Sunteți pe pagina 1din 10

AL MASHARIQ COMPANY

INSPECTION AND TEST RECORD


Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 01
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

DISTANCE AND DEF RELAY MICOM P443

1. GENERAL DATA & INFORMATION:


Make Designation
Model / Type Aux. Voltage
Sr. No.

2. GENERAL INSPECTION & WIRING CHECK:


SR.NO. ITEM DESCRIPTION REMARKS
1 Inspect for any physical damage or defects.  Yes  N/A
2 Verify connections as per approved drawings.  Yes  N/A
3 Check tightness of all the connections.  Yes  N/A
4 Case Earthing verified  Yes  N/A

3. ELECTRICAL TEST:

PRELIMINARY CHECK:
(With relay energized condition)
ITEM DESCRIPTION CHECKED
1 Watchdog contacts (N11-N12 open, N13-N14 closed)

Set Clock to local time


2 Date & time
Time maintained when Aux. Supply
removed
Make Test Mode Enable under commissioning menu to
3
check ALARM LED (Yellow)
Make Test Mode Enable under commissioning menu to
4
check OUT OF SERVICE LED (Yellow)
5 Apply any fault condition to check TRIP LED (Red)
Apply Test LEDs under commissioning menu to check all 8
6
programmable LEDs.
Measured FIELD SUPPLY Between terminals N1 – N2
7
Voltage Between terminals N1 – N10
INPUT OPTO ISOLATORS TEST:

SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date
AL MASHARIQ COMPANY
INSPECTION AND TEST RECORD
Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 02
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

(To check status of OPTO Input, go to SYSTEM DATA menu.)


(Energize only one OPTO INPUT at a time with relay rated OPTO input voltage – CAUTION!! -Check
RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal)
V DC Applied Terminal
OPTO No. Status of OPTO Function assigned for
Remarks
Input No. +Ve Terminal -Ve Terminal INPUT OPTO INPUT
No. No.
OPTO-1 D2 D1
OPTO-2 D4 D3
OPTO-3 D6 D5
OPTO-4 D8 D7
OPTO-5 D10 D9
OPTO-6 D12 D11
OPTO-7 D14 D13
OPTO-8 D16 D15
OPTO-9 E2 E1
OPTO-10 E4 E3
OPTO-11 E6 E5
OPTO-12 E8 E7
OPTO-13 E10 E9
OPTO-14 E12 E11
OPTO-15 E14 E13
OPTO-16 E16 E15
OPTO-17 F2 F1
OPTO-18 F4 F3
OPTO-19 F6 F5
OPTO-20 F8 F7
OPTO-21 F10 F9
OPTO-22 F12 F11
OPTO-23 F14 F13
OPTO-24 F16 F15

OUTPUT RELAY TEST:

SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date
AL MASHARIQ COMPANY
INSPECTION AND TEST RECORD
Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 03
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

(To check status of output relay, go to COMMISSIONING menu, UNBLOC & TEST PATTERN mode &
select each relay to be tested by apply contact test.)

(Check only one OUTPUT RELAY at a time by “CONTACT TEST” in “APPLY TEST” mode)

Output
Relay Output Contact No. Output relay status Remarks
No.

RL1 M1 – M2

RL2 M3 – M4

RL3 M5 – M6

RL4 M7 – M8

RL5 M9 – M10

RL6 M11 – M12

RL7 M13 – M14 – M15

RL8 M16 – M17 – M18

RL9 L1 – L2

RL10 L3 – L4

RL11 L5 – L6

RL12 L7 – L8

RL13 L9 – L10

RL14 L11 – L12

RL15 L13 – L14 – L15

RL16 L16 – L17 – L18

Output
Relay Output Contact No. Output relay status Remarks
No.

SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date
AL MASHARIQ COMPANY
INSPECTION AND TEST RECORD
Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 04
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

RL17 K1 – K2

RL18 K3 – K4

RL19 K5 – K6

RL20 K7 – K8

RL21 K9 – K10

RL22 K11 – K12

RL23 K13 – K14 – K15

RL24 K16 – K17 – K18

RL25 J1 – J2

RL26 J3 – J4

RL27 J5 – J6

RL28 J7 – J8

RL29 J9 – J10

RL30 J11 – J12

RL31 J13 – J14 – J15

RL32 J16 – J17 – J18

CURRENT INPUT TEST:


C.T RATIO:

SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date
AL MASHARIQ COMPANY
INSPECTION AND TEST RECORD
Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 05
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

Displayed value (Note down with phase angle)


Phase Injected Current
In Secondary % Error In Primary % Error

IA

IB

IC

IN

VOLTAGE INPUT TEST:


V.T RATIO:

Displayed value (Note down with phase angle)


Phase Applied voltage
In Secondary % Error In Primary % Error

VA

VB

VC

DISTANCE ZONE REACH TEAST:

Fault Zone-1 Zone-2 Zone-3 Zone-p Zone-4

SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date
AL MASHARIQ COMPANY
INSPECTION AND TEST RECORD
Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 06
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

Set Act Set Act Set Act Set Act Set Act
Type
Reach Reach Reach Reach Reach Reach Reach Reach Reach Reach

AN

BN

CN

AB

BC

CA

ABC

DISTANCE OPERATING TIME TEST:

Phase Zone 1 Zone 2 Zone 3 Zone 4 Zone 5

Set Measured Set Measured Set Measured Set Measured Set Measur
Theoretical
time Time time Time time Time time Time time ed Time
Value
(MS) (MS) (MS) (MS) (MS) (MS) (MS) (MS) (MS) (MS)

AN

BN

CN

AB

BC

CA

ABC

VTS FUNCTION TEST:


Loss of one or two phases Test

SET Current 3 = 0.1In (Refer application manual Sh # 117)


Negative Sequence V2 Fixed=10V

SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date
AL MASHARIQ COMPANY
INSPECTION AND TEST RECORD
Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 07
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

Negative Sequence Set time = 5 sec.


Apply 66.4 V, 3 Ph balanced Volts with In=1.0 A, time delay 5 Sec

Measured Time in
Phase Pick up Drop Off Set Time in Sec.
Sec.

AN
BN
CN
AB
BC
CA
* MONITOR Pickup value from MiCOM relay measurements

Absence of 3 Phase Volts on Line Energization Test:

VT MCB input energized ( VT MCB OFF), Apply 3 Phase 1 A current with no volts Check for No Trip

VT MCB input Not energized ( VT MCB ON), Apply 3 Ph 1 A current with No Volt check zone 1 Trip

SOTF TEST:
Setting: All Zones Enabled

ZONES Relay Conditions Time Measured

ZONES – 1

ZONES – 2

ZONES – 3

ZONES – 4

ZONES – 5

POWER SWING BLOCKING


SET power swing blocking zone time

Actual power swing blocking zone time


SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date
AL MASHARIQ COMPANY
INSPECTION AND TEST RECORD
Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 08
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

DISTANCE COMMUNICATION SCHEME CHECK:

Permissive Under Reach Scheme: PUTT


Send Logic : CS = ZM1 : _______________
Trip Logic : Trip = ZM2xCR : _______________
Trip time : Without CS : _______________
Permissive Over Reach Scheme: POTT
Send Logic : CS = ZM2 : _______________
Trip Logic : Trip = ZM2xCR : _______________
Trip time : Without CS : _______________
Blocking Scheme:
Send Logic : CS = ZM4 : _______________
Trip Logic : Trip = ZM2 x NO CR : _______________
Trip time : Without CS : _______________
Direct Transfer Trip Scheme:
Send Logic : DTT : ________NA_____
Trip Logic : Trip = CR : _______________

DISTANCE WEI FUNCTION:

WEI Echo : __________, WEI Trip: __________ _____

DIRECTIONAL EARTH FAULT RELAY – MICOMHO P443


Aided def element (instantaneous) test:
Settings: IN> =
Vo =
T =

SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date
AL MASHARIQ COMPANY
INSPECTION AND TEST RECORD
Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 09
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

DEF Status = Enable


DEF Polarizing = Zero Sequence
DEF Char Angle = -60
DEF UN POL = 3

First apply healthy condition for 2.00sec.

Pick up drop off voltage test:

Note:
Apply 3phase volts healthy voltage, inject only one phase current for this test to the phase under test and
reduce voltage of phase under test.

Note: Vo=Vn/3=(Va+Vb+Vc)

Applied Voltage (V) Vo Zero sequence (V) Pick up Drop off


Contacts
current current Indication
R Y B Display Calculated operated
(mA) (mA)

Timing test:
Applied Voltage (V)
Vo Zero Applied current Actual
Setting
sequence measured Limits
R Y B Phas time
(V) Current time
e

Same procedure for other phases, but reduce one phase voltage under test to the polarizing voltage.
DEF COMMUNICATION SCHEME CHECK:

Permissive Over Reach Scheme: POTT


Send Logic : CS = Forward Fault : _______________
Trip Logic : Forward Fault x CR : _______________

Blocking Scheme:
Send Logic : Reverse Fault : _______________
Trip Logic : Forward Fault x NO CR : _______________

DEF WEI FUNCTION:

SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date
AL MASHARIQ COMPANY
INSPECTION AND TEST RECORD
Description : DISTANCE AND DIR. E/F RELAY
Record No. :
MICOM P443
Equip. No. Drawing ref.: Sheet : 010
Customer :SEC-EOA Contract no.:30531169/00 Site :115/13.8KV AL-FURSAN S/S

WEI Echo : __________, WEI Trip: __________ _____

4. TEST EQUIPMENTS USED:

SEC-EOA
Description Testing Engineer
CTAPD Engineer CSD-CFS-East Engineer
Name
Signature
Date