Documente Academic
Documente Profesional
Documente Cultură
Below is the IEE Checklist for Poultry Farm Project with a population raging from 5,001
to 40,000 heads. Read the questions carefully and provide the appropriate answers in
the spaces/blocks provided. Use additional sheets if necessary and provide
attachments as directed/required.
Misleading statements and erroneous answers provided in the blocks/spaces are basis
for legal actions and revocation of Environmental Compliance Certificate (ECC).
___________________________________________________
(State complete address: street, barangay, municipality/city, and
province)
____________________________________________________
TIN :____________________________________________________
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
1.1 Project Status
[ ] Proposed/New
[ ] Existing/Operational
If existing, date/year when the project was started:
____________
[ ] Yes [ ] No
[ ] In-house [ ] Bank
1.7 Market
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
2.0 PROJECT OPERATIONS
Project Description:
Extent of Operations:
[ ] Hatchery
[ ] Grow-out
[ ] Processing
[ ] Feed Milling
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
Table 2.2 List of Existing or Proposed Infrastructure
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
2.2.1 Attach treatment scheme for the proposed wastewater treatment
facility with dimensions and description of each of the treatment
units, if applicable.
! Vicinity Map;
! Picture of the proposed site (Provide captions and brief description of the area.);
! Site development plan showing the location of the following:
• Birdhouses;
• Mortality pits;
• Composting area;
! If with a Feedmill, identify location of air pollution control structures.
COMMERCIAL
RESIDENTIAL
INDUSTRIAL
INDUSTRIAL
(specify)
houses)
AGRO-
DIRECTION
North
South
East
West
Remarks:______________________________________________________________
________________________________________________________________
________________________________________________________________
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
Table 3.2 Description of existing land use of the immediate/adjoining area
beyond the 200-meter radius from project periphery. (Check dominant land use
and indicate estimated density locators.)
AGRICULTURAL
INSTITUTIONAL
(Estimated # of
COMMERCIAL
RESIDENTIAL
INDUSTRIAL
INDUSTRIAL
(specify)
houses)
AGRO-
DIRECTION
North
South
East
West
Remarks:______________________________________________________________
________________________________________________________________
________________________________________________________________
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
3.4 Identification of existing ecosystem
[ ] No [ ] Yes
____________________________________________________
____________________________________________________
____________________________________________________
____________________________________________________
____________________________________________________
[ ] No [ ] Yes
Manner of Resolution:___________________________________
Date of Resolution:_____________________________________
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
4.0 DESCRIPTION OF IMPACT AND MITIGATING MEASURES
Please Mitigating/Enhancement
Check Measure
Appropriate Describe (Recommendation to
Components/Parameters Answer the impact come from the inspecting
Yes No area office for compliance by
the proponent)
Will there be land clearing?
(m2)
Will there be vegetation
clearing?
(m2)
Will there be tree cutting?
trees
Will there be to soil
removal? replacement? (m2)
Will there be excavation
works and cut & fill (m2)
activities?
Will there be other
earthmoving activities? (m2)
Will there be any slope
modification or ground
leveling?
Will there be an increased
traffic movement in the
area?
Will there be an increase
economic activity in the
area?
Will there be an increase in
availability of employment?
Will there be displacement
of people in the area?
Does the displacement will
involve relocation of
affected parties?
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
4.2 Operation Phase
Wastewater Physical
Treatment
Physical
Biological
Tertiary
Treatment
Others, pls.
specify (use
additional
sheet if
necessary
Odor Chemical
Treatment
Feed Additives
Green Zone
Establishment
Others
Bag House
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
4.2.1 Attach scheme of treatment for the proposed wastewater facility/plans
with dimensions and description of each of the treatment units.
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
5.0 PROPONENT’S COMMITMENT
_________________________________________
Project Proponent’s Signature over printed Name
________________________________________
Title/Designation
_________________________________________
Date
Poultry Checklist
DENR-EMB-EIA & DA-NAFC
6.0 ATTACHMENTS
PERMITS/CLEARANCES ATTACHED?
YES NO
Mayor’s Permit
Business Permit
Sanitary Permit
Building Permit
Endorsement from LGU/Brgy.
Locational clearance/certificate of Locational Viability (HLURB
Clearance)
2. Other Attachments
DESCRIPTION ATTACHED?
YES NO
Transfer Certificate of Title
Project Vicinity Map/Sketch
Site Development
Endorsement from the LGU (Barangay/Municipal Certificate)
Construction Schedule in GANTT Chart Form
Poultry Checklist
DENR-EMB-EIA & DA-NAFC