC081 Air Outlets Installation 5 02MAY10 06MAY10 0 0 Air Outlets Installation
TOWER LEVEL 20
20AC031 Chilled Water Pipe suspension System 8 30MAR10A 07APR10A 100 100 Chilled Water Pipe suspension System
20AC035 Chilled Water Pipe Installation 8 05APR10A 13APR10A 100 100 Chilled Water Pipe Installation
20AC051 Valves Installation 5 22APR10A 27APR10 90 20 Valves Installation
20AC001 Duct Suspension System Installation 9 24MAR10A 03APR10A 0 100 Duct Suspension System Installation
20AC005 Pre-insulatted Duct Installation 8 30MAR10A 07APR10A 0 100 Pre-insulatted Duct Installation
20AC021 FCU Installation 5 22APR10A 27APR10 0 20 FCU Installation
20AC061 BTU Meter 1st fix 5 22APR10A 27APR10 0 20 BTU Meter 1st fix
20AC011 Dampers Installation 3 05APR10A 07APR10A 0 100 Dampers Installation
20AC041 Chilled Water Pipe Insulation 8 25APR10 03MAY10 0 0 Chilled Water Pipe Insulation
20AC081 Air Outlets Installation 5 02MAY10 06MAY10 0 0 Air Outlets Installation
TOWER LEVEL 21
21AC031 Chilled Water Pipe suspension System 8 30MAR10A 07APR10A 100 100 Chilled Water Pipe suspension System
21AC035 Chilled Water Pipe Installation 8 14APR10A 22APR10A 100 100 Chilled Water Pipe Installation
21AC051 Valves Installation 5 22APR10A 27APR10 90 20 Valves Installation
21AC001 Duct Suspension System Installation 9 03APR10A 12APR10A 0 100 Duct Suspension System Installation
21AC005 Pre-insulatted Duct Installation 8 08APR10A 17APR10A 0 100 Pre-insulatted Duct Installation
21AC021 FCU Installation 5 22APR10A 27APR10 0 20 FCU Installation
21AC041 Chilled Water Pipe Insulation 8 22APR10A 01MAY10 0 13 Chilled Water Pipe Insulation
21AC061 BTU Meter 1st fix 5 22APR10A 27APR10 0 20 BTU Meter 1st fix
21AC011 Dampers Installation 3 14APR10A 17APR10A 0 100 Dampers Installation
21AC081 Air Outlets Installation 5 04MAY10 09MAY10 0 0 Air Outlets Installation
MECHANICAL LEVEL
23AC001 Duct Suspension System Installation 6 06APR10A 12APR10A 0 100 Duct Suspension System Installation
23AC031 Chilled Water Pipe suspension System 6 05APR10A 11APR10A 0 100 Chilled Water Pipe suspension System
23AC005 Pre-insulatted Duct Installation 5 12APR10A 17APR10A 0 100 Pre-insulatted Duct Installation
23AC035 Chilled Water Pipe Installation 4 24APR10 27APR10 0 0 Chilled Water Pipe Installation
23AC011 Dampers Installation 3 14APR10A 17APR10A 0 100 Dampers Installation
23AC051 Valves Installation 5 27APR10 02MAY10 0 0 Valves Installation
23AC021 FCU Installation 4 28APR10 02MAY10 0 0 FCU Installation
23AC041 Chilled Water Pipe Insulation 8 29APR10 08MAY10 0 0 Chilled Water Pipe Insulation
23AC022 AHU Installation 12 28APR10 11MAY10 0 0 AHU Installation
23AC081 Air Outlets Installation 5 15MAY10 19MAY10 0 0 Air Outlets Installation
SWIMMING POOL LEVEL
SP23AC001 Duct Suspension System Installation 8 11APR10A 19APR10A 0 100 Duct Suspension System Installation
SP23AC031 Chilled Water Pipe suspension System 5 15APR10A 20APR10A 0 100 Chilled Water Pipe suspension System
SP23AC005 Pre-insulatted Duct Installation 5 19APR10A 24APR10 0 80 Pre-insulatted Duct Installation
SP23AC011 Dampers Installation 3 21APR10A 24APR10 0 67 Dampers Installation
SP23AC035 Chilled Water Pipe Installation 5 24APR10 28APR10 0 0 Chilled Water Pipe Installation
SP23AC051 Valves Installation 5 27APR10 02MAY10 0 0 Valves Installation
SP23AC021 FCU Installation 4 28APR10 02MAY10 0 0 FCU Installation
SP23AC041 Chilled Water Pipe Insulation 8 27APR10 05MAY10 0 0 Chilled Water Pipe Insulation
SP23AC081 Air Outlets Installation 5 16MAY10 20MAY10 0 0 Air Outlets Installation
ELEV. MECH. LEVEL
2523AC031 Chilled Water Pipe suspension System 6 11APR10A 17APR10A 0 100 Chilled Water Pipe suspension System
2523AC022 AHU Installation 12 11APR10A 24APR10 0 92 AHU Installation
2523AC001 Duct Suspension System Installation 5 12APR10A 17APR10A 0 100 Duct Suspension System Installation
2523AC005 Pre-insulatted Duct Installation 5 15APR10A 20APR10A 0 100 Pre-insulatted Duct Installation
2523AC011 Dampers Installation 3 18APR10A 20APR10A 0 100 Dampers Installation
2523AC035 Chilled Water Pipe Installation 4 24APR10 27APR10 0 0 Chilled Water Pipe Installation
2523AC021 FCU Installation 4 28APR10 02MAY10 0 0 FCU Installation
2523AC041 Chilled Water Pipe Insulation 7 02MAY10 09MAY10 0 0 Chilled Water Pipe Insulation
2523AC051 Valves Installation 3 03MAY10 05MAY10 0 0 Valves Installation
2523AC081 Air Outlets Installation 5 15MAY10 19MAY10 0 0 Air Outlets Installation
Plumbing Works
PARKING LEVEL 3
Sheet 10 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
03PL031 Water Meter Installation 4 29MAR10A 01APR10A 0 100 Water Meter Installation
TOWER LEVEL 4
04PL021 Water Supply Pipes Installation 8 02NOV09A 06DEC09A 100 100 Water Supply Pipes Installation
04PL001 Drainage Pipe Installation 8 12NOV09A 19DEC09A 100 100 Drainage Pipe Installation
04PL011 Storm Water pipe Installation 5 17NOV09A 12JAN10A 100 100 Storm Water pipe Installation
04PL041 Floor Trap Installation 5 03DEC09A 21DEC09A 100 100 Floor Trap Installation
04PL051 Sanitary Fixtures Installation 6 27MAR10A 01APR10A 0 100 Sanitary Fixtures Installation
04PL031 Water Meter Installation 4 29MAR10A 01APR10A 0 100 Water Meter Installation
TOWER LEVEL 5
05PL011 Storm Water pipe Installation 5 22NOV09A 02JAN10A 100 100 Storm Water pipe Installation
05PL001 Drainage Pipe Installation 8 01DEC09A 02JAN10A 100 100 Drainage Pipe Installation
05PL021 Water Supply Pipes Installation 8 01DEC09A 27DEC09A 100 100 Water Supply Pipes Installation
05PL041 Floor Trap Installation 5 20DEC09A 25DEC09A 100 100 Floor Trap Installation
05PL051 Sanitary Fixtures Installation 6 03APR10A 08APR10A 0 100 Sanitary Fixtures Installation
05PL031 Water Meter Installation 4 03APR10A 06APR10A 0 100 Water Meter Installation
TOWER LEVEL 6
06PL021 Water Supply Pipes Installation 8 01DEC09A 11JAN10A 100 100 Water Supply Pipes Installation
06PL001 Drainage Pipe Installation 8 05JAN10A 14JAN10A 100 100 Drainage Pipe Installation
06PL041 Floor Trap Installation 5 05JAN10A 14JAN10A 100 100 Floor Trap Installation
06PL011 Storm Water pipe Installation 5 12JAN10A 16JAN10A 100 100 Storm Water pipe Installation
06PL051 Sanitary Fixtures Installation 6 03APR10A 08APR10A 0 100 Sanitary Fixtures Installation
06PL031 Water Meter Installation 4 03APR10A 06APR10A 0 100 Water Meter Installation
TOWER LEVEL 7
07PL021 Water Supply Pipes Installation 8 13DEC09A 18JAN10A 100 100 Water Supply Pipes Installation
07PL001 Drainage Pipe Installation 8 06JAN10A 16JAN10A 100 100 Drainage Pipe Installation
07PL041 Floor Trap Installation 5 06JAN10A 16JAN10A 100 100 Floor Trap Installation
07PL011 Storm Water pipe Installation 5 13JAN10A 22JAN10A 100 100 Storm Water pipe Installation
07PL051 Sanitary Fixtures Installation 6 03APR10A 08APR10A 0 100 Sanitary Fixtures Installation
07PL031 Water Meter Installation 4 07APR10A 11APR10A 0 100 Water Meter Installation
TOWER LEVEL 8
08PL001 Drainage Pipe Installation 8 10JAN10A 16MAR10A 100 100 Drainage Pipe Installation
08PL011 Storm Water pipe Installation 5 14JAN10A 24JAN10A 100 100 Storm Water pipe Installation
08PL041 Floor Trap Installation 5 14JAN10A 30JAN10A 100 100 Floor Trap Installation
08PL021 Water Supply Pipes Installation 8 11MAR10A 20MAR10A 50 100 Water Supply Pipes Installation
08PL051 Sanitary Fixtures Installation 6 05APR10A 11APR10A 0 100 Sanitary Fixtures Installation
08PL031 Water Meter Installation 4 11APR10A 14APR10A 0 100 Water Meter Installation
TOWER LEVEL 9
09PL021 Water Supply Pipes Installation 8 20DEC09A 07MAR10A 100 100 Water Supply Pipes Installation
09PL001 Drainage Pipe Installation 8 17JAN10A 06FEB10A 100 100 Drainage Pipe Installation
09PL041 Floor Trap Installation 5 17JAN10A 25JAN10A 100 100 Floor Trap Installation
09PL011 Storm Water pipe Installation 5 20JAN10A 25JAN10A 100 100 Storm Water pipe Installation
09PL051 Sanitary Fixtures Installation 6 12APR10A 18APR10A 0 100 Sanitary Fixtures Installation
09PL031 Water Meter Installation 4 15APR10A 19APR10A 0 100 Water Meter Installation
TOWER LEVEL 10
10PL011 Storm Water pipe Installation 5 23JAN10A 15FEB10A 100 100 Storm Water pipe Installation
10PL041 Floor Trap Installation 5 23JAN10A 13FEB10A 100 100 Floor Trap Installation
10PL001 Drainage Pipe Installation 8 30JAN10A 14FEB10A 100 100 Drainage Pipe Installation
10PL021 Water Supply Pipes Installation 8 01MAR10A 11MAR10A 100 100 Water Supply Pipes Installation
10PL051 Sanitary Fixtures Installation 6 12APR10A 18APR10A 0 100 Sanitary Fixtures Installation
10PL031 Water Meter Installation 4 17APR10A 20APR10A 0 100 Water Meter Installation
TOWER LEVEL 11
11PL021 Water Supply Pipes Installation 8 18JAN10A 07MAR10A 100 100 Water Supply Pipes Installation
11PL011 Storm Water pipe Installation 5 24JAN10A 21FEB10A 100 100 Storm Water pipe Installation
11PL041 Floor Trap Installation 5 24JAN10A 16FEB10A 100 100 Floor Trap Installation
11PL001 Drainage Pipe Installation 8 02FEB10A 18FEB10A 100 100 Drainage Pipe Installation
11PL051 Sanitary Fixtures Installation 6 12APR10A 18APR10A 0 100 Sanitary Fixtures Installation
11PL031 Water Meter Installation 4 21APR10A 25APR10 0 50 Water Meter Installation
TOWER LEVEL 12
12PL021 Water Supply Pipes Installation 8 20JAN10A 08MAR10A 90 100 Water Supply Pipes Installation
12PL011 Storm Water pipe Installation 5 26JAN10A 06MAR10A 100 100 Storm Water pipe Installation
12PL041 Floor Trap Installation 5 26JAN10A 03APR10A 100 100 Floor Trap Installation
12PL001 Drainage Pipe Installation 6 20FEB10A 07MAR10A 100 100 Drainage Pipe Installation
12PL051 Sanitary Fixtures Installation 6 12APR10A 18APR10A 0 100 Sanitary Fixtures Installation
12PL031 Water Meter Installation 4 21APR10A 25APR10 0 50 Water Meter Installation
TOWER LEVEL 13
Sheet 11 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
19PL031 Water Meter Installation 4 10MAY10 13MAY10 0 0 Water Meter Installation
TOWER LEVEL 20
20PL021 Water Supply Pipes Installation 8 10MAR10A 18MAR10A 0 100 Water Supply Pipes Installation
20PL001 Drainage Pipe Installation 6 17MAR10A 23MAR10A 0 100 Drainage Pipe Installation
20PL011 Storm Water pipe Installation 5 17MAR10A 22MAR10A 0 100 Storm Water pipe Installation
20PL041 Floor Trap Installation 5 18APR10A 22APR10A 0 100 Floor Trap Installation
20PL051 Sanitary Fixtures Installation 6 04MAY10 10MAY10 0 0 Sanitary Fixtures Installation
20PL031 Water Meter Installation 4 10MAY10 13MAY10 0 0 Water Meter Installation
TOWER LEVEL 21
21PL021 Water Supply Pipes Installation 8 20MAR10A 28MAR10A 60 100 Water Supply Pipes Installation
21PL001 Drainage Pipe Installation 6 24MAR10A 30MAR10A 0 100 Drainage Pipe Installation
21PL011 Storm Water pipe Installation 5 23MAR10A 28MAR10A 0 100 Storm Water pipe Installation
21PL041 Floor Trap Installation 5 18APR10A 22APR10A 0 100 Floor Trap Installation
21PL051 Sanitary Fixtures Installation 6 04MAY10 10MAY10 0 0 Sanitary Fixtures Installation
21PL031 Water Meter Installation 4 10MAY10 13MAY10 0 0 Water Meter Installation
MECHANICAL LEVEL
23PL001 Drainage Pipe Installation 6 24MAR10A 30MAR10A 0 100 Drainage Pipe Installation
23PL011 Storm Water pipe Installation 5 23MAR10A 28MAR10A 0 100 Storm Water pipe Installation
23PL021 Water Supply Pipes Installation 8 20MAR10A 28MAR10A 0 100 Water Supply Pipes Installation
23PL054 Swimming Pool Equipment Installation 20 18APR10A 10MAY10 0 25 Swimming Pool Equipment Installation
23PL045 GRP Tank Installation 14 19APR10A 04MAY10 0 29 GRP Tank Installation
23PL037 Boster Pump Installation 10 24APR10 04MAY10 0 0 Boster Pump Installation
SWIMMING POOL LEVEL
SP23PL001 Drainage Pipe Installation 6 30MAR10A 05APR10A 0 100 Drainage Pipe Installation
SP23PL011 Storm Water pipe Installation 5 30MAR10A 04APR10A 0 100 Storm Water pipe Installation
SP23PL021 Water Supply Pipes Installation 6 30MAR10A 05APR10A 0 100 Water Supply Pipes Installation
SP23PL051 Sanitary Fixtures Installation 5 10MAY10 15MAY10 0 0 Sanitary Fixtures Installation
ELEV. MECH. LEVEL
2523PL011 Storm Water pipe Installation 5 06APR10A 11APR10A 0 100 Storm Water pipe Installation
2523PL021 Water Supply Pipes Installation 4 06APR10A 10APR10A 0 100 Water Supply Pipes Installation
2523PL001 Drainage Pipe Installation 5 06APR10A 11APR10A 0 100 Drainage Pipe Installation
Fire Fighting
PARKING LEVEL 3
P3K1FF001 F.F. Pipes Suspension System 8 02AUG09A 17MAR10A 90 100 F.F. Pipes Suspension System
P3K1FF000 F.F. Pipes Installation 6 03OCT09A 23MAR10A 40 100 F.F. Pipes Installation
P3K1FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
P3K1FF031 Fire Hose Cabinet Installation 5 01MAY10 05MAY10 0 0 Fire Hose Cabinet Installation
P3K1FF041 Fire Extinguisher Installation 5 01MAY10 05MAY10 0 0 Fire Extinguisher Installation
PARKING LEVEL 2
PK1FF001 F.F. Pipes Suspension System 8 25AUG09A 20MAR10A 35 100 F.F. Pipes Suspension System
PK1FF011 Installation of FirePumps 30 07APR10A 11MAY10 0 47 Installation of FirePumps
PK1FF000 F.F. Pipes Installation 6 15MAR10A 21MAR10A 0 100 F.F. Pipes Installation
PK1FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
PK1FF031 Fire Hose Cabinet Installation 5 01MAY10 05MAY10 0 0 Fire Hose Cabinet Installation
PK1FF041 Fire Extinguisher Installation 5 01MAY10 05MAY10 0 0 Fire Extinguisher Installation
PARKING LEVEL 1
K1FF001 F.F. Pipes Suspension System 8 14MAR10A 22MAR10A 0 100 F.F. Pipes Suspension System
K1FF003 F.F. Pipes Installation 6 16MAR10A 22MAR10A 0 100 F.F. Pipes Installation
K1FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
K1FF031 Fire Hose Cabinet Installation 5 01MAY10 05MAY10 0 0 Fire Hose Cabinet Installation
K1FF041 Fire Extinguisher Installation 5 01MAY10 05MAY10 0 0 Fire Extinguisher Installation
PODIUM LEVEL 1
P1FF001 F.F. Pipes Suspension System 8 24MAR10A 01APR10A 0 100 F.F. Pipes Suspension System
P1FF003 F.F. Pipes Installation 6 27MAR10A 01APR10A 0 100 F.F. Pipes Installation
P1FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
P1FF031 Fire Hose Cabinet Installation 5 18APR10A 22APR10A 0 100 Fire Hose Cabinet Installation
P1FF041 Fire Extinguisher Installation 5 18APR10A 22APR10A 0 100 Fire Extinguisher Installation
PODIUM LEVEL 2
P2FF001 F.F. Pipes Suspension System 8 25MAR10A 03APR10A 0 100 F.F. Pipes Suspension System
P2FF005 F.F. Pipes Installation 8 25MAR10A 03APR10A 0 100 F.F. Pipes Installation
P2FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
P2FF031 Fire Hose Cabinet Installation 5 18APR10A 22APR10A 0 100 Fire Hose Cabinet Installation
P2FF041 Fire Extinguisher Installation 5 18APR10A 22APR10A 0 100 Fire Extinguisher Installation
TOWER LEVEL 1
Sheet 12 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
08FF041 Fire Extinguisher Installation 5 20APR10A 25APR10 0 60 Fire Extinguisher Installation
TOWER LEVEL 9
09FF001 F.F. Pipes Suspension System 6 21MAR10A 27MAR10A 100 100 F.F. Pipes Suspension System
09FF005 F.F. Pipes Installation 8 21MAR10A 29MAR10A 100 100 F.F. Pipes Installation
09FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
09FF031 Fire Hose Cabinet Installation 2 22APR10A 24APR10 0 50 Fire Hose Cabinet Installation
09FF041 Fire Extinguisher Installation 5 26APR10 01MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 10
10FF001 F.F. Pipes Suspension System 6 28MAR10A 03APR10A 100 100 F.F. Pipes Suspension System
10FF005 F.F. Pipes Installation 8 28MAR10A 05APR10A 100 100 F.F. Pipes Installation
10FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
10FF031 Fire Hose Cabinet Installation 2 22APR10A 24APR10 0 50 Fire Hose Cabinet Installation
10FF041 Fire Extinguisher Installation 5 26APR10 01MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 11
11FF001 F.F. Pipes Suspension System 6 28MAR10A 03APR10A 100 100 F.F. Pipes Suspension System
11FF005 F.F. Pipes Installation 8 28MAR10A 05APR10A 100 100 F.F. Pipes Installation
11FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
11FF031 Fire Hose Cabinet Installation 2 22APR10A 24APR10 0 50 Fire Hose Cabinet Installation
11FF041 Fire Extinguisher Installation 5 26APR10 01MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 12
12FF001 F.F. Pipes Suspension System 6 28MAR10A 03APR10A 100 100 F.F. Pipes Suspension System
12FF005 F.F. Pipes Installation 8 28MAR10A 05APR10A 100 100 F.F. Pipes Installation
12FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
12FF031 Fire Hose Cabinet Installation 2 22APR10A 24APR10 0 50 Fire Hose Cabinet Installation
12FF041 Fire Extinguisher Installation 5 26APR10 01MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 13
13FF001 F.F. Pipes Suspension System 6 04APR10A 10APR10A 100 100 F.F. Pipes Suspension System
13FF005 F.F. Pipes Installation 8 04APR10A 12APR10A 100 100 F.F. Pipes Installation
13FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
13FF031 Fire Hose Cabinet Installation 2 25APR10 26APR10 0 0 Fire Hose Cabinet Installation
13FF041 Fire Extinguisher Installation 5 02MAY10 06MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 14
14FF001 F.F. Pipes Suspension System 6 04APR10A 10APR10A 100 100 F.F. Pipes Suspension System
14FF005 F.F. Pipes Installation 8 04APR10A 12APR10A 100 100 F.F. Pipes Installation
14FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
14FF031 Fire Hose Cabinet Installation 2 25APR10 26APR10 0 0 Fire Hose Cabinet Installation
14FF041 Fire Extinguisher Installation 5 02MAY10 06MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 15
15FF001 F.F. Pipes Suspension System 6 04APR10A 10APR10A 50 100 F.F. Pipes Suspension System
15FF005 F.F. Pipes Installation 8 04APR10A 12APR10A 35 100 F.F. Pipes Installation
15FF021 Sprinkler Head Installation 1 17APR10A 17APR10A 0 100 Sprinkler Head Installation
15FF031 Fire Hose Cabinet Installation 2 25APR10 26APR10 0 0 Fire Hose Cabinet Installation
15FF041 Fire Extinguisher Installation 5 02MAY10 06MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 16
16FF001 F.F. Pipes Suspension System 6 11APR10A 17APR10A 50 100 F.F. Pipes Suspension System
16FF005 F.F. Pipes Installation 8 11APR10A 19APR10A 40 100 F.F. Pipes Installation
16FF021 Sprinkler Head Installation 1 20APR10A 20APR10A 0 100 Sprinkler Head Installation
16FF031 Fire Hose Cabinet Installation 2 25APR10 26APR10 0 0 Fire Hose Cabinet Installation
16FF041 Fire Extinguisher Installation 5 02MAY10 06MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 17
17FF001 F.F. Pipes Suspension System 6 11APR10A 17APR10A 30 100 F.F. Pipes Suspension System
17FF005 F.F. Pipes Installation 8 11APR10A 19APR10A 20 100 F.F. Pipes Installation
17FF021 Sprinkler Head Installation 1 27APR10 27APR10 0 0 Sprinkler Head Installation
17FF031 Fire Hose Cabinet Installation 2 28APR10 29APR10 0 0 Fire Hose Cabinet Installation
17FF041 Fire Extinguisher Installation 5 08MAY10 12MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 18
18FF001 F.F. Pipes Suspension System 6 11APR10A 17APR10A 100 100 F.F. Pipes Suspension System
18FF005 F.F. Pipes Installation 8 11APR10A 19APR10A 100 100 F.F. Pipes Installation
18FF021 Sprinkler Head Installation 1 27APR10 27APR10 0 0 Sprinkler Head Installation
18FF031 Fire Hose Cabinet Installation 2 28APR10 29APR10 0 0 Fire Hose Cabinet Installation
18FF041 Fire Extinguisher Installation 5 08MAY10 12MAY10 0 0 Fire Extinguisher Installation
TOWER LEVEL 19
19FF001 F.F. Pipes Suspension System 6 18APR10A 24APR10 100 83 F.F. Pipes Suspension System
19FF005 F.F. Pipes Installation 8 18APR10A 26APR10 100 63 F.F. Pipes Installation
19FF021 Sprinkler Head Installation 1 27APR10 27APR10 0 0
19FF031 Fire Hose Cabinet Installation 2 28APR10 29APR10 0 0
19FF041 Fire Extinguisher Installation 5 08MAY10 12MAY10 0 0
TOWER LEVEL 20
Sheet 13 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
PARKING LEVEL 2
PK1EL001 Electric Embedd.Items in Slab 2 31MAR09A 11JUN09A 100 100 Electric Embedd.Items in Slab
PK1EL011 Elect.Conduits&Junction Boxes 12 07APR09A 08OCT09A 100 100 Elect.Conduits&Junction Boxes
PK1EL021 Wiring(Power) 8 25JUL09A 01SEP09A 100 100 Wiring(Power)
PK1EL033 MCC-P Installation 1st Fix 4 10MAR10A 14MAR10A 0 100 MCC-P Installation 1st Fix
PK1EL041 Final DB Installation 1st Fix 5 09MAR10A 14MAR10A 0 100 Final DB Installation 1st Fix
PK1EL063 Light Management Control Panel 5 15MAR10A 20MAR10A 0 100 Light Management Control Panel
PK1EL071 Final DB &MCC-P Installation 8 15APR10A 24APR10 0 88 Final DB &MCC-P Installation
PK1EL081 SMDB Installation (MCB+MCCB installation) 2 13MAY10 15MAY10 0 0 SMDB Installation (MCB+MCCB installation)
PK1EL171 Switches &Socket Outlet Installation 1 11APR10A 11APR10A 0 100 Switches &Socket Outlet Installation
PK1EL181 Lighting Fixtures Installation 3 10APR10A 12APR10A 0 100 Lighting Fixtures Installation
PARKING LEVEL 1
K1EL001 Electric Embedd.Items in Slab 2 18APR09A 18APR09A 100 100 Electric Embedd.Items in Slab
K1EL021 Wiring(Power) 8 01SEP09A 15MAR10A 90 100 Wiring(Power)
K1EL011 Elect.Conduits&Junction Boxes 12 11OCT09A 10MAR10A 100 100 Elect.Conduits&Junction Boxes
K1EL033 MCC-B Installation 1st Fix 4 09MAR10A 13MAR10A 0 100 MCC-B Installation 1st Fix
K1EL041 Final DB Installation 1st Fix 5 08MAR10A 13MAR10A 0 100 Final DB Installation 1st Fix
K1EL063 Light Management Control Panel 5 16MAR10A 21MAR10A 0 100 Light Management Control Panel
K1EL071 Final DB &MCC-P Installation 8 15APR10A 24APR10 0 88 Final DB &MCC-P Installation
K1EL081 SMDB Installation (MCB+MCCB installation) 2 13MAY10 15MAY10 0 0 SMDB Installation (MCB+MCCB installation)
K1EL171 Switches &Socket Outlet Installation 1 11APR10A 11APR10A 0 100 Switches &Socket Outlet Installation
K1EL181 Lighting Fixtures Installation 3 10APR10A 12APR10A 0 100 Lighting Fixtures Installation
PODIUM LEVEL 1
P1EL001 Electric Embedd.Items in Slab 2 23MAY09A 23MAY09A 100 100 Electric Embedd.Items in Slab
P1EL191 Installation For Transformer 25 23MAR10A 20APR10A 100 100 Installation For Transformer
P1EL011 Elect.Conduits&Junction Boxes 8 06MAR10A 14MAR10A 50 100 Elect.Conduits&Junction Boxes
P1EL025 Cable From Transformer to Switchgear 5 21APR10A 26APR10 0 40 Cable From Transformer to Switchgear
P1EL031 Final DB'S Installation 1st Fix 7 16MAR10A 23MAR10A 0 100 Final DB'S Installation 1st Fix
P1EL201 Installation For Generator 25 14APR10A 12MAY10 0 32 Installation For Generator
P1EL021 Wiring(Power) 8 24MAR10A 01APR10A 0 100 Wiring(Power)
P1EL051 Water Heater 2 31MAR10A 01APR10A 0 100 Water Heater
P1EL061 Light Control Panel 3 03APR10A 07APR10A 0 100 Light Control Panel
P1EL241 Installation OF Switchgear 14 27APR10 12MAY10 0 0 Installation OF Switchgear
P1EL181 Lighting Fixtures Installation 3 11APR10A 13APR10A 0 100 Lighting Fixtures Installation
P1EL231 Gate Barrier System 10 27APR10 08MAY10 0 0 Gate Barrier System
P1EL251 ATS Panel 6 06MAY10 12MAY10 0 0 ATS Panel
P1EL081 SMDB Installation (MCB+MCCB installation) 2 16MAY10 17MAY10 0 0 SMDB Installation (MCB+MCCB installation)
P1EL071 Final DB'S Installation (MCB installation) 8 25APR10 03MAY10 0 0 Final DB'S Installation (MCB installation)
P1EL171 Switches &Socket Outlet Installation 1 12APR10A 12APR10A 0 100 Switches &Socket Outlet Installation
P1EL211 Installation For Capacitor Bank 12 25APR10 08MAY10 0 0 Installation For Capacitor Bank
P1EL221 Installation For Central Battery 12 25APR10 08MAY10 0 0 Installation For Central Battery
PODIUM LEVEL 2
P2EL001 Electric Embedd.Items in Slab 2 22JUN09A 01JUL09A 100 100 Electric Embedd.Items in Slab
P2EL011 Elect.Conduits&Junction Boxes 8 08MAR10A 16MAR10A 0 100 Elect.Conduits&Junction Boxes
P2EL031 Final DB'S Installation 1st Fix 7 24MAR10A 31MAR10A 0 100 Final DB'S Installation 1st Fix
P2EL021 Wiring(Power) 8 25MAR10A 03APR10A 0 100 Wiring(Power)
P2EL051 Water Heater 2 01APR10A 03APR10A 0 100 Water Heater
P2EL061 Light Control Panel 3 04APR10A 08APR10A 0 100 Light Control Panel
P2EL081 SMDB Installation (MCB+MCCB installation) 2 16MAY10 17MAY10 0 0 SMDB Installation (MCB+MCCB installation)
P2EL071 Final DB'S Installation (MCB installation) 8 25APR10 03MAY10 0 0 Final DB'S Installation (MCB installation)
P2EL171 Switches &Socket Outlet Installation 1 17APR10A 17APR10A 0 100 Switches &Socket Outlet Installation
P2EL181 Lighting Fixtures Installation 3 17APR10A 19APR10A 0 100 Lighting Fixtures Installation
TOWER LEVEL 1
02EL001 Electric Embedd.Items in Slab 1 30JUL09A 06AUG09A 100 100 Electric Embedd.Items in Slab
02EL011 Elect.Conduits&Junction Boxes 8 05OCT09A 22NOV09A 100 100 Elect.Conduits&Junction Boxes
02EL031 Final DB'S Installation 1st Fix 7 31OCT09A 22NOV09A 100 100 Final DB'S Installation 1st Fix
02EL021 Wiring(Power+Lighting) 8 29NOV09A 16JAN10A 100 100 Wiring(Power+Lighting)
02EL051 Water Heater 2 21MAR10A 22MAR10A 100 100 Water Heater
02EL061 Light Control Panel 3 06MAR10A 10MAR10A 0 100 Light Control Panel
02EL071 Final DB'S Installation (MCB installation) 4 15APR10A 19APR10A 0 100
02EL171 Switches &Socket Outlet Installation 1 10APR10A 10APR10A 0 100
02EL181 Lighting Fixtures Installation 3 10APR10A 12APR10A 0 100
02EL081 SMDB Installation (MCB+MCCB installation) 3 03MAY10 05MAY10 0 0
TOWER LEVEL 3
Sheet 14 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
TOWER LEVEL 7
07EL001 Electric Embedd.Items in Slab 1 14SEP09A 17SEP09A 100 100 Electric Embedd.Items in Slab
07EL011 Elect.Conduits&Junction Boxes 8 06DEC09A 06MAR10A 100 100 Elect.Conduits&Junction Boxes
07EL031 Final DB'S Installation 1st Fix 7 06DEC09A 15DEC09A 100 100 Final DB'S Installation 1st Fix
07EL021 Wiring(Power+Lighting) 8 17JAN10A 10MAR10A 100 100 Wiring(Power+Lighting)
07EL051 Water Heater 2 22MAR10A 23MAR10A 100 100 Water Heater
07EL061 Light Control Panel 3 23MAR10A 28MAR10A 0 100 Light Control Panel
07EL071 Final DB'S Installation (MCB installation) 4 20APR10A 24APR10 0 75 Final DB'S Installation (MCB installation)
07EL171 Switches &Socket Outlet Installation 1 11APR10A 11APR10A 0 100 Switches &Socket Outlet Installation
07EL181 Lighting Fixtures Installation 3 13APR10A 15APR10A 0 100 Lighting Fixtures Installation
07EL081 SMDB Installation (MCB+MCCB installation) 3 06MAY10 09MAY10 0 0 SMDB Installation (MCB+MCCB installation)
TOWER LEVEL 8
08EL001 Electric Embedd.Items in Slab 1 26SEP09A 29SEP09A 100 100 Electric Embedd.Items in Slab
08EL011 Elect.Conduits&Junction Boxes 8 10MAR10A 18MAR10A 90 100 Elect.Conduits&Junction Boxes
08EL031 Final DB'S Installation 1st Fix 7 15MAR10A 22MAR10A 100 100 Final DB'S Installation 1st Fix
08EL021 Wiring(Power+Lighting) 8 16MAR10A 24MAR10A 0 100 Wiring(Power+Lighting)
08EL051 Water Heater 2 23MAR10A 24MAR10A 0 100 Water Heater
08EL061 Light Control Panel 3 25MAR10A 30MAR10A 0 100 Light Control Panel
08EL071 Final DB'S Installation (MCB installation) 4 20APR10A 24APR10 0 75 Final DB'S Installation (MCB installation)
08EL081 SMDB Installation (MCB+MCCB installation) 3 06MAY10 09MAY10 0 0 SMDB Installation (MCB+MCCB installation)
08EL171 Switches &Socket Outlet Installation 1 11APR10A 11APR10A 0 100 Switches &Socket Outlet Installation
08EL181 Lighting Fixtures Installation 3 13APR10A 15APR10A 0 100 Lighting Fixtures Installation
TOWER LEVEL 9
09EL001 Electric Embedd.Items in Slab 1 03OCT09A 06OCT09A 100 100 Electric Embedd.Items in Slab
09EL011 Elect.Conduits&Junction Boxes 8 09DEC09A 06MAR10A 100 100 Elect.Conduits&Junction Boxes
09EL031 Final DB'S Installation 1st Fix 7 23DEC09A 17JAN10A 100 100 Final DB'S Installation 1st Fix
09EL021 Wiring(Power+Lighting) 8 24JAN10A 10MAR10A 100 100 Wiring(Power+Lighting)
09EL051 Water Heater 2 22MAR10A 23MAR10A 100 100 Water Heater
09EL061 Light Control Panel 3 29MAR10A 03APR10A 0 100 Light Control Panel
09EL071 Final DB'S Installation (MCB installation) 4 25APR10 28APR10 0 0 Final DB'S Installation (MCB installation)
09EL081 SMDB Installation (MCB+MCCB installation) 3 10MAY10 12MAY10 0 0 SMDB Installation (MCB+MCCB installation)
09EL171 Switches &Socket Outlet Installation 1 12APR10A 12APR10A 0 100 Switches &Socket Outlet Installation
09EL181 Lighting Fixtures Installation 3 17APR10A 19APR10A 0 100 Lighting Fixtures Installation
TOWER LEVEL 10
10EL001 Electric Embedd.Items in Slab 1 12OCT09A 15OCT09A 100 100 Electric Embedd.Items in Slab
10EL011 Elect.Conduits&Junction Boxes 8 27FEB10A 07MAR10A 100 100 Elect.Conduits&Junction Boxes
10EL021 Wiring(Power+Lighting) 8 22MAR10A 30MAR10A 100 100 Wiring(Power+Lighting)
10EL051 Water Heater 2 30MAR10A 31MAR10A 100 100 Water Heater
10EL031 Final DB'S Installation 1st Fix 7 23MAR10A 30MAR10A 0 100 Final DB'S Installation 1st Fix
10EL061 Light Control Panel 3 31MAR10A 05APR10A 0 100 Light Control Panel
10EL071 Final DB'S Installation (MCB installation) 4 25APR10 28APR10 0 0 Final DB'S Installation (MCB installation)
10EL081 SMDB Installation (MCB+MCCB installation) 3 10MAY10 12MAY10 0 0 SMDB Installation (MCB+MCCB installation)
10EL171 Switches &Socket Outlet Installation 1 17APR10A 17APR10A 0 100 Switches &Socket Outlet Installation
10EL181 Lighting Fixtures Installation 3 17APR10A 19APR10A 0 100 Lighting Fixtures Installation
TOWER LEVEL 11
11EL001 Electric Embedd.Items in Slab 1 17OCT09A 22OCT09A 100 100 Electric Embedd.Items in Slab
11EL011 Elect.Conduits&Junction Boxes 8 23DEC09A 06MAR10A 100 100 Elect.Conduits&Junction Boxes
11EL031 Final DB'S Installation 1st Fix 7 26DEC09A 18JAN10A 100 100 Final DB'S Installation 1st Fix
11EL021 Wiring(Power+Lighting) 8 03FEB10A 10MAR10A 100 100 Wiring(Power+Lighting)
11EL051 Water Heater 2 30MAR10A 31MAR10A 100 100 Water Heater
11EL061 Light Control Panel 3 04APR10A 08APR10A 0 100 Light Control Panel
11EL071 Final DB'S Installation (MCB installation) 4 25APR10 28APR10 0 0 Final DB'S Installation (MCB installation)
11EL081 SMDB Installation (MCB+MCCB installation) 3 10MAY10 12MAY10 0 0 SMDB Installation (MCB+MCCB installation)
11EL171 Switches &Socket Outlet Installation 1 12APR10A 12APR10A 0 100 Switches &Socket Outlet Installation
11EL181 Lighting Fixtures Installation 3 17APR10A 19APR10A 0 100 Lighting Fixtures Installation
TOWER LEVEL 12
12EL001 Electric Embedd.Items in Slab 3 24OCT09A 28OCT09A 100 100 Electric Embedd.Items in Slab
12EL011 Elect.Conduits&Junction Boxes 8 28DEC09A 04MAR10A 100 100 Elect.Conduits&Junction Boxes
12EL031 Final DB'S Installation 1st Fix 7 28DEC09A 24JAN10A 100 100 Final DB'S Installation 1st Fix
12EL021 Wiring(Power+Lighting) 8 09FEB10A 11MAR10A 100 100 Wiring(Power+Lighting)
12EL051 Water Heater 2 30MAR10A 31MAR10A 100 100 Water Heater
12EL061 Light Control Panel 3 06APR10A 11APR10A 0 100 Light Control Panel
12EL071 Final DB'S Installation (MCB installation) 4 25APR10 28APR10 0 0 Final DB'S Installation (MCB installation)
12EL081 SMDB Installation (MCB+MCCB installation) 3 10MAY10 12MAY10 0 0 SMDB Installation (MCB+MCCB installation)
12EL171 Switches &Socket Outlet Installation 1 12APR10A 12APR10A 0 100 Switches &Socket Outlet Installation
12EL181 Lighting Fixtures Installation 3 17APR10A 19APR10A 0 100 Lighting Fixtures Installation
TOWER LEVEL 13
13EL001 Electric Embedd.Items in Slab 1 31OCT09A 04NOV09A 100 100 Electric Embedd.Items in Slab
13EL011 Elect.Conduits&Junction Boxes 8 03JAN10A 04MAR10A 100 100
13EL031 Final DB'S Installation 1st Fix 7 20JAN10A 23JAN10A 100 100
13EL021 Wiring(Power+Lighting) 8 13FEB10A 11MAR10A 100 100
13EL051 Water Heater 2 30MAR10A 31MAR10A 100 100
13EL061 Light Control Panel 3 10APR10A 14APR10A 0 100
13EL071 Final DB'S Installation (MCB installation) 4 29APR10 03MAY10 0 0
13EL081 SMDB Installation (MCB+MCCB installation) 3 13MAY10 16MAY10 0 0
13EL171 Switches &Socket Outlet Installation 1 20APR10A 20APR10A 0 100
13EL181 Lighting Fixtures Installation 3 20APR10A 22APR10A 0 100
TOWER LEVEL 14
18EL001 Electric Embedd.Items in Slab 1 04DEC09A 09DEC09A 100 100 Electric Embedd.Items in Slab
18EL011 Elect.Conduits&Junction Boxes 8 14FEB10A 04MAR10A 95 100 Elect.Conduits&Junction Boxes
18EL031 Final DB'S Installation 1st Fix 7 23FEB10A 02MAR10A 100 100 Final DB'S Installation 1st Fix
18EL021 Wiring(Power+Lighting) 8 03MAR10A 23MAR10A 60 100 Wiring(Power+Lighting)
18EL061 Light Control Panel 3 24APR10 28APR10 0 0 Light Control Panel
18EL051 Water Heater 2 13APR10A 14APR10A 0 100 Water Heater
18EL071 Final DB'S Installation (MCB installation) 4 04MAY10 08MAY10 0 0 Final DB'S Installation (MCB installation)
18EL081 SMDB Installation (MCB+MCCB installation) 3 17MAY10 19MAY10 0 0 SMDB Installation (MCB+MCCB installation)
18EL171 Switches &Socket Outlet Installation 1 28APR10 28APR10 0 0 Switches &Socket Outlet Installation
18EL181 Lighting Fixtures Installation 3 28APR10 01MAY10 0 0 Lighting Fixtures Installation
TOWER LEVEL 19
19EL001 Electric Embedd.Items in Slab 1 12DEC09A 17DEC09A 100 100 Electric Embedd.Items in Slab
19EL011 Elect.Conduits&Junction Boxes 8 28FEB10A 10MAR10A 95 100 Elect.Conduits&Junction Boxes
19EL021 Wiring(Power+Lighting) 8 21MAR10A 29MAR10A 45 100 Wiring(Power+Lighting)
19EL031 Final DB'S Installation 1st Fix 7 22MAR10A 29MAR10A 100 100 Final DB'S Installation 1st Fix
19EL061 Light Control Panel 3 27APR10 02MAY10 0 0 Light Control Panel
19EL051 Water Heater 2 13APR10A 14APR10A 0 100 Water Heater
19EL071 Final DB'S Installation (MCB installation) 4 04MAY10 08MAY10 0 0 Final DB'S Installation (MCB installation)
19EL081 SMDB Installation (MCB+MCCB installation) 3 17MAY10 19MAY10 0 0 SMDB Installation (MCB+MCCB installation)
19EL171 Switches &Socket Outlet Installation 1 28APR10 28APR10 0 0 Switches &Socket Outlet Installation
19EL181 Lighting Fixtures Installation 3 28APR10 01MAY10 0 0 Lighting Fixtures Installation
TOWER LEVEL 20
20EL001 Electric Embedd.Items in Slab 1 18DEC09A 24DEC09A 100 100 Electric Embedd.Items in Slab
20EL011 Elect.Conduits&Junction Boxes 8 14MAR10A 22MAR10A 0 100 Elect.Conduits&Junction Boxes
20EL031 Final DB'S Installation 1st Fix 7 25MAR10A 01APR10A 0 100 Final DB'S Installation 1st Fix
20EL021 Wiring(Power+Lighting) 8 24MAR10A 01APR10A 0 100 Wiring(Power+Lighting)
20EL061 Light Control Panel 3 29APR10 04MAY10 0 0 Light Control Panel
20EL051 Water Heater 2 13APR10A 14APR10A 0 100 Water Heater
20EL071 Final DB'S Installation (MCB installation) 4 04MAY10 08MAY10 0 0 Final DB'S Installation (MCB installation)
20EL081 SMDB Installation (MCB+MCCB installation) 3 17MAY10 19MAY10 0 0 SMDB Installation (MCB+MCCB installation)
20EL171 Switches &Socket Outlet Installation 1 28APR10 28APR10 0 0 Switches &Socket Outlet Installation
20EL181 Lighting Fixtures Installation 3 28APR10 01MAY10 0 0 Lighting Fixtures Installation
TOWER LEVEL 21
21EL001 Electric Embedd.Items in Slab 1 26DEC09A 31DEC09A 100 100 Electric Embedd.Items in Slab
21EL011 Elect.Conduits&Junction Boxes 8 06MAR10A 14MAR10A 95 100 Elect.Conduits&Junction Boxes
21EL031 Final DB'S Installation 1st Fix 7 30MAR10A 06APR10A 50 100 Final DB'S Installation 1st Fix
21EL021 Wiring(Power+Lighting) 8 29MAR10A 06APR10A 45 100 Wiring(Power+Lighting)
21EL051 Water Heater 2 13APR10A 14APR10A 0 100 Water Heater
21EL061 Light Control Panel 3 03MAY10 08MAY10 0 0 Light Control Panel
21EL071 Final DB'S Installation (MCB installation) 4 04MAY10 08MAY10 0 0 Final DB'S Installation (MCB installation)
21EL081 SMDB Installation (MCB+MCCB installation) 3 20MAY10 23MAY10 0 0 SMDB Installation (MCB+MCCB installation)
21EL181 Lighting Fixtures Installation 3 06MAY10 09MAY10 0 0 Lighting Fixtures Installation
21EL171 Switches &Socket Outlet Installation 1 08MAY10 08MAY10 0 0 Switches &Socket Outlet Installation
MECHANICAL LEVEL
23EL001 Electric Embedd.Items in Slab 1 04JAN10A 15JAN10A 100 100 Electric Embedd.Items in Slab
23EL011 Elect.Conduits&Junction Boxes 8 11MAR10A 20MAR10A 50 100 Elect.Conduits&Junction Boxes
23EL021 Wiring(Power+Lighting) 12 01APR10A 14APR10A 50 100 Wiring(Power+Lighting)
23EL031 Final DB'S Installation 1st Fix 7 07APR10A 14APR10A 0 100 Final DB'S Installation 1st Fix
23EL061 Light Control Panel 3 15APR10A 20APR10A 0 100 Light Control Panel
23EL071 Final DB'S Installation (MCB installation) 4 09MAY10 12MAY10 0 0 Final DB'S Installation (MCB installation)
23EL081 SMDB Installation (MCB+MCCB installation) 3 20MAY10 23MAY10 0 0 SMDB Installation (MCB+MCCB installation)
23EL181 Lighting Fixtures Installation 3 15MAY10 17MAY10 0 0 Lighting Fixtures Installation
23EL171 Switches &Socket Outlet Installation 1 15MAY10 15MAY10 0 0 Switches &Socket Outlet Installation
SWIMMING POOL LEVEL
SP23EL001 Electric Embedd.Items in Slab 1 21JAN10A 15FEB10A 100 100 Electric Embedd.Items in Slab
SP23EL011 Elect.Conduits&Junction Boxes 8 25MAR10A 03APR10A 50 100 Elect.Conduits&Junction Boxes
SP23EL021 Wiring(Power+Lighting) 8 11APR10A 19APR10A 50 100 Wiring(Power+Lighting)
SP23EL031 Final DB'S Installation 1st Fix 7 12APR10A 19APR10A 0 100 Final DB'S Installation 1st Fix
SP23EL061 Light Control Panel 3 20APR10A 25APR10 0 60 Light Control Panel
SP22EL051 Water Heater 2 22APR10A 24APR10 0 50 Water Heater
SP23EL081 SMDB Installation (MCB+MCCB installation) 3 20MAY10 23MAY10 0 0 SMDB Installation (MCB+MCCB installation)
SP23EL071 Final DB'S Installation (MCB installation) 4 13MAY10 17MAY10 0 0 Final DB'S Installation (MCB installation)
SP23EL171 Switches &Socket Outlet Installation 1 16MAY10 16MAY10 0 0 Switches &Socket Outlet Installation
SP23EL181 Lighting Fixtures Installation 3 19MAY10 22MAY10 0 0 Lighting Fixtures Installation
ELEV. MECH. LEVEL
P2LC001 Low Current Conduits&Junction Boxes 8 03JUL09A 16MAR10A 90 100 Low Current Conduits&Junction Boxes
P2LC011 Low Current Cable Tray 4 25MAR10A 29MAR10A 0 100 Low Current Cable Tray
P2LC031 Fire Alram Cable installtion 6 25MAR10A 31MAR10A 0 100 Fire Alram Cable installtion
P20LC021 Low Current Cable Pulling 6 30MAR10A 05APR10A 0 100 Low Current Cable Pulling
P2LC061 Video intercome system Installation(final fix) 6 25APR10 01MAY10 0 0 Video intercome system Installation(final fix)
P2LC081 TV&Telephon Outlet 3 17APR10A 19APR10A 0 100 TV&Telephon Outlet
P2LC051 CCTV Installation 6 29APR10 05MAY10 0 0 CCTV Installation
P2LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 01MAY10 06MAY10 0 0 Fire Alarm Final Fix (Smoke detector,Speaker...)
TOWER LEVEL 1
LC001 Low Current Conduits&Junction Boxes 6 23JUL09A 22NOV09A 100 100 Low Current Conduits&Junction Boxes
LC011 Low Current Cable Tray 4 31OCT09A 28DEC09A 100 100 Low Current Cable Tray
LC031 Fire Alram Cable installtion 6 21NOV09A 20JAN10A 100 100 Fire Alram Cable installtion
0LC021 Low Current Cable Pulling 10 16DEC09A 28DEC09A 100 100 Low Current Cable Pulling
LC081 TV&Telephon Outlet 7 16JAN10A 27MAR10A 70 100 TV&Telephon Outlet
LC061 Video intercome system Installation(final fix) 6 24MAR10A 30MAR10A 50 100 Video intercome system Installation(final fix)
LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 03APR10A 08APR10A 0 100 Fire Alarm Final Fix (Smoke detector,Speaker...)
LC051 CCTV Installation 6 24MAR10A 30MAR10A 0 100 CCTV Installation
TOWER LEVEL 2
02LC001 Low Current Conduits&Junction Boxes 6 01NOV09A 22NOV09A 100 100 Low Current Conduits&Junction Boxes
02LC031 Fire Alram Cable installtion 6 22NOV09A 23JAN10A 100 100 Fire Alram Cable installtion
020LC021 Low Current Cable Pulling 10 19DEC09A 11JAN10A 100 100 Low Current Cable Pulling
02LC081 TV&Telephon Outlet 7 19JAN10A 27MAR10A 70 100 TV&Telephon Outlet
02LC061 Video intercome system Installation(final fix) 6 24MAR10A 30MAR10A 50 100 Video intercome system Installation(final fix)
02LC011 Low Current Cable Tray 4 11JAN10A 100 100 Low Current Cable Tray
02LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 03APR10A 08APR10A 0 100 Fire Alarm Final Fix (Smoke detector,Speaker...)
02LC051 CCTV Installation 6 24MAR10A 30MAR10A 0 100 CCTV Installation
TOWER LEVEL 3
03LC001 Low Current Conduits&Junction Boxes 6 09NOV09A 22NOV09A 100 100 Low Current Conduits&Junction Boxes
03LC031 Fire Alram Cable installtion 6 22NOV09A 24JAN10A 100 100 Fire Alram Cable installtion
030LC021 Low Current Cable Pulling 10 21DEC09A 14JAN10A 100 100 Low Current Cable Pulling
03LC011 Low Current Cable Tray 4 05JAN10A 14JAN10A 100 100 Low Current Cable Tray
03LC081 TV&Telephon Outlet 7 21JAN10A 27MAR10A 70 100 TV&Telephon Outlet
03LC061 Video intercome system Installation(final fix) 6 24MAR10A 30MAR10A 50 100 Video intercome system Installation(final fix)
03LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 03APR10A 08APR10A 0 100 Fire Alarm Final Fix (Smoke detector,Speaker...)
03LC051 CCTV Installation 6 24MAR10A 30MAR10A 0 100 CCTV Installation
TOWER LEVEL 4
04LC001 Low Current Conduits&Junction Boxes 2 21NOV09A 22NOV09A 100 100 Low Current Conduits&Junction Boxes
04LC031 Fire Alram Cable installtion 6 19DEC09A 25JAN10A 100 100 Fire Alram Cable installtion
04LC081 TV&Telephon Outlet 7 15JAN10A 27MAR10A 70 100 TV&Telephon Outlet
040LC021 Low Current Cable Pulling 10 17JAN10A 23JAN10A 100 100 Low Current Cable Pulling
04LC011 Low Current Cable Tray 4 17JAN10A 23JAN10A 100 100 Low Current Cable Tray
04LC061 Video intercome system Installation(final fix) 6 24MAR10A 30MAR10A 70 100 Video intercome system Installation(final fix)
04LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 03APR10A 08APR10A 0 100 Fire Alarm Final Fix (Smoke detector,Speaker...)
04LC051 CCTV Installation 6 24MAR10A 30MAR10A 0 100 CCTV Installation
TOWER LEVEL 5
05LC001 Low Current Conduits&Junction Boxes 6 03SEP09A 07DEC09A 100 100 Low Current Conduits&Junction Boxes
05LC031 Fire Alram Cable installtion 6 21DEC09A 25JAN10A 100 100 Fire Alram Cable installtion
05LC081 TV&Telephon Outlet 7 17JAN10A 03APR10A 55 100 TV&Telephon Outlet
050LC021 Low Current Cable Pulling 10 23JAN10A 27JAN10A 100 100 Low Current Cable Pulling
05LC011 Low Current Cable Tray 4 23JAN10A 27JAN10A 100 100 Low Current Cable Tray
05LC061 Video intercome system Installation(final fix) 6 31MAR10A 06APR10A 70 100 Video intercome system Installation(final fix)
05LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 10APR10A 15APR10A 0 100 Fire Alarm Final Fix (Smoke detector,Speaker...)
05LC051 CCTV Installation 6 31MAR10A 06APR10A 0 100 CCTV Installation
TOWER LEVEL 6
06LC001 Low Current Conduits&Junction Boxes 6 13SEP09A 11DEC09A 100 100 Low Current Conduits&Junction Boxes
06LC031 Fire Alram Cable installtion 6 23DEC09A 30JAN10A 100 100 Fire Alram Cable installtion
060LC021 Low Current Cable Pulling 10 24JAN10A 06FEB10A 100 100 Low Current Cable Pulling
06LC011 Low Current Cable Tray 4 24JAN10A 06FEB10A 100 100 Low Current Cable Tray
06LC081 TV&Telephon Outlet 7 07FEB10A 07APR10A 70 100 TV&Telephon Outlet
06LC061 Video intercome system Installation(final fix) 6 31MAR10A 06APR10A 70 100 Video intercome system Installation(final fix)
06LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 10APR10A 15APR10A 0 100 Fire Alarm Final Fix (Smoke detector,Speaker...)
06LC051 CCTV Installation 6 31MAR10A 06APR10A 0 100 CCTV Installation
TOWER LEVEL 7
13LC001 Low Current Conduits&Junction Boxes 6 02NOV09A 12JAN10A 100 100 Low Current Conduits&Junction Boxes
130LC021 Low Current Cable Pulling 10 23FEB10A 27MAR10A 100 100 Low Current Cable Pulling
13LC011 Low Current Cable Tray 4 23FEB10A 16MAR10A 100 100 Low Current Cable Tray
13LC031 Fire Alram Cable installtion 6 27FEB10A 02MAR10A 100 100 Fire Alram Cable installtion
13LC081 TV&Telephon Outlet 7 02MAR10A 25APR10 70 71 TV&Telephon Outlet
13LC061 Video intercome system Installation(final fix) 6 25APR10 01MAY10 70 0 Video intercome system Installation(final fix)
13LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 24APR10 29APR10 0 0 Fire Alarm Final Fix (Smoke detector,Speaker...)
13LC051 CCTV Installation 6 25APR10 01MAY10 0 0 CCTV Installation
TOWER LEVEL 14
14LC001 Low Current Conduits&Junction Boxes 6 09NOV09A 09MAR10A 100 100 Low Current Conduits&Junction Boxes
14LC031 Fire Alram Cable installtion 6 01MAR10A 04MAR10A 100 100 Fire Alram Cable installtion
140LC021 Low Current Cable Pulling 10 02MAR10A 30MAR10A 100 100 Low Current Cable Pulling
14LC011 Low Current Cable Tray 4 02MAR10A 17MAR10A 100 100 Low Current Cable Tray
14LC081 TV&Telephon Outlet 7 03MAR10A 25APR10 70 71 TV&Telephon Outlet
14LC061 Video intercome system Installation(final fix) 6 25APR10 01MAY10 70 0 Video intercome system Installation(final fix)
14LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 24APR10 29APR10 0 0 Fire Alarm Final Fix (Smoke detector,Speaker...)
14LC051 CCTV Installation 6 25APR10 01MAY10 0 0 CCTV Installation
TOWER LEVEL 15
15LC001 Low Current Conduits&Junction Boxes 6 14NOV09A 24JAN10A 100 100 Low Current Conduits&Junction Boxes
15LC031 Fire Alram Cable installtion 6 03MAR10A 04MAR10A 100 100 Fire Alram Cable installtion
150LC021 Low Current Cable Pulling 10 04MAR10A 11APR10A 100 100 Low Current Cable Pulling
15LC011 Low Current Cable Tray 4 04MAR10A 17MAR10A 100 100 Low Current Cable Tray
15LC081 TV&Telephon Outlet 7 20APR10A 27APR10 70 43 TV&Telephon Outlet
15LC061 Video intercome system Installation(final fix) 6 25APR10 01MAY10 70 0 Video intercome system Installation(final fix)
15LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 24APR10 29APR10 0 0 Fire Alarm Final Fix (Smoke detector,Speaker...)
15LC051 CCTV Installation 6 25APR10 01MAY10 0 0 CCTV Installation
TOWER LEVEL 16
16LC001 Low Current Conduits&Junction Boxes 6 21NOV09A 03FEB10A 100 100 Low Current Conduits&Junction Boxes
160LC021 Low Current Cable Pulling 10 06APR10A 17APR10A 100 100 Low Current Cable Pulling
16LC011 Low Current Cable Tray 4 21MAR10A 24MAR10A 100 100 Low Current Cable Tray
16LC081 TV&Telephon Outlet 7 21APR10A 28APR10 70 29 TV&Telephon Outlet
16LC061 Video intercome system Installation(final fix) 6 25APR10 01MAY10 70 0 Video intercome system Installation(final fix)
16LC031 Fire Alram Cable installtion 6 23MAR10A 29MAR10A 0 100 Fire Alram Cable installtion
16LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 24APR10 29APR10 0 0 Fire Alarm Final Fix (Smoke detector,Speaker...)
16LC051 CCTV Installation 6 25APR10 01MAY10 0 0 CCTV Installation
TOWER LEVEL 17
17LC001 Low Current Conduits&Junction Boxes 6 30NOV09A 07FEB10A 100 100 Low Current Conduits&Junction Boxes
17LC031 Fire Alram Cable installtion 6 30MAR10A 05APR10A 100 100 Fire Alram Cable installtion
17LC081 TV&Telephon Outlet 7 29APR10 06MAY10 70 0 TV&Telephon Outlet
170LC021 Low Current Cable Pulling 10 06APR10A 17APR10A 100 100 Low Current Cable Pulling
17LC011 Low Current Cable Tray 4 22MAR10A 25MAR10A 100 100 Low Current Cable Tray
17LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 01MAY10 06MAY10 0 0 Fire Alarm Final Fix (Smoke detector,Speaker...)
17LC051 CCTV Installation 6 02MAY10 08MAY10 0 0 CCTV Installation
17LC061 Video intercome system Installation(final fix) 6 02MAY10 08MAY10 0 0 Video intercome system Installation(final fix)
TOWER LEVEL 18
18LC001 Low Current Conduits&Junction Boxes 6 06DEC09A 21FEB10A 100 100 Low Current Conduits&Junction Boxes
18LC031 Fire Alram Cable installtion 6 30MAR10A 05APR10A 100 100 Fire Alram Cable installtion
18LC081 TV&Telephon Outlet 7 29APR10 06MAY10 70 0 TV&Telephon Outlet
180LC021 Low Current Cable Pulling 10 06APR10A 17APR10A 100 100 Low Current Cable Pulling
18LC011 Low Current Cable Tray 4 22MAR10A 25MAR10A 100 100 Low Current Cable Tray
18LC061 Video intercome system Installation(final fix) 6 02MAY10 08MAY10 70 0 Video intercome system Installation(final fix)
18LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 01MAY10 06MAY10 0 0 Fire Alarm Final Fix (Smoke detector,Speaker...)
18LC051 CCTV Installation 6 02MAY10 08MAY10 0 0 CCTV Installation
TOWER LEVEL 19
19LC001 Low Current Conduits&Junction Boxes 6 13DEC09A 07MAR10A 100 100 Low Current Conduits&Junction Boxes
19LC031 Fire Alram Cable installtion 6 30MAR10A 05APR10A 100 100 Fire Alram Cable installtion
190LC021 Low Current Cable Pulling 10 18APR10A 28APR10 100 50 Low Current Cable Pulling
19LC011 Low Current Cable Tray 4 27MAR10A 30MAR10A 100 100 Low Current Cable Tray
19LC081 TV&Telephon Outlet 7 29APR10 06MAY10 35 0 TV&Telephon Outlet
19LC061 Video intercome system Installation(final fix) 6 02MAY10 08MAY10 70 0 Video intercome system Installation(final fix)
19LC041 Fire Alarm Final Fix (Smoke detector,Speaker...) 6 01MAY10 06MAY10 0 0
19LC051 CCTV Installation 6 02MAY10 08MAY10 0 0
TOWER LEVEL 20
Sheet 18 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
Envelope (Cladding &Curtain Wall)
PODIUM LEVEL 1
P1FC001 Curtain Wall Installation 9 29MAR10A 06APR10A 0 100 Curtain Wall Installation
P1FC011 External Alumn Cladding Install.+Balcony Rail 9 29MAR10A 06APR10A 0 100 External Alumn Cladding Install.+Balcony Rail
P1FC021 Sun Shade installation 20 05APR10A 24APR10 0 90 Sun Shade installation
PODIUM LEVEL 2
P2FC001 Curtain Wall Installation 9 07APR10A 15APR10A 0 100 Curtain Wall Installation
P2FC011 External Alumn Cladding Install.+Balcony Rail 9 07APR10A 15APR10A 0 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 1
FC001 Curtain Wall Installation 5 16NOV09A 18MAR10A 100 100 Curtain Wall Installation
FC011 External Alumn Cladding Install.+Balcony Rail 3 18MAR10A 20MAR10A 68 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 2
02FC001 Curtain Wall Installation 5 16NOV09A 19MAR10A 97 100 Curtain Wall Installation
02FC011 External Alumn Cladding Install.+Balcony Rail 3 21MAR10A 23MAR10A 73 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 3
03FC001 Curtain Wall Installation 5 16NOV09A 20MAR10A 96 100 Curtain Wall Installation
03FC011 External Alumn Cladding Install.+Balcony Rail 3 20MAR10A 22MAR10A 73 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 4
04FC001 Curtain Wall Installation 5 16NOV09A 21MAR10A 100 100 Curtain Wall Installation
04FC011 External Alumn Cladding Install.+Balcony Rail 3 23MAR10A 25MAR10A 73 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 5
05FC001 Curtain Wall Installation 5 21NOV09A 22MAR10A 98 100 Curtain Wall Installation
05FC011 External Alumn Cladding Install.+Balcony Rail 3 22MAR10A 24MAR10A 71 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 6
06FC001 Curtain Wall Installation 5 21NOV09A 23MAR10A 97 100 Curtain Wall Installation
06FC011 External Alumn Cladding Install.+Balcony Rail 3 23MAR10A 25MAR10A 71 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 7
07FC001 Curtain Wall Installation 5 21NOV09A 24MAR10A 96 100 Curtain Wall Installation
07FC011 External Alumn Cladding Install.+Balcony Rail 3 24MAR10A 26MAR10A 71 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 8
08FC001 Curtain Wall Installation 5 21FEB10A 28MAR10A 99 100 Curtain Wall Installation
08FC011 External Alumn Cladding Install.+Balcony Rail 3 27MAR10A 29MAR10A 71 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 9
09FC001 Curtain Wall Installation 5 21FEB10A 28MAR10A 95 100 Curtain Wall Installation
09FC011 External Alumn Cladding Install.+Balcony Rail 3 27MAR10A 29MAR10A 70 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 10
10FC001 Curtain Wall Installation 5 21FEB10A 28MAR10A 93 100 Curtain Wall Installation
10FC011 External Alumn Cladding Install.+Balcony Rail 3 27MAR10A 29MAR10A 70 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 11
11FC001 Curtain Wall Installation 5 21FEB10A 01APR10A 90 100 Curtain Wall Installation
11FC011 External Alumn Cladding Install.+Balcony Rail 3 01APR10A 03APR10A 69 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 12
12FC001 Curtain Wall Installation 5 21FEB10A 06APR10A 93 100 Curtain Wall Installation
12FC011 External Alumn Cladding Install.+Balcony Rail 3 06APR10A 08APR10A 69 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 13
13FC001 Curtain Wall Installation 5 21FEB10A 06APR10A 91 100 Curtain Wall Installation
13FC011 External Alumn Cladding Install.+Balcony Rail 3 06APR10A 08APR10A 69 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 14
14FC001 Curtain Wall Installation 5 21FEB10A 06APR10A 90 100 Curtain Wall Installation
14FC011 External Alumn Cladding Install.+Balcony Rail 3 06APR10A 08APR10A 69 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 15
15FC001 Curtain Wall Installation 5 27FEB10A 11APR10A 90 100 Curtain Wall Installation
15FC011 External Alumn Cladding Install.+Balcony Rail 3 10APR10A 12APR10A 69 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 16
16FC001 Curtain Wall Installation 5 27FEB10A 12APR10A 93 100 Curtain Wall Installation
16FC011 External Alumn Cladding Install.+Balcony Rail 3 11APR10A 13APR10A 69 100 External Alumn Cladding Install.+Balcony Rail
TOWER LEVEL 17
P3K1RS041 Drainage For the Floor Installation 5 30SEP09A 10OCT09A 100 100
P3K1RS051 Storm Water Riser For the Floor Installation 5 30SEP09A 10OCT09A 100 100
P3K1RS001 Duct Riser For the Floor Installation 6 06MAR10A 11MAR10A 0 100
P3K1RS021 CH.W. Pipe Riser For the Floor Installation 6 06MAR10A 11MAR10A 0 100
P3K1RS061 Water Supply Riser For the Floor Installation 5 06MAR10A 10MAR10A 0 100
P3K1RS071 Fire Fighting Riser For the Floor 6 06MAR10A 11MAR10A 0 100
Sheet 19 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
P3K1RS081 Bus Bar For the Floor Installation 5 26APR10 01MAY10 0 0 Bus Bar For the Floor Installation
P3K1RS091 Fire Alarm Cable Riser 5 17MAR10A 22MAR10A 0 100 Fire Alarm Cable Riser
P3K1RS101 Law Current Cable Riser 5 23MAR10A 28MAR10A 0 100 Law Current Cable Riser
PARKING LEVEL 2
PK1RS041 Drainage For the Floor Installation 5 30SEP09A 10OCT09A 100 100 Drainage For the Floor Installation
PK1RS051 Storm Water Riser For the Floor Installation 5 30SEP09A 10OCT09A 100 100 Storm Water Riser For the Floor Installation
PK1RS001 Duct Riser For the Floor Installation 6 13MAR10A 18MAR10A 0 100 Duct Riser For the Floor Installation
PK1RS021 CH.W. Pipe Riser For the Floor Installation 6 13MAR10A 18MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
PK1RS071 Fire Fighting Riser For the Floor 6 13MAR10A 18MAR10A 0 100 Fire Fighting Riser For the Floor
PK1RS081 Bus Bar For the Floor Installation 5 26APR10 01MAY10 0 0 Bus Bar For the Floor Installation
PK1RS091 Fire Alarm Cable Riser 5 23MAR10A 28MAR10A 0 100 Fire Alarm Cable Riser
PK1RS101 Law Current Cable Riser 5 29MAR10A 03APR10A 0 100 Law Current Cable Riser
PK1RS061 Water Supply Riser For the Floor Installation 5 22APR10A 27APR10 0 20 Water Supply Riser For the Floor Installation
PARKING LEVEL 1
K1RS041 Drainage For the Floor Installation 5 03OCT09A 10OCT09A 100 100 Drainage For the Floor Installation
K1RS051 Storm Water Riser For the Floor Installation 5 03OCT09A 10OCT09A 100 100 Storm Water Riser For the Floor Installation
K1RS081 Bus Bar For the Floor Installation 5 26APR10 01MAY10 0 0 Bus Bar For the Floor Installation
K1RS001 Duct Riser For the Floor Installation 6 20MAR10A 25MAR10A 0 100 Duct Riser For the Floor Installation
K1RS021 CH.W. Pipe Riser For the Floor Installation 6 20MAR10A 25MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
K1RS071 Fire Fighting Riser For the Floor 6 20MAR10A 25MAR10A 0 100 Fire Fighting Riser For the Floor
K1RS091 Fire Alarm Cable Riser 5 29MAR10A 03APR10A 0 100 Fire Alarm Cable Riser
K1RS101 Law Current Cable Riser 5 04APR10A 08APR10A 0 100 Law Current Cable Riser
K1RS061 Water Supply Riser For the Floor Installation 5 28APR10 03MAY10 0 0 Water Supply Riser For the Floor Installation
PODIUM LEVEL 1
P1RS051 Storm Water Riser For the Floor Installation 5 10MAR10A 15MAR10A 0 100 Storm Water Riser For the Floor Installation
P1RS111 Power Cable From MDB to SMDB 6 06MAR10A 11MAR10A 0 100 Power Cable From MDB to SMDB
P1RS081 Bus Bar For the Floor Installation 5 02MAY10 06MAY10 0 0 Bus Bar For the Floor Installation
P1RS001 Duct Riser For the Floor Installation 6 27MAR10A 01APR10A 0 100 Duct Riser For the Floor Installation
P1RS021 CH.W. Pipe Riser For the Floor Installation 6 27MAR10A 01APR10A 0 100 CH.W. Pipe Riser For the Floor Installation
P1RS071 Fire Fighting Riser For the Floor 6 27MAR10A 01APR10A 0 100 Fire Fighting Riser For the Floor
P1RS091 Fire Alarm Cable Riser 5 04APR10A 08APR10A 0 100 Fire Alarm Cable Riser
P1RS101 Law Current Cable Riser 5 10APR10A 14APR10A 0 100 Law Current Cable Riser
P1RS041 Drainage For the Floor Installation 5 27APR10 02MAY10 0 0 Drainage For the Floor Installation
P1RS061 Water Supply Riser For the Floor Installation 5 04MAY10 09MAY10 0 0 Water Supply Riser For the Floor Installation
PODIUM LEVEL 2
P2RS051 Storm Water Riser For the Floor Installation 5 16MAR10A 21MAR10A 0 100 Storm Water Riser For the Floor Installation
P2RS111 Power Cable From MDB to SMDB 6 13MAR10A 18MAR10A 0 100 Power Cable From MDB to SMDB
P2RS081 Bus Bar For the Floor Installation 5 02MAY10 06MAY10 0 0 Bus Bar For the Floor Installation
P2RS001 Duct Riser For the Floor Installation 6 03APR10A 08APR10A 0 100 Duct Riser For the Floor Installation
P2RS021 CH.W. Pipe Riser For the Floor Installation 6 03APR10A 08APR10A 0 100 CH.W. Pipe Riser For the Floor Installation
P2RS071 Fire Fighting Riser For the Floor 6 03APR10A 08APR10A 0 100 Fire Fighting Riser For the Floor
P2RS091 Fire Alarm Cable Riser 5 10APR10A 14APR10A 0 100 Fire Alarm Cable Riser
P2RS041 Drainage For the Floor Installation 5 27APR10 02MAY10 0 0 Drainage For the Floor Installation
P2RS101 Law Current Cable Riser 5 15APR10A 20APR10A 0 100 Law Current Cable Riser
P2RS061 Water Supply Riser For the Floor Installation 5 10MAY10 15MAY10 0 0 Water Supply Riser For the Floor Installation
TOWER LEVEL 1
RS041 Drainage For the Floor Installation 5 11OCT09A 10NOV09A 100 100 Drainage For the Floor Installation
RS051 Storm Water Riser For the Floor Installation 5 11OCT09A 10NOV09A 100 100 Storm Water Riser For the Floor Installation
RS061 Water Supply Riser For the Floor Installation 4 11OCT09A 16MAR10A 90 100 Water Supply Riser For the Floor Installation
RS001 Duct Riser For the Floor Installation 6 01MAR10A 10MAR10A 75 100 Duct Riser For the Floor Installation
RS071 Fire Fighting Riser For the Floor 6 06MAR10A 11MAR10A 100 100 Fire Fighting Riser For the Floor
RS021 CH.W. Pipe Riser For the Floor Installation 6 06MAR10A 11MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
RS091 Fire Alarm Cable Riser 5 06MAR10A 10MAR10A 0 100 Fire Alarm Cable Riser
RS101 Law Current Cable Riser 5 06MAR10A 10MAR10A 0 100 Law Current Cable Riser
RS081 Bus Bar For the Floor Installation 4 26APR10 29APR10 0 0 Bus Bar For the Floor Installation
TOWER LEVEL 2
02RS041 Drainage For the Floor Installation 5 11NOV09A 01DEC09A 100 100 Drainage For the Floor Installation
02RS051 Storm Water Riser For the Floor Installation 5 11NOV09A 03DEC09A 100 100 Storm Water Riser For the Floor Installation
02RS061 Water Supply Riser For the Floor Installation 4 11NOV09A 16MAR10A 50 100 Water Supply Riser For the Floor Installation
02RS001 Duct Riser For the Floor Installation 6 01MAR10A 10MAR10A 75 100 Duct Riser For the Floor Installation
02RS071 Fire Fighting Riser For the Floor 6 06MAR10A 11MAR10A 100 100 Fire Fighting Riser For the Floor
02RS021 CH.W. Pipe Riser For the Floor Installation 6 06MAR10A 11MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
02RS091 Fire Alarm Cable Riser 5 06MAR10A 10MAR10A 0 100 Fire Alarm Cable Riser
02RS101 Law Current Cable Riser 5 06MAR10A 10MAR10A 0 100 Law Current Cable Riser
02RS081 Bus Bar For the Floor Installation 4 26APR10 29APR10 0 0 Bus Bar For the Floor Installation
TOWER LEVEL 3
03RS051 Storm Water Riser For the Floor Installation 5 17NOV09A 03DEC09A 100 100 Storm Water Riser For the Floor Installation
03RS041 Drainage For the Floor Installation 5 06DEC09A 13DEC09A 100 100 Drainage For the Floor Installation
03RS061 Water Supply Riser For the Floor Installation 4 20JAN10A 16MAR10A 50 100
03RS001 Duct Riser For the Floor Installation 6 02MAR10A 10MAR10A 75 100
03RS071 Fire Fighting Riser For the Floor 6 06MAR10A 11MAR10A 100 100
03RS021 CH.W. Pipe Riser For the Floor Installation 6 06MAR10A 11MAR10A 0 100
03RS091 Fire Alarm Cable Riser 5 06MAR10A 10MAR10A 0 100
03RS101 Law Current Cable Riser 5 06MAR10A 10MAR10A 0 100
03RS081 Bus Bar For the Floor Installation 4 26APR10 29APR10 0 0
TOWER LEVEL 4
04RS051 Storm Water Riser For the Floor Installation 5 04NOV09A 12JAN10A 100 100
04RS041 Drainage For the Floor Installation 5 12DEC09A 23DEC09A 100 100
04RS001 Duct Riser For the Floor Installation 6 02MAR10A 10MAR10A 55 100
04RS061 Water Supply Riser For the Floor Installation 4 13MAR10A 16MAR10A 50 100
04RS071 Fire Fighting Riser For the Floor 6 06MAR10A 11MAR10A 100 100
04RS021 CH.W. Pipe Riser For the Floor Installation 6 06MAR10A 11MAR10A 0 100
04RS091 Fire Alarm Cable Riser 5 06MAR10A 10MAR10A 0 100
04RS101 Law Current Cable Riser 5 06MAR10A 10MAR10A 0 100
04RS081 Bus Bar For the Floor Installation 4 26APR10 29APR10 0 0
TOWER LEVEL 5
05RS051 Storm Water Riser For the Floor Installation 5 22NOV09A 02JAN10A 100 100
05RS041 Drainage For the Floor Installation 5 22DEC09A 02JAN10A 100 100
05RS001 Duct Riser For the Floor Installation 6 06MAR10A 11MAR10A 55 100
05RS061 Water Supply Riser For the Floor Installation 4 13MAR10A 16MAR10A 50 100
05RS071 Fire Fighting Riser For the Floor 6 06MAR10A 11MAR10A 100 100
05RS021 CH.W. Pipe Riser For the Floor Installation 6 06MAR10A 11MAR10A 0 100
05RS091 Fire Alarm Cable Riser 5 10MAR10A 15MAR10A 0 100
05RS101 Law Current Cable Riser 5 10MAR10A 15MAR10A 0 100
05RS081 Bus Bar For the Floor Installation 4 01MAY10 04MAY10 0 0
TOWER LEVEL 6
06RS041 Drainage For the Floor Installation 5 23DEC09A 04JAN10A 100 100
06RS051 Storm Water Riser For the Floor Installation 5 12JAN10A 16JAN10A 100 100
06RS001 Duct Riser For the Floor Installation 6 13MAR10A 18MAR10A 55 100
06RS061 Water Supply Riser For the Floor Installation 4 17MAR10A 21MAR10A 50 100
06RS071 Fire Fighting Riser For the Floor 6 13MAR10A 18MAR10A 100 100
06RS091 Fire Alarm Cable Riser 5 16MAR10A 21MAR10A 0 100
06RS101 Law Current Cable Riser 5 16MAR10A 21MAR10A 0 100
06RS021 CH.W. Pipe Riser For the Floor Installation 6 13MAR10A 18MAR10A 0 100
06RS081 Bus Bar For the Floor Installation 4 01MAY10 04MAY10 0 0
TOWER LEVEL 7
07RS041 Drainage For the Floor Installation 5 05JAN10A 22JAN10A 100 100
07RS051 Storm Water Riser For the Floor Installation 5 13JAN10A 22JAN10A 100 100
07RS001 Duct Riser For the Floor Installation 6 13MAR10A 18MAR10A 55 100
07RS061 Water Supply Riser For the Floor Installation 4 17MAR10A 21MAR10A 50 100
07RS071 Fire Fighting Riser For the Floor 6 13MAR10A 18MAR10A 90 100
07RS091 Fire Alarm Cable Riser 5 16MAR10A 21MAR10A 0 100
07RS101 Law Current Cable Riser 5 16MAR10A 21MAR10A 0 100
07RS021 CH.W. Pipe Riser For the Floor Installation 6 13MAR10A 18MAR10A 0 100
07RS081 Bus Bar For the Floor Installation 4 01MAY10 04MAY10 0 0
Sheet 20 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
TOWER LEVEL 8
08RS051 Storm Water Riser For the Floor Installation 5 14JAN10A 24JAN10A 100 100 Storm Water Riser For the Floor Installation
08RS041 Drainage For the Floor Installation 5 16JAN10A 30JAN10A 100 100 Drainage For the Floor Installation
08RS001 Duct Riser For the Floor Installation 6 13MAR10A 18MAR10A 55 100 Duct Riser For the Floor Installation
08RS071 Fire Fighting Riser For the Floor 6 15MAR10A 21MAR10A 90 100 Fire Fighting Riser For the Floor
08RS061 Water Supply Riser For the Floor Installation 4 17MAR10A 21MAR10A 0 100 Water Supply Riser For the Floor Installation
08RS021 CH.W. Pipe Riser For the Floor Installation 6 13MAR10A 18MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
08RS101 Law Current Cable Riser 5 08APR10A 13APR10A 0 100 Law Current Cable Riser
08RS081 Bus Bar For the Floor Installation 4 01MAY10 04MAY10 0 0 Bus Bar For the Floor Installation
08RS091 Fire Alarm Cable Riser 5 30MAR10A 04APR10A 0 100 Fire Alarm Cable Riser
TOWER LEVEL 9
09RS041 Drainage For the Floor Installation 5 22JAN10A 03FEB10A 100 100 Drainage For the Floor Installation
09RS051 Storm Water Riser For the Floor Installation 5 22JAN10A 25JAN10A 100 100 Storm Water Riser For the Floor Installation
09RS001 Duct Riser For the Floor Installation 6 13MAR10A 18MAR10A 55 100 Duct Riser For the Floor Installation
09RS071 Fire Fighting Riser For the Floor 6 13MAR10A 18MAR10A 90 100 Fire Fighting Riser For the Floor
09RS061 Water Supply Riser For the Floor Installation 4 17MAR10A 21MAR10A 0 100 Water Supply Riser For the Floor Installation
09RS091 Fire Alarm Cable Riser 5 16MAR10A 21MAR10A 0 100 Fire Alarm Cable Riser
09RS101 Law Current Cable Riser 5 16MAR10A 21MAR10A 0 100 Law Current Cable Riser
09RS021 CH.W. Pipe Riser For the Floor Installation 6 13MAR10A 18MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
09RS081 Bus Bar For the Floor Installation 4 05MAY10 09MAY10 0 0 Bus Bar For the Floor Installation
TOWER LEVEL 10
10RS041 Drainage For the Floor Installation 5 23JAN10A 15FEB10A 100 100 Drainage For the Floor Installation
10RS051 Storm Water Riser For the Floor Installation 5 23JAN10A 15FEB10A 100 100 Storm Water Riser For the Floor Installation
10RS001 Duct Riser For the Floor Installation 6 13MAR10A 18MAR10A 55 100 Duct Riser For the Floor Installation
10RS071 Fire Fighting Riser For the Floor 6 13MAR10A 18MAR10A 90 100 Fire Fighting Riser For the Floor
10RS061 Water Supply Riser For the Floor Installation 4 17MAR10A 21MAR10A 0 100 Water Supply Riser For the Floor Installation
10RS091 Fire Alarm Cable Riser 5 30MAR10A 04APR10A 0 100 Fire Alarm Cable Riser
10RS101 Law Current Cable Riser 5 31MAR10A 05APR10A 0 100 Law Current Cable Riser
10RS021 CH.W. Pipe Riser For the Floor Installation 6 13MAR10A 18MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
10RS081 Bus Bar For the Floor Installation 4 05MAY10 09MAY10 0 0 Bus Bar For the Floor Installation
TOWER LEVEL 11
11RS041 Drainage For the Floor Installation 5 24JAN10A 21FEB10A 100 100 Drainage For the Floor Installation
11RS051 Storm Water Riser For the Floor Installation 5 24JAN10A 21FEB10A 100 100 Storm Water Riser For the Floor Installation
11RS001 Duct Riser For the Floor Installation 6 20MAR10A 25MAR10A 55 100 Duct Riser For the Floor Installation
11RS071 Fire Fighting Riser For the Floor 6 22MAR10A 28MAR10A 90 100 Fire Fighting Riser For the Floor
11RS061 Water Supply Riser For the Floor Installation 4 22MAR10A 25MAR10A 0 100 Water Supply Riser For the Floor Installation
11RS101 Law Current Cable Riser 5 14APR10A 19APR10A 0 100 Law Current Cable Riser
11RS021 CH.W. Pipe Riser For the Floor Installation 6 20MAR10A 25MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
11RS081 Bus Bar For the Floor Installation 4 05MAY10 09MAY10 0 0 Bus Bar For the Floor Installation
11RS091 Fire Alarm Cable Riser 5 05APR10A 10APR10A 0 100 Fire Alarm Cable Riser
TOWER LEVEL 12
12RS041 Drainage For the Floor Installation 5 26JAN10A 13MAR10A 100 100 Drainage For the Floor Installation
12RS051 Storm Water Riser For the Floor Installation 5 26JAN10A 11MAR10A 100 100 Storm Water Riser For the Floor Installation
12RS001 Duct Riser For the Floor Installation 6 20MAR10A 25MAR10A 55 100 Duct Riser For the Floor Installation
12RS071 Fire Fighting Riser For the Floor 6 22MAR10A 28MAR10A 90 100 Fire Fighting Riser For the Floor
12RS061 Water Supply Riser For the Floor Installation 4 22MAR10A 25MAR10A 0 100 Water Supply Riser For the Floor Installation
12RS101 Law Current Cable Riser 5 14APR10A 19APR10A 0 100 Law Current Cable Riser
12RS021 CH.W. Pipe Riser For the Floor Installation 6 20MAR10A 25MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
12RS081 Bus Bar For the Floor Installation 4 05MAY10 09MAY10 0 0 Bus Bar For the Floor Installation
12RS091 Fire Alarm Cable Riser 5 05APR10A 10APR10A 0 100 Fire Alarm Cable Riser
TOWER LEVEL 13
13RS041 Drainage For the Floor Installation 5 09FEB10A 11MAR10A 100 100 Drainage For the Floor Installation
13RS051 Storm Water Riser For the Floor Installation 5 22FEB10A 11MAR10A 100 100 Storm Water Riser For the Floor Installation
13RS001 Duct Riser For the Floor Installation 6 20MAR10A 25MAR10A 55 100 Duct Riser For the Floor Installation
13RS071 Fire Fighting Riser For the Floor 6 22MAR10A 28MAR10A 90 100 Fire Fighting Riser For the Floor
13RS061 Water Supply Riser For the Floor Installation 4 22MAR10A 25MAR10A 0 100 Water Supply Riser For the Floor Installation
13RS101 Law Current Cable Riser 5 14APR10A 19APR10A 0 100 Law Current Cable Riser
13RS021 CH.W. Pipe Riser For the Floor Installation 6 20MAR10A 25MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
13RS091 Fire Alarm Cable Riser 5 05APR10A 10APR10A 0 100 Fire Alarm Cable Riser
13RS081 Bus Bar For the Floor Installation 4 10MAY10 13MAY10 0 0 Bus Bar For the Floor Installation
TOWER LEVEL 14
14RS041 Drainage For the Floor Installation 5 22FEB10A 10MAR10A 100 100 Drainage For the Floor Installation
14RS051 Storm Water Riser For the Floor Installation 5 28FEB10A 10MAR10A 100 100 Storm Water Riser For the Floor Installation
14RS001 Duct Riser For the Floor Installation 6 20MAR10A 25MAR10A 55 100 Duct Riser For the Floor Installation
14RS071 Fire Fighting Riser For the Floor 6 22MAR10A 28MAR10A 90 100 Fire Fighting Riser For the Floor
14RS061 Water Supply Riser For the Floor Installation 4 22MAR10A 25MAR10A 0 100 Water Supply Riser For the Floor Installation
14RS101 Law Current Cable Riser 5 14APR10A 19APR10A 0 100 Law Current Cable Riser
14RS021 CH.W. Pipe Riser For the Floor Installation 6 20MAR10A 25MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
14RS091 Fire Alarm Cable Riser 5 05APR10A 10APR10A 0 100
14RS081 Bus Bar For the Floor Installation 4 10MAY10 13MAY10 0 0
TOWER LEVEL 15
15RS041 Drainage For the Floor Installation 5 01MAR10A 11MAR10A 100 100
15RS051 Storm Water Riser For the Floor Installation 5 02MAR10A 13MAR10A 100 100
15RS001 Duct Riser For the Floor Installation 6 20MAR10A 25MAR10A 55 100
15RS071 Fire Fighting Riser For the Floor 6 22MAR10A 28MAR10A 90 100
15RS061 Water Supply Riser For the Floor Installation 4 22MAR10A 25MAR10A 0 100
15RS101 Law Current Cable Riser 5 14APR10A 19APR10A 0 100
15RS021 CH.W. Pipe Riser For the Floor Installation 6 20MAR10A 25MAR10A 0 100
15RS091 Fire Alarm Cable Riser 5 05APR10A 10APR10A 0 100
15RS081 Bus Bar For the Floor Installation 4 10MAY10 13MAY10 0 0
TOWER LEVEL 16
16RS041 Drainage For the Floor Installation 5 15MAR10A 20MAR10A 100 100
16RS051 Storm Water Riser For the Floor Installation 5 15MAR10A 20MAR10A 100 100
16RS001 Duct Riser For the Floor Installation 6 27MAR10A 01APR10A 55 100
16RS071 Fire Fighting Riser For the Floor 6 29MAR10A 04APR10A 90 100
16RS061 Water Supply Riser For the Floor Installation 4 27MAR10A 30MAR10A 0 100
16RS101 Law Current Cable Riser 5 20APR10A 25APR10 0 60
16RS021 CH.W. Pipe Riser For the Floor Installation 6 27MAR10A 01APR10A 0 100
16RS081 Bus Bar For the Floor Installation 4 10MAY10 13MAY10 0 0
16RS091 Fire Alarm Cable Riser 5 11APR10A 15APR10A 0 100
TOWER LEVEL 17
17RS001 Duct Riser For the Floor Installation 6 27MAR10A 01APR10A 55 100
17RS041 Drainage For the Floor Installation 5 15MAR10A 20MAR10A 40 100
17RS051 Storm Water Riser For the Floor Installation 5 15MAR10A 20MAR10A 30 100
17RS071 Fire Fighting Riser For the Floor 6 29MAR10A 04APR10A 90 100
17RS061 Water Supply Riser For the Floor Installation 4 27MAR10A 30MAR10A 0 100
17RS101 Law Current Cable Riser 5 20APR10A 25APR10 0 60
17RS021 CH.W. Pipe Riser For the Floor Installation 6 27MAR10A 01APR10A 0 100
17RS081 Bus Bar For the Floor Installation 4 15MAY10 18MAY10 0 0
17RS091 Fire Alarm Cable Riser 5 11APR10A 15APR10A 0 100
TOWER LEVEL 18
18RS001 Duct Riser For the Floor Installation 6 27MAR10A 01APR10A 55 100
18RS071 Fire Fighting Riser For the Floor 6 29MAR10A 04APR10A 90 100
18RS041 Drainage For the Floor Installation 5 15MAR10A 20MAR10A 0 100
18RS051 Storm Water Riser For the Floor Installation 5 15MAR10A 20MAR10A 0 100
18RS061 Water Supply Riser For the Floor Installation 4 27MAR10A 30MAR10A 0 100
18RS101 Law Current Cable Riser 5 20APR10A 25APR10 0 60
18RS021 CH.W. Pipe Riser For the Floor Installation 6 27MAR10A 01APR10A 0 100
18RS081 Bus Bar For the Floor Installation 4 15MAY10 18MAY10 0 0
18RS091 Fire Alarm Cable Riser 5 11APR10A 15APR10A 0 100
TOWER LEVEL 19
19RS001 Duct Riser For the Floor Installation 6 27MAR10A 01APR10A 55 100
19RS071 Fire Fighting Riser For the Floor 6 29MAR10A 04APR10A 70 100
19RS041 Drainage For the Floor Installation 5 15MAR10A 20MAR10A 0 100
19RS051 Storm Water Riser For the Floor Installation 5 21MAR10A 25MAR10A 0 100
19RS061 Water Supply Riser For the Floor Installation 4 27MAR10A 30MAR10A 0 100
Sheet 21 of 22
Activity Activity Orig Target 1 Target 1 % Target 1 1 2 3
M JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
ID Description Dur Early Start Early Finish Comp % Comp
19RS101 Law Current Cable Riser 5 29APR10 04MAY10 0 0 Law Current Cable Riser
19RS021 CH.W. Pipe Riser For the Floor Installation 6 27MAR10A 01APR10A 0 100 CH.W. Pipe Riser For the Floor Installation
19RS081 Bus Bar For the Floor Installation 4 15MAY10 18MAY10 0 0 Bus Bar For the Floor Installation
19RS091 Fire Alarm Cable Riser 5 11APR10A 15APR10A 0 100 Fire Alarm Cable Riser
TOWER LEVEL 20
20RS001 Duct Riser For the Floor Installation 6 27MAR10A 01APR10A 55 100 Duct Riser For the Floor Installation
20RS071 Fire Fighting Riser For the Floor 6 29MAR10A 04APR10A 70 100 Fire Fighting Riser For the Floor
20RS041 Drainage For the Floor Installation 5 17MAR10A 22MAR10A 0 100 Drainage For the Floor Installation
20RS051 Storm Water Riser For the Floor Installation 5 17MAR10A 22MAR10A 0 100 Storm Water Riser For the Floor Installation
20RS061 Water Supply Riser For the Floor Installation 4 27MAR10A 30MAR10A 0 100 Water Supply Riser For the Floor Installation
20RS021 CH.W. Pipe Riser For the Floor Installation 6 27MAR10A 01APR10A 0 100 CH.W. Pipe Riser For the Floor Installation
20RS081 Bus Bar For the Floor Installation 4 15MAY10 18MAY10 0 0 Bus Bar For the Floor Installation
20RS091 Fire Alarm Cable Riser 5 13APR10A 18APR10A 0 100 Fire Alarm Cable Riser
20RS101 Law Current Cable Riser 5 29APR10 04MAY10 0 0 Law Current Cable Riser
TOWER LEVEL 21
21RS001 Duct Riser For the Floor Installation 6 03APR10A 08APR10A 55 100 Duct Riser For the Floor Installation
21RS041 Drainage For the Floor Installation 5 21MAR10A 25MAR10A 0 100 Drainage For the Floor Installation
21RS051 Storm Water Riser For the Floor Installation 5 27MAR10A 31MAR10A 0 100 Storm Water Riser For the Floor Installation
21RS071 Fire Fighting Riser For the Floor 6 05APR10A 11APR10A 0 100 Fire Fighting Riser For the Floor
21RS061 Water Supply Riser For the Floor Installation 4 31MAR10A 04APR10A 0 100 Water Supply Riser For the Floor Installation
21RS081 Bus Bar For the Floor Installation 4 15MAY10 18MAY10 0 0 Bus Bar For the Floor Installation
21RS021 CH.W. Pipe Riser For the Floor Installation 6 03APR10A 08APR10A 0 100 CH.W. Pipe Riser For the Floor Installation
21RS091 Fire Alarm Cable Riser 5 19APR10A 24APR10 0 80 Fire Alarm Cable Riser
21RS101 Law Current Cable Riser 5 05MAY10 10MAY10 0 0 Law Current Cable Riser
MECHANICAL LEVEL
23RS001 Duct Riser For the Floor Installation 6 03APR10A 08APR10A 0 100 Duct Riser For the Floor Installation
23RS021 CH.W. Pipe Riser For the Floor Installation 6 16MAR10A 22MAR10A 0 100 CH.W. Pipe Riser For the Floor Installation
23RS041 Drainage For the Floor Installation 5 21MAR10A 25MAR10A 0 100 Drainage For the Floor Installation
23RS051 Storm Water Riser For the Floor Installation 5 27MAR10A 31MAR10A 0 100 Storm Water Riser For the Floor Installation
23RS071 Fire Fighting Riser For the Floor 6 05APR10A 11APR10A 0 100 Fire Fighting Riser For the Floor
23RS061 Water Supply Riser For the Floor Installation 4 31MAR10A 04APR10A 0 100 Water Supply Riser For the Floor Installation
23RS081 Bus Bar For the Floor Installation 4 19MAY10 23MAY10 0 0 Bus Bar For the Floor Installation
23RS091 Fire Alarm Cable Riser 5 19APR10A 24APR10 0 80 Fire Alarm Cable Riser
23RS101 Law Current Cable Riser 5 06MAY10 11MAY10 0 0 Law Current Cable Riser
SWIMMING POOL LEVEL
SP23RS001 Duct Riser For the Floor Installation 6 03APR10A 08APR10A 0 100 Duct Riser For the Floor Installation
SP23RS041 Drainage For the Floor Installation 5 30MAR10A 04APR10A 0 100 Drainage For the Floor Installation
SP23RS051 Storm Water Riser For the Floor Installation 5 30MAR10A 04APR10A 0 100 Storm Water Riser For the Floor Installation
SP23RS071 Fire Fighting Riser For the Floor 6 05APR10A 11APR10A 0 100 Fire Fighting Riser For the Floor
SP23RS061 Water Supply Riser For the Floor Installation 4 31MAR10A 04APR10A 0 100 Water Supply Riser For the Floor Installation
SP23RS081 Bus Bar For the Floor Installation 4 19MAY10 23MAY10 0 0 Bus Bar For the Floor Installation
SP23RS091 Fire Alarm Cable Riser 5 20APR10A 25APR10 0 60 Fire Alarm Cable Riser
SP23RS021 CH.W. Pipe Riser For the Floor Installation 6 10APR10A 15APR10A 0 100 CH.W. Pipe Riser For the Floor Installation
SP23RS101 Law Current Cable Riser 5 06MAY10 11MAY10 0 0 Law Current Cable Riser
ELEV. MECH. LEVEL
2523RS071 Fire Fighting Riser For the Floor 6 06APR10A 12APR10A 0 100 Fire Fighting Riser For the Floor
2523RS001 Duct Riser For the Floor Installation 6 06APR10A 12APR10A 0 100 Duct Riser For the Floor Installation
2523RS041 Drainage For the Floor Installation 5 06APR10A 11APR10A 0 100 Drainage For the Floor Installation
2523RS051 Storm Water Riser For the Floor Installation 5 06APR10A 11APR10A 0 100 Storm Water Riser For the Floor Installation
2523RS061 Water Supply Riser For the Floor Installation 4 07APR10A 11APR10A 0 100 Water Supply Riser For the Floor Installation
2523RS081 Bus Bar For the Floor Installation 4 19MAY10 23MAY10 0 0 Bus Bar For the Floor Installation
2523RS091 Fire Alarm Cable Riser 5 20APR10A 25APR10 0 60 Fire Alarm Cable Riser
2523RS101 Law Current Cable Riser 5 06MAY10 11MAY10 0 0 Law Current Cable Riser
2523RS021 CH.W. Pipe Riser For the Floor Installation 6 17APR10A 22APR10A 0 100 CH.W. Pipe Riser For the Floor Installation
External Works
General
Sheet 22 of 22