KETERANGAN / CATATAN

H I J K L M N O STARTER BARS REFER TO DRAWING NO.: NOTES :


ZONE B ZONE A - IK2-BAM -B2-SC-D-6500 TO 6515 METRIC UNITS USED THROUGHOUT.
PILE CAP REINFORCEMENT REFER TO DRAWING NO.: 1. ALL DIMENSIONS IN MILLIMETERS (mm)
8000 8000 8000 8000 8000 8000 8000 8000 8000 - IK2-BAM -B2-SC-D-6200 TO 6220 UNLESS NOTED OTHERWISE (U.N.O).
2. LEVELS IN METERS WITH REFERENCE.
TB12 TB12 TB12 TB12 TB12 TB12 TB22 TB21 3. ELEVATION
- EL= EXCAVATION LEVEL
- SL= STRUCTURE LEVEL
- FFL = FINISH FLOOR LEVEL
TB12 REBARS AND CONNECTIONS ARE TYPICAL - BEL = BOTTOM EXCAVATION LEVEL
4. LEAN CONCRETE 100mm Thk : K-100
SCALE 1:200 5. ALL DIMENSION HERE IN ARE SUBJECT TO CHANGE
AS PER SITE CONDITION.
6. CONCRETE GRADE:

L M N O - PILECAP & TIE BEAM ; FC'= 25 MPA


- SLABS ON GRADE ; FC'= 32 MPA
- COLUMNS
8000 8000 8000 BASEMENT 1 & BASEMENT 2 ; FC'= 55 MPA
GROUND FLOOR, 1ST FLOOR & 2ND FLOOR ; FC'= 35 MPA
0 7. STELL GRADE BJTD40
8. CONCRETE COVER:
- PILE CAP = 50MM FOR BOTTOM, SIDES AND TOP
(TOP LAYER BELOW OF THE SLAB REINFORCEMENT)
- PIT COVER = 40MM
1300 1675 1300 1675 - SLAB TOP COVER = 20MM INTERNAL, 40MM EXTERNAL
- TIE BEAM & BEAM = 40MM TO TIES
- COLUMN = 40MM TO TIES

TB12 TB12 TB22 TB21


- SHEAR WALL = 40MM
9. THIS DRAWING PRODUCE IN CROSS REFERENCE
WITH STRUCTURAL IFC DRAWING :
DWG NO. -17025-FD-S-1-0200-C
-17025-FD-S-1-0231-B TO 0234-A

Bar schedule - bending shapes


DENAH KUNCI / KEY PLAN

P4 P4 P4 P1 Mark Pcs ø Single Dimensioned bending shape Total M


A B C D E F G H J length (not to scale) BASEMENT 2length
- - - - - - - - -
[mm] [m] ZONE A [m]

1675 1300 TB21


1 16 13 0.78 12.45
1675 3350 1675 1675 3350 1675 1700 3400 1700

1300 6700 1300 6700 1300 6800 1100 No. PERUBAHAN / REVISION TGL / DATE

TIE BEAMS GRID 0, 3-5 & 7 (TYP.) ZONE A SECTION SECTION J 3 24 25 4.65 111.60

SCALE 1:50 SCALE 1:20 -


TIE BEAM GRID 0, 3-5, 7 (TYPICAL PER GRID) 4 67 13 1.43 95.68

Bar schedule - bending shapes


0 0 0 0
00 FOR CONSTRUCTION 15 May 2019
Mark Pcs ø Single Dimensioned bending shape Total Mass Mark Pcs ø Single Dimensioned bending shape Total 6 219
Mass 16 3.44 754.24 1
Pemilik/Owner :
length (not to scale) length length (not to scale) length
[mm] [m] [m] [kg] [mm] [m] [m] [kg]

1 16 13 0.78 12.45 12.97 20 5 25 7.92 39.607 201


152.62 13 1.43 287.43
Proyek/Project :

250
IKEA - 2
250

3 24 25 4.65 111.60 430.11 8 6 25 8.65 51.90


21 5 25 2.16 10.80 41.62 JAKARTA GARDEN CITY
9 6 25 9.30 55.80
4 67 13 1.43 95.68 99.69 Konsultan M&E/Mechanical & Electrical Consultant :

1050
22 8 25 2.19 17.52 67.52
950

10 132 16 3.67 483.91


SUSTAINABLE BUILDING CONSULTANTS
6 219 16 3.44 754.24 1190.94 JL. PEJATEN BARAT II No. 20 BLOK E
23 21 25 3.90 81.90 315.64 Pasar Minggu - Jakarta Selatan 12510, Indonesia
Phone : (62-21) 719 1044 / 719 1045
Fax : (62-21) 7179 3736
E-mail : floth@flothindonesia.com
7 201 13 1.43 287.43 299.50
24 6 16 3.45 20.68 32.65
TB12 TB12 TB12 TB22 11 3 25 2.22 6.66
Konsultan Arsitektur/Architect Consultant :

600 600 8 6 25 8.65 51.90 200.02 25 6 13 10.83 64.95 67.68 PT. ANGGARA ARCHITEAM
ARCHITECTURE DESIGNERS
12 150 13 1.59 238.50
SECTION A SECTION B SECTION C SECTION D
Jl. Tebet Barat II No.12B, Jakarta 12810 - INDONESIA
PH : (021)83706091, 83705334, FAX : (021)83701757
9 6 25 9.30 55.80 215.05 26 18 13 8.80 158.40 165.05 E-mail : adm@anggara.co.id

SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - SCALE 1:20 -


Konsultan Struktur/Structure Consultant :
13 5 25 7.99 39.95
0 0 0 0 10 132 16 3.67 483.91 764.10 27 2 16 3.27 6.53 10.31
Indonesia
PT TTW Indonesia Consulting Engineers
14 14 13 0.83Graha Chantia L3 JI Bangka Raya No.6 Jakarta Selatan 12720 Indonesia 11.56
T: +6221 719 0011 F: +6221 719 0877 ttw@ttwindonesia.com
11 3 25 2.22 6.66 25.67 51 6 25 4.83 28.98 111.69
Kontraktor Utama/Main Contractor :
15 3 16 3.05 9.14
12 150 13 1.59 238.50 248.52 52 6 25 10.69 64.11 247.08 PT. BAM DECORIENT INDONESIA
General Contractor
Gedung Menara Jamsostek, Lt. 20
250

250

Jl. Jendral Gatot Subroto No. 38


Jakarta 12170
13 5 25 7.99 39.95 153.97 16 5 25 2.56 12.80
53 1 25 8.72 8.73 33.63
Nama Gambar/Drawing Title :

54 9 25 3.40 17
30.61 2
117.97 13 TIE BEAM REINFORCEMENT
1.39 2.78
14 14 13 0.83 11.56 12.05
BASEMENT 2 - ZONE A
1050

1050

55 18 25 9.30 167.40 645.16


18 21 25 2.21GRID 0, 3-5 & 7 (TYPICAL) 46.31
15 3 16 3.05 9.14 14.43
56 24 25 3.35 80.40 309.86
SHOP DRAWING
16 5 25 2.56 12.80 49.33 57 1 25 5.05 5.05 19.46 Oleh/By init. sign. Tanggal/Date
TB22 TB22 TB21 TB21 19 8 25 2.21 17.65
Digambar/Drawn DWA 15 May 2019
58 6 25 3.00 18.00 69.37
600 17 2 13 1.39 2.78 2.89 Diperiksa/Checked NWI 15 May 2019
Diperiksa/Checked GFS

SECTION E SECTION F SECTION G SECTION H 18 21 25 2.21 46.31 178.46


20 5 25 7.92
Diperiksa/Checked 39.60

SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - Total mass [kg] : 6373.03 Diperiksa/Checked
19 8 25 2.21 17.65 68.02 Disetujui/Approved MRA
21 5 25 Project
2.16No./ Drawing No./ Scale/
0 0.2 0.4 0.6 0.8 1 Metre 0 0.5 1 1.5 2 2.5 Metres 0 2 4 6 8 10 Metres No. Proyek No. Gambar Skala Rev10.80

Scale 1:20 @A1 Scale 1:50 @A1 Scale 1:200 @A1


P10065 IK2-BAM -B2-SC-D-6304 1:50 00

A1 (841 x 594mm)
22 8 25 2.19 17.52