The Development of Shamkha South

Hazard / Impact Risk Assessment


Infrastructure Works – Lot 4
Operation/Task: Installation and Use of temporary Electrical Supplies HIRA No: 22
Method Statement Title:
Location/Area: South Shamkha – Lot 4 Method Statement No:
Item Activity Hazards/Risks Identified Risk Rating Control Measures Residual Risk Responsibility Monitoring
S L RR S L RR Responsibility
Installation and Electrocution 4 4 16 Temporary supplies will be planned to take 4 2 8 Operator Supervisor
Use of into account foreseen load requirements,
temporary Fire environmental conditions, progress of work 4 2 8 Operator Supervisor
4 4 16
Electrical and compatibility/maintenance of
Supplies equipment. Competence of electrical sub-
Damage to Equipment contractors will be checked before 2 1 2
2 4 8
contracting work. The installation will be
certified before being brought into use.
Locked supply cabinets will form part of
the system. Offices, stores, drying rooms
and canteens will be regarded as permanent
installations. Supply and distribution units
will be lockable and the keys controlled.
Signs warning of electrical hazard will be
displayed on supply units. Fire
extinguishers (carbon dioxide) will be
available adjacent to distribution units.
Rubber gloves and rubber mats to an
appropriate standard are to be used for live
work. All cables will be routed so as to
prevent damage to cables and avoid tripping
hazards. Permit to work system or other
suitable means of control to be used when
work on live systems is foreseen.
Operatives will not be permitted to work
alone on live systems. Only competent
electricians are authorised to install or
modify temporary supplies; certification
will be obtained after modification.
Systems will be monitored for physical
damage and will be checked and recertified
every 3 months.

SBD SMS Revision: 02


SMSP09/F02 Date Issued: Nov 10
Issue No: 01 Page No: 1 of 2
The Development of Shamkha South
Hazard / Impact Risk Assessment
Infrastructure Works – Lot 4
Operation/Task: Installation and Use of temporary Electrical Supplies HIRA No: 22
Method Statement Title:
Location/Area: South Shamkha – Lot 4 Method Statement No:
Item Activity Hazards/Risks Identified Risk Rating Control Measures Residual Risk Responsibility Monitoring
S L RR S L RR Responsibility
Installation and 2 4 8 Electricians will receive additional training 2 1 2 Supervisor PM
Use of in the above standards and HSE guidance
temporary material, toolbox talks will be given at
Electrical regular intervals..
Supplies

KEY: S = Severity Rating L = Likelihood of Occurrence RR = Risk Rating


1. Negligible 1. Improbable 5 5 10 15 20 25 R Unacceptable risk, plan out or add further controls
2. Minor Injury / Minor Spill / Leak 2. Remote 1 – 10% ityverSe 4 4 8 12 16 20 O Acceptable only if no other method viable and with high level controls in place
3. Major Injury (RIDDOR) / Major Spill / Contamination 3. Possible 10 – 50% 3 3 6 9 12 15 Y Acceptable with suitable controls
4. Fatality / Serious Hazardous Release 4. Probable 50 – 90% 2 2 4 6 8 10 G Acceptable, no further action required
5. Multiple Fatality / Multiple Catastrophe 5. Almost certain 90%+ 1 1 2 3 4 5
1 2 3 4 5
Likelihood

HIRA Prepared by (Name): Signature: Date:

HIRA Approved by (Name): Signature: Date:

SBD SMS Revision: 02


SMSP09/F02 Date Issued: Nov 10
Issue No: 01 Page No: 2 of 2