Sunteți pe pagina 1din 18

Vertical Lines In Shaft Work in Vertical Lines FF Shaft

Typical Floor
Drencher Fire Work
Floor Nos. Sprinkler Sprinkler Hydrant Hydrant Drain Pipe Shaft Assembly
Check Floor
Low Pressure High Pressure Low Pressure High Pressure

1 Completed Completed Completed Completed Completed Completed Done 12/19/2018


2 Completed Completed Completed Completed Completed Completed Done 12/20/2018
3 Completed Completed Completed Completed Completed Completed Done 12/21/2018
4 Completed Completed Completed Completed Completed Completed Done 12/22/2018
5 Completed Completed Completed Completed Completed Completed Done 12/23/2018
6 Completed Completed Completed Completed Completed Completed Done 12/24/2018
7 Completed Completed Completed Completed Completed Completed Done 12/25/2018
8 Completed Completed Completed Completed Completed Completed Done 12/26/2018
9 Completed Completed Completed Completed Completed Completed Done 12/27/2018
10 Completed Completed Completed Completed Completed Completed Done 12/28/2018
11 Completed Completed Completed Completed Completed Completed Done 12/29/2018
12 Completed Completed Completed Completed Completed Completed Done 12/30/2018
13 Completed Completed Completed Completed Completed Completed Done 12/31/2018
14 Completed Completed Completed Completed Completed Completed Done 1/1/2019
15 Completed Completed Completed Completed NA Completed 12/24/2018 1/2/2019
16 Completed Completed Completed Completed NA Completed 12/27/2018 1/3/2019
17 NA Completed Completed Completed NA Completed 12/30/2018 1/4/2019
18 NA Completed Completed Completed NA Completed 12/2/2018 1/5/2019
19 NA Completed Completed Completed NA Completed 1/5/2018 1/6/2019
20 NA Completed Completed Completed NA Completed 1/8/2018 1/7/2019
21 NA Completed Completed Completed NA Completed 1/11/2019 1/8/2019
22 NA Completed Completed Completed NA Completed 1/13/2019 1/9/2019
23 NA Completed Completed Completed NA Completed 1/16/2019 1/10/2019
24 NA Completed Completed Completed NA Completed 1/19/2019 1/11/2019
25 NA Completed Completed Completed NA Completed 1/21/2019 1/12/2019
26 NA Completed Completed Completed NA Completed 1/24/2019 1/13/2019
27 NA Completed Completed Completed NA Completed 1/27/2019 1/14/2019
28 NA Completed Completed Completed NA Completed 1/30/2019 1/15/2019
29 NA Completed Completed Completed NA Completed 2/2/2019 1/16/2019
30 NA Completed Completed Completed NA Completed 2/5/2019 1/17/2019
Work in Vertical Lines FF Shaft
Drain Pipe
"T" Tapping
Connection

Done 12/19/2018
Done 12/20/2018
Done 12/21/2018
Done 12/22/2018
Done 12/23/2018
Done 12/24/2018
Done 12/25/2018
Done 12/26/2018
Done 12/27/2018
Done 12/28/2018
Done 12/29/2018
Done 12/30/2018
Done 12/31/2018
Done 1/1/2019
Done 1/2/2019
Done 1/3/2019
Done 1/4/2019
Done 1/5/2019
Done 1/6/2019
Done 1/7/2019
12/20/2018 1/8/2019
12/20/2018 1/9/2019
12/20/2018 1/10/2019
12/20/2018 1/11/2019
12/20/2018 1/12/2019
12/21/2018 1/13/2019
12/21/2018 1/14/2019
12/21/2018 1/15/2019
12/21/2018 1/16/2019
12/21/2018 1/17/2019
Vertical Lines In Shaft
Floor Nos. Sprinkler Sprinkler Hydrant Hydrant Drencher Fire
Check Floor
Low Pressure High Pressure Low Pressure High Pressure

1 Completed Completed Completed Completed Completed


2 Completed Completed Completed Completed Completed
3 Completed Completed Completed Completed Completed
4 Completed Completed Completed Completed Completed
5 Completed Completed Completed Completed Completed
6 Completed Completed Completed Completed Completed
7 Completed Completed Completed Completed Completed
8 Completed Completed Completed Completed Completed
9 Completed Completed Completed Completed Completed
10 Completed Completed Completed Completed Completed
11 Completed Completed Completed Completed Completed
12 Completed Completed Completed Completed Completed
13 Completed Completed Completed Completed Completed
14 Completed Completed Completed Completed Completed
15 Completed Completed Completed Completed NA
16 Completed Completed Completed Completed NA
17 NA Completed Completed Completed NA
18 NA Completed Completed Completed NA
19 NA Completed Completed Completed NA
20 NA 1/7/2019 Completed Completed NA
21 NA 1/9/2019 Completed Completed NA
22 NA 1/11/2019 Completed Completed NA
23 NA 1/13/2019 Completed Completed NA
24 NA 1/15/2019 Completed Completed NA
25 NA 1/17/2019 Completed Completed NA
26 NA 1/19/2019 Completed Completed NA
27 NA 1/21/2019 Completed Completed NA
28 NA 1/23/2019 Completed Completed NA
29 NA 1/25/2019 Completed Completed NA
30 NA 1/27/2019 Completed Completed NA
Work in Vertical Lines FF Shaft
Typical Floor
Drain Pipe work Shaft "T" Tapping Drain Pipe
Assembly Connection

Completed Completed 12/19/2018 Done 12/19/2018


Completed Completed 12/20/2018 Done 12/20/2018
Completed Completed 12/21/2018 Done 12/21/2018
Completed Completed 12/22/2018 Done 12/22/2018
Completed Completed 12/23/2018 Done 12/23/2018
Completed Completed 12/24/2018 Done 12/24/2018
Completed Completed 12/25/2018 Done 12/25/2018
Completed Completed 12/26/2018 Done 12/26/2018
Completed Completed 12/27/2018 Done 12/27/2018
Completed Completed 12/28/2018 Done 12/28/2018
Completed Completed 12/29/2018 Done 12/29/2018
Completed Completed 12/30/2018 Done 12/30/2018
Completed Completed 12/31/2018 Done 12/31/2018
Completed Completed 1/1/2019 Done 1/1/2018
Completed Completed 1/2/2019 Done 1/2/2018
Completed Completed 1/3/2019 Done 1/3/2018
Completed Completed 1/4/2019 Done 1/4/2018
Completed Completed 1/5/2019 Done 1/5/2018
Completed Completed 1/6/2019 Done 1/6/2018
1/7/2019 1/7/2019 1/7/2019 Done 1/7/2019
1/9/2019 1/9/2019 1/9/2019 12/19/2018 1/9/2019
1/11/2019 1/11/2019 1/11/2019 12/19/2018 1/11/2019
1/13/2019 1/13/2019 1/13/2019 12/19/2018 1/13/2019
1/15/2019 1/15/2019 1/15/2019 12/19/2018 1/15/2019
1/17/2019 1/17/2019 1/17/2019 12/20/2018 1/17/2019
1/19/2019 1/19/2019 1/19/2019 12/20/2018 1/19/2019
1/21/2019 1/21/2019 1/21/2019 12/20/2018 1/21/2019
1/23/2019 1/23/2019 1/23/2019 12/20/2018 1/23/2019
1/25/2019 1/25/2019 1/25/2019 12/20/2018 1/25/2019
1/27/2019 1/27/2019 1/27/2019 12/20/2018 1/27/2019
TOWER- B 1/9/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft
Typical
Floor Drencher Fire Shaft "T" Drain Pipe
Sprinkler Sprinkler Hydrant Hydrant Drain Pipe Floor Work
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure

1 Completed Completed Completed Completed Completed Completed Done Completed Done


2 Completed Completed Completed Completed Completed Completed Done Completed Done 1/4/2019
3 Completed Completed Completed Completed Completed Completed Done Completed Done
4 Completed Completed Completed Completed Completed Completed Done Completed Done 1/5/2019
5 Completed Completed Completed Completed Completed Completed Done Completed Done
6 Completed Completed Completed Completed Completed Completed Done Completed Done 1/6/2019
7 Completed Completed Completed Completed Completed Completed Done Completed Done
8 Completed Completed Completed Completed Completed Completed Done Completed Done 1/7/2019
9 Completed Completed Completed Completed Completed Completed Done Completed Done
10 Completed Completed Completed Completed Completed Completed Done Completed Done 1/8/2019
11 Completed Completed Completed Completed Completed Completed Done Completed Done
12 Completed Completed Completed Completed Completed Completed Done Completed Done 1/9/2019
13 Completed Completed Completed Completed Completed Completed Done Completed Done
14 Completed Completed Completed Completed Completed Completed Done Completed Done 1/10/2019
15 Completed Completed Completed Completed NA Completed Done Completed Done
16 Completed Completed Completed Completed NA Completed Done Completed Done 1/11/2019
17 NA Completed Completed Completed NA Completed Done Completed Done
18 NA Completed Completed Completed NA Completed Done Completed Done 1/12/2019
19 NA Completed Completed Completed NA Completed Done Completed Done
20 NA Completed Completed Completed NA Completed Done Completed Done 1/13/2019
21 NA Completed Completed Completed NA Completed Done 1/8/2019 Done
22 NA Completed Completed Completed NA Completed Done 1/9/2019 Done 1/14/2019
23 NA Completed Completed Completed NA Completed Done 1/10/2019 Done
24 NA Completed Completed Completed NA Completed Done 1/11/2019 Done 1/15/2019
25 NA Completed Completed Completed NA Completed Done 1/12/2019 Done
26 NA Completed Completed Completed NA Completed 1/8/2019 1/13/2019 Done 1/16/2019
27 NA Completed Completed Completed NA Completed 1/11/2019 1/14/2019 Done
28 NA Completed Completed Completed NA Completed 1/14/2019 1/15/2019 Done 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 1/16/2019 Done
30 NA Completed Completed Completed NA Completed 1/17/2019 1/17/2019 Done 1/18/2019
TOWER- A 1/9/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft

Typical Floor
Floor Sprinkler Sprinkler Hydrant Hydrant Drencher Fire Drain Pipe work Shaft "T" Drain Pipe
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure

1 Completed Completed Completed Completed Completed Completed Completed 12/19/2018 Completed


2 Completed Completed Completed Completed Completed Completed Completed 12/20/2018 Completed 1/4/2019
3 Completed Completed Completed Completed Completed Completed Completed Completed Completed
4 Completed Completed Completed Completed Completed Completed Completed Completed Completed 1/5/2019
5 Completed Completed Completed Completed Completed Completed Completed Completed Completed
6 Completed Completed Completed Completed Completed Completed Completed Completed Completed 1/6/2019
7 Completed Completed Completed Completed Completed Completed Completed Completed Completed
8 Completed Completed Completed Completed Completed Completed Completed Completed Completed 1/7/2019
9 Completed Completed Completed Completed Completed Completed Completed Completed Completed
10 Completed Completed Completed Completed Completed Completed Completed Completed Completed 1/8/2019
11 Completed Completed Completed Completed Completed Completed Completed Completed Completed
12 Completed Completed Completed Completed Completed Completed Completed Completed Completed 1/9/2019
13 Completed Completed Completed Completed Completed Completed Completed Completed Completed
14 Completed Completed Completed Completed Completed Completed Completed Completed Completed 1/10/2019
15 Completed Completed Completed Completed NA Completed Completed Completed Completed
16 Completed Completed Completed Completed NA Completed Completed Completed Completed 1/11/2019
17 NA Completed Completed Completed NA Completed Completed Completed Completed
18 NA Completed Completed Completed NA Completed Completed Completed Completed 1/12/2019
19 NA Completed Completed Completed NA Completed Completed Completed Completed
20 NA Completed Completed Completed NA Completed Completed Completed Completed 1/13/2019
21 NA Completed Completed Completed NA Completed 1/8/2019 Completed
22 NA Completed Completed Completed NA Completed 1/5/2019 1/9/2019 Completed 1/14/2019
23 NA Completed Completed Completed NA Completed 1/10/2019 Completed
24 NA Completed Completed Completed NA Completed 1/9/2019 1/11/2019 Completed 1/15/2019
25 NA Completed Completed Completed NA Completed 1/12/2019 Completed
26 NA Completed Completed Completed NA Completed 1/12/2019 1/13/2019 Completed 1/16/2019
27 NA Completed Completed Completed NA Completed 1/14/2019 Completed
28 NA Completed Completed Completed NA Completed 1/15/2019 1/15/2019 Completed 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 Completed
30 NA Completed Completed Completed NA Completed 1/17/2019 1/17/2019 Completed 1/18/2019
TOWER- B 1/16/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft
Typical
Floor Drencher Fire Shaft "T" Drain Pipe
Sprinkler Sprinkler Hydrant Hydrant Drain Pipe Floor Work
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure

1 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
2 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
3 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
4 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
5 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
6 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
7 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
8 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
9 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
10 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
11 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
12 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
13 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
14 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
15 Completed Completed Completed Completed NA Completed Done Completed Done Completed
16 Completed Completed Completed Completed NA Completed Done Completed Done Completed
17 NA Completed Completed Completed NA Completed Done Completed Done Completed
18 NA Completed Completed Completed NA Completed Done Completed Done Completed
19 NA Completed Completed Completed NA Completed Done Completed Done Completed
20 NA Completed Completed Completed NA Completed Done Completed Done Completed
21 NA Completed Completed Completed NA Completed Done Completed Done
22 NA Completed Completed Completed NA Completed Done Completed Done 1/14/2019
23 NA Completed Completed Completed NA Completed Done Completed Done
24 NA Completed Completed Completed NA Completed Done 1/11/2019 Done 1/15/2019
25 NA Completed Completed Completed NA Completed Done 1/12/2019 Done
26 NA Completed Completed Completed NA Completed Done 1/13/2019 Done 1/16/2019
27 NA Completed Completed Completed NA Completed Done 1/14/2019 Done
28 NA Completed Completed Completed NA Completed 1/14/2019 1/15/2019 Done 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 1/16/2019 Done
30 NA Completed Completed Completed NA Completed 1/17/2019 1/17/2019 Done 1/18/2019
TOWER- A 1/16/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft

Typical Floor
Floor Sprinkler Sprinkler Hydrant Hydrant Drencher Fire Drain Pipe work Shaft "T" Drain Pipe
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure

1 Completed Completed Completed Completed Completed Completed Completed 12/19/2018 Completed Completed
2 Completed Completed Completed Completed Completed Completed Completed 12/20/2018 Completed Completed
3 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
4 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
5 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
6 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
7 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
8 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
9 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
10 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
11 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
12 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
13 Completed Completed Completed Completed Completed Completed Completed Completed Completed
14 Completed Completed Completed Completed Completed Completed Completed Completed Completed 1/10/2019
15 Completed Completed Completed Completed NA Completed Completed Completed Completed
16 Completed Completed Completed Completed NA Completed Completed Completed Completed 1/11/2019
17 NA Completed Completed Completed NA Completed Completed Completed Completed
18 NA Completed Completed Completed NA Completed Completed Completed Completed 1/12/2019
19 NA Completed Completed Completed NA Completed Completed Completed Completed
20 NA Completed Completed Completed NA Completed Completed Completed Completed 1/13/2019
21 NA Completed Completed Completed NA Completed Completed Completed Completed
22 NA Completed Completed Completed NA Completed Completed 1/9/2019 Completed 1/14/2019
23 NA Completed Completed Completed NA Completed 1/10/2019 Completed
24 NA Completed Completed Completed NA Completed 1/9/2019 1/11/2019 Completed 1/15/2019
25 NA Completed Completed Completed NA Completed 1/12/2019 Completed
26 NA Completed Completed Completed NA Completed 1/12/2019 1/13/2019 Completed 1/16/2019
27 NA Completed Completed Completed NA Completed 1/14/2019 Completed
28 NA Completed Completed Completed NA Completed 1/15/2019 1/15/2019 Completed 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 Completed
30 NA Completed Completed Completed NA Completed 1/17/2019 1/17/2019 Completed 1/18/2019
TOWER- A 1/23/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft

Typical Floor
Floor Sprinkler Sprinkler Hydrant Hydrant Drencher Fire Drain Pipe work Shaft "T" Drain Pipe
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure

1 Completed Completed Completed Completed Completed Completed Completed 12/19/2018 Completed Completed
2 Completed Completed Completed Completed Completed Completed Completed 12/20/2018 Completed Completed
3 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
4 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
5 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
6 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
7 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
8 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
9 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
10 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
11 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
12 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
13 Completed Completed Completed Completed Completed Completed Completed Completed Completed
14 Completed Completed Completed Completed Completed Completed Completed Completed Completed 1/10/2019
15 Completed Completed Completed Completed NA Completed Completed Completed Completed
16 Completed Completed Completed Completed NA Completed Completed Completed Completed 1/11/2019
17 NA Completed Completed Completed NA Completed Completed Completed Completed
18 NA Completed Completed Completed NA Completed Completed Completed Completed 1/12/2019
19 NA Completed Completed Completed NA Completed Completed Completed Completed
20 NA Completed Completed Completed NA Completed Completed Completed Completed 1/13/2019
21 NA Completed Completed Completed NA Completed Completed Completed Completed
22 NA Completed Completed Completed NA Completed Completed 1/9/2019 Completed 1/14/2019
23 NA Completed Completed Completed NA Completed 1/10/2019 Completed
24 NA Completed Completed Completed NA Completed 1/9/2019 1/11/2019 Completed 1/15/2019
25 NA Completed Completed Completed NA Completed 1/12/2019 Completed
26 NA Completed Completed Completed NA Completed 1/12/2019 1/13/2019 Completed 1/16/2019
27 NA Completed Completed Completed NA Completed 1/14/2019 Completed
28 NA Completed Completed Completed NA Completed 1/15/2019 1/15/2019 Completed 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 Completed
30 NA Completed Completed Completed NA Completed 1/17/2019 1/17/2019 Completed 1/18/2019
TOWER- B 1/23/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft
Typical
Floor Drencher Fire Shaft "T" Drain Pipe
Sprinkler Sprinkler Hydrant Hydrant Drain Pipe Floor Work
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure

1 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
2 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
3 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
4 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
5 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
6 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
7 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
8 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
9 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
10 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
11 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
12 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
13 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
14 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
15 Completed Completed Completed Completed NA Completed Done Completed Done Completed
16 Completed Completed Completed Completed NA Completed Done Completed Done Completed
17 NA Completed Completed Completed NA Completed Done Completed Done Completed
18 NA Completed Completed Completed NA Completed Done Completed Done Completed
19 NA Completed Completed Completed NA Completed Done Completed Done Completed
20 NA Completed Completed Completed NA Completed Done Completed Done Completed
21 NA Completed Completed Completed NA Completed Done Completed Done
22 NA Completed Completed Completed NA Completed Done Completed Done 1/14/2019
23 NA Completed Completed Completed NA Completed Done Completed Done
24 NA Completed Completed Completed NA Completed Done 1/11/2019 Done 1/15/2019
25 NA Completed Completed Completed NA Completed Done 1/12/2019 Done
26 NA Completed Completed Completed NA Completed Done 1/13/2019 Done 1/16/2019
27 NA Completed Completed Completed NA Completed Done 1/14/2019 Done
28 NA Completed Completed Completed NA Completed 1/14/2019 1/15/2019 Done 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 1/16/2019 Done
30 NA Completed Completed Completed NA Completed 1/17/2019 1/17/2019 Done 1/18/2019
Fire fighting
TOWER- A 1/30/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft

Typical Floor
Floor Sprinkler Sprinkler Hydrant Hydrant Drencher Fire Drain Pipe work Shaft "T" Drain Pipe Pressure Testing
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure Flat+lobby Shaft

1 Completed Completed Completed Completed Completed Completed Completed 12/19/2018 Completed Completed Completed
2 Completed Completed Completed Completed Completed Completed Completed 12/20/2018 Completed Completed Completed
3 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
4 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
5 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
6 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
7 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
8 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
9 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
10 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
11 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
12 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
13 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
14 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
15 Completed Completed Completed Completed NA Completed Completed Completed Completed Completed Completed
16 Completed Completed Completed Completed NA Completed Completed Completed Completed Completed Completed
17 NA Completed Completed Completed NA Completed Completed Completed Completed Completed Completed
18 NA Completed Completed Completed NA Completed Completed Completed Completed Completed Completed
19 NA Completed Completed Completed NA Completed Completed Completed Completed Completed
20 NA Completed Completed Completed NA Completed Completed Completed Completed Completed
21 NA Completed Completed Completed NA Completed Completed Completed Completed
22 NA Completed Completed Completed NA Completed Completed 1/9/2019 Completed 1/14/2019
23 NA Completed Completed Completed NA Completed 1/10/2019 Completed
24 NA Completed Completed Completed NA Completed 1/9/2019 1/11/2019 Completed 1/15/2019
25 NA Completed Completed Completed NA Completed 1/12/2019 Completed
26 NA Completed Completed Completed NA Completed 1/12/2019 1/13/2019 Completed 1/16/2019
27 NA Completed Completed Completed NA Completed 1/14/2019 Completed
28 NA Completed Completed Completed NA Completed 1/15/2019 1/15/2019 Completed 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 Completed
Fire fighting
TOWER- B 1/30/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft
Typical Floor
Floor Drencher Fire Work Shaft "T" Drain Pipe
Sprinkler Sprinkler Hydrant Hydrant Drain Pipe Pressure Testing
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure Flat+Lobby Shaft

1 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
2 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
3 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
4 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
5 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
6 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
7 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
8 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
9 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
10 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
11 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
12 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
13 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
14 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
15 Completed Completed Completed Completed NA Completed Done Completed Done Completed
16 Completed Completed Completed Completed NA Completed Done Completed Done Completed
17 NA Completed Completed Completed NA Completed Done Completed Done Completed
18 NA Completed Completed Completed NA Completed Done Completed Done Completed
19 NA Completed Completed Completed NA Completed Done Completed Done Completed
20 NA Completed Completed Completed NA Completed Done Completed Done Completed
21 NA Completed Completed Completed NA Completed Done Completed Done
22 NA Completed Completed Completed NA Completed Done Completed Done 1/14/2019
23 NA Completed Completed Completed NA Completed Done Completed Done
24 NA Completed Completed Completed NA Completed Done 1/11/2019 Done 1/15/2019
25 NA Completed Completed Completed NA Completed Done 1/12/2019 Done
26 NA Completed Completed Completed NA Completed Done 1/13/2019 Done 1/16/2019
27 NA Completed Completed Completed NA Completed Done 1/14/2019 Done
28 NA Completed Completed Completed NA Completed Done 1/15/2019 Done 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 1/16/2019 Done
30 NA Completed Completed Completed NA Completed 1/17/2019 1/17/2019 Done 1/18/2019
Fire fighting
TOWER- A 2/13/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft

Typical Floor
Floor Sprinkler Sprinkler Hydrant Hydrant Drencher Fire Drain Pipe work Shaft "T" Drain Pipe Pressure Testing
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure Flat+lobby Shaft

1 Completed Completed Completed Completed Completed Completed Completed 12/19/2018 Completed Completed Completed
2 Completed Completed Completed Completed Completed Completed Completed 12/20/2018 Completed Completed Completed
3 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
4 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
5 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
6 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
7 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
8 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
9 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
10 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
11 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
12 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
13 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
14 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
15 Completed Completed Completed Completed NA Completed Completed Completed Completed Completed Completed
16 Completed Completed Completed Completed NA Completed Completed Completed Completed Completed Completed
17 NA Completed Completed Completed NA Completed Completed Completed Completed Completed Completed
18 NA Completed Completed Completed NA Completed Completed Completed Completed Completed Completed
19 NA Completed Completed Completed NA Completed Completed Completed Completed Completed
20 NA Completed Completed Completed NA Completed Completed Completed Completed Completed
21 NA Completed Completed Completed NA Completed Completed Completed Completed
22 NA Completed Completed Completed NA Completed Completed Completed Completed 1/14/2019
23 NA Completed Completed Completed NA Completed Completed 1/10/2019 Completed
24 NA Completed Completed Completed NA Completed Completed 1/11/2019 Completed 1/15/2019
25 NA Completed Completed Completed NA Completed Completed 1/12/2019 Completed
26 NA Completed Completed Completed NA Completed Completed 1/13/2019 Completed 1/16/2019
27 NA Completed Completed Completed NA Completed 1/14/2019 Completed
28 NA Completed Completed Completed NA Completed 1/15/2019 1/15/2019 Completed 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 Completed
Fire fighting
TOWER- B 2/13/2019
Vertical Lines In Shaft Work in Vertical Lines FF Shaft
Typical
Floor Drencher Fire Shaft "T" Drain Pipe
Sprinkler Sprinkler Hydrant Hydrant Drain Pipe Floor Work Pressure Testing
Nos. Check Floor Assembly Tapping Connection

Low Pressure High Pressure Low Pressure High Pressure Flat+Lobby Shaft

1 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
2 Completed Completed Completed Completed Completed Completed Done Completed Done Completed
3 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
4 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
5 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
6 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
7 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
8 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
9 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
10 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
11 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
12 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
13 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
14 Completed Completed Completed Completed Completed Completed Done Completed Done Completed Completed
15 Completed Completed Completed Completed NA Completed Done Completed Done Completed Completed
16 Completed Completed Completed Completed NA Completed Done Completed Done Completed
17 NA Completed Completed Completed NA Completed Done Completed Done Completed
18 NA Completed Completed Completed NA Completed Done Completed Done Completed
19 NA Completed Completed Completed NA Completed Done Completed Done Completed
20 NA Completed Completed Completed NA Completed Done Completed Done Completed
21 NA Completed Completed Completed NA Completed Done Completed Done
22 NA Completed Completed Completed NA Completed Done Completed Done 1/14/2019
23 NA Completed Completed Completed NA Completed Done Completed Done
24 NA Completed Completed Completed NA Completed Done 1/11/2019 Done 1/15/2019
25 NA Completed Completed Completed NA Completed Done 1/12/2019 Done
26 NA Completed Completed Completed NA Completed Done 1/13/2019 Done 1/16/2019
27 NA Completed Completed Completed NA Completed Done 1/14/2019 Done
28 NA Completed Completed Completed NA Completed Done 1/15/2019 Done 1/17/2019
29 NA Completed Completed Completed NA Completed 1/16/2019 1/16/2019 Done
30 NA Completed Completed Completed NA Completed 1/17/2019 1/17/2019 Done 1/18/2019
FIRE FIGHTING 2/13/2019
TOWER-A

Sprinkler piping Drencher piping Hydrant Pining


LOCATION Road side Back side Core area flat 1 Core area flat 3 Road side Back side Core area flat 1 Core area flat Road side Back side Core area flat 1 Core area flat
Driveway Driveway &2 &4 Driveway Driveway &2 3&4 Driveway Driveway &2 3&4

Ground Flr 4/15/2019 4/15/2019 4/15/2019 4/15/2019 NA NA NA NA 5/15/2019 5/15/2019 5/15/2019 5/15/2019

Podium-1 4/15/2019 4/15/2019 4/15/2019 4/15/2019 4/30/2019 4/30/2019 4/30/2019 4/30/2019 5/15/2019 5/15/2019 5/15/2019 5/15/2019

Podium-2 3/1/2019 3/1/2019 3/1/2019 3/1/2019 3/15/2019 3/15/2019 3/15/2019 3/15/2019 3/31/2019 3/31/2019 3/31/2019 3/31/2019

Podium-3 3/1/2019 3/1/2019 3/1/2019 3/1/2019 3/15/2019 3/15/2019 3/15/2019 3/15/2019 3/31/2019 3/31/2019 3/31/2019 3/31/2019

Stilt Flr 6/30/2019 6/30/2019 6/30/2019 6/30/2019 NA NA NA NA 6/30/2019 6/30/2019 6/30/2019 6/30/2019

Completion date 6/30/2019

FIRE FIGHTING
TOWER-B

Sprinkler piping Drencher piping Hydrant Pining


LOCATION Road side Back side Core area flat 1 Core area flat 3 Road side Back side Core area flat 1 Core area flat Road side Back side Core area flat 1 Core area flat
Driveway Driveway &2 &4 Driveway Driveway &2 3&4 Driveway Driveway &2 3&4

Ground Flr 4/15/2019 4/15/2019 4/15/2019 4/15/2019 NA NA NA NA 5/15/2019 5/15/2019 5/15/2019 5/15/2019

Podium-1 4/15/2019 4/15/2019 4/15/2019 4/15/2019 4/30/2019 4/30/2019 4/30/2019 4/30/2019 5/15/2019 5/15/2019 5/15/2019 5/15/2019

Podium-2 3/1/2018 3/1/2018 3/1/2018 3/1/2018 3/15/2018 3/15/2018 3/15/2018 3/15/2018 3/31/2019 3/31/2019 3/31/2019 3/31/2019

Podium-3 3/1/2018 3/1/2018 3/1/2018 3/1/2018 3/15/2018 3/15/2018 3/15/2018 3/15/2018 3/31/2019 3/31/2019 3/31/2019 3/31/2019

Stilt Flr 6/30/2019 6/30/2019 6/30/2019 6/30/2019 NA NA NA NA 6/30/2019 6/30/2019 6/30/2019 6/30/2019

Completion date 6/30/2019


Pump Pump Room Pressure
Instalation Piping Testing

3/31/2019 3/31/2019

3/31/2019 3/31/2019

Pump Pump Room Pressure


Instalation Piping Testing

3/31/2019 3/31/2019

3/31/2019 3/31/2019