Documente Academic
Documente Profesional
Documente Cultură
10)
Test Guide
ZXUR 9000 UMTS(V4.17.10) Test Guide
LEGAL INFORMATION
The contents of this document are protected by copyright laws and international treaties. Any
reproduction or distribution of this document or any portion of this document, in any form by any
means, without the prior written consent of ZTE CORPORATION is prohibited. Additionally, the
contents of this document are protected by contractual confidentiality obligations.
All company, brand and product names are trade or service marks, or registered trade or service
marks, of ZTE CORPORATION or of their respective owners.
This document is provided “as is”, and all express, implied, or statutory warranties,
representations or conditions are disclaimed, including without limitation any implied warranty of
merchantability, fitness for a particular purpose, title or non-infringement. ZTE CORPORATION and
its licensors shall not be liable for damages resulting from the use of or reliance on the information
contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or
applications covering the subject matter of this document. Except as expressly provided in any
written license between ZTE CORPORATION and its licensee, the user of this document shall not
acquire any license to the subject matter herein.
ZTE CORPORATION reserves the right to upgrade or make technical change to this product without
further notice. Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire
related information.
ZTE CORPORATION
Address: NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057
Website: http://support.zte.com.cn
Email: 800@zte.com.cn
ZTE Confidential & Proprietary. © 2020 ZTE CORPORATION. All rights reserved. I
ZXUR 9000 UMTS(V4.17.10) Test Guide
Revision History
Author
ZTE Confidential & Proprietary. © 2020 ZTE CORPORATION. All rights reserved. II
ZXUR 9000 UMTS(V4.17.10) Test Guide
Summary
Chapter Description
1 RNC Hardware Test Describes the RNC hardware tests.
2 State Management Test Describes the state management tests.
3 Software Version Management Describes the software version management tests.
Test
4 Service Test Describes the service tests.
ZTE Confidential & Proprietary. © 2020 ZTE CORPORATION. All rights reserved. III
ZXUR 9000 UMTS(V4.17.10) Test Guide
TABLE OF CONTENTS
4 Service Test....................................................................................................18
4.1 Basic Service Test...........................................................................................18
4.1.1 CS Service Call Test........................................................................................18
4.1.2 Videophone Service Test.................................................................................19
4.1.3 PS Service Test...............................................................................................20
4.1.4 HSPA Service Test..........................................................................................21
4.1.5 Concurrent Service Test..................................................................................24
4.2 Handover Test.................................................................................................28
4.2.1 Softer Handover...............................................................................................28
ZTE Confidential & Proprietary. © 2020 ZTE CORPORATION. All rights reserved. IV
ZXUR 9000 UMTS(V4.17.10) Test Guide
4.2.2 Intra-RNC Inter-NodeB Soft Handover between Two Cells of the Same
Frequency.......................................................................................................32
4.2.3 Inter-RNC Soft Handover between Two Cells of the Same Frequency............37
4.2.4 Intra-NodeB Hard Handover between Two Cells of Different Frequencies.......41
4.2.5 Intra-RNC Inter-NodeB Hard Handover between Two Cells of Different
Frequencies.....................................................................................................46
4.2.6 Inter-RNC Hard Handover between Different Frequencies (Iur Interface
between two RNCs).........................................................................................50
4.2.7 Inter-RNC Hard Handover between Different Frequencies (No Iur interface
between two RNCs).........................................................................................54
4.2.8 Inter-RNC Hard Handover between Identical Frequencies (No Iur interface
between two RNCs).........................................................................................58
4.3 Interoperability Test between UMTS System and GSM/GPRS System...........62
4.3.1 Reselection in CS Domain (UMTS -> GSM)....................................................62
4.3.2 Reselection in CS Domain (GSM -> UMTS)....................................................63
4.3.3 Inter-system Handover of CS 12.2 K Voice Call (UMTS->GSM).....................64
4.3.4 Inter-system Handover of CS 12.2 K Voice Call (GSM->UMTS)......................65
4.3.5 Cell Reselection in PS Domain (UMTS -> GSM/GPRS)...................................66
4.3.6 Handover in PS Domain (UMTS-> GSM/GPRS)..............................................68
4.3.7 Handover in PS Domain (GSM/GPRS-> UMTS)..............................................69
ZTE Confidential & Proprietary. © 2020 ZTE CORPORATION. All rights reserved. V
ZXUR 9000 UMTS(V4.17.10) Test Guide
Procedure:
2. Pull out all boards in the subrack under the fan subrack.
3. Put a 20cm-long paper slip into the subrack under the fan subrack.
Acceptance Criteria:
2. The paper slip in the service subrack should be sucked/blown upwards, which
3. The paper slip at the back of the wind-guiding subrack can obviously feel the wind
force, and the surface wind-guiding subrack converts the wind direction from vertical
to horizontal.
Remarks:
None
Prerequisites:
Procedure:
(Pushing the switches upwards is to turn them on; pushing the switches downwards
2. When the power switches are turned on, the shelves of ECTA can get power input
Acceptance Criteria:
Remarks:
1. Refer to the Hardware Description for the criteria of board indicator status. Refer to
Hardware Description for the judgment of board indicator status in the following
contents.
2. Before the RNC boards are reset, at least one voice call (CS 12.2K) can be made
successfully.
Procedure:
2. Reset the active board only, if there are both active board and standby board.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Acceptance Criteria:
1. The RUN indicator flashes at 1 Hz after the board resets, which means that
the board runs properly.
Remarks:
1. If no standby board is configured, resetting a board will release the services on it.
2. If an active board is configured with a standby board, after the active board is reset,
the standby board will serve as the active board and the original active board will be
in standby status.
Procedure:
1. Shut down OMM service from the Linux system of the OMM board, and then shut
2. Wait for 2-3 minutes and then insert the OMM board again.
3. When the Linux system is started, start the application programs of OMC server.
Acceptance Criteria:
1. After the OMC server is shut down, the status bar at the bottom displays “Link is
broken and the system is trying to recover it. Please wait and retry later!” After that,
a timeout prompt will appear, indicating the “Link is broken and session has been
2. After the OMC server application program is launched, run the OMC again and it
Remarks:
1. The indicators of all RNC boards are in normal status. The active/standby boards to
switchover.
Procedure:
1. Make calls to a pair of CS12.2K CS service users, and maintain the conversation
2. Locate the boards with active and standby configuration, and press the EXCH key
on the active board to trigger the switchover between the active and standby
boards.
Acceptance Criteria:
1. The RUN indicators flash at 1 Hz, and both the active board and standby board run
normally after the switchover.
2. After the switchover, the ACT indicator of the original active board becomes OFF,
3. During the switchover, the CS service in step one is normal, without pause or
Remarks:
1. The boards that support active/standby switchover include: EAPB, EGPB, ESDTA,
within 5 minutes after the first active/standby switchover. Otherwise, the second
1. The indicators of all RNC boards are in normal status. The active/standby boards to
switchover.
Procedure:
1. Initiate calls to a pair of CS 12.2K service users, and hold on a while (skip this step
2. In the left pane of Status Management interface, click UTRAN subnet > RNC
Managed Element > RNC ConfigSet > Status Management > Rack > Rack 1. The
3. 3. Right-click the board to be tested and select Normal Master-slave State Switch.
A dialog box will appear: “Do you want to perform master/slave switchover?” Click
Acceptance Criteria:
1. All RUN indicators flash at 1 Hz and both the active and standby boards run
2. After the switchover, the ACT indicator of the original active board becomes OFF,
and that of the original standby board becomes ON. And the original active board is
reset.
3. During the switchover, the CS service in step one is normal, without pause or
Remarks:
1. The indicators of all RNC boards are in normal status. The load-share boards to be
switchover.
Procedure:
1. Locate the load-share boards with the planning configuration, and plug out the
Acceptance Criteria:
1. For the board that is configured with load-share, the services carried on the board
power-off will suffer from call drops; the newly-started calls will all be carried on the
2. The board which be plugged out, the newly-started services can be fulfilled
Remarks:
1. The boards that support load-share switchover include: EGBS, EGFS, EGPB, DMP,
and RUP.
2. When the data are being synchronized, no load-share switchover is allowed within 5
minutes after the first load-share switchover. Otherwise, the second load-share
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN Sub-network > UMTS Managed Element > UMTS Radio Resource >
IuCS Link. In the window that pops up on the right, right-click an item to choose
IuCS Reset. Click UTRAN Sub-network > UMTS Managed Element > UMTS Radio
Resource > IuPS Link. In the window that pops up on the right, right-click an item to
3. Click UTRAN Sub-network > UMTS Managed Element > Physical Resource >
Controller Rack, and double-click a piece of record to open the rack diagram. Click
the icon on the tool bar on the right view, and reset all network elements. In the
pop-up dialogue box for confirmation, click OK to start the all-NE reset, otherwise
click Cancel.
4. Click UTRAN Sub-network > UMTS Managed Element > Transmission Resource >
AAL2 Path. In the tab of corresponding office, choose the AAL2 path to be tested
and right-click it to execute AAL2 link block/unblock or AAL2 link reset/stop reset.
5. Click UTRAN Sub-network > UMTS Managed Element > Physical Resource > Slave
Sub-unit. In the tab of corresponding office, choose the sub-unit to be tested and
6. Click UTRAN Sub-network > UMTS Managed Element > UMTS Physical Resource
> Cell. Choose the cell to be tested and right-click it to choose Cell Reset.
Acceptance Criteria:
1. RNC, Iu interface, and cell can be successfully reset. SLAVE sub-unit and the AAL2
Remarks:
None
ZXUR 9000 UMTS(V4.17.10) Test Guide
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN Sub-network > UMTS Managed Element > Physical Resource > Logic
CPU. Choose the CPU to be tested and right-click it to perform the test.
3. Click UTRAN Sub-network > UMTS Managed Element > Physical Resource >
Module to perform Module State Query for the DMP, OMP, and CMP module. Click
UTRAN Sub-network > UMTS Managed Element > Physical Resource > Unit to
perform Unit State Query for the RUP module and DPI Card State Query of RUB.
4. For the CPU module of rear board, Unit State Query, Subunit State Query, and
5. Click UTRAN Sub-network > UMTS Managed Element > Physical Resource >
Board. In the tab, CPU Use Rate Query, Process CPU Use Rate Query, and Board
Acceptance Criteria:
1. The status of corresponding CPU module or unit can be obtained after being
queried.
Remarks:
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN Sub-network > UMTS Managed Element > Transmission Resource >
Terminal PVC Management. In this tab, choose the PCV to be queried and right-
3. Click UTRAN Sub-network > UMTS Managed Element > Transmission Resource >
Exchange PVC. In this tab, choose the PCV to be queried and right-click it to
Acceptance Criteria:
Remarks:
None
Prerequisites:
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN Sub-network > UMTS Managed Element > Physical Resource >
Controller Rack, and double-click a piece of record to open the rack diagram. Right-
click the board to be queried on the rack diagram, and execute Optical Interface
Status Query.
Acceptance Criteria:
1. After we query the status of ATM optical port, the residual bandwidth and bandwidth
Remarks:
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN sub-network > UMTS Managed Element > Transmission Resource,
and choose IMA Group, IMA Link or TC Link in the tab. Right-click the
3. The following operations can be performed for IMA Group: Get Status,
4. The following operations can be performed for IMA Link: Get Status,
Inhibit/Uninhibit, etc.
Inhibit/Uninhibit, etc.
Acceptance Criteria:
2. The Inhibit and Uninhibit of test object can be completed successfully. After the
3. The IMA Group can be tested and the test results can be displayed correctly.
Remarks:
None
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN Sub-network > UMTS Managed Element > Transmission Resource >
RPU Board. Choose the board to be queried and right-click it to perform Interface
Inquiry in RPU, BFD Sessions Brief/Detail query in RPU, and Interface Query
3. Click UTRAN Sub-network > UMTS Managed Element > Transmission Resource >
EPU Board. Choose the board to be queried and right-click it to perform Interface
Inquiry in RPU, BFD Sessions Brief/Detail query in EPU, and Interface Query
4. Click UTRAN Sub-network > UMTS Managed Element > Transmission Resource >
Ethernet OAM. Right-click the corresponding test object to perform the tests:
Ethernet OAM, Ethernet CFM’s MD, Ethernet CFM’s MA, and Ethernet CFM’s MEP.
Acceptance Criteria:
1. For the test object, the status of corresponding IP protocol stack configuration object
Remarks:
None
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN Sub-network > UMTS Managed Element > UMTS Radio Resource >
Cell. Choose the corresponding cell in the tab and right-click it to perform the
3. Click UTRAN Sub-network > UMTS Managed Element > UMTS Radio Resource >
Channel. Choose the channel in the corresponding cell and right-click it to perform
Acceptance Criteria:
1. After we Perform Cell Status Update, the status of the serving cell can be displayed
correctly.
2. Cell Reset can be performed for the serving cell, and the serving cell works normally
3. After we perform Channel Status Query, the real-time status of channel can be
displayed.
Remarks:
None
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN Sub-network > UMTS Managed Element > Transmission Resource.
Choose M3UA AS, M3UA ASP or Association in the tab, and right-click the test
Query.
ASP State Query, ASP Up, ASP Down, ASP Active, ASP Inactive, etc.
Associations, SCTP State Query, and SCTP All Static Association State Query.
Acceptance Criteria:
2. We can query ASP status and get the real-time status of ASP, and perform
3. We can query the status of association and get the real-time status of the
Remarks:
None
Prerequisites:
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN Sub-network > UMTS Managed Element > Transmission Resource.
Choose Adjacent No.7 Office, Signaling Link, or Signaling Linkset in the tab, and
3. For the adjacent office, we can right-click the corresponding office to perform the
operations such as To Query the Status of Office and To Query the Status of All
Office.
Acceptance Criteria:
1. After querying the adjacent office status, we can view the status of the
2. After querying the link group, we can view the configuration and real-time
3. After querying the MTP3 link, we can view the configuration and real-time
Remarks:
None
Prerequisites:
1. The OMC server runs normally, and the client can access the server.
Procedure:
2. Click UTRAN Sub-network > UMTS Managed Element > Shelf-ECMM, and right-
click Shelf-ECMM to perform Version Download, Version Validate, Set Board Master
and Slave Version File Sync, and Set ECMM Initial Configuration.
3. Version upgrade: Click the button on the tool bar to perform version upgrade
management; choose the NE and version in the tab on the right window, and then
Controller-OMP. In the tab of Default Version on the right pane, select the
5. Set OMP boot mode: Click the button on the tool bar to set the OMP boot mode.
Acceptance Criteria:
3. Activate or deactivate the RNC version, and set the OMP start mode to compare
whether the versions are consistent before and after the operation.
Remarks:
4 Service Test
2. UE A and UE B finish PLMN selection, cell selection, and location update, and they
4. The Signaling Trace software is used to monitor the signaling on the Iu interface.
Procedure:
3. UE B rings and hooks off. UE A and UE B are in the conversation status. Perform
Acceptance Criteria:
Remarks:
None
2. UE A and UE B finish PLMN selection, cell selection, and location update; and they
4. The Signaling Trace software is used to monitor the signaling on the Iu interface.
Procedure:
2. When UE B rings and hooks off, both parties are in the conversation status. Verify
whether they can perform the conversation normally, and can see the images of
each other.
Acceptance Criteria:
3. UE A and UE B users can see the images of each other. The images are stable (the
resolution of the images is related to the specification of the terminals), and a little
Remarks:
None
ZXUR 9000 UMTS(V4.17.10) Test Guide
2. The USIM card of UE A is subscribed with the interactive service: UL 64 Kbps and
DL 64 Kbps.
3. The USIM card of UE B is subscribed with the interactive service: UL 64 Kbps and
DL 128 Kbps.
4. The USIM card of UE C is subscribed with the interactive service: UL 64 Kbps and
DL 384 Kbps.
5. All the radio KPIs of the cell (which supports CS and PS services) meet the
requirements.
Procedure:
1. Connect the computer to the internet through the dial-up service of UE. PDP is
activated successfully.
2. Access the ftp server through the UE (log into ftp server with the ping command).
3. Upload and download the test files in the ftp server with an ftp tool in UE. The upload
and download process should last for 5 minutes. Calculate the actual traffic and rate
4. After uploading and downloading the files, log out of the ftp server.
5. Disconnect the dial-up connection to finish the call release process of UE.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Acceptance Criteria:
2. The files on the FTP site can be downloaded successfully, and remain intact.
3. The average download speed of UE A is not lower than 60 Kbps. The average
download speed of UE B is not lower than 120 Kbps. The average download speed
4. The file is uploaded to the FTP site successfully, and remains intact. The average
Remarks:
None
3. UE A and UE B already finish PLMN selection, cell selection, and location update;
Procedure:
1. The PC dials through UE, and starts PS service in the HSDPA cell. PDP activation is
successful.
2. Access the ftp server through the UE (log into ftp server with the ping command).
3. Download the test files from the FTP server with an FTP tool in UE. The download
process should last for 5 minutes. Calculate the actual traffic and rate with Dumeter
or Wireshark.
4. After the download of files is completed, log out of the ftp server.
5. Disconnect the dial-up connection to finish the call release process of UE.
Acceptance Criteria:
Remarks:
1. If the transmission bandwidth of the site and the cell throughput are limited, the tests
2. HSPA service has a higher requirement for network quality. CQI at UE A test spot
should be higher than 20, and CQI at UE B test spot should be higher than 20.
3. The HSDPA cell where UE A resides should be configured with at least 5 HS-
4. The HSDPA cell where UE B resides is configured with at least 10 HS-PDSCH code
channels.
5. There are no other HSDPA users in the cell during the tests.
Prerequisites:
3. UE already finishes PLMN selection, cell selection, and location update; and it is in
384Kbps; the maximum HSUPA upload rate of the UE should be not lower than
1.8Mbps.
Procedure:
1. The computer is connected to the internet with dial-up service via UE. PS service is
2. Access the ftp server through the UE (log into ftp server with the ping command).
3. Upload the test files in the ftp server with an ftp tool in UE. The upload process
should last for 5 minutes. Calculate the actual traffic and rate with Dumeter or
Wireshark.
4. After the upload of files is completed, log out of the ftp server.
5. 5. Disconnect the dial-up connection to finish the call release process of UE.
Acceptance Criteria:
Remarks:
1. The transmission bandwidth of the site and the cell throughput should not be limited.
2. There are no other HSUPA users in the cell during the tests.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Kbps.
3. The Signaling Trace software is used to monitor the signaling on the Iu interface.
4. The cell should support R99 protocol, and all the radio KPIs of the cell meet the
requirement.
6. UE already finishes PLMN selection, cell selection, and location update; and it is in
Procedure:
2. Connect the computer to the internet through the dial-up service of UE. PDP is
activated successfully.
3. Access the ftp server through the UE (log into ftp server with the ping command).
4. Download the test files from the FTP server with an FTP tool in UE. The download
process should last for 5 minutes. Calculate the actual traffic and rate with Dumeter
or Wireshark.
5. After the download of files is completed, log out of the ftp server.
Acceptance Criteria:
1. Calls can be initiated with the UE. The audio quality is satisfying and there is no
obvious delay.
Remarks:
None
Kbps.
3. The Signaling Trace software is used to monitor the signaling on the Iu interface.
4. The cell should support R99 protocol, and all the radio KPIs of the cell meet the
requirement.
6. UE already finishes PLMN selection, cell selection, and location update; and it is in
Procedure:
2. Connect the computer to the internet through the dial-up service of UE. PDP is
activated successfully.
3. Access the ftp server through the UE (log into ftp server with the ping command).
4. Download the test files from the FTP server with an FTP tool in UE. The download
process should last for 5 minutes. Calculate the actual traffic and rate with Dumeter
or Wireshark.
5. After the download of files is completed, log out of the ftp server.
Acceptance Criteria:
1. Calls can be initiated with the UE. The audio quality is satisfying and there is no
obvious delay.
Remarks:
None
Prerequisites:
2. USIM card of UE is subscribed with the interactive service: UL 64 Kbps and DL 384
Kbps.
3. The Signaling Trace software is used to monitor the signaling on the Iu interface.
4. The cell should support R99 protocol, and all the radio KPIs of the cell meet the
requirement.
6. UE already finishes PLMN selection, cell selection, and location update; and it is in
Procedure:
2. Connect the computer to the internet through the dial-up service of UE. PDP is
activated successfully.
3. Access the ftp server through the UE (log into ftp server with the ping command).
4. Download the test files from the FTP server with an FTP tool in UE. The download
process should last for 5 minutes. Calculate the actual traffic and rate with Dumeter
or Wireshark.
5. After the download of files is completed, log out of the ftp server.
Acceptance Criteria:
1. Calls can be initiated with the UE. The audio quality is satisfying and there is no
obvious delay.
Remarks:
None
UE should support the concurrent service of AMR 12.2Kbps, PS UL64Kbps DL384Kbps.
1. Cell A and Cell B with the same frequency are set up under the same Node B. They
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
3. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
3. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
2. In the signaling statistics of UE A, there are at least one signaling flow for the
addition of radio link, one for the deletion of radio link, and two for the update of
active set.
3. In one active set update, the primary scrambling code of Cell B is added. In another
Remarks:
1. In Procedure Step 2 “UE A moves from the area only covered by Cell A into the area
covered by both Cell A and Cell B, then moves into the area only covered by Cell B.”
is equivalent to “UE A is located in the overlapped coverage area of Cell A and Cell
gradually.” Either of the above test methods can be used according to the specific
test environment.
2. The test remarks of the following handover test items are the same as this one. In
addition, refer to Appendix B for the signaling flow of handover, which is not detailed
here.
1. Cell A and Cell B with the same frequency are set up under the same Node B. They
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
3. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear. The image is
2. In the signaling statistics of UE A, there are at least one signaling flow for the
addition of radio link, one for the deletion of radio link, and two for the update of
active set.
3. In one active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
1. Cell A and Cell B with the same frequency are set up under the same NodeB, and
2. UE A already finishes PLMN selection, cell selection, and location update; it is in the
idle state.
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 384 Kbps.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B.
3. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
interruption or delay.
2. In the signaling statistics of UE A, there are at least one signaling flow for the
addition of radio link, one for the deletion of radio link, and two for the update of
active set.
3. In one active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
1. Cell A and Cell B with the same frequency are set up under the same NodeB, and
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 128 Kbps.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Procedure:
2. UE A initiates PS service.
3. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
4. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear, without
obvious interruption or delay. And the PS service of UE A also remains normal and
2. In the signaling statistics of UE A, the signaling flows for radio link addition and radio
link deletion appear at least once respectively, and the flow for active set update
3. In one active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
Prerequisites:
1. In the same RNC, Cell A is set up under NodeB A, and Cell B is set up under NodeB
B. They are configured as the neighbor cells with the same frequency. Besides,
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
3. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
3. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
2. In the signaling statistics of UE A, there are at least one signaling flow for the
addition of radio link, one for the deletion of radio link, and two for the update of
active set.
3. In one active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
Prerequisites:
1. In the same RNC, Cell A is set up under NodeB A, and Cell B is set up under NodeB
B. They are configured as the neighbor cells with the same frequency. Besides,
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
3. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear. The image is
2. In the signaling statistics of UE A, there are at least one signaling flow for the
addition of radio link, one for the deletion of radio link, and two for the update of
active set.
3. In one active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
Prerequisites:
1. In the same RNC, Cell A is set up under NodeB A, and Cell B is set up under NodeB
B. They are configured as the neighbor cells with the same frequency. Besides,
2. UE A already finishes PLMN selection, cell selection, and location update; it is in the
idle state.
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 384 Kbps.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B.
3. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
interruption or delay.
2. In the signaling statistics of UE A, there are at least one signaling flow for the
addition of radio link, one for the deletion of radio link, and two for the update of
active set.
3. In one active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
Prerequisites:
1. In the same RNC, Cell A is set up under NodeB A, and Cell B is set up under NodeB
B. They are configured as the neighbor cells with the same frequency. Besides,
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 128 Kbps.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A initiates PS service.
3. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
4. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear, without obvious
interruption or delay. And the PS service of UE A also remains normal and has no
2. In the signaling statistics of UE A, the signaling flows for radio link addition and radio
link deletion appear at least once respectively, and the flow for active set update
3. In one active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
ZXUR 9000 UMTS(V4.17.10) Test Guide
4.2.3 Inter-RNC Soft Handover between Two Cells of the Same Frequency
1. RNC A and RNC B belong to the same CN. Cell A is set up under RNC A, and Cell B
is set up under RNC B. They are configured as the neighbor cells with the same
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
4. The Signaling Trace software is used to monitor the signaling on the Uu interface of
RNC A.
Procedure:
2. UE A moves from the area only covered by Cell A towards the area covered by both
Cell A and Cell B until soft handover is triggered, as the signaling shows; then it
returns to the area only covered by Cell A. UE B stays at the original place.
3. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Complete” on the Uu interface of RNC A.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
2. In the signaling statistics of UE A, there are at least one signaling flow for the addition
of radio link, one for the deletion of radio link, and two for the update of active set.
3. In an active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
1. RNC A and RNC B belong to the same CN. Cell A is set up under RNC A, and Cell B
is set up under RNC B. They are configured as the neighbor cells with the same
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
5. The Signaling Trace software is used to monitor the signaling on the Uu interface of
RNC A.
Procedure:
2. UE A moves from the area only covered by Cell A towards the area covered by both
Cell A and Cell B until soft handover is triggered, as the signaling shows; then it
returns to the area only covered by Cell A. UE B stays at the original place.
3. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear. The image is
2. In the signaling statistics of UE A, there are at least one signaling flow for the addition
of radio link, one for the deletion of radio link, and two for the update of active set.
3. In an active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
1. RNC A and RNC B belong to the same CN. Cell A is set up under RNC A, and Cell B
is set up under RNC B. They are configured as the neighbor cells with the same
2. UE A already finishes PLMN selection, cell selection, and location update; it is in the
idle state.
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 384 Kbps.
Procedure:
2. UE A moves from the area only covered by Cell A towards the area covered by both
Cell A and Cell B until soft handover is triggered, as the signaling shows; then it
returns to the area only covered by Cell A. UE B stays at the original place.
3. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
interruption or delay.
2. In the signaling statistics of UE A, there are at least one signaling flow for the addition
of radio link, one for the deletion of radio link, and two for the update of active set.
3. In an active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
1. RNC A and RNC B belong to the same CN. Cell A is set up under RNC A, and Cell B
is set up under RNC B. They are configured as the neighbor cells with the same
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
5. The Signaling Trace software is used to monitor the signaling on the Uu interface of
RNC A.
Procedure:
2. UE A initiates PS service.
3. UE A moves from the area only covered by Cell A towards the area covered by both
Cell A and Cell B until soft handover is triggered, as the signaling shows; then it
returns to the area only covered by Cell A. UE B stays at the original place.
4. Observe the signaling statistics of “Active Set Update” and “Active Set Update
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear, without obvious
interruption or delay. And the PS service of UE A also remains normal and has no
2. In the signaling statistics of UE A, the signaling flows for radio link addition and radio
link deletion appear at least once respectively, and the flow for active set update
3. In an active set update, the primary scrambling code of Cell B is added. In another
Remarks:
None
1. Cell A and Cell B, two cells of different frequencies, are set up under the same
2. UE A completes its location update in Cell A, and UE B completes its location update
in Cell B.
3. The Signaling Trace software is used to monitor the signaling on the Uu interface.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
1. Cell A and Cell B, two cells of different frequencies, are set up under the same
NodeB. Besides, the two cells have an overlapped coverage area.
2. UE A completes its location update in Cell A, and UE B completes its location update
in Cell B.
3. The Signaling Trace software is used to monitor the signaling on the Uu interface.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear. The image is
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
1. Cell A and Cell B, two cells of different frequencies, are set up under the same
NodeB. Besides, the two cells have an overlapped coverage area.
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 384 Kbps.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B.
3. Observe the signaling on the Uu interface and the statistics of Physical Channel
Acceptance Criteria:
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
1. Cell A and Cell B, two cells of different frequencies, are set up under the same
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
4. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 128 Kbps.
5. The Signaling Trace software is used to monitor the signaling on the Uu interface.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Procedure:
2. UE A initiates PS service.
3. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear, without obvious
interruption or delay. And the PS service of UE A also remains normal and has no
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. Under the same RNC, Cell A is set up in NodeB A, and Cell B is set up in NodeB B.
Cell A and Cell B use different frequencies, and they have an overlapped coverage
area.
2. UE A completes its location update in Cell A, and UE B completes its location update
in Cell B.
3. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. Under the same RNC, Cell A is set up in NodeB A, and Cell B is set up in NodeB B.
Cell A and Cell B use different frequencies, and they have an overlapped coverage
area.
2. UE A completes its location update in Cell A, and UE B completes its location update
in Cell B.
3. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear. The image is
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. Under the same RNC, Cell A is set up in NodeB A, and Cell B is set up in NodeB B.
Cell A and Cell B use different frequencies, and they have an overlapped coverage
area.
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 384 Kbps.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B.
3. Observe the signaling on the Uu interface and the statistics of Physical Channel
Acceptance Criteria:
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. Under the same RNC, Cell A is set up in NodeB A, and Cell B is set up in NodeB B.
Cell A and Cell B use different frequencies, and they have an overlapped coverage
area.
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 128 Kbps.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A initiates PS service.
3. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear, without obvious
interruption or delay. And the PS service of UE A also remains normal and has no
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
ZXUR 9000 UMTS(V4.17.10) Test Guide
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use different frequencies, and they have
2. UE A completes its location update in Cell A, and UE B completes its location update
in Cell B.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use different frequencies, and they have
2. UE A completes its location update in Cell A, and UE B completes its location update
in Cell B.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear. The image is
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use different frequencies, and they have
4. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 384 Kbps.
5. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B.
3. Observe the signaling on the Uu interface and the statistics of Physical Channel
Acceptance Criteria:
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use different frequencies, and they have
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
5. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 128 Kbps.
6. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A initiates PS service.
3. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear, without
obvious interruption or delay. And the PS service of UE A also remains normal and
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
ZXUR 9000 UMTS(V4.17.10) Test Guide
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use different frequencies, and they
update in Cell B.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use different frequencies, and they
update in Cell B.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear. The image is
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use different frequencies, and they
5. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B.
3. Observe the signaling on the Uu interface and the statistics of Physical Channel
Acceptance Criteria:
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use different frequencies, and they
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 128 Kbps.
5. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A initiates PS service.
3. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear, without
obvious interruption or delay. And the PS service of UE A also remains normal and
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
ZXUR 9000 UMTS(V4.17.10) Test Guide
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use the same frequency, and they have
update in Cell B.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use the same frequency, and they have
update in Cell B.
4. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear. The image is
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use the same frequency, and they have
5. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B.
3. Observe the signaling on the Uu interface and the statistics of Physical Channel
Acceptance Criteria:
interruption or delay.
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
Prerequisites:
1. RNC A and RNC B belong to the same CN. Cell A is created under RNC A, and Cell
B is created under RNC B. Cell A and Cell B use the same frequency, and they have
2. UE A and UE B already finish PLMN selection, cell selection, and location update,
3. The USIM card of UE A is subscribed with the PS service UL 64 Kbps/DL 128 Kbps.
5. The Signaling Trace software is used to monitor the signaling on the Uu interface.
Procedure:
2. UE A initiates PS service.
3. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B. UE B stays at the
original place.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear, without
obvious interruption or delay. And the PS service of UE A also remains normal and
2. The statistics of the signaling of UE A shows that the signaling flow of radio link
Remarks:
None
ZXUR 9000 UMTS(V4.17.10) Test Guide
1. Both the UMTS system and GSM system work properly, and the link between them
2. Corresponding parameters of the UMTS system and GSM system are configured.
3. Create Cell A under the UMTS system and create Cell B under the GSM system.
Procedure:
2. UE A moves from the area only covered by Cell A towards the area covered by both
Cell A and Cell B, and then enters the area only covered by Cell B. UE B stays at
3. Observe the signaling on the Uu interface, lu interface, and A interface, which shows
that UE A makes a reselection and accesses Cell B of the GSM system, and
Acceptance Criteria:
1. UE A can successfully complete a call with UE B, and the voice quality feels good.
2. The signaling statistics on the lu interface of UE A show that the signaling flow of
interface of UE A show that the location update flow appears once at least.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Remarks:
None
1. Both the UMTS system and GSM system work properly, and the link between them
2. Corresponding parameters of the UMTS system and GSM system are configured.
3. Create Cell A under the UMTS system and create Cell B under the GSM system.
Procedure:
2. UE A moves from the area only covered by Cell B towards the area covered by both
Cell A and Cell B, and then enters the area which is only covered by Cell A. UE B
stays at the original place.
3. Observe the signaling on the Uu interface and lu interface, which shows that UE A
makes a reselection and accesses Cell A of the WCDMA system, and completes the
Acceptance Criteria:
1. The signaling statistics of UE A on the Uu interface and Iu interface show that the
Remarks:
None
1. Both the UMTS system and GSM system work properly, and the link between them
2. Corresponding parameters of the UMTS system and GSM system are configured.
3. Create Cell A under the UMTS system and create Cell B under the GSM system.
5. UE A and UE B support both the UMTS mode and the GSM mode.
Procedure:
1. UE A originates a CS 12.2K voice call towards UE B in the area only covered by Cell
2. UE A moves from the area only covered by Cell A towards the area covered by both
Cell A and Cell B, and then enters the area only covered by Cell B. UE B stays at
3. Observe the signaling on the Uu interface and Iu interface, which shows that
handover between systems is triggered and the lu interface has the Relocation
Required message.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
Required signaling flow appears once at least. The signaling statistics on the Uu
interface show that the Handover from UTRAN signaling flow appears once at least.
Remarks:
None
1. Both the UMTS system and GSM system work properly, and the link between them
2. Corresponding parameters of the UMTS system and GSM system are configured.
3. Create Cell A under the UMTS system and create Cell B under the GSM system.
Procedure:
1. UE A originates a voice call towards UE B in the area only covered by Cell B. The
2. UE A moves from the area only covered by Cell B towards the area covered by both
Cell A and Cell B, and then enters the area which is only covered by Cell A. UE B
3. Observe the signaling on the Uu interface and Iu interface, which shows that the
handover between systems is triggered. Besides, the lu interface has the Relocation
Request message.
Acceptance Criteria:
1. When UE A is moving, the call remains normal and the voice is clear without
interruption or delay.
2. The signaling statistics on the lu interface of UE A show that the Relocation Request
signaling flow appears once at least. The signaling statistics on Uu interface show
that the Handover To UTRAN Complete signaling flow appears once at least.
Remarks:
None
Prerequisites:
1. Both the UMTS system and GSM system work properly, and the link between them
2. Corresponding parameters of the UMTS system and GSM system are configured.
3. Create Cell A under the UMTS system and create Cell B under the GSM system.
Procedure:
1. UE A originates the PS service in Cell A. It can ping through to the FTP server and
2. During a certain period (for example, 20 minutes, or the value set based on the
network parameters), the UE does not transmit data. The network direct the UE to
3. UE A moves from the area only covered by Cell A into the area covered by both Cell
A and Cell B, then moves into the area only covered by Cell B.
shows that UE A makes a reselection and accesses Cell B of the GPRS system, and
5. UE B initiates the GPRS service in Cell B and can connect to the server with the
ping command.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Acceptance Criteria:
1. UE A downloads the file in Cell B from the FTP site successfully, and the file is
complete.
2. The signaling statistics on the lu interface of UE A show that the signaling flow of
the Gb interface of UE A show that the routing area update flow appears once at
least.
Remarks:
None
1. Both the UMTS system and GSM system work properly, and the link between them
2. Corresponding parameters of the UMTS system and GSM system are configured.
3. Create Cell A under the UMTS system and create Cell B under the GSM system.
Procedure:
1. UE A originates the service in the PS domain in Cell A, and can ping through to the
FTP server.
2. UE A moves from the area only covered by Cell A towards the area covered by both
Cell A and Cell B, and then enters the area only covered by Cell B. The current cell
3. Observe the signaling on the Uu interface and Iu interface, which shows that UE A
makes a reselection and accesses Cell B of the GPRS system, and then completes
4. UE A starts to use the GPRS service, and can ping through to the FTP server.
Acceptance Criteria:
1. During the whole test procedure, UE A can always ping through to the FTP server,
2. The signaling statistics on the lu interface of UE A show that the signaling flow of
interface Gb of UE A show that the routing area update flow appears once at least.
Remarks:
None
Prerequisites:
1. Both the UMTS system and GSM system work properly, and the link between them
2. Corresponding parameters of the UMTS system and GSM system are configured.
3. Create Cell A under the UMTS system and create Cell B under the GSM system.
Procedure:
1. UE A originates the GPRS service in Cell B. It can ping through to the FTP server
2. UE A moves from the area only covered by Cell B towards the area covered by both
Cell A and Cell B, and then enters the area only covered by Cell A. Cell B has an
3. Observe the signaling on the Uu interface and Iu interface, which shows that UE A
makes a reselection and accesses Cell A of the UMTS system, and then completes
4. UE A starts to use the PS service and makes a connection to the FTP server.
ZXUR 9000 UMTS(V4.17.10) Test Guide
Acceptance Criteria:
1. UE A downloads the file in Cell A from the FTP site successfully, and the
file is complete.
Remarks:
None