Infrastructure Works – Lot 4 Operation/Task: Installation and Use of temporary Electrical Supplies HIRA No: 22 Method Statement Title: Location/Area: South Shamkha – Lot 4 Method Statement No: Item Activity Hazards/Risks Identified Risk Rating Control Measures Residual Risk Responsibility Monitoring S L RR S L RR Responsibility Installation and Electrocution 4 4 16 Temporary supplies will be planned to take 4 2 8 Operator Supervisor Use of into account foreseen load requirements, temporary Fire environmental conditions, progress of work 4 2 8 Operator Supervisor 4 4 16 Electrical and compatibility/maintenance of Supplies equipment. Competence of electrical sub- Damage to Equipment contractors will be checked before 2 1 2 2 4 8 contracting work. The installation will be certified before being brought into use. Locked supply cabinets will form part of the system. Offices, stores, drying rooms and canteens will be regarded as permanent installations. Supply and distribution units will be lockable and the keys controlled. Signs warning of electrical hazard will be displayed on supply units. Fire extinguishers (carbon dioxide) will be available adjacent to distribution units. Rubber gloves and rubber mats to an appropriate standard are to be used for live work. All cables will be routed so as to prevent damage to cables and avoid tripping hazards. Permit to work system or other suitable means of control to be used when work on live systems is foreseen. Operatives will not be permitted to work alone on live systems. Only competent electricians are authorised to install or modify temporary supplies; certification will be obtained after modification. Systems will be monitored for physical damage and will be checked and recertified every 3 months.
SBD SMS Revision: 02
SMSP09/F02 Date Issued: Nov 10 Issue No: 01 Page No: 1 of 2 The Development of Shamkha South Hazard / Impact Risk Assessment Infrastructure Works – Lot 4 Operation/Task: Installation and Use of temporary Electrical Supplies HIRA No: 22 Method Statement Title: Location/Area: South Shamkha – Lot 4 Method Statement No: Item Activity Hazards/Risks Identified Risk Rating Control Measures Residual Risk Responsibility Monitoring S L RR S L RR Responsibility Installation and 2 4 8 Electricians will receive additional training 2 1 2 Supervisor PM Use of in the above standards and HSE guidance temporary material, toolbox talks will be given at Electrical regular intervals.. Supplies
KEY: S = Severity Rating L = Likelihood of Occurrence RR = Risk Rating
1. Negligible 1. Improbable 5 5 10 15 20 25 R Unacceptable risk, plan out or add further controls 2. Minor Injury / Minor Spill / Leak 2. Remote 1 – 10% ityverSe 4 4 8 12 16 20 O Acceptable only if no other method viable and with high level controls in place 3. Major Injury (RIDDOR) / Major Spill / Contamination 3. Possible 10 – 50% 3 3 6 9 12 15 Y Acceptable with suitable controls 4. Fatality / Serious Hazardous Release 4. Probable 50 – 90% 2 2 4 6 8 10 G Acceptable, no further action required 5. Multiple Fatality / Multiple Catastrophe 5. Almost certain 90%+ 1 1 2 3 4 5 1 2 3 4 5 Likelihood
HIRA Prepared by (Name): Signature: Date:
HIRA Approved by (Name): Signature: Date: