Sunteți pe pagina 1din 1

KETERANGAN / CATATAN

STARTER BARS REFER TO DRAWING NO.: NOTES :


H I J K L M N O - IK2-BAM -B2-SC-D-6500 TO 6507 METRIC UNITS USED THROUGHOUT.
PILE CAP REINFORCEMENT REFER TO DRAWING NO.: 1. ALL DIMENSIONS IN MILLIMETERS (mm)
ZONE B ZONE A - IK2-BAM -B2-SC-D-6200 TO 6220 UNLESS NOTED OTHERWISE (U.N.O).
2. LEVELS IN METERS WITH REFERENCE.
0 8000 8000 8000 8000 8000 8000 8000 8000 3. ELEVATION
- EL= EXCAVATION LEVEL
TB26 TB26 TB12 TB26 TB26 TB12 TB11 TB10 - SL= STRUCTURE LEVEL
- FFL = FINISH FLOOR LEVEL
- BEL = BOTTOM EXCAVATION LEVEL
4. LEAN CONCRETE 100mm Thk : K-100
5. ALL DIMENSION HERE IN ARE SUBJECT TO CHANGE
AS PER SITE CONDITION.
6. CONCRETE GRADE:
SCALE 1:200 - PILECAP & TIE BEAM ; FC'= 25 MPA
- SLABS ON GRADE ; FC'= 32 MPA

H I J K - COLUMNS
BASEMENT 1 & BASEMENT 2 ; FC'= 55 MPA
GROUND FLOOR, 1ST FLOOR & 2ND FLOOR ; FC'= 35 MPA
8000 8000 8000 8000 8000 7. STELL GRADE BJTD40 8000
8. CONCRETE COVER:
- PILE CAP = 50MM FOR BOTTOM, SIDES AND TOP
(TOP LAYER BELOW OF THE SLAB REINFORCEMENT)
- PIT COVER = 40MM
- SLAB TOP COVER = 20MM INTERNAL, 40MM EXTERNAL
- TIE BEAM & BEAM = 40MM TO TIES

TB26 TB12 TB26 TYP.


TB26 - COLUMN = 40MM TO TIES
- SHEAR WALL = 40MM
9. THIS DRAWING PRODUCE IN CROSS REFERENCE
WITH STRUCTURAL IFC DRAWING :
DWG NO. -17025-FD-S-1-0200-C
-17025-FD-S-1-0231-B TO 0234-A

DENAH KUNCI / KEY PLAN

2P6 2P6
3P4 3P4
1300 1983 1300 1550 1300 1550 1300 1983
BASEMENT 2
ZONE A
2917 1459 1242 2484 1242 1675 3350 1675 1459 2917 1459 1242 2484 1242
No. PERUBAHAN / REVISION TGL / DATE
5834 3898 4968 1300 6700 1300 5834 3898 4968 1300 6700

A B C D E F G
TIE BEAMS GRID 1 ZONE A - - - - - - -
SCALE 1:50

K L M N O
00 FOR CONSTRUCTION 16 May 2019
8000 8000 8000 8000 Pemilik/Owner :

1300 1800

Proyek/Project :

IKEA - 2
TYP.
TB26 TB12 TB11 TB10 JAKARTA GARDEN CITY
Konsultan M&E/Mechanical & Electrical Consultant :

SUSTAINABLE BUILDING CONSULTANTS


JL. PEJATEN BARAT II No. 20 BLOK E

2P1
Pasar Minggu - Jakarta Selatan 12510, Indonesia

2P6 2P6
Phone : (62-21) 719 1044 / 719 1045

2P6
Fax : (62-21) 7179 3736

3P4
E-mail : floth@flothindonesia.com

Konsultan Arsitektur/Architect Consultant :


1983 1300 1550 1300 1550 1300 1550
PT. ANGGARA ARCHITEAM
ARCHITECTURE DESIGNERS
1242 2484 1242 1675 3350 1675 1675 3350 1675 1663 3325 1663 Jl. Tebet Barat II No.12B, Jakarta 12810 - INDONESIA
PH : (021)83706091, 83705334, FAX : (021)83701757
E-mail : adm@anggara.co.id
3898 4968 1300 6700 1300 6700 1300 6650 1100
Konsultan Struktur/Structure Consultant :
G H J A B C K L M N P Q
- - - - - - - - - - - -
Indonesia
PT TTW Indonesia Consulting Engineers
Graha Chantia L3 JI Bangka Raya No.6 Jakarta Selatan 12720 Indonesia

1 1 1 1 1 1 1 1
T: +6221 719 0011 F: +6221 719 0877 ttw@ttwindonesia.com

Kontraktor Utama/Main Contractor :

PT. BAM DECORIENT INDONESIA


General Contractor
Gedung Menara Jamsostek, Lt. 20
Jl. Jendral Gatot Subroto No. 38
Jakarta 12170

Nama Gambar/Drawing Title :


250

250

TIE BEAM REINFORCEMENT


BASEMENT 2 - ZONE A GRID 1
950

950

SHOP DRAWING
Oleh/By init. sign. Tanggal/Date
Digambar/Drawn DWA 16 May 2019
TB12 TB12 TB12 TB26 TB26 TB26 TB26 TB26 Diperiksa/Checked NWI 16 May 2019

600 600 Diperiksa/Checked GFS


Diperiksa/Checked
SECTION A SECTION B SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H Diperiksa/Checked
SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - SCALE 1:20 -
Disetujui/Approved MRA
Project No./ Drawing No./ Scale/
0 0.2 0.4 0.6 0.8 1 Metre 0 0.5 1 1.5 2 2.5 Metres 0 2 4 6 8 10 Metres No. Proyek No. Gambar Skala Rev

Scale 1:20 @A1 Scale 1:50 @A1 Scale 1:200 @A1


P10065 IK2-BAM -B2-SC-D-6305 1:50 00

A1 (841 x 594mm)