Documente Academic
Documente Profesional
Documente Cultură
AMITY UNIVERSITY
------UTTAR PRADESH------
Amity Institute of Information Technology
NTCC - MAJOR PROJECT / MAJOR PROJECT - II
Program: PG (MCA / BCA+MCA (Dual)) BATCH: 2017- 2020 / 2015-2020
Course Title: Major Project / Major Project II
Course Code: ETMJ600/ETMJ602 Credit Unit: 15 Semester: 6th/10th
Duration: 20 weeks Assessment: 50/50
Sl. No. Dates Work to be done
1 1st - 10th Nov 2019 Identify Industry consultation with Placement team
2 15th – 16th July 2019 Briefing session for students
3 26th – 30rd March 2019 Approval of Components by Dean SSA & SS, AUUP
4 17th December 2019 Online Registration / Commencement date
5 18th December 2019 Allocation of faculty guide on Amizone / Approval
Registration
6 18th Dec – 5th Feb 2020 Week 1-8
Introduction to the Problem Statement and clarity of the
Project , Data collection, Analysis,
Report Preparation of first Draft and submission of WPR
7 20th Feb 2020 1st Assessment
8 6th Feb – 1st April 2020 Week 9-16
Analysis, Result finding & Conclusion
Report Preparation of Second Draft and submission of
WPR
9 26th March 2020 2nd Assessment
10 2nd April - 6th May 2020 Week 17-20
Submission of WPR ,Future Scope, Limitations Outlined,
Review of Quality of work and Written Expression
Future Scope, Limitations Outlined, Performance review
with Industry guide by faculty guide
11 7th – 8th May 2020 Submission of soft copy of report and Plagiarism Check
12 8th May 2020 Update Internal Marks on Amizone
13 11th May 2020 Submission of Final Report
14 20th May 2020 Proposed date of Viva Voce
Course Objectives:
The main objectives of Major Project are:
To practice and apply the acquired knowledge “hands - on” in the working environment
To experience learning process in a realistic way.
To assist the student's development of communications skill, responsibility and attention to detail.
To develop a sense of responsibility to complete a project on time
Understand subject better
Chance to showcase skills
Pre-requisites:
Basic knowledge of Computer Programming
Basic knowledge of Database System
Regular reporting to internal guide once a week is mandatory (Total WPR 20).
Students, please note that this will be important criteria for internal evaluation process as well. Meeting with guide will be the criteria for the
eligibility of the final evaluation. The final Report submission should be according to University Guidelines inclusive of Plagiarism
Percentage less than 15%.
Attendance
The students are required to follow the timings given by their respective Department. Student must be present in all activities announced by faculty
guide/HOI. Students who have planned to do their Project training in the industry, they must workout weekly schedule of reporting with the
concerned faculty guide.
Marks Format
Submission
Weekly
Timely Synopsis Progress Plagiarism of Final
Enroll Progress Total
S.N. Name Registration Approval Reviews Report Report On
No Reports (50 Marks)
(5 Marks) (5 Marks) (15 Marks) (5 Marks) Time
(15 Marks)
(5 Marks)
S.
N. Student
Feasibility Data Innovation Final Report
Enroll Learning Presentation Total
Name Study Analysis & Quality Assessment
No. Outcomes (10 Marks) (50 Marks)
(5 Marks) (10 Marks) (5 Marks) (10 Marks)
(10 Marks)
o Plagiarism Report
A student will be eligible to submit his report and final assessment provided he/she meets following conditions:
o Online Registration for the NTCC course
o Approval of Topic, Synopsis and Project Plan by the guide
o 90 % of WPR were submitted
o 80% of the WPR were satisfactory
o Similarity index not more than 15 % as per Plagiarism Prevention Policy.
Students must submit the 2 copies of final spiral bound project report
No report will be accepted after the due date. Academic Department copy will be finally housed in departmental library. The evaluations of the Practical
Training will be done by a board comprising of internal and external faculty and experts. The NTCC Team will submit the final marks (continuous and
final viva) to Exams Department as per dates given along with project reports.
The starting and the closing dates of the program should be adhered to strictly.
Annexure - I
-------------------Uttar Pradesh-------------------
Project Report on
Submitted To Submitted By
<Guide Name> <Student Name>
Enroll No:
Batch:
`
DECLARATION BY STUDENT
I <Name of the Student> student of BCA + MCA (Dual) hereby declare that the Seminar titled “<Title of the Project>” which is submitted by
me to <Guide Name>, Amity Institute of Information Technology, Amity University Uttar Pradesh, Noida, in partial fulfillment of requirement for the
award of the degree of <Program Name>, has not been previously formed the basis for the award of any degree, diploma or other similar title or
recognition.
The Author attests that permission has been obtained for the use of any copy righted material appearing in the Dissertation / Project report other than
brief excerpts requiring only proper acknowledgement in scholarly writing and all such use is acknowledged.
i
`
GUIDE CERTIFICATE
I hereby certify that the Project Report by <Student Name>, student of BCA + MCA (Dual) <Semester Number> (Enrolment No:) with title
“Title of the Project” which is submitted to Amity Institute of Information Technology, Amity University Uttar Pradesh, Noida in partial
fulfillment of requirement for the award of the degree of <Program Name> is an original contribution with existing knowledge and faithful
record of work carried out by him/her under my guidance and supervision and to the best of my knowledge this work has not been submitted in part
or full for any Degree or Diploma to this University or elsewhere.
Noida
Date: (Signature)
<Guide Name>
Designation:
Amity Institute of Information Technology
AUUP, Noida
`
ACKNOWLEDEGEMENT
It is high privilege for me to express my deep sense of gratitude to those entire faculty Members who helped me in the completion of the project, specially
my internal guide <Guide Name> who was always there at hour of need.
My special thanks to all other faculty members, Batch mate & Seniors of Amity Institute of Information Technology, Amity University, Uttar Pradesh for
helping me in the completion of project work and its report submission.
<If you want you can add other name also>
<Student Name>
<Enrolment Number>
Iii
`
LIST OF TABLES
LIST OF FIGURES
2
`
Annexure - II
Major Project
WEEKLY PROGRESS REPORT (WPR)
Week’s Summary
Days/Time