Sunteți pe pagina 1din 2

STUDY TITLE: Process Example SHEET: 1 of 2

DRAWINGS: DATE: 10 mar, 2020

TEAM COMPOSITION: DH, JK, LB, EK, NE, MG MEETING DATE: 15 dez, 1998 11:56

PART CONSIDERED: Transfer Line from supply tank A to reactor


DESIGN INTENT:

Action allocated
No. Guide Word Element Deviation Possible Causes Consequences Existing Controls Comments Actions required
to

1 NO Material A No material A Supply Tank A is empty No flow of A into reactor None Shown Situation not Consider installation on tank MG
acceptable A of a low-level alarm plus a
Explosion low-level trip to stop pump B
2 NO Transfer A (at No transfer of A Pump A stopped, line Explosion None Shown Situation Not Measurement of flow rate for JK
a rate > B) takes place blocked Acceptable material A plus a low flow
which trips pump B
3 MORE Material A More material A: Filling of tank from Tank will overflow into None Shown Remark: This would Consider high-level alarm if EK
supply tank over tanker when insufficient bounded area have been identified not previously identified
full capacity exists during examination
of the tank
4 MORE Transfer A More transfer of Wrong size impeller Possible reduction in None Check pump flows and JK
A yield characteristics during
Wrong pump fitted commissioning
Increased flow Product will contain large
rate of A excess A
Revise the commissioning JK
procedure
5 LESS Material A Less A Low level in tank Inadequate net positive None Unacceptable Consider installation on tank MG
suction head A of a low-level alarm plus a
low-level trip to stop pump B
Possible vortexing and
leading to an explosion

Inadequate flow
6 LESS Transfer A (at Reduced flow Line partially blocked, Explosion None Shown Not Acceptable Measurement of flow rate for JK
a rate > B) rate of A leakage, pump under material A plus a low flow
performing etc which trips pump B
7 AS WELL AS Material A As well as A Contaminated supply to Not Known Contents of all tankers Considered Check operating procedure LB
there is other tank checked and analysed Acceptable
fluid material prior to discharge into
also present in tank
the supply tank
STUDY TITLE: Process Example SHEET: 2 of 2

DRAWINGS: DATE: 10 mar, 2020

TEAM COMPOSITION: DH, JK, LB, EK, NE, MG MEETING DATE: 15 dez, 1998 11:56

PART CONSIDERED: Transfer Line from supply tank A to reactor


DESIGN INTENT:

Action allocated
No. Guide Word Element Deviation Possible Causes Consequences Existing Controls Comments Actions required
to

8 AS WELL AS Material A As well as The potential for each The potential for each The potential for each The potential for The potential for each NE
transferring A, considered in the light of considered in the light of considered in the light of each considered in considered in the light of
something else more specific details more specific details more specific details the light of more more specific details
happens such specific details
as corrosion,
erosion,
crystallization or
decomposition
9 AS WELL AS Destination As well as to Line, valve or gland Evironmental Use of accepted piping Qualified Locate flow sensor for trip DH
Reactor reactor leaks Contamination code / standard acceptance as close as possible to the
reactor
External leaks Possible Explosion
10 REVERSE Transfer A Reverse Pressure in reactor Back contamination of None Shown Position not Consider installing a MG
direction of flow higher than pump supply tank with reaction satisfactory non-return high valve in the
discharge pressure material line
Material flows
from reactor to
supply tank
11 OTHER THAN Material A Other than A Wrong material in Unknown - would depend Tanker contents identity Position Acceptable
supply tank on material checked and analysed
Material other prior to discharge
than A in supply
tank
12 OTHER THAN Destination External leaks Line fracture Evironmental Integrity of piping Check piping design Specify that proposed flow MG
Reactor Contamination and trip should have a
Nothing reaches possible explosion sufficiently rapid response to