Duration: 20 weeks Assessment: 50/50
Sl. No. Dates Work to be done
1 1st - 10th Nov 2019 Identify Industry consultation with Placement team
2 15th – 16th July 2019 Briefing session for students
3 26th – 30rd March 2019 Approval of Components by Dean SSA & SS, AUUP
4 17th December 2019 Online Registration / Commencement date
5 18th December 2019 Allocation of faculty guide on Amizone / Approval
Registration
6 18th Dec – 5th Feb 2020 Week 1-8
Introduction to the Problem Statement and clarity of the
Project , Data collection, Analysis,
Report Preparation of first Draft and submission of WPR
7 20th Feb 2020 1st Assessment
8 6th Feb – 1st April 2020 Week 9-16
Analysis, Result finding & Conclusion
Report Preparation of Second Draft and submission of
WPR
9 26th March 2020 2nd Assessment
10 2nd April - 6th May 2020 Week 17-20
Submission of WPR ,Future Scope, Limitations Outlined,
Review of Quality of work and Written Expression
Future Scope, Limitations Outlined, Performance review
with Industry guide by faculty guide
11 7th – 8th May 2020 Submission of soft copy of report and Plagiarism Check
12 8th May 2020 Update Internal Marks on Amizone
13 11th May 2020 Submission of Final Report
14 20th May 2020 Proposed date of Viva Voce

Signature of NTCC Coordinator Signature of HOI


`

Course Title: Major Project - II


L T P/ SW/F TOTAL
Course Level: BCA+MCA (Dual) S W CREDIT
Course Type: Non-Teaching Credit Course UNITS
Credit Units: 15 - - - - 15
Course Code: ETMJ602

Course Objectives:
The main objectives of Major Project are:
 To practice and apply the acquired knowledge “hands - on” in the working environment
 To experience learning process in a realistic way.
 To assist the student's development of communications skill, responsibility and attention to detail.
 To develop a sense of responsibility to complete a project on time
 Understand subject better
 Chance to showcase skills

Pre-requisites:
Basic knowledge of Computer Programming
Basic knowledge of Database System

Student Learning Outcomes:


After completion of this course, students will be able to:
 To provide a curriculum that emphasizes the core competencies in the disciplines of computer science and application.
`

 Understand Goal setting, Team working and team management.


 Experience of applying existing engineering knowledge in similar or new situations
 Practical applications of project management to formulate strategies to achieve strategic goals
 Critical-thinking and analytical decision-making capabilities to investigate complex problems to propose project-based solutions
 Understand the importance of the continuous improvement process and be a lifelong learner
 Understand the importance of responsibility and conflict management skills
 Skills to manage creative project processes effectively and efficiently

Guidelines for Conduct Major Project


1. On-line Registration for Project on Amizone
Each student is required to register him/herself for project on amizone immediately after the registration in the final semester.
2. On-line filling of the Synopsis Form on Amizone
After online project registration and approval by the project co-coordinator, each student is required to duly fill in the synopsis form available on
amizone.
3. Submission of the Synopsis report by e-mail/in-person to respective guides
After filling the synopsis form, a synopsis report of 3-4 pages must reach allocated internal guide either by e-mail or handed over in person.
4. Submission of the Mid-Term Report by e-mail/in-person to respective guides
A Mid-Term report of 3-4 pages must be submitted to your Internal Guide in-person and get approval before meeting (submission of 1st and 2nd
Mid-term report).

Regular reporting to internal guide once a week is mandatory (Total WPR 20).
Students, please note that this will be important criteria for internal evaluation process as well. Meeting with guide will be the criteria for the
eligibility of the final evaluation. The final Report submission should be according to University Guidelines inclusive of Plagiarism
Percentage less than 15%.

Allocation of Faculty Guide


Each student shall be assigned a faculty guide for the practical training well in advance in a formal manner depending on the number of students per
faculty member, the available specialization among the faculty guides by HOI / Institution Non-Teaching Credit Course (NTCC) Committee.
List of the faculty guides will be available on AMIZONE. The orientation programme will be organized by the department. The students will finalize
the problem title in consultation with their faculty guide assigned by the HOD. Overall Coordination will be done by the NTCC Coordinator.
The faculty guide closely interacts with the student and monitors the progress of the student in project.
`

Approval of Topic, Synopsis


Student will finalize the broad area /topic, synopsis of his / her project in consultation with the faculty guide. If the student is undertaking the practical
training outside Amity, he/she will provide broad area of practical training course at the time of Registration. However, within ten days after the
registration / joining the organization, whichever is earlier, the student will work on the topic, synopsis of his/her training under the guidance of external
supervisor and faculty guide. The student will submit the synopsis duly approved and signed by external guide to his faculty guide as per the following
Format:
 Student Details (Name, Enrollment Number, Programme, Section)
 Faculty Guide
 Topic/Problem
 Objective(s)
 Description
 Proposed Methodology
 Resources Required
 Work schedule (in consultation with faculty guide)
 References

Attendance
The students are required to follow the timings given by their respective Department. Student must be present in all activities announced by faculty
guide/HOI. Students who have planned to do their Project training in the industry, they must workout weekly schedule of reporting with the
concerned faculty guide.

Assessment/ Examination Scheme:

Internal Assessment External Total


Assessment
50% 50% 100%
`

Marks Format

Internal Marks format

Submission
Weekly
Timely Synopsis Progress Plagiarism of Final
Enroll Progress Total
S.N. Name Registration Approval Reviews Report Report On
No Reports (50 Marks)
(5 Marks) (5 Marks) (15 Marks) (5 Marks) Time
(15 Marks)
(5 Marks)

External Marks Format

S.
N. Student
Feasibility Data Innovation Final Report
Enroll Learning Presentation Total
Name Study Analysis & Quality Assessment
No. Outcomes (10 Marks) (50 Marks)
(5 Marks) (10 Marks) (5 Marks) (10 Marks)
(10 Marks)

Submission of Final Report


The following points must be ensured for producing quality report:
 The student will start the project report while doing his/her practical training as per the prescribed guidelines.
 The students will submit 1st draft of the report to the guide for guidance. Followed by the submission of second draft of report after making
necessary changes as suggested by the guide.
 The final report shall be submitted after checking plagiarism through Turnitin or any other format subscribed by University. Copying material
should not be more than 10% provided source is mentioned in the report along with proper acknowledgement and referencing as per plagiarism
policy of the university.
 Following will be submitted along with final report:
o WPR
o NTCC Dairy
`

o Plagiarism Report
 A student will be eligible to submit his report and final assessment provided he/she meets following conditions:
o Online Registration for the NTCC course
o Approval of Topic, Synopsis and Project Plan by the guide
o 90 % of WPR were submitted
o 80% of the WPR were satisfactory
o Similarity index not more than 15 % as per Plagiarism Prevention Policy.

Students must submit the 2 copies of final spiral bound project report
No report will be accepted after the due date. Academic Department copy will be finally housed in departmental library. The evaluations of the Practical
Training will be done by a board comprising of internal and external faculty and experts. The NTCC Team will submit the final marks (continuous and
final viva) to Exams Department as per dates given along with project reports.

The starting and the closing dates of the program should be adhered to strictly.

Annexure-1: Report format


Annexure-2: WPR & Daily Diary format
`

Annexure - I

-------------------Uttar Pradesh-------------------

Project Report on

<Title of the Project>


Submitted to
Amity Institute of Information Technology
In partial fulfilment of the requirements for the award of the degree of

Master of Computer Applications

Submitted To Submitted By
<Guide Name> <Student Name>
Enroll No:
Batch:
`

DECLARATION BY STUDENT
I <Name of the Student> student of BCA + MCA (Dual) hereby declare that the Seminar titled “<Title of the Project>” which is submitted by
me to <Guide Name>, Amity Institute of Information Technology, Amity University Uttar Pradesh, Noida, in partial fulfillment of requirement for the
award of the degree of <Program Name>, has not been previously formed the basis for the award of any degree, diploma or other similar title or
recognition.
The Author attests that permission has been obtained for the use of any copy righted material appearing in the Dissertation / Project report other than
brief excerpts requiring only proper acknowledgement in scholarly writing and all such use is acknowledged.

Place: - Noida (Student Signature)


<Student Name>
Enrollment No:
Semester:

i
`

GUIDE CERTIFICATE

I hereby certify that the Project Report by <Student Name>, student of BCA + MCA (Dual) <Semester Number> (Enrolment No:) with title
“Title of the Project” which is submitted to Amity Institute of Information Technology, Amity University Uttar Pradesh, Noida in partial
fulfillment of requirement for the award of the degree of <Program Name> is an original contribution with existing knowledge and faithful
record of work carried out by him/her under my guidance and supervision and to the best of my knowledge this work has not been submitted in part
or full for any Degree or Diploma to this University or elsewhere.

Noida
Date: (Signature)
<Guide Name>
Designation:
Amity Institute of Information Technology
AUUP, Noida
`

ACKNOWLEDEGEMENT

It is high privilege for me to express my deep sense of gratitude to those entire faculty Members who helped me in the completion of the project, specially
my internal guide <Guide Name> who was always there at hour of need.
My special thanks to all other faculty members, Batch mate & Seniors of Amity Institute of Information Technology, Amity University, Uttar Pradesh for
helping me in the completion of project work and its report submission.
<If you want you can add other name also>

<Student Name>
<Enrolment Number>

Iii
`

FORMAT FOR TABLE OF CONTENTS


TABLE OF CONTENTS

S. No. Topic Page No.


1 Declaration
2 Certificate
3 Acknowledgement
4 Abstract
5 Chapter-1: Introduction
6 Chapter-2: Objective
7 Chapter-3: Feasibility Study
8 Chapter-4: Proposed System
9 Chapter-5: System Analysis
10 Chapter-6: Information Gathering
11 Chapter-7: Architecture
12 Chapter-8: Implementation
13 Chapter-9: Testing
14 Chapter-10: Conclusion and Future Scope
15 References
`

LIST OF TABLES

Table No. Title of the Table Page No.

LIST OF FIGURES

Figure No. Caption of the Figure Page No.

2
`

Annexure - II

AMITY INSTITUTE OF INFORMATION & TECHNOLOGY

Major Project
WEEKLY PROGRESS REPORT (WPR)

For the week commencing on: ----------

Program: Student Name:


WPR: Enrollment Number:
Company Name (if any):
Industry Guide’s Name (if any):
Faculty Guide’s Name:
Project / Seminar Title:
TARGETS SET FOR THE WEEK:

ACHIEVEMENTS FOR THE WEEK:

FUTURE WORK PLANS:


`

AMITY INSTITUTE OF INFORMATION & TECHNOLOGY


DAILY DIARY

WPR of Week: WPR’s remaining:


Student Name:
Enrollment Number: Program:
Seminar / Project Area:

Week’s Summary
Days/Time

S-ar putea să vă placă și